Extracted text

OCR Page 1 of 2
Bureau of Ships: Reports 2/1/42 T THE WHITE HOUSE WASHINGTON February 26, 1942. MEMORANDUM FOR THE PRESIDENT The attached report of progress, as of February 1, 1942, on Patrol Craft under construction for the Navy is forwarded for the information of the President. Very respectfully, John his and JOHN L. McCREA RESTRICTED REPRODUCTION OF THIS MATERIAL IN ANY FORM IS NOT AUTHORIZED EXCEPT BY SPECIFIC APPROVAL OF THE SECRETARY OF THE NAVY. MONTHLY PROGRESS REPORT COMBATANT VESSELS UNDER CONSTRUCTION Distribution: The President The Secretary of the Navy The Under Secretary of the Navy The Assistant Secretary of the Navy The Chief of Naval Operations The Naval Aide to the President The Chief of the Bureau of Ships Senator David I. Walsh Congressman Carl Vinson Congressman William S. Jacobson Congressman George J. Bates Franklin D. Roosevelt Library DECLASSIFIED DOD DIR. 5200.9 (9/27/58) Date- 3-11-59 Signature= Carl L. Specer AMOTHIOTED Reproduction of this material in any KATT DEPARTMENT form is not authorized except by BURRAU OF SHIPS specific approval of the Secretary WASHINGTON, D.C. of the Navy N.B.S.(745) COMBATANT VESSELS UNDER CONSTRUCTION, UNITED STATES KAVI - REPORT OF PROGRESS AS OF FEBRUARY 1, 1942. 3-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction BATTLESHIPS BB57 SOUTH DAKOTA N.Y. S.B. Corp. 90.8 5.1 5/39 7/41 32-5/6 4/15/43 6/ 1/42 4/ 1/42 2+ BB58 INDIANA N.N. S.B. & D.D. Co. 78.4 6.3 11/20/39 11/21/41 31 4/15/43 10/20/42 6/18/42 4+ BB59 MASSACHUSETTS Beth. Fore River 57.6 4.2 7/20/39 9/23/41 33-5/6 7/15/43 11/ 1/42 5/16/42 5-1/2+ BB60 ALABAMA Norfolk 67.0 4.7 2/ 1/40 34 8/ 1/43 10/ 1/43 12/ 1/42 10+ BB61 IOWA New York 40.8 2.6 6/27/40 33 8/ 1/43 11/ 1/43 4/ 1/43 7+ BB62 NEW JERSEY Philadelphia 29.3 1,6 9/16/40 33-1/2 5/ 1/44 1/44 7/ 1/43 10+ BB63 MISSOURI New York 13.0 0.7 1/ 6/41 45-5/6 6/12/44 11/ 1/44 11/ 1/44 o BB64 WISCONSIN Philadelphia 7.5 0.5 1/25/41 43-1/5 6/12/45 6/12/45 9/ 1/44 9-1/3+ BB65 ILLINOIS Philadelphia 34 5/ 1/46 5/ 1/46 10/ 1/45 7+ BB66 KENTUCKY Norfolk 2.1 0.4 32-1/2 5/ 1/45 5/ 1/45 12/ 1/4 5+ BB67 MONTANA Philadelphia 48 1/ 1/46 1/ 1/46 11/ 1/46 10- BB68 CHIO Philadelphia 48 11/ 1/46 11/ 1/46 5/ 1/47 6- BB69 MAINE New York 38 11/ 1/45 11/ 1/45 2/ 1/46 1 BB70 NEW HAMPSHIRE New York 43 1/46 5/ 1/46 10/ 1/46 & BB71 LOUISIANA Norfolk 42 11/ 1/46 5/ 1/46 12/ 1/45 5+ AIRCRAFT CARRIERS cv9 ESSEX N.N. S.B. & D.D. Co. 19.0 3.8 4/28/41 20 4/15/44 1/15/44 12/31/42 12-1/2+ CV10 BON HOMME RICHARD N.N. S.B. & D.D. Co. 13.2 3.2 12/ 1/41 15 9/15/44 4/15/44 2/28/43 13-1/2+ CV11 INTREPID N.N. S.B. & D.D. Co. 7.2 1,8 12/ 1/41 17 2/15/45 7/15/44 4/30/43 14-1/2+ CV12 KEARSARGE N.N. S.B. & D.D. Co. 3.2 0.6 18-1/2 7/15/45 10/15/44 9/30/43 12-1/2+ CV13 FRANKLIN N.N. S.B. & D.D. Co. 1.2 0.2 17-3/5 12/15/45 6/ 1/45 12/31/43 17+ CV14 HANCOCK N.N. S.B. & D.D. Co. 1.2 0.2 16-1/2 4/15/46 9/ 1/45 2/28/44 18+ CV15 RANDOLPH N.N. S.B. & D.D. Co. 1,2 0,2 17-1/4 8/15/46 12/ 1/45 4/30/44 19+ CV16 CABOT Beth. Fore River 14.2 2.8 7/15/41 18-1/2 5/15/44 2/15/44 1/31/43 12-1/2+ CV17 BUNKER HILL Beth. Fore River 12.1 3.0 9/15/41 18-1/2 8/15/44 6/15/44 3/31/43 14-1/2+ CV18 CRISKANY Beth. Fore River 1.3 0.0 20 2/15/46 11/ 1/45 11/30/43 23+ CV19 TICONDEROGA Beth. Fore River 1.3 0,0 21-1/2 4/15/46 12/31/45 5/31/44 19+ CV20 New York 29 12/ 1/44 3/ 1/45 3- CV21 N.N. S.B. & D.D. Co. 16-1/2 6/ 1/45# 6/30/44 11+ CV22 AMSTERDAM (c) N.Y. S.B. Corp. 46.3 6.8 1/41 19 11/16/43 1/43 12/1/42 3+ CV23 TALLAHASSEE(, N.Y. S.B. Corp. 36.2 5.1 6/ 2/41 20 3/16/44 6/ 1/43 2/ 1/43 4+ CV24 NEW HAVEN (f) N.Y. S.B. Corp. 20.6 4.0 5/11/41 19-2/3 5/15/44 8/ 1/43 4/ 1/43 4+ (e) Former CL59. (e) Forner CL61. (f) Former CL76. + Ahead of contract completion date. (+) Date reported 1/ 1/42, vessels awarded subsequent to 11/ 1/41. - Behind contract completion date. RESERICTED N.B.S.(745) Page 2 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per An Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Latd Launched Completion Order 11-1-'11 Yard Prediction LARGE CRUISERS CB1 ALASKA N.Y. S.B. Corp. 3.7 1.8 12/17/41 30-1/2 4/ 1/45 1/ 1/45 7/ 1/44 6+ CB2 GUAM N.Y. S.B. Corp. 2.7 1.6 2/ 2/42 31 8/ 1/45 31 1/45 9/ 1/44 6+ CB3 HAWAII N.Y. S.B. Corp. 0.8 0.3 31 12/ 1/45 5/ 1/45 11/ 1/44 6+ CB4 PHILIPPINES N.Y. S.B. Corp. 0.8 0.3 30 4/ 1/46 7/ 1/45 17 1/45 6+ CB5 PUERTO RICO N.Y. S.B. Corp. 0.6 0,2 30-1/2 8/ 1/46 9/ 1/45 3/ 1/45 6+ CB6 SAMOA N.Y. S.B. Corp. 0.6 0.2 29-1/2 12/ 1/46 11/ 1/45 5/ 1/45 6+ HEAVY CRUISERS CA68 BALTIMORE Beth. Fore River 27.2 7.4 5/26/41 21-1/6 6/14/43 4/ 1/43 36 1/43 1+ CA69 BOSTON Beth. Fore River 24.8 5.9 6/30/41 21-1/2 8/14/43 6/ 1/43 4/15/43 1-1/2+ CA70 PITTSBURGH Beth. Fore River 18.9 4.0 3/41 22 12/14/43 8/15/43 7/ 1/43 1-1/2+ CA71 ST. PAUL Beth. Fore River 17.5 3.5 10/ 9/41 26-1/5 4/14/44 12/15/43 12/15/43 0 CA72 ALBANY Beth. Fore River 3.0 0.4 23 7/14/45 12/ 1/44 9/ 1/44 3+ CA73 ROCHESTER Beth. Fore River 2.9 0.3 22-1/2 8/14/45 1/15/45 10/ 1/44 3-1/2+ CA74 COLUMBUS Beth. Fore River 2.9 0.3 21 9/14/45 3/ 1/45 12/15/44 2-1/2+ CA75 DES MOINES Beth. Fore River 2.9 0.3 21 10/14/45 5/ 1/45 2/15/45 2-1/2+ LIGHT CRUISERS (6000 ton) 0152 JUNEAU Fed. S.B. & D.D. Co. 98.6 2.9 5/27/40 10/25/41 21 6/25/42 3/ 3/42 2/11/42 3/4+ 0153 SAN DIEGO Beth. Fore River Delivered and pla saion 10 January 1942. 0154 SAN JUAN Beth. Fore River 94.7 3.5 5/15/40 9/ 6/41 21-2/5 9. 25/42 4/ 1/42 2/28/42 1+ 0195 OAKLAND Beth. San Francisco 11.0 2.4 7/15/41 21-1/2 9/43 5/ 1/43 5/ 1/43 o CL96 RENO Beth. San Francisco 9.4 2.1 8/ 1/41 23 8/ 9/43 7/ 1/43 7/ 1/43 o CL97 SPOKANE Beth. San Francisco 3.1 0,6 21-1/2 10/ 9/44 8/ 1/44 8/ 1/44 o 0198 TUCSON Beth. San Francisco 3.0 0.6 22 12/ 9/44 10/ 1/44 10/ 1/44 o + Ahead of contract completion date. ANOTHIOTED N.B.S.(745) Page 3 As of February 1, 1942. 3-2 Percentage Date of Completion of Completion Months Feb.1 Gain for No. of Mos. As per A.s. Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction LIGHT CRUISERS (10,000 ton) CL55 CLEVELAND N.Y. S.B. Corp. 71.5 4.5 1/40 11/ 1/41 24 3/23/43 1/42 1/42 o 0156 COLUMBIA N.Y. S.B. Corp. 67.9 4.5 8/19/40 12/17/41 21-5/6 6/23/43 1/42 8/15/42 1/2+ 0L57 MONTPELIER N.Y. S.B. Corp. 57.4 3.3 12/ 2/40 22 6/27/43 11/ 1/42 10/ 1/42 1+ 0L58 DENVER N.Y. S.B. Corp. 52.7 2.7 12/26/40 22-2/3 9/27/43 12/30/43 11/15/42 13-1/2+ CL60 SANTA FE N.Y. S.B. Corp. 39.1 5.5 6/ 7/41 19 1/16/44 4/15/43 1/10/43 3-1/6+ 0L62 BIRMINGHAM N.S. S.B. & D.D. Co. 49.2 5.9 2/17/41 20 3/ 3/43 3/ 3/43 11/20/42 3-1/2+ 0L63 MOBILE N.N. S.B. & D.D. Co. 38.3 6.1 4/14/41 22-1/6 6/ 3/43 6/ 3/43 2/19/43 3-1/2+ 0L64 FLINT Beth. Fore River 12.4 1.9 9/23/41 26-1/4 12/ 1/43 10/15/43 12/ 1/43 1-1/2- CL65 PASADENA Beth. Fore River 10.6 0.9 20-1/2 6/ 1/44 4/15/44 6/ 1/44 1-1/2- CL66 SPRINGFIELD Beth. Fore River 9.9 0.9 22 9/ 1/44 8/15/44 9/ 1/44 1/2- CL67 TOPEKA Beth. Fore River 9.7 0.8 21-1/2 11/ 1/44 10/15/44 11/ 1/44 1/2- 0177 HUNTINGTON N.T. S.B. Corp. 16.5 3.1 11/17/41 31 7/ 1/45 10/ 1/43 6/20/43 3-1/3+ 0L78 DATTON N.Y. S.B. Corp. 11.4 3.2 12/29/41 19-2/3 9/ 1/45 12/31/43 8/20/43 4-1/3+ CL79 WILMINGTON N.Y. S.B. Corp. 8.2 1.3 19-1/6 11/ 1/45 3/ 1/44 7/20/44 4-2/3- CLSO BILOXI N.N. S.B. & D. D. Co. 27.3 5.8 7/ 9/41 22-2/5 11/ 9/43 9/ 3/43 5/21/43 3-1/30 CL81 VICKSBURG N.N. S.B. & D. D. Co. 19.4 4.3 8/ 4/41 24-1/2 3/ 9/44 2/ 1/44 8/20/43 5-1/3+ CL82 PROVIDENCE Beth. Fore River 2.4 0,0 21 12/ 9/45 11 1/45 3/15/45 3-1/2+ CL83 MANCHESTER Beth. Fore River 2.4 0.0 21-1/2 2/ 9/46 9/ 1/45 10/ 1/45 1- CL85 FARGO (1) N.Y. S.B. Corp. 7.3 0.0 18-1/3 12/ 9/43 10/20/43 1-2/3+ CL86 CHEYENNE (c) N.N. S.B. & D. D. Co. 5.4* 0.0 20-1/3 71 8/44 12/30/43 6-1/3+ CL87 DULUTH (e) N.N. 8. 