Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
1553656
label
China, Republic of (7)
core
doc
dtoType
document
pageCount
1
Source metadata
id
1553656
contentType
document
title
China, Republic of (7)
collections
Presidential Country Files for East Asia and the Pacific (Ford Administration)
East Asia and Pacific Country Files
subjects
Taiwan
Military bases
Foreign aid
Arms transfers
imageCount
1
hasImages
yes
source
import
hasTranscription
no
Source extras
naId
1553656
coverageEndDate
logicalDate
1975-10-31
month
10
year
1975
coverageStartDate
logicalDate
1974-04-01
month
4
year
1974
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
c9fb6cece75857e4
ocrText
The original documents are located in Box 5, folder "China, Republic of (7)" of the Presidential Country Files for East Asia and the Pacific at the Gerald R. Ford Presidential Library. Copyright Notice The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material. The Council donated to the United States of America his copyrights in all of his unpublished writings in National Archives collections. Works prepared by U.S. Government employees as part of their official duties are in the public domain. The copyrights to materials written by other individuals or organizations are presumed to remain with them. If you think any of the information displayed in the PDF is subject to a valid copyright claim, please contact the Gerald R. Ford Presidential Library. Digitized from Box 5 of Presidential Country Files for East Asia and the Pacific at the Gerald R. Ford Presidential Library APPLICANT DATE CASE No. CATEGORY No. Philco- Ford Corporation 7/19/74 11. 13A la CONSIGNEE Government of the Republic of China DESTINATION DEPARTMENT OF STATE China COMMODITY DESCRIPTION 1974 AUG 9 AM 9.46 Proposed amendment to upgrade 1000 AIM 9B GCU missiles to AIM 9J configuration. & GERALD FORD STBRARY NITIONS CONTROL Sent to: STD, Mavy EA/RA, EB/ITP/EWT, XREKASK Sanford AGENCIES REFERRED TO ISA AF NAV ARMY NASA AEC ODDR&E NEA/RA FDCO AFJALE DSR 20-WORKDAY DEADLINE FOR REPLY, APPROVED DISAPPROVED MC COMMENT: TO AP: FORM 7 - 66 DS-1649 DEPARTMENT OF STATE COMMODITY CARD PHILCO Ford Philco Overseas Services, Inc. % Aeronutronic Division Ford Road Philco-Ford Corporation Newport Beach, California 92663 18 June 1974 Office of Munitions Control PM/MC, Room 800, SA-6 Department of State Washington, D.C. 20520 Subject: Application for Approval of Technical Support Services Agreement Reference: OMC Case No. 113-73, Technical Assistance Agreement between Philco Overseas Services, Inc. and the Government of the Republic of China Gentlemen: The reference agreement is currently in effect for support of the Republic of China's program to modify 1000 of their AIM-9B Guidance and Control Units (GCU's) to the AIM-9E configuration. To continue this program to upgrade their inventory of air-to-air missiles, the Government of the Republic of China has elected to proceed with a modification of an additional 1000 AIM-9B GCU's, but this time to the AIM-9J configuration. Approval of a modification to the reference agreement or an approval of a new agreement is required to support this program. For your approval, I enclose four copies of this letter and five copies of Philco Overseas Services, Inc. Contract No. C-22021A which includes the technical assistance effort. The technical assistance effort is detailed in Section A3. 8 which covers training, and Section A3. 9 which covers technical and support services for the depot. An application on Form DSP-85 is being made under separate cover for the export of the com- modities for the program. These include AIM-9J modification kits and equipment necessary to modify the existing AIM-9E depot for the AIM-9J effort. FORD & GERALD LIBRARY Office of Munitions Control -2- In accordance with 22CFR124.11, the following information is provided: a) Our Munition Control registration number is 275-1639. b) The AIM-9J GCU configuration was developed by Philco-Ford with in-house funds. The USAF subsequently bought a production quantity under F09603-71-C-0167. The AN/ASM-447 was developed and produced for the USAF under the same contract. c) The military security classification of the AIM-9J GCU is "Confidential". The AN/ASM-447 is unclassified. Classified technical data to be exported for this program will be listed as separate items on the DSP-85 application. d) If the agreement is approved by the Department of State, such approval will not be construed by Philco Overseas Services, Inc. as passing on the legality of the agreement from the standpoint of antitrust laws or other applicable statutes, nor will Philco Overseas Services, Inc. construe the department's approval as constituting either approval or disapproval of any of the business terms or conditions between the parties to the agreement. e) There are no patent applications covered by secrecy orders of the U.S. Patent Office known to us which disclose any of either the AIM-9J modification, the AN/ASM-447 or related technical data. f) Philco Overseas Services, Inc. will not proceed with the services covered in Sections A3. 8 and A3.9 of Contract No. C-22021A until approval has been received from the Department of State. g) The Chinese Government Procurement and Services Mission, Division for Ministry of National Defense, has issued their Purchase Order No. EC(63)3004 for the program, and it has been accepted by Philco Overseas Services, Inc. It is therefore anticipated that additional copies of Contract C-22021A will not be required by the Department of State. Philco Overseas Services, Inc. will advise the Department of the contract's termination not less than 60 days prior to expiration, including information on the continuation of any rights or flow of technical data to the foreign party. FORD & GERALD LIBRARY Office of Munitions Control -3- To facilitate Government consideration of the application, all requirements of 22CFR124. 10 are contained in Section 5.1.1 of the Contract. Department of Defense personnel familiar with the equipment and this program are: Mr. Robert J. Halsall, AFLGFDA, 5B-330, Pentagon OX7-0592 Major Scigtried OX 7-0822 Col. James Pierce, AFLGFD, 5B 330, Pentagon 0x7-8220 Further information concerning this request may be obtained from Mr. R. M. Mentzer, Philco-Ford Corporation, Aerospace and Communication Operations Marketing, 815 Connecticut Avenue, N. W., Washington, D.C. 20006, telephone (202) 785-6081, or Mr. D. Graham at Aeronutronic Division, telephone (714) 640-1500, extension 1831. Yours truly, R. W. Menzel Manager of Marketing Enclosures: Four (4) copies of this letter Five (5) copies of Contract C-22021A and Revisions Five (5) copies of Purchase Order EC(63)3004 FORD LIBRARY & OERALD CHINESE GOVERNMENT PROCUREMENT & SERVICES MISSION DIVISION FOR MINISTRY OF NATIONAL DEFENSE TELEPHONES 2224 R STREET. NORTHWEST (202) 462 1323 WASHINGTON, D. C. 20008 462 1324 CABLE ADDRESS: "SINOPROSE" 462 4840 462 4841 X PURCHASE ORDER NO. EC(63)3004 Date: June 6, 1974 To: Philco Oversers Services, Inc. c/o Philco-Ford Corp. Aeronutronic Division Newport Beach, Ca. 92663 Attention: Mr. J. L. Dampman Gentlemen: We wish to enter our firm order with you for the material and/or equipment in accordance with your proposal No. C-22021A & revisions dated May 31, 1974 for a total amount of $ 8,764,665.00 covering the following items: Item No. Description Quantity Unit Price Extension Supply of AIM-9J modification kits, modification of the overhaul and repair depot, field test sets, training, and spare parts as per Philco's proposed contract No. C-22021A dated April 8, 1974 and attached revisions dated May 31, 1974. Total Contract Price $8,764,665.00 FORD & M Encl. a/s GERALD LIBRARY Order No. EC(63)3004 GENERAL CONDITIONS PRICE: $ 8,764,665.00 COMMISSION: It is understood that the above prices are absolute net and no commission of any kind is involved between any member of your company and of this Mission. SHIPMENT: Delivery is to be made within 26 months after acceptance of contract and/or letter of credit. Partial shipments allowed. Partial shipments not allowed. QUALITY: Newly manufactured PACKING: The material should be securely packed in accordance with standard commercial practice for export shipment, unless specified otherwise. MARKING: All cases and shipping documents to be marked as follows: Order EC(63)3004 Lt. C.C. Chang Measurement P.O. Box 7197-3 Case No. CAF Sung-shan Air Receiving Center Gross Wt. EC (63) Taipei, Taiwan, Net Wt. 3004 Republic of China PORT OF DISCHARGE: Sung-shan International Airport, Taipei CONSIGNEE: To the order of Bank of Taiwan, Taipei, notify Hqs CAF EXPORT LICENSE: Supply us and our forwarder with Export Schedule B Number and Processing Code. * Export license will be applied by the supplier if required. INSPECTION: Manufacturer's and/or supplier's inspection on specification, quantity, quality, and proper packing and marking is required. INSURANCE: All Risks, Marine/Air Risks and War Risks coverages required. SHIPPING INSTRUCTIONS: When the material is ready for shipment: Please contact our forwarders, Monegan memational Corporation, direct for shipping instruc- tions. Rohner, Gehrig 8 Co., Inc. I Whiteball Street New York, N.Y. 10004 GERALD R FORD Tel. (212) 482-2915-16 Order No. EC(63)3004 PAYMENT: X Cash against documents as specified under DOCUMENTATION. Letter of Credit of the contract amount will be established in your favor through Bank of China, New York Agency, 40 Wall Street, New York, N. Y. 10005. DOCUMENTATION: Please send to this office the following original and/or duplicate documents after shipment is made: X Certified invoice in 12 copies, X Packing list in 4 copies. X Manufacturer's and/or supplier's Inspection Certificate in 2 copies. Dock receipt and/or inland bill of lading in 1 copy. Insurance Certificate in 3 copies. Ocean bill of lading: 3 Clean "On Board" Ocean B/L and 4 non-negotiable B/L. X Air Waybill: 1 original and 3 duplicate. Mailing Certificate and/or Insured Parcel Post Receipt. COPIES OF ORDER: This order is executed in 3 copies. It is requested that you sign and return the 2 carbon copies to this office as your acceptance of the order. Chinese Government Procurement & Services Mission Div. for Ministry of National Defense WEN Wen Ha-hsiung Harbowing Major General, CA Director Live Tou-chien LIU Tzu-chien Colonel, CAF Ass't Director ACCEPTED - By : Date : 6-11-74 FORD LIBRARY s GERALO PHILCO OVERSEAS SERVICES, INC. C/o PHILCO Aeronutronic Division Ford Road Philco-Ford Corporation Newport Beach, California 92663 May 31, 1974 G031-74-579 Chinese Government Procurement and Services Division Division for Ministry of National Defense CORRESPONALISCE 2224 R. Street, N. W. CONT Washington, D.C. 20008 JUII Attention: WEN Ha-hsiung Major General, CA Director Subject: Proposed Contract C-22021A Gentlemen: Philco Overseas Services, Inc. advises that it will accept Proposed Contract C-22021A dated 8 April 1974, provided the following revisions are incorporated prior to formal acceptance by the parties: 1. Article 2, page 4, Performance and Delivery Schedule: All deliveries remain as shown on the schedule except that Modification Kits which will be delivered at the end of the 21st, 22nd and 23rd months will be at 50 per month starting with the 21st month and ending in the 26th month. A copy of the Performance and Delivery Schedule, revised to incorporate the above revisions is attached. 2. Article 5.2. 