Ask the Scholar

Page 1 of 2
I can add historical knowledge about this page.

Page image

Page 1

OCR

JLVIV THE WHITE HOUSE WASHINGTON February 3, 1983 NATIONAL SECURITY DECISION DIRECTIVE NUMBER 80 INCLASSIFIED SHUTTLE ORBITER PRODUCTION CAPABILITY The Senior Interagency Group (SIG) for Space, established to implement my National Space Policy, has examined the issue of whether Shuttle Orbiter production capability should continue beyond the four Orbiters currently scheduled for delivery. After reviewing various options presented by the SIG (Space) I have decided that maintaining Orbiter production capability is in the best interests of the Nation. This objective will be achieved through the production of structural and component spares necessary to insure that the Nation can operate the four Orbiter fleet in a robust manner. These spares will provide the necessary assurance that Shuttle operations will continue in the face of minor problems, modifications or other periods of extended Orbiter outages. While this decision does not constitute approval for procurement of a fifth Orbiter in FY 1984, it does partially preserve this option for a future decision should optimistic estimates of demand materialize and other conditions dictate. It is my intent that the full potential of the Shuttle concept as originally envisioned is achieved and commercialization of space becomes a reality. The National Aeronautics and Space Administration is directed to submit to the Office of Management and Budget for inclusion in the Fiscal Year 1984 Budget a request for procurement of structural and component spares that will carry out this decision. Declassified/ Released on 10/23/98 Ramed over Reagan by L. Salvetti, National Security Council under provisions of E.O. 12958 F98-515 cy t 11 copies FOR OFFICIAL USE ONLY UNCLASSIFIET

Page data

Page
1
Source index
0
Type
photo
Media ID
e4c0d7e577708d7b
Size
unknown

Document data

ID
6879679
Core
doc
Type
document
DTO data
{
    "id": "6879679",
    "sourceUrl": "https://catalog.archives.gov/id/6879679",
    "contentType": "document",
    "title": "NSDD 80 Shuttle Orbiter Production Capability",
    "citationUrl": "https://catalog.archives.gov/id/6879679",
    "collections": [
        "Numbered National Security Policy Papers",
        "National Security Decision Directives (NSDDs)"
    ],
    "iiifBase": "https://s3.amazonaws.com/NARAprodstorage/opastorage/live/79/8796/6879679/content/arcmedia/presidential-libraries/reagan/nsdd/NSDD80.jpg",
    "thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/opastorage/live/79/8796/6879679/content/arcmedia/presidential-libraries/reagan/nsdd/NSDD80.jpg",
    "largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/opastorage/live/79/8796/6879679/content/arcmedia/presidential-libraries/reagan/nsdd/NSDD80.jpg",
    "imageCount": 2,
    "hasImages": true,
    "source": "import",
    "hasTranscription": false
}

Context sent to Scholar

Document identity
{
    "localId": "6879679",
    "label": "NSDD 80 Shuttle Orbiter Production Capability",
    "core": "doc",
    "dtoType": "document",
    "citationUrl": "https://catalog.archives.gov/id/6879679"
}
Document source metadata
{
    "id": "6879679",
    "sourceUrl": "https://catalog.archives.gov/id/6879679",
    "contentType": "document",
    "title": "NSDD 80 Shuttle Orbiter Production Capability",
    "citationUrl": "https://catalog.archives.gov/id/6879679",
    "collections": [
        "Numbered National Security Policy Papers",
        "National Security Decision Directives (NSDDs)"
    ],
    "iiifBase": "https://s3.amazonaws.com/NARAprodstorage/opastorage/live/79/8796/6879679/content/arcmedia/presidential-libraries/reagan/nsdd/NSDD80.jpg",
    "thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/opastorage/live/79/8796/6879679/content/arcmedia/presidential-libraries/reagan/nsdd/NSDD80.jpg",
    "largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/opastorage/live/79/8796/6879679/content/arcmedia/presidential-libraries/reagan/nsdd/NSDD80.jpg",
    "imageCount": 2,
    "hasImages": true,
    "source": "import",
    "hasTranscription": false
}
Document source extras
{
    "url": "https://catalog.archives.gov/id/6879679",
    "naId": 6879679,
    "levelOfDescription": "item",
    "productionDates": [
        {
            "day": 3,
            "logicalDate": "1983-02-03",
            "month": 2,
            "year": 1983
        }
    ],
    "recordType": "description",
    "ocrSource": "nara-archive"
}
Page context
{
    "seq": 1,
    "pageIndex": 0,
    "type": "photo",
    "url": "https://s3.amazonaws.com/NARAprodstorage/opastorage/live/79/8796/6879679/content/arcmedia/presidential-libraries/reagan/nsdd/NSDD80.jpg",
    "mediaId": "e4c0d7e577708d7b",
    "ocrText": "JLVIV\nTHE WHITE HOUSE\nWASHINGTON\nFebruary 3, 1983\nNATIONAL SECURITY DECISION\nDIRECTIVE NUMBER 80\nINCLASSIFIED\nSHUTTLE ORBITER PRODUCTION CAPABILITY\nThe Senior Interagency Group (SIG) for Space, established to\nimplement my National Space Policy, has examined the issue of\nwhether Shuttle Orbiter production capability should continue\nbeyond the four Orbiters currently scheduled for delivery.\nAfter reviewing various options presented by the SIG (Space)\nI have decided that maintaining Orbiter production capability\nis in the best interests of the Nation. This objective will\nbe achieved through the production of structural and component\nspares necessary to insure that the Nation can operate the\nfour Orbiter fleet in a robust manner. These spares will\nprovide the necessary assurance that Shuttle operations will\ncontinue in the face of minor problems, modifications or other\nperiods of extended Orbiter outages.\nWhile this decision does not constitute approval for procurement\nof a fifth Orbiter in FY 1984, it does partially preserve this\noption for a future decision should optimistic estimates of\ndemand materialize and other conditions dictate. It is my\nintent that the full potential of the Shuttle concept as originally\nenvisioned is achieved and commercialization of space becomes\na reality.\nThe National Aeronautics and Space Administration is directed\nto submit to the Office of Management and Budget for inclusion\nin the Fiscal Year 1984 Budget a request for procurement of\nstructural and component spares that will carry out this decision.\nDeclassified/ Released on 10/23/98\nRamed over Reagan\nby L. Salvetti, National Security Council\nunder provisions of E.O. 12958\nF98-515\ncy t 11 copies\nFOR OFFICIAL USE ONLY\nUNCLASSIFIET"
}