3. & D.D. Co. 5.4x 0.0 21 12/30/44 2/29/44 10+ CL89 MIAMI Cramp S.B. Co. 25.5 8.7 8/ 2/41 24 1/ 1/44 11/ 1/43 8/ 1/43 3+ CL90 WILKES-BARRE Cramp S.B. Co. 20.1 8.4 9/ 6/41 23-5/6 71 1/44 3/20/44 1/43 6-2/3+ CL91 OKLAHOMA CITY Cramp S.B. Co. 8.1 3.6 24 1/ 1/45 8/15/44 11/ 1/44 2-1/2- CL92 LITTLE ROCK Cramp S.B. Co. 7.0 3.2 23 5/ 1/45 1/ 7/45 12/ 1/44 1-1/4+ CL93 GALVESTON Cramp S. B. Co. 5.8 2.1 23 9/ 1/45 6/ 8/45 1/ 1/46 6-3/4- CL94 YOUNGSTOWN Cramp S.B. Co. 5.8 2.1 23 12/31/45 10/ 1/45 2/ 1/46 f CL99 BUFFALO N.Y.S.B. Corp. 5.2 1.1 19-1/3 12/30/45 10/15/44 9/10/44 1-1/6+ CL100 NEWARK N.Y.S.B. Corp. 5.1 1.2 18-5/6 3/ 1/46 12/ 1/44 11/10/44 2/3+ CL101 N.N.S.B. & D.D. Co. 20-2/5 + 3/ 1/44 4/30/44 2- CL102 N.N.S.B. & D.D. Co. 19-3/5 + 6/ 1/44 7/31/44 2- + Ahead of contract completion date. - Behind contract completion date. Cruisers CL84 and 0188 cancelled 16 December 1940. Percentage as of January 1941 for Federal 5.3. & D.D. Co. "0159 converted to OV22.* *0161 converted to CV23." None reported for N.T. S.3. Corp. + Date reported 1/ 1/42, vessels awarded subsequent to 11/ 1/41. (e) Construction changed from Fed. 5.3. & D.D. Co. to Newport News 5.3. & D.D. Co. *Percentage as of 1 January 1942 for Fed. 5.3. & D.D. Co. (1) Construction changed from Fed. 5.3. & D.D. Do. to New York 5.3. Corp. None reported by I.V. S.D. & D.D. Co. 4 Contract not yet prepared. *Materials and equipment ordered prior to March 20, 1941 with Priority A-1-0 assigned will hold that rating. RESTRICTED N.B.S.(745) Page it As of February 1, 1942 B-? Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction DESTROTERS (1620 and 1630 ton) DD456 RODMAN Fed. S.B. & D.D. Co. Delivered 26 January 1942. Placed in commission 27 January 1942. DD458 MACOMB Bath Iron Wks. Delivered and placed in commission 26 January 1942. DD459 LAFFEY Beth. San Francisco 86.0 5.0 1/13/41 10/30/41 14-3/5 3/ 1/42 4/ 1/42 4/ 1/42 o DD460 WOODWORTH Beth. San Francisco 78.5 3.4 1/13/41 11/29/41 15-3/5 4/ 1/42 5/ 1/42 5/ 1/42 o DD461 FORREST .. Boston 97.0 4.5 1/ 6/41 6/14/41 14-1/5 2/12/42 2/12/42 3/12/42 1- DD462 FITCH .... Boston 91.0 4.9 1/ 6/41 6/14/41 15 4/12/42 3/20/42 3/31/42 1/3- DD463 CORRY . Charleston 98.0 5.8 4/40 7/28/41 18-1/4 2/12/42 2/12/42 3/12/42 1- DD464 HOBSON ... Charleston 94.0 5.6 11/14/40 9/ 8/41 17 4/12/42 3/12/42 4/12/42 1- DD483 AARON WARD Fed. S.B. & D.D. Co. 89.0 8.2 2/11/41 11/22/41 12-3/5 7/ 9/42 2/19/42 2/28/42 1/3- DD484 BUCHANAN Fed. S.B. & D.D. Co. 85.3 5.0 2/11/41 11/22/41 13-1/3 8/ 9/42 3/19/42 3/21/42 0 DD485 DUNCAN Fed. S.B. & D.D. Co. 75.9 9.9 7/31/41 8-1/2 9/ 9/42 4/17/42 4/15/42 o DD486 LANSDOWNE Fed. S.B. & D.D. Co. 72.5 8.0 7/31/41 9 10/ 9/42 5/ 1/42 5/ 1/42 o DD487 LARDNER Fed. S.B. & D.D. Co. 62.5 3.0 9/15/41 8 11/ 9/42 5/22/42 5/15/42 1/4+ DD488 MC CALLA Fed. S.B. & D.D. Co. 61.0 4.3 9/15/41 6-2/5 12/ 9/42 6/ 3/42 5/27/42 1/4+ DD489 MERVINE Fed. S.B. & D.D. Co. 54.2 5.2 11/ 3/41 7-1/4 3/ 9/44 7/15/42 6/10/42 1-1/6+ DD490 QUICK Fed. S.B. & D.D. Co. 51.0 6.3 11/3/41 8 4/ 9/44 8/ 1/42 7/ 3/42 1+ DD491 FARENHOLT Beth. Staten Island 87.3 10.2 12/11/40 11/19/41 15-2/3 4/ 9/42 4/ 1/42 4/ 1/42 o DD492 BAILEY Beth. Staten Island 78.7 6.5 1/29/41 12/19/41 16 8/ 9/42 6/ 1/42 6/ 1/42 0 DD493 CARMICK Seattle Tacoma S.B. Co. 48.1 9.6 5/29/41 17 2/ 1/43 11/ 2/42 11/ 2/42 0 DD494 DOYLE Seattle Tacoma S.B. Co. 39.8 6.2 5/26/41 17-2/3 2/15/43 11/16/42 11/16/42 o DD495 ENDICOTT Seattle Tacoma S.B. Co. 33.2 5.0 1/41 19 3/ 1/43 11/28/42 11/28/42 O DD496 MC COOK Seattle Tacoma S.B. Co. 30.0 4.8 1/41 19-2/5 3/15/43 12/14/42 12/14/42 o DD497 FRANKFORD Senttle Tacoma S.B. Co. 26.4 3.6 6/ 5/41 18-4/5 3/31/43 12/29/42 12/29/42 o DD598 BANCROFT Beth. Fore River 66.7 5.7 1/41 12/31/41 11-1/3 11/ 1/42 7/ 1/42 4/15/42 2-1/2+ DD599 BARTON Beth. Fore River 61.2 8.0 5/20/41 1/31/42 12 12/ 1/42 9/ 1/42 5/22/42 3-1/3+ DD600 BOYLE Beth. Fore River 33.2 5.5 12/31/41 10-1/2 12/ 1/43 11/15/42 11/15/42 o DD601 CHAMPLIN Beth. Fore River 32.9 5.4 1/31/42 11 12/31/43 12/31/42 12/31/42 0 DD602 MEADE Beth. Staten Island 53.5 8.5 3/25/41 16-1/5 9/15/42 8/ 1/42 8/ 1/42 o DD603 MURPHT Beth. Staten Island 43.0 6.6 5/19/41 15-5/6 11/ 1/42 9/15/42 9/15/42 o DD604 PARKER Beth. Staten Island 40.5 7.3 6/ 9/41 16-3/4 12/31/42 11/ 1/42 11/ 1/42 o . Commissioned 18 December 1941 + Ahead of contract completion date. .. Commissioned 13 January 1942. - Behind contract completion date. ... Commissioned 22 January 1942. .... Commissioned 3 February 1942. N.B.S.(745) Page 5 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported yBehind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-41 Yard Prediction DESTROYERS (1620 and 1630 ton) (Cont'd) DD605 CALDWELL Beth. San Francisco 61.7 8.5 3/24/41 1/15/42 14-2/3 8/ 1/42 6/15/42 6/15/42 o DD606 COGHLAN Beth. San Francisco 52.5 8.4 3/28/41 15-3/5 9/ 1/42 7/15/42 7/15/42 o DD607 FRAZIER Beth. San Francisco 47.7 5.1 7/ 5/41 14-1/3 10/ 1/42 9/15/42 9/15/42 o DD608 GANSEVOORT Beth. San Francisco 43.3 9.0 6/16/41 14 10/15/42 8/15/42 8/15/42 o DD609 GILLESPIE Beth. San Francisco 36.2 6.9 6/16/41 16 11/ 1/42 10/15/42 10/15/42 o DD610 HOBBY Beth. San Francisco 32.1 4.3 6/30/41 16-1/2 12/ 1/42 11/15/42 11/15/42 o DD611 KALE Beth. San Francisco 30.9 4.1 6/30/41 17-1/2 12/31/42 12/15/42 12/15/42 o DD612 KENDRICK Beth. San Pedro 48.0 8.5 5/1/41 17 11/1/42 10/1/42 10/1/42 o DD613 LAUB Beth. San Pedro 42.0 5.4 5/ 1/41 18 12/ 1/42 11/ 1/42 11/ 1/42 o DD614 MAC KENZIE Beth. San Pedro 34.5 7.3 5/29/41 18 1/15/43 12/ 1/42 12/1/42 o DD615 He LANAHAN Beth. San Pedro 32.5 7.0 5/29/41 19 2/15/43 12/28/42 12/28/42 o DD616 NIELDS Beth. Fore River (h) 13.9 1.9 10-1/3 6/15/43(x) 6/ 1/43 DD617 ORDRONAUX Beth. Fore River (h) 13.9 1.9 10-1/3 7/15/43(x) 7/ 1/43 DD618 DAVISON Fed. S.B. & D.D. Co. 17.8 3.3 7-2/3 12/31/43 10/30/42 10/15/42 1/2+ DD619 EDWARDS Fed. S.B. & D.D. Co. 17.0 2.5 8-1/6 12/31/43 11/27/42 10/31/42 1+ DD620 GLENNON Fed. S.B. & D.D. Co. 17.7 3.7 7-3/5 12/31/43 12/15/42 11/14/42 1+ DD621 JEFFERS Fed. S.B. & D.D. Co. 16.7 2.9 8-1/6 12/31/43 12/31/42 12/1/42 1+ DD622 MADDOX Fed. S.B. & D.D. Co. 16.6 2.8 7-1/3 12/31/43 2/20/43 12/15/42 2-1/6+ DD623 NELSON Fed. S.B. & D.D. Co. 16.3 2.4 8 12/31/43 3/13/43 12/31/42 2-1/2+ DD624 BALDWIN Seattle Tacona S.B. Co. 21.7 2,6 7/19/41 18 12/31/43 3/15/43 1/15/43 2+ DD625 HARDING Seattle Tacoma S.B. Co. 19.1 2.6 7/22/41 18-1/4 12/31/43 4/1/43 1/30/43 2+ DD626 SATTERLEE Seattle Tacoma S.B. Co. 16.5 2.3 9/10/41 17-1/6 12/31/43 4/15/43 2/15/43 2+ DD627 THOMPSON Seattle Tacoma S.B. Co. 15.4 2.2 9/22/41 17-1/5 12/31/43 1/43 2/28/43 2+ DD628 WELLES Seattle Tacoma S.B. Co. 13.8 2.2 9/27/41 17-3/5 12/31/43 5/15/43 3/15/43 2+ DD632 COWIE Boston 61.8 6.7 3/18/41 9/27/41 15 8/ 1/42 6/15/42 6/15/42 o DD633 ENIGHT Boston 60.1 6.7 3/18/41 9/27/41 16 9/ 1/42 7/15/42 7/15/42 o DD634 DORAN Boston 42.1 4.2 6/14/41 12/10/41 15 12/ 1/42 9/15/42 9/15/42 o DD635 EARLE Boston 41.2 3.5 6/14/41 12/10/41 16 1/ 1/43 10/15/42 10/15/42 0 DD636 BUTLER Philadelphia 22,4 10.0 9/16/41 14-1/2 4/ 1/43 12/ 1/42 12/1/42 0 DD637 GHERARDI Philadelphia 22.4 10.0 9/16/41 15-1/2 5/ 1/43 12/31/42 12/31/42 o DD638 HERNDOM Norfolk 41.0 8.3 8/26/41 5/42 20-1/2 5/ 1/43 5/ 1/43 5/1/43 o DD639 SHUBRICK Norfolk 29.7 5.8 16-1/4 6/15/43 6/15/43 6/15/43 o DD640 BEATTY Charleston 64.3 7.0 5/ 1/41 12/20/41 14 7/ 1/42 7/ 1/42 11 1/42 o DD641 TILLMAN Charleston 58.3 5.5 5/ 1/41 12/20/41 16 9/ 1/42 9/ 1/42 1/42 o DD645 STEVENSON Fed. S.B. & D.D. Co. 4.7 0,2 6-2/5 2/15/44 5/12/43 3/15/43 2+ DD646 STOCKTON Fed. S.B. & D.D. Co. 4.7 0.2 7 3/15/44 6/ 1/43 5/ 1/43 2+ DD647 THORN Fed. S.B. & D.D. Co. 4.6 0.1 7 4/15/44 8/20/43 1/43 1/3- DD648 TURNER Fed. S.B. & D.D. Co. 4.6 0.1 7-1/3 5/15/44 9/9/ 43 9/15/43 1/5- (h) DD616 and DD617 transferred from Beth. San Pedro to + Ahead of contract completion date. Beth. Fore River October 7. 