1b, change to read: "Seller further warrants for a period of 6 months after each delivery of modification kits and field tost sets under Articles 1.1.1 and 1.1.2, respectively and for a period of 12 months after each delivery of Guidance and Control Unit Depot Facility modification equipment under Article 1.1.3 to Buyor hereunder " 3. Article 5.2.1b, Line 15, change to read: "Seller and Buyer shall coordinate prior to returning a non- conforming item to Soller's plant. In the event the Seller and Buyer determine that a non-conforming item should be returned to Seller's plant, the said item shall be returned FORD & GERALD LIBRARY Major General WEI -2- G031-74-579 F.O.B. Seller's plant, packed and packaged for arrival at destination in on undamaged condition and Seller shall incur the expenses of air freight and insurance for such returned items. This warranty is not " 4. Article 5.6, Line 4, change to read: " Seller may terminate performance and the Buyer shall pay Seller reasonable and proper charges mutually agreed to resulting from such termination upon submission of Seller's invoices, " 5. Article 5.9, Line 3, change to read: " claimed to infringe any patent application or patent of the Republic of China, " 6. Article 5. 13: " if requested by Buyer" at the end of the Article shall be deleted. 7. Article A3. 6. 1, change sentence to read: " of the following documentation plus one reproducible for all items except (7) and (8) shall be furnished " 8. Article Al. 4.2, Bulk Materials, add Item Number 36, Federal Stock Number: Blank; Part Number: 14-40-0013; Nomenclature: Chemical Depotting Solution. It is recommended that this letter be included as part of the Purchase Order that is issued for Proposed Contract C-22021A in order that the parties have a record of the revisions made to the original Proposed Contract. Very truly yours, J. L. Dampman, Controller Attachment: FORD & GERALD PHILCO Ford Philco-Ford Corporation Aeronutronic Division Newport Beach, California GERMLD A FORD LIBRARY Contract No. C-22021A 8 APRIL 1974 CONTRACT FOR DELIVERY OF AIM-9J MODIFICATION KITS, MODIFICATION OF THE OVERHAUL AND REPAIR DEPOT, FIELD TEST SETS AND TRAINING BUYER: Republic of China ACTING THROUGH: Chinese Government Procurement and Services Mission Division for Ministry of National Defense 2224 R. Street, N.W. Washington, D.C. 20008 SELLER: Philco Overseas Services, Inc. c/o Philco-Ford Corporation Aeronutronic Division Newport Beach, California 92663 FORD & bail GERALD 3r CONTRACT NO. C-22021A Between The Republic of China Acting Through: Chinese Government Procurement and Services Mission Division For Ministry of National Defense 2224 R. Street, N.W. Washington, D. C. 20008 Hereafter Called Buyer And Philco Overseas Services, Inc. c/o Philco-Ford Corporation Aeronutronic Division Ford Road Newport Beach, California 92663 Telephone: (714) 640-1500, Extension 2864 Telex: 678470 TWX: 9105961354 Hereafter Called Seller Covering The Supply of AIM-9J Missile Guidance and Control Unit Modification Kits, Modification of Depot Facility, Field Test Sets and Training. NOTE: Philco Overseas Services, Inc., has agreed that Philco-Ford Corporation may receive on its behalf payments under this contract. FORD & GERALD LIBRANY CONTENTS PAGE ARTICLE 1 - SUPPLIES, SERVICES AND PRICES 2 ARTICLE 2 - TERMS OF DELIVERY AND DELIVERY SCHEDULE 3 ARTICLE 3 - INSPECTION AND ACCEPTANCE 5 ARTICLE 4 - INVOICING AND PAYMENT 8 ARTICLE 5 - TERMS AND CONDITIONS 9 ARTICLE 6 - CONTRACT ACCEPTANCE 16 ANNEX 1 - COMPOSITION OF AIM-9J MODIFICATION KITS 17 ANNEX 2 - AN/ASM 447 FIELD TEST SETS 41 ANNEX 3 - MODIFICATION OF THE AIM-9E DEPOT FACILITY TO PROVIDE AN AIM-9J GCU CAPABILITY 42 SUPPLEMENT TO ANNEX 3 - DETAILED MODIFICATIONS TO DEPOT TEST STATIONS TO ADD AIM-9J CAPABILITY 52 FORD & GERALD LIBRARY -1- ARTICLE 1 SUPPLIES, SERVICES AND PRICES 1.1 Seller agrees to provide the following supplies and services at the fixed prices stated: Description Quantity Total Price 1.1.1 AIM-9J Modification Kits for 1000 total U.S. $7,259,000 conversion of: 1000 AIM-9B Guidance and Control Units to AIM-9J configura- tion in accordance with Annex 1. 1.1.2 AIM-9J Field Test Sets 12 each U.S. $ 295,776 (AN/ASM-447), including calibration adapter boxes and torque tool adapters, as described in Annex 2. 1.1.3 Guidance and Control Unit Depot 1 each U.S. $1,209,889 Facility modification, including: Depot modifications; spare parts; depot equip- ment tools; test equipment tools; and technical services as described in Annex 3 and the Supplement to Annex 3. Total Contract Price U.S. $8,764,665 FORD & -2- GERALD LIBRARY ARTICLE 2 TERMS OF DELIVERY AND DELIVERY SCHEDULE 2.1 GENERAL 2.1.1 The dates of delivery for the supplies and services identified in Article 1 are set forth in the Performance and Delivery Schedule on Page 4. 2.1.2 All deliverable material and equipment will be packaged and packed in accordance with normal commercial practice adequate for air transpor- tation to the Buyer's Port of Entry. 2.2 SELLER'S DELIVERY OF MATERIAL AND EQUIPMENT TO BUYER 2.2.1 Seller shall deliver the materials and equipment identified in Article 1.1.1 on the dates set forth in the Performance and Delivery Schedule to Los Angeles International Airport, Los Angeles, California, which will be the point of transfer of custody. Buyer will be respon- sible for transportation costs from the Los Angeles International Air- port. Seller will be responsible for costs of insuring each delivery from Los Angeles International Airport to Buyer's Port of Entry. Buyer will reimburse Seller for such insurance costs upon Sellers presentation of an invoice to the Chinese Government Procurement and Services Mission. 2.2.2 Seller shall deliver materials and equipment identified in Arti- cles 1.1.2 and 1.1.3 FOB Buyer's Port of Entry. Buyer shall provide the necessary insurance, materials, handling equipment, manpower, vehi- cles and drivers for the unloading/loading and movement of deliverable materials and equipment from Buyer's Port of Entry to the final storage and/or Depot installation site. Buyer is responsible that all materials and equipment are packaged, packed and handled, with regard to such movement, so as to assure safe, undamaged arrival at destination. Seller is not responsible for delivered material and equipment after their arri- val at the Buyer's Port of Entry. 2.2.3 Due to the U.S. Government regulations, the AIM-9J Modification Kits described in Annex 1 will be delivered through a U.S. Government Repre- sentative into the custody of Buyer's designated authorized representative at the point of transfer of custody specified in Article 2.2.1. Buyer will provide Seller with the name of its authorized representative at the point of custody transfer at least 60 days prior to first delivery of Modification Kits. FORD & -3- GERALD LIBRARY PERFORMANCE AND DELIVERY SCHEDULE ( ( 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 CONTRACT AWARD POST AWARD CONFERENCE ROC SELLER DELIVER FACILITY TEST EQUIPMENT EQUIPMENT INSTALLATION AND ACCEPTANCE 1 -4- 25 75 100 100 100 100 100 100 50 50 50 50 50 50 SELLER DELIVER AIM-9B TO AIM-9J MOD KITS 2 2 4 4 SELLER DELIVER FIELD TEST SETS TRAINING TECHNICAL SERVICES ( GERALD ? 31 May 1974 Revised FORD ARTICLE 3 INSPECTION AND ACCEPTANCE 3.1 AIM-9J GCU MODIFICATION KITS AND AN/ASM-447 TEST SETS 3.1.1 Final inspection for purposes of acceptance of the AIM-9J Modifi- cation Kits shall be accomplished at the Seller's facility in Newport Beach, California, by Seller's Quality Control personnel. Final acceptance of the seekers will be accomplished in accordance with the requirements of draw- ing 397-1481 and paragraphs 4.7 through 4.7.25 of Specification AS 132168. Seeker limited environmental tests will be performed in accordance with paragraphs 4.8 through 4.8.2.4 of AS 132168. Full environmental tests in accordance with Philco-Ford Specification AS 132168, paragraphs 4.9 through 4.9.2.10 will not be performed. Upon request, a copy of Seller's Acceptance Test records evidencing satisfactory completion of work performed will be provided to the Buyer. In addition, the Buyer may inspect the work at his expense, if desired, subject to U.S. Government security requirements which include a requirement for escort by Seller's personnel. 3.1.2 Final inspection for purposes of acceptance of the AIM-9J Field Test Sets (AN/ASM-447) shall be accomplished at the Seller's facility in Newport Beach, California, by Seller's Quality Control personnel. Acceptance tests will be performed in accordance with Philco-Ford Specifcation AS 130380. Upon request, a copy of Seller's Acceptance Test records evidencing satis- factory completion of work performed will be provided to the Buyer. In addition, an authorized representative of the Buyer can be present to inspect these operations and certify that performance is satisfactory, if desired, subject to U.S. Government security requirements which include a requirement for escort by Seller's personnel. 3.2 GUIDANCE AND CONTROL UNIT DEPOT FACILITY 3.2.1 Acceptance will be conducted in two discrete increments: one at Seller's plant and one at Buyer's installation site as described below. 3.2.1.1 AT SELLER'S PLANT a. Seller will accomplish a visual and mechanical inspection of all modification kits prior to installation into Test Stations. b. Seller will check each Test Station modified upon completion of the modification for satisfactory operation and calibration, utilizing the procedures to be supplied with the end items and through observation of the tests performed on two Seller supplied AIM-9J servos. C. Seller supplied tools will be checked for proper operation before delivery to Buyer. FORD & -5- GERALD LIBRARY d. All calibration equipment, both special and standard, will be certified against primary standards and checked for proper operation. 