Ask the Scholar
Page 537 of 2087
I can add historical knowledge about this page.
Page image
OCR
(2) 7687x1
roadbed-ecarryall equipment making fille-AV cleared roadbed section
surveyor checks bed grads as leveicr works,bg--Overhead hs deep eut
thru ridges to eliminate steep grades, showing rail team at worken
men lay rails--pushing rail car loaded with ties--men carry rail bles
on shoulders to end of construction--men drop tées in
rails into same passing over unspiked using
tongs to slice reils into position--rail and tongs--rail sections being
bolted together--enginear checks rial tie width(one
crews at work "nailing doun the rails" waral worker drive in
rail workors wearing bandana works in rapid notionesspike into clew
spiking rail,pan to same--pan workeze complete rail section
over trestle=srunning shot across finished with procmatic
hammers packing the roadbod between the tiesemmen at work with hammers
workers--hands holding air crev at work
jacking up rails to level position--AV two spans bridge section across
one of the tributary rivers of the Magdelena--workers riding on rail
flat cars over section of completed Atlantic Railroad
BOGOTA, COLOMB IA RAILROAD CONSTRUCTION. MONTAGE(
constructi on) -
Page data
- Page
- 537
- Source index
- 0
- Type
- photo
- Media ID
- c3c2655f61b8ec2a
- Size
- unknown
Document data
- ID
- 75442328
- Core
- doc
- Type
- document
DTO data
{
"id": "75442328",
"sourceUrl": "https://catalog.archives.gov/id/75442328",
"contentType": "document",
"title": "Conveyances: Railroad Stations, U.S. - Railroad Trains, Wrecks",
"citationUrl": "https://catalog.archives.gov/id/75442328",
"collections": [
"MCA/Universal Pictures Collection",
"Universal Newsreels' Subject Card Catalog"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-CONVEYANCES/Universal-M1516-Conveyances-Roll-133/M1516-133-0001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-CONVEYANCES/Universal-M1516-Conveyances-Roll-133/M1516-133-0001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-CONVEYANCES/Universal-M1516-Conveyances-Roll-133/M1516-133-0001.jpg",
"imageCount": 2087,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Context sent to Scholar
Document identity
{
"localId": "75442328",
"label": "Conveyances: Railroad Stations, U.S. - Railroad Trains, Wrecks",
"core": "doc",
"dtoType": "document",
"citationUrl": "https://catalog.archives.gov/id/75442328"
}
Document source metadata
{
"id": "75442328",
"sourceUrl": "https://catalog.archives.gov/id/75442328",
"contentType": "document",
"title": "Conveyances: Railroad Stations, U.S. - Railroad Trains, Wrecks",
"citationUrl": "https://catalog.archives.gov/id/75442328",
"collections": [
"MCA/Universal Pictures Collection",
"Universal Newsreels' Subject Card Catalog"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-CONVEYANCES/Universal-M1516-Conveyances-Roll-133/M1516-133-0001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-CONVEYANCES/Universal-M1516-Conveyances-Roll-133/M1516-133-0001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-CONVEYANCES/Universal-M1516-Conveyances-Roll-133/M1516-133-0001.jpg",
"imageCount": 2087,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Document source extras
{
"url": "https://catalog.archives.gov/id/75442328",
"naId": 75442328,
"levelOfDescription": "fileUnit",
"recordType": "description",
"ocrSource": "nara-archive"
}
Page context
{
"seq": 537,
"pageIndex": 0,
"type": "photo",
"url": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-CONVEYANCES/Universal-M1516-Conveyances-Roll-133/M1516-133-0548.jpg",
"mediaId": "c3c2655f61b8ec2a",
"ocrText": "(2) 7687x1\nroadbed-ecarryall equipment making fille-AV cleared roadbed section\nsurveyor checks bed grads as leveicr works,bg--Overhead hs deep eut\nthru ridges to eliminate steep grades, showing rail team at worken\nmen lay rails--pushing rail car loaded with ties--men carry rail bles\non shoulders to end of construction--men drop tées in\nrails into same passing over unspiked using\ntongs to slice reils into position--rail and tongs--rail sections being\nbolted together--enginear checks rial tie width(one\ncrews at work \"nailing doun the rails\" waral worker drive in\nrail workors wearing bandana works in rapid notionesspike into clew\nspiking rail,pan to same--pan workeze complete rail section\nover trestle=srunning shot across finished with procmatic\nhammers packing the roadbod between the tiesemmen at work with hammers\nworkers--hands holding air crev at work\njacking up rails to level position--AV two spans bridge section across\none of the tributary rivers of the Magdelena--workers riding on rail\nflat cars over section of completed Atlantic Railroad\nBOGOTA, COLOMB IA RAILROAD CONSTRUCTION. MONTAGE(\nconstructi on) -"
}