1941. - Behind contract completion date. (x) Contract completion dates of DD616 and DD617 changed October 7. 1941. N.B.S.(745) Page 6 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction DESTROYERS (2100 Ton) DD445 FLETCHER Fed. S.B. & D.D. Co. 44.9 9.2 10/ 2/41 8-2/3 6/ 9/43 8/19/42 6/22/42 2+ DD446 RADFORD Fed. S.B. & D.D. Co. 41.5 9.6 10/ 2/41 9-2/5 7/ 9/43 9/15/42 7/15/42 2+ DD447 JENKINS Fed. S.B. & D.D. Co. 33.4 8.5 11/27/41 8-3/5 8/ 9/43 10/15/42 8/15/42 2+ DD448 LA VALLETTE Fed. S.B. & D.D. Co. 31.2 7.2 11/27/41 9-1/6 9/ 9/43 10/17/42 2/42 1-1/2+ DD449 NICHOLAS Bath Iron Vks. 61.1 6.0 3/ 3/41 13-3/4 1/ 9/43 4/25/42 4/25/42 o DD450 O'BANNON Bath Iron Vks. 57.2 5.6 3/ 3/41 142/5 2/24/43 5/26/42 5/15/42 1/3+ DD451 CHEVALIER Bath Iron Vks. 50.4 5.6 4/30/41 13-1/5 3/24/43 6/30/42 6/ 6/42 4/5+ DD452 PERSIVAL Fed. S.B. & D.D. Co. 10 10/ 1/43 3/ 1/44 3/15/44 1/2- DD465 SAUFLEY Fed. S.B. & D.D. Co. 24.5 6.2 1/27/42 7-3/5 10/ 9/43 1/11/43 9/15/42 3-5/6+ DD466 WALLER Fed. S.B. & D.D. Co. 23.3 5.7 7-1/2 11/ 9/43 1/30/43 10/ 1/42 4+ DD467 STRONG Bath Iron Vks. 47.7 6.4 4/30/41 15 4/24/43 5/30/42 6/27/42 1- DD468 TAYLOR Bath Iron Vice. 41.8 7.6 8/28/41 10-3/5 6/ 9/43 6/30/42 7/15/42 1/2- DD469 DE HAVEN Bath Iron Vics. 38.7 6.2 9/27/41 10-1/3 8/ 9/43 7/30/42 R/ 6/42 1/5- DD470 BACHE Beth. Staten Island 12.8 3.2 11/19/41 16-2/5 8/ 1/43 4/ 1/43 4/ 1/43 o DD471 BEALS Beth. Staten Island 12.1 2.7 12/19/41 16-2/5 10/ 1/43 6/ 1/43 5/ 1/43 1+ DD472 GUEST Boston 30.8 10.4 9/27/41 16 31 1/43 3/ 1/43 2/ 1/43 1+ DD473 BENNETT Boston 10.3 3.0 12/10/41 14-2/3 5/ 1/43 5/ 1/43 31 1/43 2+ DD474 FULLAM Boston 10.3 3.0 12/10/41 15-1/6 7/ 1/43 6/15/43 3/15/43 3+ DD475 HUDSON Boston 6.2 1,0 14-1/3 9/ 1/43 8/ 1/43 5/ 1/43 3+ DD476 HUTCHINS Boston 30.8 10.4 9/27/41 15 1/ 1/43 1/31/43 12/31/42 1+ DD477 PRINGLE Charleston 22.3 5.5 7/31/41 16-1/2 1/ 1/43 1/ 1/43 12/15/42 1/2+ DD478 STANLY Charleston 20.2 4.8 9/15/41 17 3/ 1/43 3/ 1/43 2/15/43 1/2+ DD479 STEVENS Charleston 13.5 2.4 12/30/41 15 5/ 1/43 5/ 1/43 4/ 1/43 1+ DD480 HALFORD Puget Sound 23.3 4.5 6/ 3/41 21 2/ 1/43 2/ 1/43 3/ 1/43 1- DD481 LEUTZE Puget Sound 23.3 4.5 6/ 3/41 22 4/ 1/43 4/ 1/43 4/ 1/43 o DD482 WATSON Fed. S.B. & D.D. Co. 11 11/ 1/43 4/ 1/44 4/15/44 1/2- DD498 PHILIP Fed. S.B. & D.D. Co. 9.9 1.6 8-1/4 6/ 9/44 4/ 2/43 1/15/43 2-1/2+ DD499 RENSHAW Fed. S.B. & D.D. Co. 9.2 1.7 8-5/6 7/ 9/44 4/22/43 2/ 2/43 2-2/3+ DD500 RINGGOLD Fed. S.B. & D.D. Co. 9.9 3.0 8-4/5 1/ 9/45 6/21/43 2/15/43 4-1/5+ DD501 SCHRONDER Fed. S.B. & D.D. Co. 9.3 2.3 8-1/3 2/ 9/45 7/10/43 3/ 1/43 4-1/3+ DD502 SIGSHEE Fed. S.3. & D.D. Co. 8.9 2.6 7-5/6 3/ 9/45 7/31/43 7/ 1/43 1+ Destroyers DD503 to DD506, inclusive, cancelled 10 February 1941. + Ahead of contract completion date. - Behind contract completion date. RESTRICTED N.B.S.(745) Page 7 As of February 1, 1942 3-2 Percentage Date of Completion Months of Completion Ahead(+)or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind(-) Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-91 Yard DESTROTERS (2100 ton) (Cont'd) DD507 CONWAT Bath Iron Vice. 22.1 6.7 11/ 5/41 9-3/4 1/43 8/27/42 8/27/42 o DD508 CONT Bath Iron Vks. 21.2 6.1 12/24/41 9-1/5 4/ 1/43 9/30/42 9/30/42 o DD509 CONVERSE Bath Iron Vice. 14.3 4.2 8-2/5 10/ 1/43 10/30/42 10/30/42 o DD510 EATON Bath Iron Vice. 13.6 3.7 8-2/5 11/ 1/43 11/30/42 11/30/42 o DD511 FOOTE Bath Iron Vks. 11.8 2.3 8-1/2 12/31/43 12/30/42 12/30/42 0 DD512 SPENCE Bath Iron Vks. 10.9 1.6 8-3/5 12/31/43 1/30/43 1/30/43 0 DD513 TERRY Bath Iron Vks. 8.9 1.2 8-1/2 12/31/43 2/25/43 2/25/43 o DD514 THATCHER Bath Iron Vks. 8.8 1.3 8-3/4 12/31/43 3/30/43 3/30/43 o DD515 ANTHONY Bath Iron Vks. 8.6 1.3 8-5/6 12/31/43 4/30/43 4/30/43 o DD516 WADSWORTH Bath Iron Vks. 8.6 1.4 8-5/6 12/31/43 5/27/43 5/27/43 o DD517 WALKER Bath Iron Wks. 8.4 1,4 9 1/ 3/44 6/30/43 6/30/43 o DD518 BROWNSON Beth. Staten Island 4.1 1.9 16 11/15/43 7/15/43 6/15/43 1+ DD519 DALY Beth. Staten Island 4.1 1.9 15 12/31/43 9/ 1/43 7/15/23 1-1/2+ DD520 ISHERWOOD Beth. Staten Island 4.1 1.9 16 2/15/44 10/15/43 9/ 1/43 1-1/2+ DD521 KIMBERLY Beth. Staten Island 2.1 0,6 16-1/4 7/ 1/44 12/ 1/43 12/ 1/43 o DD522 LUCE Beth. Staten Island 2.0 0.5 16-1/3 8/15/44 1/15/44 12/31/43 1/2+ DD526 ABNER READ Beth. San Francisco 7.6 2.1- 10/30/41 16 7/ 1/43 3/ 1/43 3/ 1/43 o DD527 AMMEN Beth. San Francisco 7.1 1.8 11/29/41 16 7/15/43 4/ 1/43 4/ 1/43 o DD528 MULLANT Beth. San Francisco 4.6 1.7 1/15/42 16-1/2 8/15/43 6/ 1/43 67 1/43 0 DD529 BUSH Beth. San Francisco 4.1 1.2 18-1/2 9/ 1/43 8/ 1/43 8/ 1/43 0 DD530 TRATHEN Beth. San Francisco 3.8 1.1 17 10/ 1/43 9/ 1/43 9/ 1/43 0 DD531 HAZELWOOD Beth. San Francisco 3.5 0,8 17-1/2 11/ 1/43 10/ 1/43 10/ 1/43 o DD532 EXERMAN Beth. San Francisco 3.5 0.9 18 11/15/43 11/ 1/43 11/ 1/43 o DD533 HOEL Beth. San Francisco 2.6 0.3 17-1/2 12/ 1/43 12/ 1/43 12/ 1/43 o DD534 MC CORD Beth. San Francisco 2,6 0,3 18 12/31/43 12/31/43 12/31/43 o DD535 MILLER Beth. San Francisco 2.4 0,4 16 6/ 1/44 2/ 1/44 21 1/44 o DD536 OWEN Beth. San Francisco 2.4 0.4 16 7/ 1/44 3/ 1/44 3/ 1/4 0 DD537 PUTNAM Beth. San Francisco 2.3 0.3 15 8/ 1/44 4/ 1/44 4/ 1/4 o DD538 STEPHEN POTTER Beth, San Francisco 2.3 0.3 15-1/2 8/15/44 5/ 1/44 5/ 1/44 o DD539 TINGEY Beth. San Francisco 2.3 0.3 14 10/15/44 6/ 1/44 6/ 1/44 o 00540 TWINING Beth. San Francisco 2.3 0.3 16 11/ 1/44 7/ 1/44 71 1/44 o DD541 TARNELL Beth. San Francisco 2.3 0.7 17-1/2 12/15/44 9/ 1/44 9/ 1/44 o DD544 BOYD Beth. San Pedro 2.5 0.6 17-1/2 4/ 1/44 10/ 1/43 10/ 1/43 0 DD545 BRADFORD Beth. San Pedro 2.5 0.6 17-1/2 5/ 1/44 11/ 1/43 11/ 1/48 0 DD546 BROWN Beth. San Pedro 2.0 0.1 17-1/2 12/15/43(x) 12/ 1/43 12/ 1/43 DD547 COVELL Beth. San Pedro 2.0 0.1 17-1/2 1/15/44(x) 12/31/43 12/31/43 00 o o Destroyers DD523 to DD525, inclusive, DD542, DD543, DD548, and 00549 cancelled 16 December 1940. + Ahend of contract completion date. (x) Contract completion dates of DD546 and DD547 changed October 7. 1941. RECTRICTED N.B.5.(745) Page 8 As of February 1, 1942 B-2 Percentage Date of Completion Months of Completion Ahend(+)or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind(-) Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-41 Yard DESTROYERS (2100 ton) (Cont'd) DD550 CAPPS Gulf S. 3. Co. 35.0 5.0 6/12/41 24 7/ 9/43 6/15/43 6/15/43 o DD551 DAVID W. TAYLOR Gulf 5. 