Images (2)
Document
| id |
id
75718507
|
|---|---|
| contentType |
contentType
document
|
| source |
source
import
|
Source image fields (6)
Extracted text
OCR Page 1 of 2R. L. M. C. INTERIOR MEMORANDUM
Date 1/26/21
For Attention of
Mr. Roeder
your
Answering Memo. of
STATE FACTORY INSPECTOR'S VISIT
This morning we received a visit from the
State Tactory Inspector entirely without warning.
The Inspector has not be en her e in considerably
over a year and maie a very thorough examination
of entire premises.
He made one recommendation, that the belts
in our t wo drill presses should be completely
enclosed with mesh wire, which was part of the
MAT
installation work of th ese machines which we ha d
not as yet completed but which would have been done
in another week's time anyway.
Othe r than this, he had no comments to make
but stated that in every single respect we had the
finést factory that he had inspected in his part
of Jersgy, and stated that he was extremely wéll
pleased in everything he had seen.
This information is no doubt of interest to
you, since it had been the object of this plant
to be in': BO condition to cause such comment
Yours very
by-
Pr causily oduc tion Manager
WHD/W
the
your
Relations
belongs_to
belongs_to