3.2.1.2 AT BUYER'S INSTALLATION SITE a. Seller's installation personnel will modify, check out and cali- brate the Test Stations in accordance with the calibration procedures and calibration equipment supplied. This task will be accomplished with the assistance of Buyer's technical personnel. b. Acceptable performance of the test stations, tools, and calibration equipment will be based on the ability of the modified depot and overhaul items to perform the various operations as stated in Seller-furnished documentation. C. End-item performance will be demonstrated by operation utilizing AIM-9J GCU's. Both Seller and Buyer personnel will accomplish tests and evaluate this performance for acceptance. d. Criteria for acceptance of the delivered equipment shall be the satisfactory functional performance of the equipment as demonstrated by Seller. Inspection of tooling for dimensional conformance to the documen- tation will be limited to those critical dimensions that will affect end- item performance as determined by Seller. e. Acceptance and sign-off of all deliverable end items shall be based solely on the acceptance testing and criteria defined herein. f. Acceptance tests will be conducted during the test phase of the installation period. g. Recertification of calibration, if required, must be performed by the Buyer utilizing Buyer-supplied primary or secondary standards, facilities, and procedures. h. As the modification of equipment nears completion, Seller shall give the Buyer five (5) days advance notice of the date on which each test station will be ready for checkout and system test. i. Acceptance of deliverable documentation will be based on its con- formance with paragraph A3.6 of Annex 3 and paragraph SA3.5 of the supplement to Annex 3. FORD & GERALD -6- 3.2.2 INSPECTION Subject to any applicable U.S. Governmental regulations, the Buyer's authorized inspector shall have the right to inspect equipment manufactured at Seller's facilities. This right, however, shall be confined to inspec- tion of completed equipment and major components thereof. Inspection shall include the right to witness the Seller's standard tests. At least two (2) months prior to the scheduled date of shipment, the Buyer shall notify Seller, in writing, of the specific equipment, if any, upon which the Buyer desires to exercise its inspection rights hereunder. Notice of inspection date(s) shall be given to Buyer at least five days in advance thereof. Buyer's inspector shall exercise his rights in such a manner as not to delay the manufacture, test or shipment of any equipment. Buyer's inspector shall signify acceptance after he inspects the equipment by signing Seller's certificate of inspection or shall submit a written statement of his specific reasons for withholding his signature. If a written statement is not received by Seller, within 24 hours after Buyer's inspection, then the signature of an authorized quality assurance repre- sentative of Seller shall suffice. However, such acceptance shall not relieve Seller of its obligation under the "Warranties" Article. FORD LERA GERALD y -7- ARTICLE 4 INVOICING AND PAYMENT 4.1 All payments to Philco Overseas Services, Inc. hereunder shall be made in United States currency or checks denominated in United States currency made payable to Controller, Philco-Ford Corporation, Aeronutronic Division, Newport Beach, California 92663 in accordance with the payment schedule set forth in paragraph 4.2. Seller shall submit invoices for approval and pay- ment to the Chinese Government Procurement and Services Mission, Division for Ministry of National Defense, Washington, D.C. Buyer may make payment hereunder through the United States Army Finance and Comptroller Information Systems Command, Military Assistance/Sales Accounting Division under a Credit Agreement between the United States of America and the Republic of China. 4.2 Buyer shall remit payments to Seller in accordance with the following payment schedule: Percent of Total Contract Price to be Type of Payment Payment Date Paid in U.S. Dollars Down Payment 30 days after contract award 30 Progress Payment End of 13th month after contract award 55 Progress Payment End of 25th month after contract award 10 Final Payment End of 26th month after 5 contract award FORD & -8- GERALD LEBRARY ARTICLE 5 TERMS AND CONDITIONS 5.1 GENERAL Contractual terms and conditions for this effort must meet any U.S. Govern- ment requirements and be acceptable to Philco Overseas Services, Inc. 5.1.1 MANDATORY U.S. GOVERNMENT PROVISIONS The United States Government International Traffic in Arms Regulations (ITAR) requires that the following terms be a part of technical assistance agreements with parties outside the United States. 5.1.1.1 This agreement shall not become effective without the prior approval of the Department of State of the U.S. Government. 5.1.1.2 This Agreement is subject to all the laws and regulations, and other administrative acts, now or hereafter in effect, of the U.S. Government and its departments and agencies. 5.1.1.3 The parties to this agreement declare that the obligations contained in this agreement shall not affect the performance of any obligations created by prior contracts or subcontracts which the parties may have individually or collectively with the U.S. Government or its departments and agencies. 5.1.1.4 Any use of tooling and facilities which the U.S. Government owns or to which it has the right to acquire title must be authorized by the U.S. Government contracting officer. 5.1.1.5 No liability shall be incurred by or attributed to the U.S. Govern- ment in connection with any possible infringements of privately owned patent or proprietary rights, either domestic or foreign, by reason of the U.S. Government's approval of this agreement. 5.1.1.6 The technical data pertaining to the military hardware items con- cerning which the services under this contract are rendered and to be rendered are not authorized to be directly or indirectly sold, leased, released, assigned, transferred, conveyed, or in any manner disposed of in or to Albania, Bulgaria, Communist China, Cuba, Czechoslovakia, East Germany, Estonia, Hungary, Latvia, Lithuania, North Korea, Outer Mongolia, Poland, Romania, Union of Soviet Socialist Republics, any of the area of Vietnam which is under de facto Communist control, and any other area which is determined by the Department of State of the U.S. Government to be under Communist control. 5.2 SPECIAL TERMS AND CONDITIONS In addition to the terms and conditions mentioned above the following special provisions are included in this Contract. FORD & -9- GERALD 5.2.1 WARRANTIES a. Seller warrants that all parts, components or subassemblies which are manufactured or acquired by Seller and installed on or incorporated in the deliverable end items hereunder will be free and clear of all liens and encumbrances at time of delivery to Buyer. b. Seller further warrants for a period of 6 months after each delivery to Buyer hereunder that at the time of delivery the parts and components furnished by Seller and Seller's work incorporated into the delivered items will be of good quality and in substantial conformity with applicable specifications set forth elsewhere in this contract. Seller's liability under this warranty shall be limited to repairing, replacing, or granting a credit for any part or component or work which is determined to Seller's reasonable satisfaction to have failed to comply with this warranty at the time of delivery, Seller to have the choice of selecting the manner of discharging its said liability. To receive the benefit of this warranty, Buyer must give Seller written notification within 20 days after Buyer knows, or reasonably should have known, of the alleged nonconformity, and prior to expiration of the warranty period. Such notification shall identify the nonconforming item involved and shall contain details of the circumstances of discovery by Buyer and nature of the nonconformity. Unless Seller other- wise instructs, Buyer shall return the nonconforming item F.O.B. Seller's plant, packed and packaged for arrival at destination in an undamaged con- dition. This warranty is not applicable to items which have been damaged by misuse after delivery, by negligence of Buyer or third parties, or by other causes beyond Seller's control. This is not a warranty of GCU's which have been modified by Buyer; rather it is a warranty applicable only to items delivered by Seller to Buyer hereunder. After any item warranted by this clause has been corrected or replaced by Seller. This warranty shall con- tinue with respect to such item for the remainder of the original warranty period. C. The warranties stated herein are in lieu of all other warranties, EXPRESS OR IMPLIED, including warranty of MERCHANTABILITY, and warranty of SUITABILITY FOR INTENDED PURPOSE. Seller shall not be liable or responsible for consequential or incidental damages with respect to any goods sold or services rendered hereunder, and Buyer agrees to indemnify and hold Seller harmless against any such damages. 5.3 DELAYS a. Seller shall not be liable for delays in performing its obliga- tions, and the date on which Seller's obligations are to be fulfilled shall be extended without penalty for a period equal to the time lost, by reason of any delay arising directly or indirectly from: (1) Acts of God, unforeseeable circumstances, acts (including delay or failure to act) of any governmental authority (De Jure or De Facto), war (declared or undeclared), riot, revolution, FORD & priorities, fires, strikes, sabotage or epidemics. GERALD LIBRARY -10- (2) Inability due to causes beyond Seller's reasonable control to timely obtain necessary and proper labor, materials, components, facilities, transportation or instructions from Buyer. b. If delay resulting from any of the foregoing causes extends for more than 60 days and the parties have not agreed upon a revised basis for con- tinuing the work at the end of the delay, including an adjustment of the price, then either party, upon 30 days advance written notice, may terminate this contract in respect to the unexecuted portion of Seller's work whereupon the Buyer shall pay Seller reasonable and proper charges for work actually performed. 5.4 SUPPORT FROM BUYER In addition to the requirements of any other provisions of this contract, the Buyer shall provide to Seller, at no cost to Seller, the following: (1) All real estate including facilities for depot installation, i.e., sites including buildings, roadways, walks, parking areas, security fences and sewage disposal. (2) Test equipment and calibration services and associated adjustment/repair in the Buyer's Precision Measuring Equipment Laboratory (PMEL) as required. (3) Armed guards for security of equipment and per- sonnel at the depot facility on a full time (24 hours) basis. (4) One Buyer liaison officer at the depot facility for necessary coordination of Buyer personnel with Seller's installation. (5) One (1) Chinese-English interpreter at the depot and warehouse facility. (6) Access to the Depot Facility and noninterference in the performance of the work to be performed. (7) Use of available Buyer's communications services at no cost. (8) Electric and air power for all needs. (9) Office space for 13 people within air conditioned buildings adjacent to the depot. FORD LUBRARY -11- GERALD (10) All other services, property and facilities as specified in this contract to be furnished by Buyer. Equitable adjustment in the contract price or delivery schedule, or both, for delays or added costs incurred by Seller as a result of failure of the Buyer to provide the above support to Seller, shall be made. 5.5 EMERGENCY MEDICAL CARE In the event that Seller's employees assigned to this program become injured or ill while in the Buyer's territorial limits, the Buyer will provide, with- out cost to Seller, such medical attention as is required for the health and well being of said employe, until such time as it is practicable for Seller to arrange for other suitable medical attention. 5.6 NONFULFILLMENT In the event of nonfulfillment by the Buyer of any of the conditions of this contract, Seller may suspend performance and any costs incurred by Seller as a result thereof shall be payable by Buyer. If such nonfulfillment is not rectified by the Buyer promptly upon notice thereof, Seller may terminate performance and the Buyer shall pay Seller reasonable and proper charges resulting from such termination upon submission of Seller's invoices. In the event Seller fails to perform its obligations as set forth in this contract and further, fails to correct this deficiency promptly upon notice thereof by Buyer, Buyer may reduce the contract value by the amount that is deemed mutually to be reasonable to correct the deficiency. 