3. Co. 29.0 6.0 6/12/41 26 1/ 9/44 8/15/43 8/15/43 o DD552 EVANS Gulf S. B. Co. 13.6 3.5 7/21/41 26-4/5 6/ 9/44 10/15/43 10/15/43 o DD553 JOHN D. HENLEY Gulf S.B. Co. 13.6 3.5 7/21/41 28-4/5 11/9/44 12/15/43 12/15/43 o DD554 FRANKS Senttle Tacoma S.B. Co. 7.2 2.1 16 6/30/43 10/15/43 8/ 1/43 2-1/2+ DD555 HAGGARD Seattle Tacoma S.B. Co. 7.1 2.0 16 7/15/43 11/15/43 8/15/43 3+ DD556 HAILEY Seattle Tacoma S.B. Co. 6.9 1.8 16 7/31/43 12/ 1/43 9/ 1/43 3+ DD557 JOHNSTON Seattle Tacoma S.B. Co. 6.9 1.8 16 8/16/43 1/ 3/44 9/15/43 3-3/5+ DD558 LAWS Seattle Incoma S.B. Co. 6.9 1.8 16 8/31/43 2/ 1/44 10/1/43 4+ DD559 LONGSHAW Seattle Tacoma S.B. Co. 5.6 0.5 16-1/2 12/1/43 2/15/44 11/ 1/43 3-1/2+ DD560 MCRRISON Seattle Tacoma S.B. Co. 5.6 0.5 16-1/2 12/15/43 3/15/44 11/15/43 4+ DD561 PRICHETT Seattle Tacoma S.B. Co. 5.6 0.5 16-1/3 1/ 3/44 4/ 1/44 11/30/43 4+ DD562 ROBINSON Seattle Tacoma S.B. Co. 5.6 0.5 15-5/6 1/15/44 5/ 1/44 12/15/43 4-1/2+ DD563 ROSS Seattle Tacoma S.B. Co. 5.6 0.5 15-1/3 1/31/44 6/ 1/44 12/30/43 5+ DD564 ROWE Seattle Tacoma S.B. Co. 5.6 0.5 15-1/2 10/31/44 6/ 15/44 6/15/44 0 DD565 SMALLEY Seattle Tacoma S.B. Co. 5.6 0.5 16 11/15/44 7/15/44 7/15/44 0 DD566 STODDARD Seattle Tacoma S.B. Co. 5.6 0.5 16-1/2 11/30/44 8/15/44 8/15/44 o DD567 WATTS Seattle Tacoma S.B. Co. 5.6 0.5 16-1/2 12/15/44 9/ 1/44 9/ 1/44 o DD568 WREN Seattle Tacoma S.B. Co. 5.6 0.5 17 12/30/44 10/ 2/44 10/ 2/44 o DD569 AULICE Con. Steel Corp. (Crange) 30.5 6.4 5/14/41 17-1/2 7/ 9/43 10/28/42 10/28/42 0 DD570 CHARLES AUSBURN Con. Steel Corp. (Orange) 28.5 8.2 5/14/41 18 8/24/43 11/11/42 11/11/42 0 DD571 CLAXTON Con. Steel Corp. (Orange) 23.3 5.2 6/25/41 17 10/ 9/43 11/24/42 11/24/42 0 DD572 DYSON Con. Steel Corp. (Orange) 20.2 3.3 6/25/41 17-2/5 11/24/43 12/ 8/42 12/ 8/42 o DD573 HARRISON Con. Steel Corp. (Orange) 15.6 4.8 7/25/41 16-5/6 1/ 9/44 12/20/42 12/20/42 0 DD574 JOHN RODGERS Con. Steel Corp. (Orange) 14.7 4.7 7/25/41 17-1/5 2/24/44 12/31/42 12/31/42 0 DD575 MC XXX Con. Steel Corp. (Orange) 7.0 2.4 14 4/ 9/44 5/ 1/43 5/ 1/43 0 DD576 MURRAY Con. Steel Corp. (Orange) 6.4 1.8 14 5/24/44 5/15/43 5/15/43 0 DD577 SPROSTON Con. Steel Corp. (Orange) 5-7 1.7 14 7/ 9/44 6/ 1/43 6/ 1/43 0 DD578 WICKES Con. Steel Corp. (Orange) 5.6 1.6 14 8/24/44 6/15/43 6/15/43 0 DD579 WILLIAM D. PORTER Con. Steel Corp. (Orange) 5.5 1,6 14 10/ 9/44 7/ 1/43 7/ 1/43 0 DD580 TOUNG Con. Steel Corp. (Orange) 5.4 1.5 14 11/24/44 7/15/43 7/15/43 o Destroyers DD548 and DD549 cancelled 16 December 1940. + Ahead of contract completion date. N.B.S.(745) RESTRICTED Page 9 As of February 1. 1942 3-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction DESTROYERS (2100 ton) (Cont'd) DD581 CHARRETTE Boston 3.8 1,0 14-5/6 11/ 1/43 9/ 1/43 5/15/43 3-1/2+ DD582 CONNER Boston 3.0 0.5 14 1/ 2/44 10/ 1/43 7/ 1/43 3+ DD583 HALL Boston 3.0 0.5 14-1/2 3/ 1/44 11/ 1/43 7/15/43 3-1/2+ DD584 HALLIGAN Boston 2.7 0,2 14 5/ 1/44 12/1/43 9/ 1/43 3+ DD585 HARADEN Boston 2.7 0,2 14-1/2 7/ 1/44 1/ 1/44 9/15/43 3-1/2+ DD586 NEWCOMB Boston 2.7 0.2 14 9/ 1/44 2/ 1/44 11/ 1/43 3+ DD587 BELL Charleston 11,0 4.4 12/30/41 16-1/2 8/ 1/43 7/ 1/43 5/15/43 1-1/2+ DD588 BURNS Charleston 5.9 1.0 14 11/ 1/43 9/ 1/43 7/ 1/43 2+ DD589 IZARD Charleston 6.3 1.5 15-1/2 2/ 1/44 11/ 1/43 8/15/43 2-1/2+ DD590 PAUL HAMILTON Charleston 5.3 0.8 15 5/ 1/44 1/ 1/44 10/ 1/43 3+ DD591 TWIGGS Charleston 4.9 0.5 16-1/2 8/ 1/44 3/ 1/44 11/15/43 3-1/2+ DD592 HOWORTH Puget Sound 17.2 5.2 11/26/41 17-1/6 61 1/43 6/ 1/43 1/43 1+ DD593 KILLEN Puget Sound 17.2 5.2 11/26/41 18-1/6 8/ 1/43 8/ 1/43 6/ 1/43 2+ DD594 MANSFIELD Puget Sound 10.3 2.3 17-1/3 10/ 1/43 1/15/45 12/ 1/43 13-1/2+ DD595 METCALF Puget Sound 10.3 2.3 18-1/3 12/ 1/43 3/15/45 1/ 1/44 14-1/2+ DD596 SHIELDS Puget Sound 10.3 2.3 22-5/6 2/ 1/44 7/15/45 5/15/44 14+ DD597 WILEY Puget Sound 10.3 2.3 23-5/6 4/ 1/44 9/15/45 6/15/44 15+ DD629 ABBOT Bath Iron Vice. 4.6 0.6 9 2/ 1/44 7/30/43 7/30/43 o DD630 BRAINE Bath Iron Vks. 4.5 0.6 9-1/6 3/ 1/44 8/30/43 8/30/43 o DD631 ERBEN Bath Iron Wke. 4.5 0.6 9-1/4 4/ 1/44 9/30/43 9/30/43 o DD642 HALE Bath Iron Vice. 3.9 0.4 9-1/3 8/ 1/44 10/30/43 10/30/43 o DD643 SIGOURNEY Bath Iron Wks. 3.9 0.4 9-2/5 11/ 1/44 11/30/43 11/30/43 o DD644 STEMBEL Bath Iron Vice. 3.9 0.4 9-2/5 12/30/44 12/30/43 12/30/43 o DD649 Charleston 0,2 0.2 13 1/ 1/444 1/1/44 0 DD650 Bath Iron Vice. 9-1/2 1/30/444 1/30/44 0 DD651 Bath Iron Vice. 9-1/2 2/27/44 2/27/44 o DD652 Bath Iron Vice. 9-2/3 3/30/44* 3/30/44 o DD653 Bath Iron Vks. 9-4/5 4/30/444 4/30/44 o DD654 Gulf S.B. Corp. 0.2 0.1 21 3/ 1/44 1/44 o DD655 Gulf S.B. Corp. 0,2 0.1 15-1/2 4/15/44* 4/15/44 o DD656 Gulf S.B. Corp. 0.2 0.1 15 5/31/44# 5/31/44 o DD657 Beth. Staten Island 16 2/15/44# 2/15/44 o DD658 Staten Island 16-1/5 3/15/444 3/15/44 0 DD659 Fed. S.B. & D.D. Co. 8-1/3 7/15/43# 7/15/43 o DD660 Fed. S.B. & D.D. Co. 7-1/2 9/ 1/434 3/ 2/43 1+ DD661 Fed. S.B. & D.D. Co. 8 9/ 1/434 8/16/43 1/2+ DD662 Boston 0.2 0.2 14-1/2 3/ 1/4/4 11/15/43 3-1/2+ DD663 Boston 0.2 0.2 13-1/2 4/ 1/4/4 12/15/43 3-1/2+ DD664 Boston 0.2 0,2 14 5/ 1/44 12/31/43 4+ DD665 Charleston 0.2 0,2 14-1/2 2/15/44 (#) Date reported 1/ 1/42. vessels awarded subsequent to 11/1/41. + Ahead of contract completion date. N.B.S.(745) Page 10 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Abead(+)or Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-41 Yard Prediction ESCORT VESSELS DE 51 (*) + Bethlehes Steel Co. DE 52 (a) t Bethlehem Steel Co. DE 53 (*) + Bethlehem Steel Co. DE 54 (*) + Bethlehem Steel Co. DE 55 (a) , Bethlehem Steel Co. DE 56 (*) + Bethlehem Steel Co. DE 57 (*) 1 Bethlehem Steel Co. DE 58 (*) t Bethlehem Steel Co. DE 59 (a) + Bethlehem Steel Co. DE 60 (s) + Bethlehem Steel Co. DE 61 (*) + Bethlehem Steel Co. DE 62 (*) + Bethlehem Steel Co. DE 63 (s) + Bethlehem Steel Co. DE 64 (s) + Bethlehem Steel Co. DE 65 (*) + Bethlehem Steel Co. DE 66 (*) + Bethlehem Steel Co. DE 67 (a) + Bethlehem Steel Co. DE 68 (*) + Bethlehem Steel Co. DE 69 (*) + Bethlehem Steel Co. DE 70 (*) 1 Bethlehem Steel Co. DE 71 (*) + Bethlehem Steel Co. DE 72 (*) + Bethlehem Steel Co. DE 73 (a) + Bethlehem Steel Co. DE 74 (*) + Bethlehem Steel Co. DE 75 (*) + Bethlehem Steel Co. DE 76 (*) 1 Bethlehem Steel Co. DE 77 (*) 1 Bethlehem Steel Co. DE 78 (a) + Bethlehem Steel Go. DE 79 (a) + Bethlehem Steel Co. DE 80 (a) 1 Bethlehem Steel Co. DE 81 (*) 1 Bethlehem Steel Go. (a) Steel Balls. + Being constructed under Emergency Authorization. N.B.S.(745) RESERVED Page 11 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction ESCORT VESSELS (Cont'd) DE82 (*) + Bethlehem Steel Co. DE83 (*) + Bethlehem Steel Co. DESL (*) + Bethlehem Steel Co. DE85 (*) + Bethlehem Steel Co. DM86 (*) + Bethlehem Steel Co. DM87 (*) + Bethlehem Steel Co. DESE (*) + Bethlehem Steel Co. DE89 (*) + Bethlehem Steel Co. DE90 (*) + Bethlehem Steel Co. DE91 (*) + Bethlehem Steel Co. DW92 (a) + Bethlehem Steel Co. DE93 (a) + Bethlehem Steel Co. DE94 (*) + Bethlehem Steel Co. 0895 (*) + Bethlehem Steel Co. DW96 (*) + Bethlehem Steel Co. DE97 (*) + Bethlehem Steel Co. DE98 (*) + Bethlehem Steel Co. DE99 (*) t Dravo Corp. DE100 (s) + Dravo Corp. DE101 (*) t Dravo Corp. DE102 (*) + Dravo Corp. DE103 (*) 1 Dravo Corp. DW104 (*) + Dravo Corp. DE105 (*) + Dravo Corp. DE106 (*) + Dravo Corp. DE107 (a) + Dravo Corp. DE105 (1) + Dravo Corp. DE109 (*) + Dravo Corp. JE110 (*) + Dravo Corp. DE111 (*) + Dravo Corp. DE112 (*) + Dravo Corp. DE113 (*) + Dravo Corp. DE114 (a) , Drave Corp. DE115 (a) + Dravo Corp. DE116 (*) + Dravo Corp. DE117 (a) + Dravo Corp. DK118 (*) + Dravo Corp. DELLY (*) + Dravo Corp. DE120 (a) , Dravo Corp. DX121 (*) 1 Dravo Corp. DW122 (a) + Dravo Corp. DE123 (a) + Dravo Corp. (s) Steel Hulls + Being constructed under Emergency Authorization. N.B.5.