Extracted text

OCR Page 1 of 4
NAVAL MESSAGE NAVY DEPART ENT DRAFTER EXTENSION NUMBER ADDRESSEES PRECEDENCE ASTERISK (*) MAILGRAM ADDRESSEE 1 FROM EDWIN A LOCKE, JR. 2 PRIORITY P 3 RELEASED BY Wrock , J. MR. A. T. KEARNEY 4 ROUTINE AMERICAN PRODUCTION MISSION 5 DATE 7 JUNE 1945 FOR CHUNGKING, CHINA DEFERRED 6 7 TOR CODEROOM 8 Rdo Chunking 9 BY PRIORITY DECODED 10 S. 11 TYPED ROUTINE BY 12 SERVICE" DEFERRED 13 14 15 WISE INDICATED THIS DISPATCH WILL BE JRANSMITTED WITH DEFERRED PRECEDENCE ANJ AS ADMINISTRATIVE. 422 IF OPERATIONAL 16 2J CHECK BELOW 17 18 DATE 7 JUNE 1945 3 19 ORIGINATOR FILL IN DATE AND TIME: TIME 02100 GCT 20 Pasa action to mr. A. T. ABOUT Rearney ONE INCH CLEAR SPACE american BEFORE BEGINNING TEXT ON OUTGOING DISPATCHES PLEASE LEAVE ACTION 21 Production mission Chunking from Edwins A LOCKE 22 23 DEPARTURE OF BOSCH AND JAKE UNAVOIDABLY DELAYED FOR FEW DAYS BY F-01 24 F-02 25 INNOCULATION REQUIREMENT ON BOSCH. HOWEVER, THEY ARE NOW DEFINITELY 26 F-05 27 SCHEDULED TO LEAVE TOGETHER ON JUNE TWELFTH WITH NUMBER ONE PRIORITIES. F-07 28 29 THIS MAY NOT GET THEM TO CHUNGKING UNTIL THREE OR FOUR DAYS BEYOND MY F-1 30 F-2 31 COMMITMENT TO YOU OF JUNE FIFTEENTH. I SINCERELY HOPE AND REQUEST THAT 32 F-20 33 YOU AND PENN WILL BE GOOD ENOUGH TO REMAIN IN CHUNGKING TO MEET THEM, 34 F-3 35 BUT IF YOU. SIMPLY CANNOT SEE YOUR WAY CLEAR TO DOING THIS, PLEASE CABLE F-30 36 F-31 37 ME IMMEDIATELY SO THAT, IF NECESSARY, ARRANGEMENTS CAN BE MADE FOR YOU ALL 38 F-32 39 TO MEET ENROUTE. F-33 40 41 w/u F-34 DECLASSIFIED by authority of 42 273 TONAR 11.5.72 F-4 43 DEPT. or COMMEREE Cesing 44 name from NL 70 state michael HLT 4-12-73 CCM-26- SOI 45 FX30 46 biti: $BR Date 5/21/14 47 admin RM FX37 48 FX40 49 R8 50 IG-oo 51 52 VCNO SECRIT Make original only. Deliver to Code Room Watch Officer in person. (See Art. 76 (4) NAVREGS.) OPNAV 19-67