5.7 TITLE AND CUSTODY All items modifying the Depot Facility, which are furnished by Seller from Chinese, U.S. or other sources, either for incorporation into the systems or for permanent acquisition by the Buyer, shall be delivered to the Buyer's carrier at the factory of origin in Taiwan for Chinese sources and at Los Angeles International Airport for supplies obtained from other than Chinese sources. Upon such delivery, title to such items and responsibility for care and control during transit shall vest in the Buyer. Notwithstanding the foregoing provisions, except for the period of transport on Buyer's carrier to site location, Seller shall retain care and control of all such items until system turnover. Upon system turnover, Seller shall be relieved of all responsibility for such care and control. To the extent it is neces- sary to transfer custody of any deliverable item from Seller to Buyer through a representative of the United States Government, such transfer will occur at the Los Angeles International Airport, Los Angeles, California. 5.8 PRIVILEGES PROVIDED BY BUYER This contract is based upon the following privileges and exemptions and in the event any of the privileges or exemptions identified herein are denied Seller, or its non-Taiwan subcontractor despite compliance by the person(s) concerned with all relevant laws, regulations and administrative requirements FOHD -12- & LIBRARY of the Buyer, its agencies and political subdivisions, and with the direc- tions, instructions or regulations of the Buyer, Seller shall give prompt written notice thereof to the Buyer. a. It is understood that Buyer will provide Seller in a timely manner with all necessary permits, licenses and authorizations required for per- sonnel to perform services under this contract in Taiwan. b. All property, material, equipment and supplies imported into Taiwan by Seller or its subcontractors exclusively for use on this contract shall be exempt from import and export duties, taxes, licenses, excises, imposts and charges, and such of these items as do not become a part of the completed work or supplies to be furnished under the terms of the contract may, at Seller's discretion, be removed from Taiwan or disposed of in Taiwan free of any restrictions or claims which may arise by reasons of such removal or dis- posal; except that any applicable customs duty, tax or charge will be paid in the event of sale or disposal by Seller in Taiwan to a purchaser other than an agency or representative of the Buyer. C. The Buyer, its agencies and political subdivisions, shall levy no taxes or fees (including taxes on corporate income, or property, customs or import duties and other taxes) on Seller or its non-Taiwan subcontractors. In the event these exemptions are not granted or if such taxes are imposed and required to be paid, Seller shall be reimbursed for said payments or additional costs incurred thereby. 5.9 PATENT INFRINGEMENT If performance of the contract by Seller, or use, sale or other disposal by Buyer of anything furnished by Seller under this Contract, infringes or is claimed to infringe any patent application or patent, Buyer agrees to indem- nify and save Seller, its officers, agents and employees and also its sub- contractors and suppliers under this contract, harmless against all judgments, decrees, costs, expenses and other liabilities related to said infringement or claimed infringement. As part of this duty to indemnify and save harmless, Buyer shall defend or settle at no expense to Seller every suit based upon such infringement or claim of infringement. Seller agrees to notify Buyer promptly on receipt of each such claim and each notice of such suit. 5.10 USE OF U.S. GOVERNMENT-OWNED TEST EQUIPMENT AND SPECIAL TOOLING Seller shall be authorized noninterference rent free use of the test equip- ment and special tooling presently accountable under U.S. Air Force Con- tracts F09603-71-C-0167, F09603-71-C-1425 and F09603-74-A-0223 in the per- formance of this Contract. In the event the U.S. Government does not grant rent-free use or withdraws permission for the rent free use of equipment as specified above, necessary rent will be computed and added to the contract price. Denial of use of the equipment either on a rent-free use basis or rental basis shall cause the contract to be equitably adjusted to reflect the additional investment required for performance. FORD & GERALD LIBRARY -13- 5.11 CONFLICTING PROVISIONS Seller's failure to object to provisions contained in any communication from Buyer which conflict with Seller's terms of sale shall not be deemed accep- tance thereof by Seller. Only those terms and conditions contained herein apply to any Sale under this contract, unless Seller agrees in writing that other or additional terms are applicable. Modifications to this contract of sale between the parties shall be made only in writing, executed by a duly authorized representative of each party. 5.12 APPLICABLE LAW This contract shall be construed according to the laws of the State of California insofar as existence of the contract as a binding agreement and matters concerning performance or breach thereof are concerned. If the par- ties find themselves in an irreconcilable disagreement as to any matter con- cerning this contract which is not resolved after bona fide negotiation and effort at compromise - which each party commits itself to attempt in good faith - then such disagreement shall be subjected to settlement by arbitra- tion in accordance with the rules of the International Chamber of Commerce then in effect, arbitration to take place in Los Angeles, California, and the third arbiter to be designated by the two arbiters appointed by the parties. Judgment upon the award rendered may be entered in any court having jurisdic- tion in Taiwan or the United States, or application may be made to such court for judicial acceptance of the award and an order of enforcement, as the case may be. 5.13 PERFORMANCE BY SUBSIDIARY Seller reserves the right to assign this contract or any part thereof or to subcontract all or any part of the performance hereof, to a wholly owned subsidiary of Seller or to Seller's parent or an affiliated company. If such assignment or subcontract is made, Seller will guarantee performance by such subsidiary, parent or affiliate if requested by Buyer. 5.14 LICENSES, PERMITS AND COMPLIANCE WITH U.S. EXPORT REQUIREMENTS Seller's obligations hereunder are contingent upon Seller being able to obtain all necessary U.S. Government Licenses, permits, authorizations and other clearances. Seller will undertake to obtain such clearances and will inform the Buyer of any delays or difficulties relating thereto. Such clearances may be granted subject to incorporation herein of certain clauses or terms required by the U.S. Department of State or other U.S. Agency and Buyer agrees that any such required clause may be incorporated herein. Any delay occasioned by the foregoing shall be considered an excusable delay. 5.15 LIMITATION OF LIABILITY The total liability of Seller (including its suppliers) for any claim, whether in contract, tort (including negligence) or otherwise, arising out of, con- nected with or resulting from the manufacture, sale, delivery resale, repair, FORD & -14- GERALD LIBRATY replacement or use of any equipment or the furnishing of any services shall not exceed an amount equal to the total contract price. 5.16 IN-COUNTRY CONFERENCE AND REVIEW A technical conference will be held in Buyer's country approximately four (4) weeks after contract award. The subject matter of this technical conference will include discussion of detailed requirements of the contract. A pro- visioning review of spare parts selected for support of the depot will be held at this conference. Within eighteen (18) weeks after contract award, Seller will review with Buyer's technical personnel in Buyer's country pre- viously furnished depot area layouts, process, flow and detailed facility requirements. FORD & GERALD LIBRARY -15- ARTICLE 6 CONTRACT ACCEPTANCE CONTRACT NO. C22021A is hereby accepted as indicated below: Philco Overseas Services, Inc. by: AUTHORIZED hour REPRESENTATIVE date: April 8, 1974 Accepted on behalf of the Republic of China by: date: -16- GERALD A. FORD ANNEX 1 COMPOSITION OF AIM-9J MODIFICATION KITS A1.1 GENERAL The modification kits will modify AIM-9B GCU's to the AIM-9J GCU configuration in accordance with part number 120681 and specification number AS120532. A1.2 AIM-9B GCU An AIM-9B GCU is defined as AIM-9B Missile Guidance and Control Unit, FSN 1427-874-5660 AB, Mods 9 through 15. A1.3 MODIFICATION KIT CONTENTS, AIM-9B TO AIM-9J A1.3.1 MODIFICATION PARTS a. The quantities listed in this section are for each kit. That is, in order to modify 1,000 GCU's, the total quantity delivered by the Seller will be 1,000 times the quantities listed. The quantities include an amount for probable loss or damage. b. If commercial parts are not readily available, equivalent or superior parts may be substituted. C. Incorporation of design improvements may necessitate minor revisions to this list. FORD & GERALD -17- Item See No. Part No. Item Description Qty Note 1 123136 Servo Section 1 2 123641 Shield 1 3 130211-1 Canard, Double Delta 4 1 4 132127-1 Delay, Gyro Drive (Z305) 1 5 132153-1 Component Board Assy TB9 1 6 132154-1 Board Assy TB5 1 7 132155-1 Spacer 1 8 132156-1 Insulation 1 9 132157-1 Spacer 1 10 132158-1 Screw, Nonmetallic 1 11 132170-1 Block, Diode 1 12 132181-1 Separation 1 13 132688-1 Module Z201 1 14 132669-1 Dome Protector 1 15 132981-1 Transistor Q101 1 16 1537514 Nut, Plain Knurled 2 17 1537569 Terminal 2 18 1559239-1 Screw 8 19 1559240-1 Screw 3 20 1564939-1 Capacitor C107 1 21 1564939-2 Capacitor, C306 1 NOTE: 1. Canards (130211-1) are shipped separately in their own container. FORD & -18- GERALD Item See No. Part No. Item Description Qty Note 22 1564939-3 Capacitor, C121 1 23 1586019-2 Washer, Lock 2 24 1586111-1 Insulation 1 25 397-1481-1 Seeker 1 2 26 10122411-2 Splice, Conductor 1 27 AN960PD10L Washer 8 28 AS132123-1 Driver, Gyro Drive (Z301 thru Z304) 4 29 AS132124-1 Driver, Z101, Z102 2 30 AS132665-1 Diode CR226 1 31 AS132996-1 Sync Filter, Z103 1 32 CM15ED151JN3 Capacitor, C131 1 33 CK148X223K Capacitor, C124 1 34 CP04A1KC223K3 Capacitor, C119, C120 2 35 CP08A3KF102K3 Capacitor, C104 1 36 JAN1N4246 Rectifier, CR214, CR224 2 37 JAN1N645 Diode CR104 1 38 M39003/01-2304 Capacitor, C133 1 39 M39014/01-0446 Capacitor, C117 1 40 M39014/02-0407 Capacitor, C132 1 41 MS21262-36 Screw 8 42 MS35338-40 Washer, Split 2 NOTE: 2. Seekers (397-1481-1) are classified items and are shipped separately. Dome protectors shipped with seekers. FORD R. LIBRAR -19- GERALD Item See No. Part No. Item Description Qty Note 43 MS35338-135 Lock Washer 2 44 MS51957-15 Screw 2 45 MS51959-43 Screw 4 46 MS77068-1 Terminal (No. 85) 1 47 MS20470A5-8 Rivet 2 48 MS39014/01-0455 Capacitor, C207, C208 2 49 RCR07G153JS Resistor R163 1 50 RCR07G470JS Resistor R162 1 51 RCR20G105JS Resistor R132 1 52 RCR20G241JS Resistor R159 1 53 RCR20G273J Resistor R315 1 54 RCR20G334JS Resistor R160 1 55 RCR20G474JS Resistor R157 1 56 RCR20G684JS Resistor R117 1 57 RCR20G823JS Resistor R158 1 58 RLR32C104GM Resistor R247 1 59 RN60D4750F Resistor R211, R212, R243, R244 4 60 RW69V331 Resistor R201 and R202 2 3 NOTE: 3. R201 and R202 are matched within 1 percent. FORD R -20- GERALD A1.4.2 BULK MATERIALS a. The items listed in this section are the requirements for 1,000 GCU Modification Kits. b. Incorporation of design improvements may necessitate minor revi- sions to this list. Item Federal See No. Stock No. Part No. Nomenclature Note 1 6145-144-0231 M81044/12-22-9 Wire, 22 AWG 2 6145-422-2644 M81044/12-24-9 Wire, 24 AWG 3 6142-938-5965 M81044/12-26-9 Wire, 26 AWG 4 QQ-W-343 Wire, 22 AWG, Types, Soft 5 QQ-W-343 Wire, 20 AWG, Types, Soft 6 MIL-I-22129 Insulation, 20 AWG, White 7 MIL-I-22129 Insulation, 22 AWG 8 MIL-I-22129 Insulation, 3 AWG, White 9 MIL-I-22129 Insulation, 16 AWG 10 MIL-I-23052/5CL1 Sleeving, 0.062 ID 11 4020-202-1924 MIL-T-713CL2 Lacing Twine, Type P, Waxed 12 QQ-S-571 Solder, SN60, WRAP 3 13 MIL-I-15126 Tape, Glass, Type GFT, 1/2 Inch 14 0S7446, Type 3 Marking Ink, Black 1 15 5970-548-9520 MIL-V-173 Varnish 2 16 5970-161-7422 GE-1201 Glyptal, Red NOTES: 1. Shelf Life 6 Months. 