(745) RESTRICTIO Page 12 As of February 1, 1942 B-2 Percentage Date of Completion Months of Completion Ahead(+)or Feb.1 Gain for No. of Mos. As per As Reported As Last Behind(-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction - Laid Launched Completion Order 11-1-41 Yard ESCORT VESSELS (Cont'd) 08124 (*) + Dravo Corp. 02125 (a) + Dravo Corp. DE126 (a) 1 Dravo Corp. DE127 (s) 1 Dravo Corp. DE128 (*) 1 Dravo Corp. DE129 (s) + Consolidated Steel Co. DE130 (a) 1 Consolidated Steel Co. DE131 (*) + Consolidated Steel Co. DE132 (a) + Consolidated Steel Co. DE133 (*) + Consolidated Steel Co. DE134 (*) 1 Consolidated Steel Co. DE135 (*) + Consolidated Steel Co. DE136 (a) t Consolidated Steel Co. 02137 (a) , Consolidated Steel Co. DE138 (*) + Consolidated Steel Co. DE139 (a) + Consolidated Steel Co. DE140 (*) + Consolidated Steel Co. DE141 (*) + Consolidated Steel Co. DE142 (*) + Consolidated Steel Co. DE143 (*) + Consolidated Steel Co. DE146 (*) + Consolidated Steel Co. DE145 (*) + Consolidated Steel Co. DE146 (*) 1 Consolidated Steel Co. DM147 (*) + Consolidated Steel Co. DE148 (*) + Consolidated Steel Co. DE149 (*) + Consolidated Steel Co. DE150 (*) + Consolidated Steel Co. DE151 (*) + Consolidated Steel Co. DE152 (*) + Consolidated Steel Co. DE153 (a) + Norfolk Savy Tard DE154 (*) + Norfolk Havy Tard 10/10/42 DE155 (*) + Norfolk Havy Tard 11/10/42 DE156 (*) + Norfolk Havy Tard 12/10/42 DE157 (*) 1 Norfolk Havy Tard 1/10/43 DE158 (*) 1 Norfolk Navy Tard 2/10/43 DE159 (*) + Norfolk Navy Tard 3/10/43 DE160 (*) + Norfolk Havy Tard 4/10/43 DB161 (*) + Norfolk Havy Tard 5/10/43 DM162 (*) + Federal 8.3. & D.D. Co. 6/10/43 DM163 (*) + Federal 5.3. & D.D. Oo. DM164 (*) + Federal 5.3. & D.D. Co. DB165 (*) + Federal 5.3. & D.D. Co. (a) Steel Hulls + Being constructed under Emergency Authorization. N.B.5.(745) RESTRICTED Page 13 As of February 1, 1942 B-2 Percentage Date of Completion Months of Completion Ahead(+)or Feb.1 Gain for No. of Mos. As per As Reported As Last Behind(-) Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-11 Yard ESCORT VESSELS (Cont'd) DE166 (s) + Federal 5.3. & D.D. Co. DE167 (*) t Federal 5.3. & D.D. Co. DE168 (*) 1 Federal 3.3. & D.D: Co. DE169 (*) + Federal 3.3. & D.D. Co. DE170 (*) 1 Federal 8.3. & D.D. Co. DE171 (*) + Federal S.B. & D.D. Co. DE172 (*) + Federal S.B. & D.D. Co. DE173 (*) + Federal S.B & D.D. Co. DE174 (*) + Federal 5.3: & D.D. Co. DE175 (*) + Federal 5.3 & D.D. Co. DE176 (*) + Federal S.B. & D.D. Co. DE177 (*) , Federal 5.3. & D.D. Co. DE178 (*) 1 Federal S.B. & D.D. Co. DE179 (*) + Federal S.3. & D.D. Co. DELSO (a) 1 Federal S.3. & D.D. Co. DE181 (a) + Federal S.3. & D.D. Co. 08152 (e) 1 Federal S.3. & D.D. Co. DE183 (*) + Federal S.3. & D.D. Co. DX184 (a) + Federal S.3. & D.D. Co. DE185 (a) + Federal S.B. & D.D. Co. DE186 (*) t Federal 5.3. & D.D. Co. DE187 (*) 1 Federal 5,3. & D.D. Co. DE158 (a) t Federal S.B. & D.D. Co. DE189 (*) 1 Federal S.B. & D.D. Co. DE190 (*) 1 Federal 5,3. & D.D. Co. DE191 (*) , Federal 5.3. & D.D. Co. DE192 (*) + Federal S.B. & D.D. Co. DE193 (*) + Federal S.B. & D.D. Co. DE194 (*) 1 Federal S.3. & D.D. Co. DE195 (*) 1 Federal 5,3. & D.D. Co. DE196 (*) + Foieral 3.3. & D.D. Co. DE197 (*) 1 Federal S.3. & D.D. Co. DE198 (*) 1 Newport Neva S.B. & D.D. Co. DE199 (*) + Newport News 5.3. & D.D. Co. DE200 (*) + Nevport Neve S.B. & D.D. Co. DE201 (*) + Newport News 5.3. & D.D. Co. DE202 (*) 1 Newport News S.B. & D.D. Co. DE203 (*) + Newport News 3.3. & D.D. Co. DEP04 (a) 1 Newport News 5.3. & D.D. Co. DE205 (*) 1 Newport Neve 5.3. & D.D. Co. DE206 (*) . Newport News 5.3. & D.D. Co. DE207 (a) 1 Newport News 5.3. & D.D. Co. DE205 (*) + Newport leve 5.3. & D.D. Co. (a) Steel Hulls 1 being constructed under Emergency Authorization. N.B.S. (745) I Page 14 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mes. An per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Latd Launched Completion Order 11-1-41 Yard Prediction ESCORT VESSELS (Cont'd) DE209 C + Nevport News S.3. & D.D. Co. DE210 (e) + Nevport News 3.3. & D.D. Co. DK211 (a) 1 Nevoort News S.B. & D.D. Co. DE212 (a) 1 Newoort Seve S.B. & D.D. Co. DE213 (*) + Newport News 3.3. & D.D. Co. DE214 (*) , Newport News S.B. & D.D. Co. DE215 (a) , Newport News S.B. & D.D. Co. DE216 (*) 1 Newport News S.B. & D.D. Co. DE217 (a) + Newport News s.b. & D.D. Co. DE218 (s) + Newport leve S.B. & D.D. Co. DE219 (s) + Newport News S.B. & D.D. Co. DE220 (a) + Newport lieve S.B. & D.D. Co. DM221 (*) + Newport News S.B. & D.D. Co. DE222 (*) + Newport Seve S.B. & D.D. Co. DE223 (*) 1 Newport News S.B. & D.D. Co. DE224 (a) + Newport News S.B. & D.D. Co. DE225 (a) 1 Newport News S.B. & D.D. Co. DE226 (a) , Newport News S.B. & D.D. Co. DE227 (a) 1 Newport News S.B. & D.D. Co. DE228 (*) + Newport News S.B. & D.D. Co. DE229 (*) 1 Newport News 5,3. & D.D. Co. DE230 (a) t Newport News S.B. & D.D. Co. DE231 (a) + Newport News S.B. & D.D. Co. DE232 (*) 1 Newport News S.3. & D.D. Co. DE233 (s) 1 Newport Feve 5.3. & D.D. Co. DE234 (*) + Newport News 5.3. & D.D. Co. DE235 (*) t Newport News S.B. & D.D. Co. DE236 (*) + Newport Neve 5.3. & D.D. Co. DB237 (*) 1 Newport News S.B. & D.D. Co. DB238 (*) + Brown Shipbldg. Co. DE239 (*) + Brown Shipbldg. Co. DE240 (*) t Brown Shipbldg. Co. DE241 (*) + Brown Shipbldg. Co. DM242 (a) + Brown Shipbldg. Co. DM243 (a) + Brown Shipblig. Co. DE244 (*) 1 Brown Shipbldg. Co. DE245 (*) + Brown Shipbldg. Co. DB246 (*) + Brown Shipbldg. Co. DE247 (*) + Brown Shipbldg. Co. 08248 (*) , Brown Shipbldg. Co. DM249 (a) + Brown Shipbldg. Co. DB250 (a) + Brown Shipbldg. Co. DB251 (a) . Brown Shipblde. Co. (a) Steel Hulls 1 Being constructed under Emergency Authorization. N.B.3.(745) RESERIOTED Page 15 As of February 1, 1942 3-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-41 Yard Prediction ESCORT VESSELS (Cont'd) DE252 C + Brown Shipbldg. Co. DE253 (a) 1 Brown Shipbldg. Co. DE254 (*) + Brown Shipbldg. Co. 08255 (s) + Brown Shipbldg. Co. DE256 (*) + Boston Navy Yard 10/ 1/43 DE257 (*) 1 Boston Havy Yard 10/10/43 DE258 (*) 1 Boston Havy Yard 10/25/43 DE259 (a) 1 Boston Havy Yard 11/5/43 DE260 (*) + Boston Havy Yard 11/15/43 DE261 (*) + Boston Havy Tard 11/25/43 DE262 (*) + Boston Navy Yard 12/10/43 DE263 (a) 1 Boston Navy Yard 12/20/43 DE264 (a) + Boston Navy Yard 1/44 DE265 (a) + Boston Havy Yard 1/10/44 DE266 (a) + Boston Havy Tard 1/25/44 DE267 (*) + Boston Havy Yard 2/5/44 DE268 (*) * Boston Navy Yard 2/15/44 DE269 (a) + Boston Havy Yard 2/25/44 DE270 (*) + Boston Navy Yerd 3/10/44 DE271 (a) , Boston Havy Tard 3/20/44 DE272 (s) + Boston Navy Yard 4/ 1/44 08273 (a) + Boston Navy Tard 4/10/44 DM274 (a) 1 Boston Navy Yard 4/25/44 DE275 (*) + Boston Havy Yard 5/5/44 DX276 (a) + Boston Havy Yard 5/15/44 DE277 (a) , Boston Havy Tard 5/25/44 08278 (a) t Boston Havy Yard 6/10/44 DE279 (a) t Boston Havy Yard 6/20/44 DE280 (a) + Boston Havy Tard 91 1/44 DE281 (a) 1 Charleston Savy Yard DE282 (a) + Charleston Havy Tard DE283 (a) + Charleston Havy Yard DE284 (a) + Charleston Havy Yard DE285 (a) 1 Charleston Havy Yard DM286 (*) 1 Charleston Navy Yard 02287 (a) + Charleston Navy Yard 02288 (*) + Charleston Navy Tard DE289 (a) + Charleston Navy Tard DEP90 (*) + Charleston Navy Tard DM291 (*) 1 Charleston Havy Yard DE292 (a) + Charleston Havy Yard DM293 (a) t Charleston Navy Yard (a) Steel Fulls 1 being constructed under Emergency authorization. N.B.S.(745) RESTRICTED Page 16 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb.1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-41 Yard Prediction ESCORT VESSELS (Cont'd) DM294 (*) , Charleston Navy Yard DE295 (s) + Charleston Savy Yard DE296 (a) + Charleaton Navy Yard DE297 (a) + Charleston Navy Yard DE298 (a) + Charleaton Savy Yard DE299 (a) 1 Charleston Navy Yard DE300 (*) + Charleston Navy Yard (a) Steel Hulls. 1 Being constructed under Emergency Authorization. N.B.S.(745) B-2 Page 17 M of February 1. 1942 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction SUBMARINES (1526 ton) $5213 GREENLING Elec. Boat Co. Delivered and placed in commission 21 January 1942. SS214 GROUPER Elec. Boat Co. 98.5 3.0 12/25/40 10/27/41 13-5/6 5/12/42 3/21/42 2/23/42 1+ 88215 GROWLER Elec. Boat Co. 94.8 4,2 2/10/41 11/22/40 13-1/3 7/16/42 4/21/42 3/21/42 1+ $8216 GRUNION Elec. Boat Co. 89.5 5.0 1/41 12/22/41 13-2/3 9/ 1/42 5/20/42 4/20/42 1+ $$217 GUARDFISH Elec. Boat Co. 83.8 6.1 4/ 1/41 1/20/42 13-2/3 10/16/42 6/20/42 5/20/42 1+ 58218 ALBACORE Elec. Boat Co. 76.6 8.2 4/21/41 13-5/6 12/1/42 7/14/42 6/17/42 1+ $9219 AMBERJACK Elec. Boat Co. 69.4 7-9 5/15/41 13-2/3 1/16/43 6/42 6/42 1+ $8220 BARB Elec. Boat Co. 62.7 6.4 6/ 7/41 13-5/6 1/43 9/1/42 8/3/42 1+ $8221 BLACKFISH Elec. Boat Co. 56.7 6.0 7/ 1/41 13-2/3 4/16/43 9/21/42 5/21/42 1+ 58222 BLUEFISH Elec. Boat Co. 5.7 1.1 12-1/5 2/24/44 8/19/43 7/20/43 1+ $8223 BONEFISH Elec. Bout Co. 5.7 1.1 13-1/4 3/24/44 9/21/43 8/21/43 1+ SS224 COD Elec. Boat Co. 5.7 1.1 13-1/4 4/24/44 10/21/43 9/21/43 1+ 38225 CERO Elec. Boat Co. 5.7 1.1 13-1/4 5/24/44 11/20/43 10/21/43 1+ $8226 CORVINA Elec. Boat Co. 5.7 1.1 13-1/5 6/24/44 12/21/43 11/20/43 1+ $$227 DARTER Elec. Boat Co. 5.7 1.1 13-1/4 7/24/44 1/20/44 12/21/43 1+ $8229 FLYING FISH** Portemouth 97.6 4.6 12/ 6/40 9/41 14 5/27/42 1/24/42 2/7/42 1/2- $$230 FINBACK* Portemouth 91.0 10.4 2/ 5/41 8/25/41 13-1/2 9/12/42 7/42 3/21/42 1/2- $$231 HADDOCK Portsmouth 78.0 12.0 3/31/41 10/20/41 12-4/5 11/12/42 4/25/42 4/25/42 o $$232 HALIBUT Portemouth 68.4 11.7 5/16/41 12/3/41 12-2/3 1/28/43 6/42 6/6/42 o $8233 HERRING Portemouth 54,6 10.6 7/14/41 1/15/42 12-1/3 4/12/43 7/25/42 7/25/42 o SS234 KINGFISH Portsmouth 42.6 10.5 8/29/41 12-1/5 6/28/43 5/42 5/42 o 88235 SHAD Portsmouth 28.1 7.4 10/24/41 11-4/5 9/12/43 10/17/42 10/17/42 o 88236 SILVERSIDES*** Mare Island 94.8 5.8 11/ 4/40 8/26/41 15-1/3 5/28/42 2/15/42 2/14/42 o S8237 TRIGGER**** Mare Island 88.2 4.5 2/ 1/41 10/22/41 14 8/28/42 4/ 1/42 4/ 1/42 0 58238 WAHOO Mare Island 71.9 11.3 6/28/41 13 3/28/43 8/ 1/42 1/42 o $$239 WHALE Mare Island 58.3 6.4 6/28/41 14 6/28/43 1/42 1/42 o SS240 ANGLER Elec. Boat Co. 5.7 1.1 13-1/4 8/24/44 2/14/44 1/14/42 1+ 88241 BASHAW Elec. Boat Co. 5.7 1.1 13 9/24/44 3/ 7/44 2/ 7/44 1+ $5242 BLUEGILL Elec. Boat Co. 5.7 1.1 13-1/3 10/24/44 4/ 1/44 1/44 1+ 88243 BREAM Elec. Bont Co. 5.7 1.1 13 11/24/44 4/19/44 3/20/44 1+ $8244 CAVALLA Elec. Boat Co. 5.7 1.1 14-1/4 12/24/44 5/15/44 4/15/46 1+ $8245 COBIA Elec. Boat Co. 5.7 1.1 13 1/24/45 6/ 7/44 5/ 6/44 1+ .. Commissioned 10, December 1941 + Aheed of contract completion date. ... Commissioned 15 December 1941. - Behind contract completion date. .... Consissioned 31 January 1942 Commissioned 31 January 1942 N.B.5.(745) REPRESED Page 18 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mes. As per As Reported As Last Aheed(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Latd Launched Completion Order 11-1-41 Yard Prediction SUBMARINES (Cont'd) (1526 ton) 85246 CROAKER Elec. Boat Co. 5.7 1.1 13-1/5 2/24/45 7/ 6/44 6/ 7/44 1+ SS247 DACE Elec. Boat Co. 5.7 1.1 15-1/2 3/24/45 8/ 7/44 11/16/43 8-2/3+ SS248 DORADO Elec. Boat Co. 5.7 1.1 15-1/4 4/24/45 9/ 7/44 11/29/43 9-1/3+ 88249 FLASHER Elec. Bont Co. 5.7 1.1 16 5/24/45 10/ 5/44 2/ 8/46 5+ 88250 FLIER Elec. Boat Co. 5.7 1.1 15-4/5 6/24/45 11/ 7/44 3/ 16/44 7-2/3+ SS251 FLOUNDER Elec. Bont Co. 5.7 1.1 15-1/2 7/24/45 12/ 1/44 4/22/44 7-1/3+ $8252 GABILAN Elec. Boat Co. 5.7 1.1 15-1/3 8/24/45 12/21/44 5/27/44 6-4/5+ 88253 GUNNEL Elec. Boat Co. 52.2 8.2 7/21/41 13-4/5 6/ 1/43 10/15/42 9/24/42 1+ 88254 GURNARD Elec. Boat Co. 46.7 7.6 9/ 2/41 13 7/16/43 11/ 5/42 10/ 6/42 1+ $$255 HADDO Elec. Boat Co. 41.0 7.0 10/ 1/41 13-1/5 9/ 1/43 12/ 7/42 11/ 7/20 1+ $$256 HAKE Elec. Boat Co. 34.6 4.7 11/ 1/41 13-1/5 10/16/43 1/ 7/43 12/ 7/42 1+ 88257 HARDEN Elec. Boat Co. 29.3 4,2 12/ 1/41 13-1/4 12/ 1/43 2/ 6/43 1/ 8/43 1+ 88258 HOE Elec. Boat Co. 24.3 3.3 1/ 2/42 13 1/16/44 6/43 2/ 6/43 1+ 88259 JACK Elec. Boat Co. 11.4 3.4 2/ 2/42 13 8/24/43 4/ 6/43 3/ 6/43 1+ 85260 LAPON Elec. Boat Co. 10,1 2.9 14-1/3 9/24/43 5/ 1/43 4/ 1/43 1+ SS261 MINGO Elec. Boat Co. 8,8 2.6 13-1/4 10/24/43 5/20/43 4/21/43 1+ 88262 MUSKALLUNGE Elec. Boat Co. 7.8 2.0 13-1/4 11/24/43 6/15/43 5/15/43 1+ SS263 PADDLE Elec. Boat Co. 7.0 1.7 13 12/24/43 7/ 6/43 6/ 5/43 1+ SS264 PARGO Elec. Boat Co. 6.4 1.4 13-1/3 1/24/44 8/ 2/43 7/ 1/23 1+ 88265 PETO Manitowoc S.B. Co. 49.2 9.7 6/18/41 17-1/2 8/4/43 6/ 1/43 12/ 3/42 6+ S9266 POGY Manitowoc S.B. Co. 31.9 5.9 9/15/41 17 11/ 4/43 9/ 1/43 2/15/43 6-1/2+ 88267 POMPON Manitowoc S.D. Co. 24.0 4.0 11/26/41 16-2/3 2/ 4/44 11/24/43 4/16/43 7-1/5+ 88268 PUFFER Manitowoc S.B. Co. 9.8 3.8 15-1/6 4/ 4/44 2/ 6/44 6/ 6/43 E+ ss269 RASHER Manitowoc S.B. Co. 7.5 1.8 15-1/6 6/ 4/44 4/18/44 7/29/43 8-2/3+ 88270 RATON Manitowoc S.B. Co. 7.0 1.3 15 1/ 4/45 6/24/44 9/21/43 9+ $5271 RAY Manitowoc S.B. Co. 7.0 1.3 15 3/ 4/45 1/44 11/18/43 9-1/2+ SS272 REDFIN Manitowoc S.D. Co. 7.0 1.3 14-4/5 5/ 4/45 2/ 6/44 1/ 6/44 1+ 88273 ROBALO Manitowoc S.B. Co. 7.0 1.3 12-3/5 7/ 4/45 1/ 6/45 2/ 3/44 11+ SS274 ROCK Manitowoc S.B. Co. 7.0 1.3 16-5/6 9/ 4/45 3/ 1/45 6/19/44 8-1/3+ $8275 HUNNER Portsmouth 16.2 4,2 12/ 8/41 11-2/3 5/ 1/43 11/28/42 11/28/42 o 88276 SAMFISH Portsmouth 9.5 2.4 1/20/42 11-2/3 7/ 1/43 1/ 9/43 1/ 9/43 o SS277 SCAMP Portsmouth 4.8 0.9 11-1/2 9/ 1/43 2/20/43 2/20/43 o 59278 SCORPION Portsmouth 2.7 0.9 11-2/3 11/ 1/43 4/10/43 3/20/43 2/3+ 88279 SNOOK Portsmouth 2.1 0.6 11-1/2 1/2 /44 5/22/43 4/17/43 1-1/6+ 38250 STEELHEAD Portsmouth 1,6 0.2 11-4/5 31 1/44 6/26/43 5/15/43 1-1/3+ S8281 SUNFISH Mare Island 35.7 5.3 9/25/41 12-2/3 10/ 1/43 10/15/42 10/15/42 o 88282 TUNNY Mare Island 31.7 5.7 11/10/41 12-1/6 1/ 2/44 12/ 1/42 11/15/42 1/2+ 88283 TINOSA Mare Island 7.6 1.9 13-1/3 7/ 1/43 4/ 1/43 4/ 1/43 o SS284 TULLIBEE Mare Island 7.6 1.9 13 8/ 1/43 5/ 1/43 5/ 1/43 o Based on completion by Manitovoe 5.3. Do. prior to operation by sub-contractor. + Ahead of contract completion date. Electric Boat Go. preparatory to delivery to Government. RESTRICTED N.B.S.