2. Shelf Life 12 Months. FORD & -21- GERALD Item Federal See No. Stock No. Part No. Nomenclature Note 17 9150-286-8088 VV-D-1078 Silicone Fluid GR 200,000CS 1 18 8010-161-7379 TT-L-32 Lacquer, Black, 17038 2 19 8010-257-5377 TT-L-32 Lacquer, White, 17875 2 20 8010-515-2208 MIL-P-8585 Primer, Color Y 2 21 9150-985-7243 MIL-G-23827 Moly Grease 22 6810-816-1025 MIL-M-7866 Molybdenum Disulfide 23 6850-880-7616 MIL-S-8660 Silicone Compound 2 24 8040-865-4991 MIL-A-46106 Sealant, White 2 25 MIL-A-46106 Primer, Type I, Red 3 26 131208-9 Sealant 2 27 8030-081-2339 MIL-S-22473 Sealant, Grade A 28 131208-1 Adhesive, DC 140 2 29 MIL-S-22473 Primer, Grade T, Form R 2 30 MIL-P-15328 Primer 31 MIS-13901A, Silicone Compound 2 Amendment 1 32 131208-27 Insulating Compound 1 33 131208-26 Rubber, Polysulfide 1 34 MIL-I-23053/5CL1 Insulation, 0.375 ID 35 MIL-R-46846 Tubing, Heat Shrink, Type 1, CL1, Size 3/4 NOTES: 1. Shelf Life 6 Months. 2. Shelf Life 12 Months. 3. Shelf Life 24 Months. FORD -22- & GERALD LIBRARY A1.4.3 AS REQUIRED PARTS (AR) (SELECTABLES) a. The quantities listed in this section represent the Seller's best estimate of the AR parts for 1,000 AIM-9B to AIM-9J GCU modification kits. However, past experience on similar programs has indicated that the AR predictions may vary according to Buyer's practices and circumstances. Accordingly, the Seller will: (1) Provide an initial quantity of AR parts to modify 500 units. (2) Provide a final quantity of AR parts for 500 units. This shipment will reflect the variation between the balance of the predicted quantity and the actual usage derived from the initial quantity. Item Part No. or See No. Description Nomenclature Qty Note 1 5719 Tube, Electron V102 400 1 2 132147-1 Insulator Disk 400 3 132148-1 Bracket, Conn 400 4 132149-1 Guide, Bushing 800 5 132150-1 Nut, Special 800 6 CP04A1KF153K3 Capacitor, C204 20 7 CP04A1KF183K3 Capacitor, C204 20 8 CP04A1KF223K3 Capacitor, C204 40 NOTE: 1. Tube 5719 is used on an "as required" basis, quantities are based upon past experience. Resistor R147 used with this tube has Part Number RW69V820. RW69V101 used if Tube 6222 is present in Buyers AIM-9B. FORD & LIBRARY -23- GERALD y Item Part No. or See No. Description Nomenclature Qty Note 9 CP04A1KF273K3 Capacitor, C204 80 10 CP04A1KF333K3 Capacitor, C204 100 11 CP04A1KF393K3 Capacitor, C204 300 12 CP04A1KF473K3 Capacitor, C204 240 13 CP04A1KF563K3 Capacitor, C204 200 14 CP08A1KF472K3 Capacitor, C110 240 15 CP08A1KF562K3 Capacitor, C110 600 16 CP08A1KF682K3 Capacitor, C110 160 17 CP08A3KF122K3 Capacitor, C314 20 18 CP08A3KB123K3 Capacitor, C314 20 19 CP08A3KF152K3 Capacitor, C314 20 20 CP08A3KB153K3 Capacitor, C314 20 21 CP08A3KF182K3 Capacitor, C314 100 22 CP08A3KF222K3 Capacitor, C314 100 23 CP08A3KE272K3 Capacitor, C314 100 24 CP08A3KE332K3 Capacitor, C314 100 25 CP08A3KC392K3 Capacitor, C314 100 26 CP08A3KC393K3 Capacitor, C312 100 27 CP08A3KC472K3 Capacitor, C314 100 28 CP08A3KC473K3 Capacitor, C312 400 29 CP08A3KC562K3 Capacitor, C314 100 30 CP08A3KC563K3 Capacitor, C312 400 31 CP08A3KC682K3 Capacitor, C314 100 FORD 4 -24- GERALD LIVER Item Part No. or See No. Description Nomenclature Qty Note 32 CP08A3KC683K3 Capacitor, C312 80 33 CP08A3KC822K3 Capacitor, C314 100 34 M39014/01-0225 Capacitor, C112 60 35 M39014/01-0230 Capacitor, C112 100 36 M39014/01-0234 Capacitor, C112 160 37 M39014/01-0236 Capacitor, C112 80 38 M39014/01-0237 Capacitor, C112 120 39 M39014/01-0239 Capacitor, C112 280 40 M39014/01-0240 Capacitor, C112 200 41 RCR20G100JS Resistor R512 20 42 RCR20G102JS Resistor R107 100 43 RCR20G105JS Resistor R108 40 44 RCR20G114JS Resistor R150, R223, R224, R318 780 45 RCR20G122JS Resistor R107 120 46 RCR20G124JS Resistor R318 100 47 RCR20G125JS Resistor R108 20 48 RCR20G133JS Resistor R133 40 49 RCR20G134JS Resistor R108, R150, R223, R224, 540 R318 50 RCR20G152JS Resistor R107 140 51 RCR20G154JS Resistor R150, R223, R318 320 52 RCR20G155JS Resistor R108 20 53 RCR20G163JS Resistor R133 120 FORD & LIBRARY GERALD -25- Item Part No. or See No. Description Nomenclature Qty Note 54 RCR20G164JS Resistor R108, R150, R223, R318 260 55 RCR20G182JS Resistor R107 140 56 RCR20G184JS Resistor R150, R223, R318 300 57 RCR20G185JS Resistor R108 20 58 RCR20G200JS Resistor R512 20 59 RCR20G203JS Resistor R133 200 60 RCR20G204JS Resistor R108, R150, R318 80 61 RCR20G222JS Resistor R107, R141, R130 740 62 RCR20G224JS Resistor R150, R223, R318 320 63 RCR20G242JS Resistor R107, R141, R130 460 64 RCR20G243JS Resistor R116, R133 300 65 RCR20G244JS Resistor R108, R150, R223 388 66 RCR20G272JS Resistor R107, R141, R130 300 67 RCE20G273JS Resistor R116, R133 280 68 RCR20G273JS Resistor R116, R133 260 69 RCR20G274JS Resistor R150, R223 160 70 RCR20G300JS Resistor R512 80 71 RCR20G302JS Resistor R141 160 72 RCR20G303JS Resistor R116, R133 360 73 RCR20G304JS Resistor R223, R308 100 74 RCR20G332JS Resistor R141 20 75 RCR20G333JS Resistor R116, R133 360 76 RCR20G334JS Resistor R108, R150, R223 300 FORD & -26- GERALD LIGRARY Item Part No. or See No. Description Nomenclature Qty Note 77 RCR20G362JS Resistor R141 320 78 RCR20G364JS Resistor R150 20 79 RCR20G390JS Resistor R512 200 80 RCR20G392JS Resistor R141 160 81 RCR20G393JS Resistor R116, R133 80 82 RCR20G394JS Resistor R223 20 83 RCR20G432JS Resistor R141 120 84 RCR20G433JS Resistor R116 20 85 RCR20G434JS Resistor R108 180 86 RCR20G473JS Resistor R116 20 87 RCR20G510JS Resistor R512 240 88 RCR20G512JS Resistor R141 60 89 RCR20G513JS Resistor R116 20 90 RCR20G562JS Resistor R141 20 91 RCR20G563JS Resistor R150 20 92 RCR20G564JS Resistor R108 180 93 RCR20G620JS Resistor R512 160 94 RCR20G622JS Resistor R141 20 95 RCR20G623JS Resistor R150 60 96 RCR20G680JS Resistor R512 160 97 RCR20G682JS Resistor R141 20 98 RCR20G683JS Resistor R150 60 99 RCR20G684JS Resistor R108 80 FORD & LORATHY -27- GERALD Item Part No. or See No. Description Nomenclature Qty Note 100 RCR20G750JS Resistor R512 120 101 RCR20G753JS Resistor R150, R318 80 102 RCR20G823JS Resistor R150 80 103 RCR20G824JS Resistor R180 60 104 RCR20G913JS Resistor R150, R318 40 105 RCR32G120JS Resistor R509 160 106 RCR32G180JS Resistor R509 240 107 RCR32G220JS Resistor R509 240 108 RCR32G270JS Resistor R509 240 109 RCR32G363JS Resistor R143 40 110 RCR32G393JS Resistor R143 40 111 RCR32G433JS Resistor R143 20 112 RCR32G470JS Resistor R509 120 113 RCR32G473JS Resistor R143 40 114 RCR32G513JS Resistor R143 40 115 RCR32G563JS Resistor R143 40 116 RCR32G623JS Resistor R143 20 117 RCR32G6R2JS Resistor R509 200 118 RCR32G683JS Resistor R143 20 119 RN60D1001F Resistor R245, R246 200 120 RN60D1003F Resistor R161, R318 80 121 RN60D1053F Resistor R318 20 122 RN60D1101F Resistor R245, R246 200 FORD & -28- GERALD LIBRARY Item Part No. or See No. Description Nomenclature Qty Note 123 RN60D1153F Resistor R318 40 124 RN60D1211F Resistor R245, R246 200 125 RN60D1213F Resistor R161 80 126 RN60D1273F Resistor R318 60 127 RN60D1301F Resistor R245, R246 160 128 RN60D1303F Resistor R161 160 129 RN60D1373F Resistor R318 80 130 RN60D1403F Resistor R161, R318 380 131 RN60D1433F Resistor R161 160 132 RN60D1473F Resistor R161 100 133 RN60D1501F Resistor R245, R246 60 134 RN60D1503F Resistor R161 60 135 RN60D1543F Resistor R161 20 136 RN60D1621F Resistor R245, R246 60 137 RN60D1693F Resistor R318 60 138 RN60D1821F Resistor R245, R246 60 139 RN60D2001F Resistor R245, R246 60 140 RN60D2211F Resistor R245, R246 60 141 RN60D2431F Resistor R245, R246 60 142 RN60D2741F Resistor R245, R246 60 143 RN60D3011F Resistor R245, R246 60 144 RN60D3321F Resistor R245, R246 60 145 RN60D3651F Resistor R245, R246 60 146 RN60D3921F Resistor R245, R246 60 FORD & LIBRARY GERALD A -29- Item Part No. or See No. Description Nomenclature Qty Note 147 RN60D4321F Resistor R245, R246 60 148 RN60D4751F Resistor R245, R246 60 149 RN60D5111F Resistor R245, R246 40 150 RN60D5620F Resistor R245, R246 80 151 RN60D5621F Resistor R245, R246 20 152 RN60D6191F Resistor R245, R246 20 153 RN60D6810F Resistor R245, R246 100 154 RN60D6811F Resistor R245, R246 20 155 RN60D7501F Resistor R245, R246 20 156 RN60D7502F Resistor R161 20 157 RN60D8250F Resistor R245, R246 120 158 RN60D8251F Resistor R245, R246 20 159 RN60D7872F Resistor R318 20 160 RN60D8252F Resistor R318 20 161 RN60D8452F Resistor R161 20 162 RN60D8662F Resistor R318 20 163 RN60D9091F Resistor R245, R246 20 164 RN60D9312F Resistor R318 40 165 RN60D9532F Resistor R161 20 166 RN60D9762F Resistor R318 40 167 RW67V131 Resistor R239 20 168 RW67V161 Resistor R239 20 169 RW67V201 Resistor R239 40 170 RW67V221 Resistor R239 60 FORD -30- & SERALD AUVREIT / Item Part No. or See No. Description Nomenclature Qty Note 171 RW67V241 Resistor R239 80 172 RW67V271 Resistor R239 160 173 RW67V301 Resistor R239 180 174 RW67V331 Resistor R239 180 175 RW67V361 Resistor R239 180 176 RW69V101 Resistor R147 600 1 177 RW69V820 Resistor R147 400 1 178 RW69V1R0 Resistor R240 20 179 RW69V1R5 Resistor R240 40 180 RW69V2R2 Resistor R240 40 181 RW69V2R7 Resistor R240 60 182 RW69V3R3 Resistor R240 200 183 RW69V3R9 Resistor R240 280 184 RW69V4R7 Resistor R240 280 185 RW69V5R6 Resistor R240 80 186 RW74U1002FM Resistor R143 20 187 RW74U1102FM Resistor R143 20 188 RW74U1212FM Resistor R143 20 189 RW74U1302FM Resistor R143 20 190 RW74U1502FM Resistor R143 40 191 RW74U1622FM Resistor R143 60 NOTE: 1. Tube 5719 is used on an "as required" basis, quantities are based upon past experience. Resistor R147 used with this tube has Part Number RW69V820. RW69V101 used if Tube 6222 is present in Buyers AIM-9B. FORD a. -31- SERALD Item Part No. or See No. Description Nomenclature Qty Note 192 RW74U1822FM Resistor R143 80 193 RW74U2002FM Resistor R143 80 194 RW74U2212FM Resistor R143 80 195 RW74U2432FM Resistor R143 80 196 RW74U2672FM Resistor R143 60 197 RW74U3012FM Resistor R143 60 198 RW74U3322FM Resistor R143 40 199 RW74U6811FM Resistor R143 20 200 RW74U7501FM Resistor R143 20 201 RW74U8251FM Resistor R143 20 202 RW74U9091FM Resistor R143 20 203 RW79V20R0F Resistor R220, R238 40 204 RW79V22R1F Resistor R220, R238 80 205 RW79V24R3F Resistor R220, R238 200 206 RW79V27R4F Resistor R220, R238 280 207 RW79V30R1F Resistor R220, R238 760 208 RW79V33R2F Resistor R220, R238 320 209 RW79V36R5F Resistor R220, R238 180 210 RW79V39R2F Resistor R220, R238 100 211 RW79V43R2F Resistor R220, R238 40 212 RWR-84S-4020FM Resistor R239 80 213 RWR-84S-4420FM Resistor R239 40 214 RWR-84S-4640FM Resistor R239 20 FORD & -32- DEPART A1.4.4 SHIPPING ITEMS The quantities listed in this section are the total requirements for 1,000 AIM-9B to AIM-9J GCU modification kits. Item Part No. or No. Description Nomenclature Qty Unit 1 132695-1 Dust Cap 1000 each 2 132696-1 Extractor 1000 each 3 1516549 Cushion, Nose 500 each 4 1516550 Cushion, Rear 500 each 5 1516469 Cover Assembly 500 each 6 ARD 7049 Confidential Tag 1000 each 7 MS51938-5 Seal 2000 each 8 MS20003-2 Indicator, Humidity 500 each 9 16 Unit Bags Desiccant 1000 each MIL-D-3464 10 Ref Label, Method II 1000 each MIL-STD-129 11 Polyethylene Bag 1000 each 4 MIL 3" X 4" 12 1516440 Container Canard 500 each 13 130885 Dunnage Canard 500 each FORD & -33- GERALD A1.4.5 REPLACEMENT PARTS Quantities shown in this list are to support modification of 1,000 AIM-9B GCU's to the AIM-9J GCU configuration. Item Part No. or Part No. of See No. Description Nomenclature Alternate Part Qty Note 1 3055B Terminal, Stud 266 2 1522521-1 Screw, Machine 100 3 1522521-5 Screw 134 4 1522524-1 Nut, Hex 100 5 1522525-2 Rivet, Tubular 140 6 1522525-5 Rivet, Tubular 450 7 1522526-1 Rivet 40 8 1522591 Transformer 58 9 1522592 Connector 440 10 1522594-1 Resistor, R218, R219, 322 R236, R237 11 1522594-2 Resistor 20 12 1522594-3 Resistor 26 13 1522594-8 Resistor 36 14 1522594-16 Resistor, R322 thru R324 52 15 1522595-2 Capacitor 492 16 1537351-6 Washer, Lock 10 17 1537354 Nut, Self Lock 78 18 1537366-1 Terminal Stud 70 19 1537366-2 Terminal 338 FORD & -34- GERALD LIBRANT Item Part No. or Part No. of See No. Description Nomenclature Alternate Part Qty Note 20 1537495 Terminal 50 21 1537496-3 Terminal 1108 22 1537511 Plug, Machine 1298 23 1537514 Nut, Plain, Knurled 70 24 1537519-2 Holder, Capacitor 14 25 1537520 Bracket, Angle 16 26 1537527 Terminal 118 27 1537540 Tube, Electron V104, 6112A 312 V105 28 1537559 Spring 122990 8 29 1537560 Spring, Helical 86 30 1537569 Terminal, Insulated 4278 31 1537570-1 Terminal Stud 4 32 1537589 Angle Bracket 14 33 1537591 Resistor R215, R233 123341 556 34 1537607 Terminal 76 35 1537614-3 Terminal 200 36 1537564 Holder, Capacitor 100 37 1554719 Printed Wiring Board 6 38 1554721-1 Capacitor, C102, C103 46 39 1559257-1 Terminal Board TB2 278 40 1564946 Connector, P103, P202 54 41 1564957 Reactor, L204 912144 34 FORD & -35- GERALD Item Part No. or Part No. of See No. Description Nomenclature Alternate Part Qty Note 42 1564966 Capacitor, C201 32 43 1564976 Pin, Straight Threads 76 44 1564988 Tube, Shield 20 45 1583908-1 Reactor, L203 134 46 1583908-2 Reactor, L301 76 47 1583911-6 Capacitor C303, C311 904342-1 98 48 1583911-7 Capacitor C308 904342-3 62 49 1583911-10 Capacitor 22 50 1583911-13 Capacitor, C205 904342-2 42 51 1583911-14 Capacitor C301, C302, 904342-4 562 C304, C305 52 1583911-18 Capacitor 4 53 1583928-1 Connector, P101 102 54 1583929 Transformer, T101 912151 60 55 1583932 Transformer 16 56 1583965-1 Semiconductor, CR101 1583965-3 or 936 thru CR103 JAN1N645 57 1583965-3 Semiconductor, CR301 1583965-1 or 1332 thru CR303 JAN1N645 58 1583965-4 Semiconductor, CR201 1583965-2 or 220 thru CR208, CR217, JAN1N914 CR218, CR225, CR306, CR307 59 1583967 Semiconductor JAN1N645 126 60 1583988 Semiconductor JAN1N645 126 FORD & GERALD LIBRARY -36- Item Part No. or Part No. of See No. Description Nomenclature Alternate Part Qty Note 61 1586011 Angle Bracket 40 62 1634186-1 Terminal Board TB1 228 63 1634186-2 Terminal Board TB3 146 64 1634187 Insulator Plate 6 65 1634188 Insulator Plate 30 66 1634190 Terminal Board 26 Subassembly 67 1634191 Insulating Sheet 26 68 1634192 Insulating Sheet 26 69 1634209 Circuit Board Assembly 8 70 1634232-1 Capacitor, C202 904339-3 238 71 1652992 Circuit Board Assembly 6 72 1653079-1 Circuit Board Assembly 6 73 1701204 Stud, Extension 30 74 1701212 Mounting Nut 6 75 1701218 Nut, Spacer 194 76 1701219 Nut 220 77 1701231 Resistor 126 78 1738420-1 E Section Skin 68 79 1739412-1 Semiconductor 840 80 1739414 Insulation Sheet 16 81 1739415 Reactor, L201, L205 912152 42 82 1804129 Transformer, T201 120 FORD & GERALD LIBRARY -37- Item Part No. or Part No. of See No. Description Nomenclature Alternate Part Qty Note 83 AN515PB6-5 Screw, Machine 6 84 AN515PB8-6 Screw 200 85 AN931-4-7 Grommet, Rubber 300 86 AN936A3 Washer, Lock 1450 87 AN936A6 Washer, Lock 500 88 CM15E151K Capacitor, C131 354 89 CP04A1KE103K3 Capacitor, C307 28 90 CP04A1KC473K3 Capacitor, C315 358 91 CP04A3KC473K3 Capacitor, C313 78 92 CP08A1KB473K3 Capacitor, C125 542 93 CP08A3KB104K3 Capacitor, C106 156 94 CP08A3KB473K3 Capacitor 40 95 JAN1N483B Semiconductor 8230 96 JAN6021 Tube, Electron, V305 324 97 MIL-E-1/1656 Tube, Vacuum, V201 5840W 416 98 MIL-E-1/97 Tube, Vacuum, V103 1537539, 228 5899 99 MS9461-01 Ball Bearing 13,500 100 MS17122-6 Terminal 1000 101 MS20613-2C2 Rivet, Solid 8 102 MS35229-28 Screw, Panhead 50 103 MS35338-97 Washer, Lock 550 104 MS35338-99 Washer, Lock 200 FORD & -38- GERALD LIBRAR , Item Part No. or Part No. of See No. Description Nomenclature Alternate Part Qty Note 105 RC20GF104J Resistor R144, R103 300 1 R311, R308 106 RC20GF105J Resistor R128, R132, 258 1 R230 107 RCR20GF112J Resistor 120 108 RC20GF121K Resistor R114 844 1 109 RC20GF152J Resistor R107, R321 44 1 110 RC20GF153JS Resistor R149, R310 186 1 111 RC20GF154J Resistor R312, R318, 56 1 R319 112 RC20GF155J Resistor R108, R111 250 1 113 RC20GF221K Resistor R306 48 1 114 RC20GF222J Resistor R107, R141, 48 1 R309 115 RC32GF222J Resistor R221 104 2 116 RC20GF223J Resistor R112, R320 114 1 117 RC20GF224K Resistor R129, R131, 266 1 R145, R223, R301, R302, R304 118 RC20GF225K Resistor R316 30 1 119 RCR20GF272J Resistor 100 120 RCR20GF301J Resistor 250 121 RC20GF334J Resistor R115 54 1 NOTES: 1. RCR 20GXXXJS Resistors are alternate parts. 2. RCR 32G222JS Resistor is an alternate part. FORD & LIBRARY GERALD -39- Item Part No. or Part No. of See No. Description Nomenclature Alternate Part Qty Note 122 RC20GF473K Resistor R146 64 1 123 RC20GF474K Resistor R106, R110 208 1 124 RC20GF682K Resistor R113, R141 88 1 125 RC20GF683J Resistor R142, R150 138 1 R303 126 RCR20GF302J Resistor 350 127 RN60D1501F Resistor R204 thru 1050 R210, R223 128 RN69V430 Resistor 148 FORD -40- 2 GERALD LIBRARY ANNEX 2 AN/ASM-447 FIELD TEST SETS A2.1 AN/ASM-447 TEST SET Field Test Sets shall be fabricated in accordance with drawing 120603 and specification AS130380. A2.1.1 AIM-9J FIELD TEST SET CALIBRATION ADAPTER BOXES The Adapter Box is used during calibration to provide for access to the test set umbilical connector. In addition, the box contains three load resistors which are used to simulate the GCU loads on the test set power supply. The FTS Calibration Adapter Boxes shall be fabricated in accordance with drawing 130936. A2.1.2 AIM-9J FIELD TEST SET TORQUE TOOL ADAPTERS The FTS Torque Tool Adapters shall be fabricated in accordance with drawing 123201. FORD & LIBRARY -41- GERALD ANNEX 3 MODIFICATION OF THE AIM-9E DEPOT FACILITY TO PROVIDE AN AIM-9J GCU CAPABILITY A3.1 GENERAL This annex describes the necessary modifications to the AIM-9E Guidance and Control Depot Facility to provide the capability to modify, test, analyze, and repair AIM-9E and AIM-9J Guidance and Control Units. This facility will include the following capabilities and characteristics: (1) A capability of testing and repairing Sidewinder Guidance and Control Units, designated as AIM-9E or AIM-9J. (2) A capability of a combined test and overhaul rate of 50 Guidance and Control Units per month based on a normal 40-hour work week on a single shift basis. (3) The special equipment will conform to good commercial manufacturing standards and Seller's quality standards pertaining to components, material and workmanship. (4) A capability of testing and repairing the AN/ASM-447 test set. This annex also includes a description of depot modification training and Technical services required to train depot personnel. A3.2 UTILITIES AND FACILITIES REQUIRED The present depot utilities and facilities must be adequate to permit modifications necessary to add an AIM-9J GCU capability. A3.3 DEPOT FACILITY MODIFICATION The modified facility shall have the capability to permit testing, analysis, and repair of the Sidewinder AIM-9J and AIM-9E GCU's in accordance with Systems Specifications. Environmental testing exclusive of vibration, is not part of this modified depot capability. FORD & LIBRAR -42- GERALD The existing test facility provides the capability to evaluate, analyze and repair the AIM-9E GCU to the levels tabulated below. The modification of this facility will provide the same capability for the AIM-9J GCU and will retain this same capability for the AIM-9E GCU. Basic Capability Guidance and Control unit (complete) Seeker/Electronics Seeker Assembly Electronic Chassis Major Servo Components Wiring Harness Umbilical Dome/Housing Assembly Head Coil Assembly Gyro Assembly Cell (CDU) Preamplifier Seeker Card Gimbal/Optical Barrel Optical Assembly A3.3.1 MODIFIED TEST POSITIONS - AIM-9J The existing test positions which must be modified to provide the AIM-9J GCU capability are: TTL-251-1 Automatic Systems Test TTL-251-2 Manual System/Seeker Electronics Test TTL-251-3 System Boresight Test TTL-251-4 System and Rocker Arm Crystal Test TTL-251-9 Servo Pneumatic Test TTL-251-10 Magnetic Amplifier and Servo Test TTL-251-11 Piston Matching Test TTL-251-12 Navigation Constant Test TTL-251-7 Magnetic Amplifier Test TTL-251-5 Servo Continuity Supplement to Annex 3 describes in detail the modifications that are to be made to the above stations to permit test of the AIM-9J GCU. FORD & -43- GERALD LIBRARY A3.4 SPECIAL TOOLS - AIM-9J GCU The special tools listed below will support the GCU disassembly, test, repair and assembly to the level defined in Paragraph A3.3 of this Annex. A3.4.1 SYSTEM LEVEL - AIM-9J Tool Number Description Quantity IPE-4885 (Mod.) Final Assembly Fixture, G&C 1 PE Gas Generator Torque Wrench 1 PE Gas Generator Hand Wrench 1 IPE-4887 (Mod.) Disassembly Fixture for G&C 1 IPE-2567 (New) G&C Unit Storage Fixture 15 PE Rocker and Boot Paint Mask 1000 IPE-4242 Boot Cement Fixture 12 A3.4.2 SERVO LEVEL - AIM-9J Tool Number Description Quantity PE Servo Horizontal Assembly Fixture 1 PE Servo Vertical Storage Fixture 5 PE Orifice Insertion Fixture 1 PE Orifice Staking Fixture 1 PE Filter, Orifice, Staker 1 PE Filter, Gas, Staking Tool 1 PE Blow Out Plug Torque Wrench 1 PE Igniter Nut Torque Wrench 1 PE Igniter Nut Hand Wrench 1 PE Relief Valve Torque Wrench 1 PE Relief Valve Hand Wrench 1 PE Gas Generator Stencil 1000 PE Servo In-Line Assembly Fixture 1 FORD Lic & -44- A3.5 AN/ASM-447 FIELD TEST SET DEPOT TEST EQUIPMENT Seller shall provide the following listed test station which includes the test equipment as detailed below. This test equipment will provide major repair and calibration capability for the field test set in addition to the current capability for field repair. Quantity Item Description Required Oscilloscope R561B 1 Dual Trace Amplifier 3A6 1 Time Base 3B4 1 Voltmeter 4300 1 Rack Mounting Flanges 403655 1 Oscillator 3300A 1 Plug In 3301A 1 Power Supply 62024C 4 Race Mounting Tray 62410A 1 Rack Tray Front Panel 62411A 1 Power Supply 6384A 1 Rack Adapter 5060-8764 1 RMS Voltmeter 3400A 1 Rack Adapter 5060-8762 1 X-Y Recorder 7044A 1 Time Base CPT001 1 Counter 5326A 1 Clip on Milliammeter 428BR 1 Decade Box 240C 1 20,000-2-NC-19-C-36-BR-24-N 1 Cabinet 2-Bay W/Castors Desk Top 82020-2 1 Rear Tapped Angle 5037 2 PR Adjustable Channel 5638-19 4 PR Shelf Angle 56 10 PR Blower 2E300A 2 Power Outlet Strip POS-7 2 SFSW-10F8D-S13GY Pan-L-Screw 1 PK of 100 Leads Interconnection AR FORD & -45- GERALD LIBRARY A3.6 DOCUMENTATION A3.6.1 DEPOT FACILITY DOCUMENTATION Two copies of the following documentation shall be furnished to the Buyer in the English language and the Seller's format: (1) Tool drawings. (2) Test procedures for each test station. (3) Maintenance and calibration procedures