(745) Price 19 As of February 1, 1942 B-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mcs. As per As Reported As Last Ahead(+)or Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-41 Yard Prediction SUBMARINES (Cont'd)(1526 ton) 33285 Portsmouth 11-2/3 6/ 1/434 6/ 1/43 o SS286 Portsmouth 13-1/2 6/20/43# 6/19/43 o 55287 Portsmouth 11-1/2 7/15/43# 7/15/43 o SS288 Portemouth 11-1/2 9/ 4/434 9/ 4/43 0 SS289 Portsmouth 11-2/5 10/ 3/434 10/ 2/43 o ss290 Portemouth 11-2/5 11/ 2/434 10/15/43 1/2+ ss291 Portsmouth 11-2/3 11/24/43# 11/ 2/43 3/4+ $8292 Cramp S.B. Co. 0,2 0.2 20 11/ 1/43 $$293 Cramp S.B. Co. 0.1 0.1 20 12/31/43 $$294 Cramp S.B. Co. 0.1 0.1 20 3/ 1/44 $$295 Cramp S.B. Co. 0.1 0.1 20 5/ 1/44 $5296 Cramp S.B. Co. 0.1 0.1 18 6/15/44 $$297 Cramp S.B. Co. 0.1 0.1 18 8/ 1/44 $8298 Cramp S.B. Co. 0.1 0.1 18 9/15/44 ss299 Cramp S.B. Co. 0.1 0.1 18 11/ 1/44 SS300 Cramp S.B. Co. 0.1 0.1 16 12/ 1/44 ss301 Cramp S.B. Co. 0.1 0.1 16 12/31/44 88302 Cramp S.B. Co. 0.1 0.1 16 2/ 1/45 88303 Cramp S.B. Co. 0,1 0.1 16 3/ 1/45 58304 Mare Island 12 1/434 5/ 1/43 o 85305 Mare Island 12 6/ 1/434 6/ 1/43 o $$306 Mare Island 12 10/ 1/434 10/ 1/43 o 88307 Mare Island 12 11/ 1/434 11/ 1/43 o (#) Date reported 1/ 1/42, vessels awarded subsequent to 11/ 1/41. Ahead of contract completion date. RESTRICTED REPRODUCTION OF THIS MATERIAL IN ANY FORM IS NOT AUTHORIZED EXCEPT BY SPECIFIC APPROVAL OF THE SECRETARY OF THE NAVY. MONTHLY PROGRESS REPORT MINE CRAFT UNDER CONSTRUCTION Distribution: The President The Secretary of the Navy The Under Secretary of the Navy The Assistant Secretary of the Navy The Chief of Naval Operations The Naval Aide to the President The Chief of the Bureau of Ships Senator David I. Walsh Congressman Carl Vinson Congressman William S. Jacobson Congressman George J. Bates Franklin D. Roosevelt Library DECLASSIFIED DOD DIR. 5200.9 (9/27/58) Date- 3-11-59 care I. specer RESTRICTED NAVY DEPARTMENT Reproduction of this material in any BUREAU OF SHIPS is not authorized except by specific WASHINGTON, D.C. of the Secretary of the Navy. N.B.S.(745) MINECRAFT UNDER CONSTRUCTION, UNITED STATES NAVY - REPORT OF PROGRESS AS OF PEBRUARY 1, 1942. Page 20 B-2 Percentage Date of Completion Months of Completion Ahead(t)or Feb. 1 Gain for No. of Mcs. As per As Reported As Last Behind(-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-91 Yard MINESWEEPERS (173 ft.) AM82 ADROIT (s) Commercial Iron Works 28.2 5.7 7/31/41 8-2/3 11/27/41 2/26/42 4/20/42 1-4/5- AM83 ADVENT (s) Commercial Iron Works 23.8 2.5 8/18/41 8-4/5 12/27/41 3/25/42 5/11/42 1-1/2- AM84 ANNOY (s) Commercial Iron Works 19.2 10.2 12/30/41 5 1/26/42 4/17/42 6/ 1/42 1-1/2- AM85 CONFLICT (s) Commercial Iron Works 12.8 4.2 1/28/42 4-3/5 2/25/42 5/7/42 6/15/42 1-1/4- AM86 CONSTANT (s) Commercial Iron Works 9.6 2.3 4-1/5 3/27/42 5/21/42 6/29/42 1-1/1- AM87 DARING (s) Commercial Iron Works B.2 1.4 5 4/26/42 6/16/42 7/13/42 1- AM88 DASH (a) Commercial Iron Works 8.4 2.0 3-3/4 5/26/42 6/16/42 7/27/42 1-1/3- AM89 DESPITE (a) Dravo Corp. 42.5 18.0 11/24/41 5-5/6 6/10/42 6/9/42 5/19/42 2/31 AM90 DIRECT (s) Dravo Corp. 40.9 18.5 12/26/41 5-2/5 7/25/42 7/24/42 6/ 9/42 1-1/2+ AM91 DYNAMIC (s) Dravo Corp. 33.3 11.3 1/16/42 5-1/2 9/8/42 7/42 6/30/42 2-1/5+ AM92 EFFECTIVE (g) Dravo Corp. 32.5 10.5 5 10/8/42 10/7/42 7/21/42 2-1/2+ AM93 ENGAGE (s) Dravo Corp. 32.5 10.5 5-4/5 11/7/42 11/6/42 8/11/42 2-5/64 AM94 EXCEL (s) Jakobson Shipyard, Inc. 11.2 4.4 12/19/41 9-3/4 1/19/42 1/42 10/10/42 2-1/3- AM95 EXPLOIT (s) Jakobson Shipyard, Inc. 7.3 2.3 9-2/3 4/ 1/42 10/1/42 12/29/42 3- AM96 PIDELITY (a) Nashville Bridge Co. 39.0 12.0 10/15/41 8 5/ 6/42 6/30/42 6/15/42 1/2+ AM97 FIERCE (a) Nashville Bridge Co. 37.0 10.0 10/18/41 8 5/ 6/42 6/30/42 6/18/42 2/5+ AM98 FIRM (s) Penn-Jersey Corp. 22.0 9.4 10/21/41 9-4/5 1/16/42 4/20/42 8/15/42 3-5/6- AM99 FORCE (s) Penn-Jersey Corp. 20.2 9.3 11/19/41 9 7/42 6/12/42 9/15/42 :- MINESWEEPERS (160 ft.) AM214 (a) (b) AM215 (s) (b) AM216 (s) (b) AM217 (s) (b) AM218 (s) (b) AM219 (a) (b) AM220 (s) (b) AM221 (s) (b) AM222 (s) (b) AM223 (s) (b) AM224 (s) (b) AM225 (s) (b) AN226 (s) (b) AM227 (s) (b) AM228 (a) (b) AM229 (a) (b) AM230 (a) (b) AM231 (s) (b) AM232 (a) (b) (=) Steel Hulls (b) Assignment to Builder Pending N.B.S.(745) As of February 1, 1942 Page 21 Z-2 Percentage of Completion Date of Completion Months Ahead(t)or Feb. 1 Gain for No. of Mes. As per As Reported As Last Behind(-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-41 Yard MINESWEEPERS (100 ft.) (Cont'd) AM233 (a) (b) AM234 (s) (b) AM235 (s) (b) AM236 (a) (b) AM237 (a) (b) AM238 (s) (b) AM239 (a) (b) AM240 (s) (b) AM241 (s) (b) AM242 (s) (b) AM243 (s) (b) AM244 (s) (b) AM245 (s) (b) AM246 (a) (b) AM247 (a) (b) AM248 (s) (b) AM249 (s) (b) AM250 (s) (b) AM251 (s) (b) AM252 (s) (b) AM253 (s) (b) AM254 (s) (b) AM255 (s) (b) AM256 (a) (b) AM257 (s) (b) AM258 (a) (b) AM259 (s) (b) AM260 (s) (b) AM261 (s) (b) AM262 (s) (b) AM263 (s) (b) AM264 (s) (b) AM265 (s) (b) AM266 (a) (b) AM267 (s) (b) AM268 (s) (b) AM269 (s) (b) AM270 (a) (b) AM271 (s) (b) AM272 (s) (b) AM273 (s) (b) AM274 (a) (b) (a) Steel Hulls (b) Assignment to Builder Pending. N.B.5.(745) As of February 1, 1942 Page 22 R2 Percentage of Completion Date of Completion Months Ahead(+) or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-41 Yard MINES#EEPERS (130 ft.) (Contid) AM275 (a) (b) AM276 (a)| (b) AM277 (a) (b) AM278 (s) (b) AM279 (s) (b) AM280 (a) (b) AM281 (a) (b) AM282 (s) (b) AM263 (s) (b) AM284 (s) (b) AM285 (s) (b) AM286 (c) (b) AM287 (s) (b) AM283 (s) (b) AM289 (a) (b) AX290 (s) (b) AM291 (s) (b) AM292 (a) (b) AM293 (s) (b) AM294 (a) (b) AM295 (s) (b) AM296 (a) (b) AM297 (s) (b) AM298 (a) (b) AX299 (s) (b) AM300 (s) (b) AM301 (s) (b) AM302 (s) (b) AH303 (n) (b) AM304 (s) (b) AM305 (a) (b) AM306 (s) (b) AM307 (s) (b) AM308 (a) (b) AN309 (s) (b) AM310 (a) (b) AM311 (a) (b) AM312 (s) (b) AM313 (s) (b) (a) Steel Hulls (b) Assignment to Builder Pending N.B.5.(745) As of February 1, 1942 Page 23 -2 Percentage of Completion Date of Completion Months Ahead(t) or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-41 Yard MINESWEEPERS (Plept Type) AM57 AUX - (s) Norfolk 95.1 7.2 4/15/41 8/26/41 10-2/5 9/12/41 2/28/42 2/28/42 0 AM58 BROADBILL (s) Defoe B. & M. Wks. 35.0 5.0 7/23/41 11-2/5 5/42 7/ 5/42 AM59 CHICKADEE (s) Defoe B. & M. Wks. 30.0 5.0 8/21/41 11-1/2 7/ 5/42 8/ 5/42 AM60 NUTHATCH (s) Defoe B. & M. Wks. 11.5 0.0 6 9/5/42 5/42 AM61 PHEASANT (s) Defoe B. & M. Wks. 10.5 0.0 7 11/ 5/42 11/5/42 AM62 SHELDRAKE (s) General Eng. & D.D. Co. 44.2 7.8 6/24/41 12-1/5 5/42 6/30/42 6/30/42 o AM63 SKYLARK (s) General Eng. & D.D. Co. 33.1 5.9 7/9/41 12-3/4 7/ 5/42 7/30/42 7/30/42 o AM64 STARLING (s) General Eng. & D.D. Co. 26.3 3.3 7/11/41 13-2/3 5/42 8/30/42 8/30/42 0 AM65 SWALLOW (a) General Eng. & D.D. Co. 22.7 2.5 7/19/41 14-1/3 11/ 5/42 9/30/42 9/30/42 o AM100 HEED (a) General Eng. & D.D. Co. 11.0 0.8 8-3/4 6/25/42 11/7/42 11/7/42 o AM101 HERALD (a) General Eng. & D.D. Co. 10.0 0.3 9 7/25/42 11/30/42 11/30/42 o AM102 MOTIVE (s) General Eng. & D.D. Co. 9.6 0.3 8-2/3 10/23/42 12/21/42 12/21/42 o AM103 ORACLE (s) General Eng. & D.D. Co. 8.2 0.4 8 11/22/42 1/15/43 12/30/42 1/2t AM104 PILOT (s) Pennsylvania S.Y., Inc. 15.5 2.5 10/27/41 11-1/3 10/8/42 10/8/42 10/8/42 o AM105 PIONEER (a) Pennsylvania S.Y., Inc. 15.0 3.0 10/30/41 11-4/5 10/23/42 10/23/42 10/23/42 o AM106 PORTENT (s) Pennsylvania S.Y., Inc. 14.0 3.0 11/15/41 11-3/4 11/7/42 11/7/42 11/7/42 0 AM107 PREVAIL (s) Pennsylvania S.Y., Inc. 13.5 2.5 11/15/41 12-1/4 11/22/42 11/22/42 11/22/42 0 AM108 PURSUIT (s) Winslow Marine Ry. & S.B. Co. 16.6 6.2 11/12/41 9-3/4 9/ 3/42 3/42 9/3/42 0 AM109 REQUISITE (e) Vinalew Marire Rs. & S.B. Co. 14.1 5.1 11/12/41 10-1/3 9/23/42 9/23/42 o AM110 9/23/42 RIGHT (s) Winslow Mar. R;, & S.B. Co. 3.0 1.0 5-1/4 AM111 SAGE 10/23/42 (s) 10/23/42 Winslow Mar. Ry, & S.B. Co. 10/23/42 o 3.0 1.0 5-1/4 AM112 SEER 11/22/42 (s) 11/22/42 11/22/42 0 American S.B. Co. 27.5 3.0 11/28/41 11 AM113 10/17/42 SENTINEL (s) American S.B. Co. 10/26/42 26.5 3.1 11/28/41 11 AM114 10/17/42 STAFF (s) American S.B. Co. 10/26/42 25.8 3.5 11/28/41 AM115 11-2/5 11/2/42 SKILL (s) 11/11/42 American S.B. Co. 25.0 3.8 11/28/41 AM116 11-2/5 11/2/42 SPEED (a) 11/11/42 American S.B. Co. 34.7 14.1 11/17/41 AM117 11-4/5 11/2/42 STRIVE (a) 11/11/42 American S.B. Co. 33.5 14.0 11/17/41 AM118 12-1/4 11/16/42 STEADY (s) 11/25/42 American S.B. Co. 32.1 13.7 11/17/41 12-1/4 11/16/42 AM119 SUSTAIN (s) 11/25/42 American S.B. Co. 31.5 14.2 11/17/41 12-1/4 11/16/42 AM120 SWAY (s) John H. Mathis Co. 11/25/42 4.7 1.1 11/18/41 13-2/5 3/22/42 AM121 SWERVE (a) 12/30/42 John H. Mathis Co. 1.6 0.2 (h) AM122 6/20/42 SWIFT (s) 1/20/43 John H. Mathis Co. 1,6 0.2 (h) 9/18/42 2/28/43 (a) Steel hulls. (h) Keel laying date not available. Placed in commission 15 January 1941. N.B.S.