for each test station. (4) Electrical schematics for all special test panels, fixtures, jigs and etc., furnished. (5) Interconnecting cabling diagrams for each test station. (6) Parts lists for all special test panels, fixtures, jigs and etc., furnished. (7) Two copies of handbook furnished by manufacturer for each piece of standard commercial equipment furnished. (8) Fabrication drawings of equipments are not included in this Statement of Work. (9) Signal Flow diagrams covering input and outputs for special panels. (10) Voltage, Waveform, and Resistance charts for special panels. A3.6.2 AIM-9J GCU AND AN/ASM-447 FIELD TEST SET DOCUMENTATION Two copies of the following documentation shall be furnished to the Buyer in the English language and the Seller's format. (1) AS120532 (c) GCU Specification (2) AS1321/68 (c) Seeker Specification (3) 131292 Precession Amplifier Schematic (4) Other drawings, specifications, and schematics which detail certain components and materials. -46- A3.6.3 TECHNICAL MANUALS (T.0.'s) The below listed T.O.'s should be procured by the Buyer directly from the U.S. Government: T.O. Number Short Title (1) 21M-AIM-9J-2CL-1 Organization Maintenance Checklist for AIM-9J (2) 21M-AIM-9J-4 Illustrated Parts Breakdown for AIM-9J (3) 21M-AIM-9J-6 Inspection Requirements for AIM-9J (4) 11A15-1-157 Inspection and Storage for AIM-9B/E/J Explosive Components (5) 33D9-3-254-1 Maintenance and IPB for AN/ASM-447 A3.7 INDUSTRIAL ENGINEERING SERVICES Two copies of the following Industrial Engineering procedures will be furn- ished to the Buyer in the English language and the format selected by Seller: (1) Facilities Layout and Process Flow. (2) Test Sequence - Incoming/Outgoing Flow. (3) Assembly and disassembly instructions for all configurations. (4) Individual work-station layout. (5) List of all standard tools required to supplement special tools supplied and their usage. A3.8 TRAINING A3.8.1 GENERAL Seller will provide training at the Buyer's Depot in the use of AIM-9J Depot equipment and field test sets. A11 instruction material and instruc- tions will be in the English language. Therefore, all students must be fluent in both spoken and written English. FORD & -47- GERALD LIBRARY A3.8.2 DEPOT MODIFICATION TRAINING a. Training will be conducted by Seller technical personnel in two phases. The first phase will be general Sidewinder Guidance Section review; the second and major phase will be on-the-job training at the Test Stations with AIM-9J hardware. b. Semiformal classroom discussions will utilize simplified block diagrams, functional flow charts and descriptive diagrams prepared by Seller technical personnel. This information will be general in nature and 20 copies will be presented as permanent retention material in loose plastic-binder form. No more than 15 Buyer technical personnel should be present at this presentation. C. Overhaul and Test Station explanation and training utilizing actual AIM-9J hardware will be conducted on the test equipment. Seller's personnel will perform the first test and repair while explaining what and why, with user personnel observing. Buyer's personnel will then disassemble, assemble, perform tests, and install components with the Seller's instructor observing. d. Course objectives and outlines for the general theory and on-the- job training portions with time allocations and schedules will be presented to the user for review 30 days before equipment delivery. e. User test station operators and technical personnel should feel free to discuss problems with the instructors at any time after the par- ticular Test Station training has been completed. Such discussions must not conflict with the normal schedule published for the accomplishment of the training segment of the overhaul facility, but may occur during break periods and after the normal working day. f. The Depot training period will extend for eight weeks of normal eight-hour days and five-day weeks, after installation and final acceptance of the equipment has been accomplished. g. The maintenance and calibration training will be accomplished during the initial installation, check-out and calibration of the equip- ment. This phase will be accomplished with the maintenance and calibra- tion personnel prior to acceptance of the equipment. FORD & -48- GERALD A3.8.3 MODIFICATION KIT TRAINING a. Training will be conducted by Seller technical personnel in two phases. The first phase will be semiformal AIM-9J classroom instruction; the second phase will be on-the-job training utilizing Modification Kits and Depot Test Stations. b. The classroom instruction will stress AIM-9E/9J differences, modification processes, and Depot hardware flow. Modification procedures will be utilized with additional training aids demonstrated to enhance classroom instruction. A11 modification procedures will be provided for permanent retention at the Depot. C. On-the-job training will commence with instructor demonstrations on all aspects of GCU modification. Subsequently, students will be instructed and assisted during actual hardware modification. d. The students for the Modification Kit training must have previously received the Depot training described above for the instruction to be effective. e. The Modification Kit training will extend for 4 weeks of normal eight-hour days and five day weeks, commencing concurrent with the Depot training where practical. A3.8.4 FIELD TEST SET TRAINING Seller shall provide two courses of instruction, including instructional materials in the Theory of Operation, Operation of the Field Test Set, Testing AIM-9J GCU's, Maintenance, and Calibration of the AN/ASM-447 Field Test Set. The courses shall be as described below. A3.8.4.1 Course Number 1 will consist of eight hours of instruction in procedures covering the operation of the AN/ASM-447 Field Test Set and testing of AIM-9J GCU's. This course will be conducted twice, and will be limited to a maximum of fifteen students in each of the two classes offered. The students selected for this course must be proficient in oral and written English and have the ability to understand written procedures relating to the operation of electronic test equipment and be proficient in the use of hand tools. A3.8.4.2 Course Number 2 will consist of 120 hours of instruction in the Theory of Operation, AN/ASM-447 Field Test Set Operating Procedures, Calibration, Maintenance, and Testing of AIM-9J GCU's. This course will be conducted once and will be limited to a maximum of fifteen students who must be advanced electronics technicians proficient in oral and written English with a good understanding of electronic system theory and familiar with the maintenance and calibration of electronic test equipment. FORD 2 LIBRARY -49- GERALD A3.8.4.3 The training courses are based on a 40 hour week. Instruction, instructional material, reports, manuals, documentation or memoranda used or developed will be in the English language. A3.9 AIM-9J DEPOT TECHNICAL SERVICES A3.9.1 GENERAL Seller agrees to provide technical assistance and support to the Buyer's depot personnel for a period of twelve continuous months in accordance with the Performance and Delivery Schedule set forth on Page 4. The depot technical assistance will commence upon completion of depot training. A3.9.2 TECHNICAL ASSISTANCE AND SUPPORT SERVICES A3.9.2.1 Seller shall provide experienced personnel to assist the Buyer in AIM-9B/J depot operations including, but not limited to: (1) Modification of AIM-9B GCU's to the AIM-9J configuration. (2) Diagnostic techniques as applied to overhaul and repair of AIM-9J GCU's. (3) Diagnostic techniques as applied to overhaul and repair of AN/ASM-447 Field Test Sets. (4) Operation and maintenance of depot test equipment. (5) Continued training of Buyer's depot personnel. (6) Liaison with Seller's personnel in the United States with regard to modification, maintenance and repair matters. The technical assistance and support service including any reports, manuals, procedures, documentation or memoranda utilized in or arising from this effort will be in the English language. FORD & SCRALD -50- A3.9.2.2 Due to the highly specialized nature of the AIM-9 technology, personnel provided by the Seller will be experienced primarily in either GCU overhaul, repair and testing, or GCU modification. The technical assistance and support to be provided by Seller will be at a level deemed necessary to support the depot while operating at a modification rate of approximately 50 units per month. A3.9.2.3 For this assistance and support, two personnel will be provided by Seller as follows: (1) One man assigned primarily to support the modification process. (2) One man assigned to support overhaul repair and test operations. A3.9.2.4 Seller may, at Seller's discretion, but without affecting the quality or nature of the assistance and support provided, make changes in Seller's personnel from time to time. Buyer will be advised of any such changes in writing. FORD & 4811 GERALD -51- SUPPLEMENT TO ANNEX 3 DETAILED MODIFICATIONS TO DEPOT TEST STATIONS TO ADD AIM-9J CAPABILITY SA3.1 UTILITIES AND FACILITIES REQUIRED No additional utilities or facilities are required for the modification of the AIM-9E Depot facility to provide an AIM-9J capability. SA3.2 TEST EQUIPMENT MODIFICATION - AIM-9J GCU DEPOT FACILITY The following test positions will be modified by revising existing test equipment or providing new test equipment and fixtures to the extent described to provide an expansion of the AIM-9E/AIM-9B Depot Facility to incorporate the AIM-9J capability. SA3.2.1 MODIFIED TEST POSITIONS - SYSTEMS LEVEL SA3.2.1.1 TTL-251-1 (MODIFIED) AUTOMATIC SYSTEM TEST This modified automatic test position will provide a capability for acceptance testing of the AIM-9J G&C in accordance with the specification. The following equipments and fixtures will be modified or added to the test position for the AIM-9J capability. Elements of the test position requiring modification are: Description Part Number Rate Table Carriage TJ-5812 (modified) Servo Air Adapter TJ-5927 (new) Torque Transducer TJ-5924 (new) Test Fins TJ-5926 (new) Program Tapes New for AIM-9J SA3.2.1.2 TTL-251-2 (MODIFIED) MANUAL SYSTEM/SEEKER TEST This modified manually operated test position will be capable of performing trouble analysis on a split G&C (seeker electronics and servo) and of per- forming test, analysis, and mating of components at the seeker and elec- tronics level. After incorporation of the AIM-9J capability, the original test position will contain the following new or modified instrumentation and fixtures. FORD & -52- ERALD Elements requiring modification are: Description Part Number Rate Table Carriage TJ-5812 (modified) Test Fins TJ-5926 (new) Torque Transducer TJ-5924 (new) Servo Air Adapter TJ-5927 (new) Torque Transducer Holder TJ-5925 (new) SA3.2.1.3 TTL-251-3 (MODIFIED) SYSTEM BORESIGHT This modified test position will be capable of measuring the AIM-9J bore- sight error. After modification for the AIM-9J, the original test position will contain the following modified fixture. Elements requiring modification are: Description Part Number Boresight Fixture TJ-5150 (modified) SA3.2.1.4 TTL-251-4 (MODIFIED) SYSTEM AND ROCKER ARM CRYSTAL TEST This modified manually operated test position will be capable of performing in-process test for the rocker arm assembly of the AIM-9J. Description Part Number Rocker Arm Crystal Fixture TJ-5124 SA3.2.1.5 TTL-251-12 NAVIGATION CONSTANT TEST This modified test position will be capable of measurement and adjustment of AIM-9J navigation constant system balance and internal power capability. Description Part Number Test Fins TJ-5926 (new) Servo Air Adapter TJ-5927 (new) Torque Transducer TJ-5924 (new) Transducer Holder TJ-5925 (new) FORD & LIBRARY -53- BERALD SA3.2.1.6 TTL-251-7 MAGNETIC AMPLIFIER TEST This modified test position will be capable of testing the torque feedback circuit card of the AIM-9J servo. Elements of the test position requiring modification are: Description Part Number Test Fixture TJ-5930 (new) Test Adapter TE-6589 (new) Control Panel TE-6346 (modified) SA3.2.2 MODIFIED TEST POSITIONS - SERVO LEVEL SA3.2.2.1 TTL-251-9 SERVO PNEUMATIC TEST This modified test position will be capable of performing AIM-9J servo impedance, cylinder block, and pneumatic unbalance measurements. The elements of the test position to be added and/or modified are: Description Part Number Cylinder Block Test Fixture TJ-5601 (new) Servo Air Adapter TJ-5927 (new) SA3.2.2.2 TTL-251-10 MAGNETIC AMPLIFIER AND SERVO TEST This modified test position will be capable of performing test, adjustment and matching of the AIM-9J magnetic amplifier and servo. Elements of the test position to be added and/or modified are: Description Part Number Torque Transducer TJ-5924 (new) Transducer Holder TJ-5925 (new) Control Panel TE-6573 (modified) Cylinder Block Holder TJ-5929 (new) Resistor Selector TE-6574 (modified) Magnetic Amplifier Simulator TE-6590 (new) FORD & -54- SA3.2.2.3 TTL-251-11 PISTON CALIBRATION AND MATCHING TEST This modified test position will be capable of testing and adjusting the AIM-9J pistons and performing servo hysteresis measurements on the AIM-9J servo. Elements of the test position to be modified are: Description Part Number Torque Transducer TJ-5924 (new) Transducer Holder TJ-5925 (new) Power Supply (current) EM-633CM/9TE-0847 (additional) Servo Air Adapter TJ-5927 (new) Test Fins TJ-5926 (new) SA3.2.2.4 TTL-251-12 SERVO CONTINUITY TEST This modified test position will be capable of measuring continuity, resistance, and electrical leakage between available points of the AIM-9J servo. Elements of the test position to be added are: Description Part Number Adapters Cable new SA3.3 TEST EQUIPMENT SPARE PARTS - AIM-9J FACILITY The seller will furnish necessary spare parts to support the modification elements. SA3.4 INDUSTRIAL ENGINEERING SERVICES Industrial Engineering Services required to support the facility modifi- cation are included. SA3.5 DOCUMENTATION Documentation of modified or new elements provided as part of this supple- ment will be furnished to the buyer. FORD & LIBRARY -55- SERALD Philco-Ford Corporation PHILCO Ford Aeronutronic Division Newport Beach, Calif. . 92663 FORD LIBRARY & 1b NATIONAL SECURITY COUNCIL WASHINGTON, D.C. 20506 CONFIDENTIAL GDS MEMORANDUM FOR John A. Wickham, Jr. Major General, U.S. Army Military Assistant to the Secretary SUBJECT: add addinssess Department of Defense Decisions Regarding Supply of Military Equipment to Taiwan and Deactivation of of the 327th Air Division The Assistant to the President for National Security Affairs has approved the following request for transfer of major items of U.S. military equipment to the Republic of China: -- Three excess T-28C trainer aircraft (memorandum from the Deputy Secretary of Defense, dated March 7, -- Four excess S-2E anti-submarine warfare (ASW) aircraft (memorandum from the Deputy Secretary of Defense, dated April 1, 1975 -- Two ocean-going minesweepers (MSOs) (memorandum from the Deputy Secretary of Defense, dated February 21, 1975 (Tab-S). -- One thousand AIM-9J (sidewinder missile conversion kits (memorandum from George S. Springsteen, Executive Secretary, Department of State, dated November 7, 1974 (Tab D)). The Assistant to the President for National Security Affairs also has approved deactivation of the 327th Air Division and related support activities in Taipei Air Station with a small contingent of USAF air FOND S & CONFIDENTIAL GDS GERALD GG 4/20/01 CONFIDENTIAL 2 control personnel to be retained at the ROC air operations center. The ROC should be informed of this move in a low-key approach through military channels. Jeanne W. Davis Staff Secretary CONFIDENTIAL FORD LIBRARY & 07AA70 NATIONAL ARCHIVES AND RECORDS ADMINISTRATION Presidential Libraries Withdrawal Sheet WITHDRAWAL ID 012659 REASON FOR WITHDRAWAL National security restriction TYPE OF MATERIAL Memorandum CREATOR'S NAME John A. Froebe, Jr. RECEIVER'S NAME Brent Scowcroft TITLE Functions of the U.S. Air Force 327th Air Division on Taiwan CREATION DATE 02/19/1975 VOLUME 2 pages COLLECTION/SERIES/FOLDER ID 032400119 COLLECTION TITLE NATIONAL SECURITY ADVISER. PRESIDENTIAL COUNTRY FILES FOR EAST ASIA AND THE PACIFIC BOX NUMBER 5 FOLDER TITLE China, Republic of (7) DATE WITHDRAWN 04/26/2001 WITHDRAWING ARCHIVIST GG santized 4/16/02 MEMORANDUM 1068 NATIONAL SECURITY COUNCIL TOP SECRET/SENSITIVE XGDS (3) URGENT INFORMATION February 19, 1975 MEMORANDUM FOR: GENERAL SCOWCROFT FROM: JOHN A. FROEBE, JR. SUBJECT: Functions of the U.S. Air Force 327th Air Division on Taiwan You have asked what the functions of our 327th Air Division on Taiwan are. My understanding of its functions, based on my own experience during the late 1960s and early 1970s, as the Political-Military Affairs Officer first in Embassy Taipei and subsequently on the ROC Desk in State, are the following: - - To serve as the Air Force component contingency command subordinate to the Taiwan Defense Command, which is our principal contingency command on Taiwan and is a unified subcommand under CINCPAC. (The Army and Navy component contingency commands consist of only a handful of persons in each case, and thus are not comparable to the 327th in the ROC's eyes.) - - To help operate the U.S. -ROC joint Air Operations Center, located in Taipei, which supervises day-to-day air defense operations for Taiwan. -- To serve as a supervising administrative headquarters for our major Air Force operational units on Taiwan -- our two F-4 squadrons (one of which was removed last July) and formerly our C-130 wing. The 327th Air Division, with its headquarters in Taipei and which presently has about 400 personnel, also has a political significance, which gives it an importance beyond the strictly military functions which it performs. Its one-star commander is one of three general and flag officers who have been assigned to our units in Taiwan over the past 20 years. (The other two are the Vice Admiral who commands the Taiwan Defense Command and the two-star officer who heads MAAG.) DECLASSIFIED E.O. 12958 Sec. 3.6 TOP SEGRET/SENSITIVE XGDS (3) With PORTIONS EXEMPTED E.O. 12958 Sec. 1.5 (d) MR01-169 # At ltr 4/1/02 By dal NARA, Date 4/16/02 TOP SECRET/SENSITIVE 2 State and Defense now contend that the 327th Air Division has no significant functions beyond those related to support of the remaining F-4 squadron, and that the Division can easily and quickly be scaled down to a handful of men necessary for contingency planning functions. The Departments maintain that Ambassador Unger therefore should tack the 327th's removal onto the F-4 withdrawal package, and should inform Premier Chiang Ching-kuo of this at the same time he tells the Premier that we plan to put CCK on caretaker status as part of the F-4 removal. Premier Chiang knows very well the range of functions that the 327th Air Division performs. He will also remember that last April, when Ambassador McConaughy told him of our plan to remove the two F-4 squadrons the Ambassador also said that this was all that there would be to this tranche. Putting CCK Air Base on caretaker status is, nevertheless, a logical part of this package. The removal of the 327th Air Division is not, and would make us lose credibility with Premier Chiang and make him lose credibility with his military leadership and others. I believe that our recommendation of last December to Secretary Kissinger, which he approved, was correct: that we examine the 327th Air Division's possible removal as a part of the next tranche of reductions that would be made sometime in FY 76. TOP SEGRET/SENSITIVE Id NATIONAL ARCHIVES AND RECORDS ADMINISTRATION Presidential Libraries Withdrawal Sheet WITHDRAWAL ID 012660 REASON FOR WITHDRAWAL National security restriction TYPE OF MATERIAL Memorandum CREATOR'S NAME Henry A. Kissinger CREATOR'S TITLE Assistant to the President for National Security Affairs RECEIVER'S NAME The Deputy Secretary of Defense TITLE Changes in U.S. Force Deployments on Taiwan CREATION DATE 12/1974 VOLUME 1 page COLLECTION/SERIES/FOLDER ID 032400119 COLLECTION TITLE NATIONAL SECURITY ADVISER. PRESIDENTIAL COUNTRY FILES FOR EAST ASIA AND THE PACIFIC BOX NUMBER 5 FOLDER TITLE China, Republic of (7) DATE WITHDRAWN 04/26/2001 WITHDRAWING ARCHIVIST GG phoitized 4/16/02 / d THE WHITE HOUSE WASHINGTON SEGRET/SENSITIVE (XGDS)(3) MEMORANDUM FOR THE DEPUTY SECRETARY OF DEFENSE SUBJECT: Changes in U.S. Force Deployments on Taiwan I have reviewed your memorandum of December 9, 1974, concerning overseas base realignments. As regards U.S. force deployments on Taiwan, it has been decided that: -- Ching Chuang Kang Air Base should be placed in caretaker status after the U.S. Air Force F-4 squadron now stationed there has been withdrawn. -- Headquarters 327th Air Division should not be deactivated. The Thailand portion of your memorandum has been dealt with in NSDM 286. Henry A. Kissinger Cc: Dup Are of state DECLASSIFIED . E.O. 12958 Sec. 3.6 With PORTIONS EXEMPTED E.O. 12958 Sec. 1.5 (d) MR 01-169, # 5; st. ltr 4/1/02 SEGRET/SENSITIVE (XGDS)(3) By dal NARA, Date 4/16/02 19 DOC RECD NBR INITIAL ACTION O SC CORRESPONDENCE PROFILE MO DA MO DA HR 4 / 4 3 10 7502041 CLEMENTS, W REFERENCE: CIRCLE AS APPROPRIATE TO: PRES FROM: KISSINGER, H S/S UNCLAS LOG IN/OUT x KISSINGER COLBY, W 910 SOURCÉYCLASS/DESCRIPTION OTHER LOU NO FORN NODIS SCOWCROFT SCHLESINGER, J EYES ONLY EXDIS DAVIS ST EX SEC S CODEWORD SUBJECT: DOP Request for Transfer Excess TS SKE Anti Sub SENSITIVE Wayfare alacraft to Rep of Phina INTERNAL ROUTING AND DISTRIBUTION REC ACTION REQUIRED ACTION INFO CY ADVANCE CYS TO HAK/SCOWCROFT FOR MEMO FOR HAK ( ) STAFF SECRETARY MEMO FOR PRES ( ) FAR EAST Swake Taylor x X REPLY FOR 1 ) APPROPRIATE ACTION ( ) DISTRIBUTION/INITIAL ACTION ASGMT SUB UARAN Barnes MID EAST / NO. AFRICA / so. ASIA EUROPE / CANADA X x MEM Eourroft TO Clemes x ( ) RECOMMENDATIONS ( ) LATIN AMERICA JOINT MEMO - ) UNITED NATIONS REFER TO FOR: ( ) ECONOMIC ANY ACTION NECESSARY? ( ) SCIENTIFIC CONCURRENCE ( ) PROGRAM ANALYSIS DUE DATE: 4/9 NSC PLANNING COMMENTS: (INCLUDING SPECIAL INSTRUCTIONS) CONGRESSIONAL OCEANS POLICY INTEL LICENSE Index X Smper X nsom 2/2 DATE FROM TO S SUBSEQUENT ACTION REQUIRED (OR TAKEN): CY TO 8/25 8/25 Junel by 7505348 Junel by 7501134 SUBSEQUENT ROUTING/ACTIONS 8/25 8/25 Jane by 7501068 750 1457 $/25 Receive Zeg (9-2) BERALD A FORD Hak 10/16 /s NSC/5 HAK apprived recom 10/16 Bames S Momo, Smith Wrokham (10/18) 10/17 Dairs S Sgn memo to Wickham Springsteen 10/17 C Sp Davis sgd nemoto Wickham Spingsteen DISPATCH CY RQMTS: SEE ABOVE PLUS: MICROFILM & FILE ROMTS: NSC/S DISP INSTR NOTIFY & DATE BY OCT/21 1975 BY OAB SPECIAL DISPOSITION: CROSS REF W/ 750 3348, 7501134, 7501457, 7501068 OPEN CRT ID: 6AB SA SF HP NS SUSPENSE CY ATTACHED: That FOLDER: CLOSE if WH EP DY delete 10/18/25 (NBC-74-21)