(745) As of February 1, 1942 Page 24 7-2 Percentage Date of Completion Months of Completion Ahead(+ or Feb. 1 Gain for No. of Mes. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-91 Yard MINESWEEPERS (Fleet Type) (Cont'd) AX123 SYMBOL (s) Savannah Mach. & Foundry Co. 14.0 3.0 11/18/41 8-1/5 7/25/42 7/24/42 7/24/42 o AM124 THREAT (s) Savannah Mach. & Foundry Co. 12.0 3.0 12/15/41 8-1/3 10/23/42 10/22/42 8/26/42 1-5/6+ AM125 TIDE (s) Savannah Mach. & Foundry Co. 8.0 1.0 8 1/21/43 1/19/43 11/ 2/42 2-1/21 AM126 TOKEN (s) Gulf S.B. Co. 33.6 12.0 7/21/41 14-1/4 9/29/42 9/29/42 9/29/42 o AM127 TUMULT (s) Gulf S.B. Co. 32.6 11.0 7/21/41 15-1/4 10/29/42 10/29/42 10/29/42 o AM128 VELOCITY (a) Oulf S.B. Co. 27.5 9.5 7/21/41 16-1/4 11/28/42 11/28/42 11/28/42 o AM129 VITAL (a) Gulf S.B. Co. 9.1 6.0 1/ 1/42 11-3/5 12/18/42 12/18/42 12/18/42 o AM130 USAGE (a) Gulf S.B. Co. 9.1 6.0 1/ 1/42 12-1/5 1/7/43 1/ 7/43 1/ 7/43 o AM131 ZEAL (s) Gulf 3.B. Co. 9.1 6.0 1/12/42 12-1/2 1/27/43 1/27/43 1/27/43 o AM166 (a) (b) AMIC7 (a) (b) AM168 (s) (b) AM169 (s) (b) AMITO (s) (b) AM171 (s) (b) AM172 (s) (b) AM173 (s) (b) AM174 (a) (b) AM175 (s) (b) AM176 (s) (b) AM177 (a) (b) AM173 (s) (b) AM179 (s) (b) AM180 (s) (b) AM161 (s) (b) AM182 (s) (b) AM133 (s) (b) AM184 (s) (b) AM185 (s) (b) (a) Steel Hulls (b) Assignment to Builder Pending. N.B.S.(745) As of February 1, 1942 Page 25 E-2 Percentage Date of Completion of Completion Months Ahend(+) or Feb. 1 Gain for No. of Mes. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-11 Yard MINESWEEPERS (Fleet Type) (Cont'd) AM186 (s) (b) AM187 (s) (b) AM188 (s) (b) AM189 (a) (b) AM190 (s) (b) AM191 (s) (b) AM192 (s) (b) AM193 (s) (b) AM194 (s) (b) AM195 (s) (b) AM196 (s) (b) AM197 (s) (b) AM198 (s) (b) AM199 (s) (b) AM200 (s) (b) AM201 (s) (b) AM202 (s) (b) AM203 (s) (b) AM204 (s) (b) AM205 (a) (b) AM206 (a) (b) AM207 (a) (b) AM208 (a) (b) AM209 (s) (b) AM210 (s) (b) AM211 (s) (b) AM212 (s) (b) AM213 (a) (b) COASTAL MINESWEEPERS (97 ft.) AMo65 ASSERTIVE (w) Bristol Yacht Building Co. 99.0 4.0 4/ 5/41 11/19/41 11 7/15/41 2/ 2/42 3/ 2/42 1- AMc66 AVENGE (w) Bristol Yacht Building Co. 85.0 10,0 8/41 10-1/5 10/ 2/41 3/ 9/42 3/14/42 1/6- AMc67 BOLD (w) Bristol Yacht Building Co. 50.0 15.0 8/27/41 8 11/12/41 5/ 4/42 4/29/42 1/5+ AMc68 BULWARK (w) Hodgdon Bros.& Goudy & Stevens Delivered 22 January 1942 Placed in Service 5 February 1942. AMc69 COMBAT (w) Hodgdon Bros.& Goudy & Stevens Delivered 4 February 1942. AMc70 CONQUEROR (w) Warren Fish Co. 95.0 7.0 8/41 8/20/41 9 10/28/41 12/12/41 3/ 3/42 2-2/3- AMc71 CONQUEST (w) Warren Fish Co. 93.0 7.0 5/ 8/41 8/25/41 9-1/3 11/17/41 12/26/41 3/ 5/42 2-1/3- AMc80 FEARLESS (w) W, A. Robinson, Inc. Delivered 4 February 1942 AMc81 PORTITUDE (w) W. A. Robinson, Inc. 88.0 23.0 8/14/41 12/2/41 6-1/4 9/22/41 1/ 9/42 2/21/42 1-2/5- (a) Steel Hull, (w) Wood Hull. (b) Assignment to Builder Pending. N.B.S.(745) ADDIRICTED As of February 1 1942 Page 26 E-2 Percentage Date of Completion Months of Completion Ahead(t)or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-91 Yard COASTAL MINESWEEPERS (97 t.)(Cont'd) AMo82 GOVERNOR (w) Camden S.B. & Marine Ry. Co. Delivered 13 January 1942. Placed in Service 29 January 1942. AMc83 QUIDE (w) Camden S.B. & Marine Ry, Co. 90.0 7.0 9/41 9/20/41 9-1/2 8/29/41 2/2/42 2/25/42 3/4- AMc84 HEROIC (w) Warren Boat Yard, Inc. 94.0 8.0 5/41 8/30/41 9-4/5 7/15/41 12/8/41 2/28/42 2-2/3- AMc85 IDEAL (w) Warren Boat Yard, Inc. 74.0 4.0 6/ 4/41 9/20/41 9-1/5 10/18/41 1/5/42 3/10/42 2-1/6- AMc87 LIBERATOR (w) F. L. Fulton 96.0 9.0 5/41 9/ 6/41 9 9/28/41 1/24/42 2/12/42 2/3- AMc88 LOYALTY (w) F. L. Fulton Delivered 16 January 1942. Placed in Service 16 January 1942. AMc89 MEMORABLE (w) F. L. Pulton 90.0 13.0 7/31/41 12/24/41 6-4/5 6/42 2/24/42 2/24/42 0 AMc90 MERIT (w) F. L. Fulton 85.0 8.0 8/15/41 1/ 4/42 6-3/4 2/15/42 3/24/42 3/7/42 1/2+ AMc91 OBSERVER (w) F. L. Pulton 80.0 7.0 6/41 1/15/42 6-2/3 3/27/42 4/24/42 3/25/42 It AMc93 PEERLESS (w) Delaware Bay S.B. Co. Inc. 95.0 5.0 4/14/41 9/ 6/41 10-1/3 11/7/41 1/5/42 2/25/42 1-2/3- AMc94 PLUCK (w) Noank S.B. Co. 55.0 3.0 6/ 7/41 9-1/2 7/30/41 1/31/42 3/21/42 1-2/3- AMc95 POSITIVE (w) Noank S.B. Co. 59.0 6.5 6/ 7/41 8-2/3 8/20/41 2/15/42 2/28/42 1/2- AMc96 POWER (w) Noank S.B. Co. 52.0 3.0 6/ 7/41 10 9/10/41 3/42 4/11/42 1-1/4- AMc98 PROGRESS (w) Anderson & Cristofani Delivered 23 January 1942. Placed in Service 23 January 1942. AMc99 RADIANT (w) Anderson & Cristofani 96.0 14.0 6/26/41 9/27/41 7-1/3 11/7/41 12/11/41 2/5/42 1-4/5- AMc100 RELIABLE (w) Anderson & Cristorani 75.0 11.0 8/18/41 11/1/41 6-2/5 12/27/41 2/5/42 3/1/42 5/6- AMc101 ROCKET (w) Anderson & Cristofani 64.0 11.0 6/41 6-2/3 2/15/42 2/28/42 3/25/42 1- AMc102 ROYAL (w) Anderson & Cristofani 60.0 12.0 11/1/41 4-5/6 3/27/42 3/31/42 3/27/42 o AMc103 SECURITY (w) H. G. Marr 95.0 10.0 4/29/41 9/27/41 9-2/3 9/28/41 12/22/41 2/20/42 2- AMc104 SKIPPER (w) E. 0. Marr 55.0 20.0 5/21/41 1/16/42 10-1/2 11/27/41 3/16/42 6/42 2/3- AMc105 STALWART (w) Snow Shipyards Delivered 8 January 1942. Placed in Service 22 January 1942. AMc106 SUMMIT (w) Snow Shipyards Delivered 16 January 1942 Placed in Service 29 January 1942. AM:107 TRIDENT (w) Snow Shipyards Delivered 2 February 1942, AMc108 VALOR (w) Snow Shipyards 90.0 10.0 5/27/41 11/ 8/41 9-1/6 11/12/41 1/12/42 2/42 1-2/3- AMc109 VICTOR (w) Snow Shipyards 75.0 15.0 7/14/41 12/ 6/41 8-1/3 11/27/41 2/6/42 3/23/42 1-1/2- AMcll0 VIGOR (w) Snow Shipyards 55.0 30.0 8/ 6/41 1/19/42 7-4/5 12/12/41 2/23/42 3/30/42 1-1/4- AMc150 (w) (b) AMc1'1 (w) (b) AMc152 (w) (b) AMc153 (w) (b) AMc154 (w) (b) AMc155 (w) (b) AMc156 (w) (b) AMc1:7 (w) (b) AMc158 (w) (b) AMc199 (w) (b) AMc160 (w) (b) AMcl 1 (w) (b) AMc162 (w) (b) AMc163 (w) (b) AMc164 (w) (b) AMc165 (w) (b) AMeloo (w) (b) AM0167 (v) e (w) Wood Hulls (b) Assignment to Builder Pending N.B.S.(745) I As of February 1, 1942 Page 27 Z.2 Percentage of Completion Date of Completion Months Ahead(+) or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-11 Yard COASTAL MINESWEEPERS (97 ft, (Cont'd) AMa169 (w) (b) AMc169 (w) (b) AMc170 (w) (b) AMc171 (w) (b) AMc172 (w) (b) AMc173 (w) (b) AMc174 (w) (b) AMc175 (w) (b) AMc176 (w) (b) AMc177 (w) (b) AMc178 (w) (b) AMc179 (w) (b) AMc180 (w) (b) AMc181 (w) (b) AMe182 (w) (b) AMc183 (w) (b) AMc184 (w) (b) AMc185 (w) (b) AMc186 (w) (b) AMc187 (w) (b) AMc188 (w) (b) AMc189 (w) (b) AMc190 (w) (b) AMc191 (w) (b) AMc192 (w) (b) AMc193 (w) (b) AMc194 (w) (b) AMc195 (w) (b) AMc196 (w) (b) AMc197 (w) (b) AMc198 (w) (b) AMc199 (w) (b) (w) Wood Hulls. (b) Assignment to Builder Pending. N.B.5.(745) | As of Februar 1 1942 Page 28 E-2 Percentage Date of Completion of Completion Months Ahead(+) or Feb.1 Gain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan.1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-41 Yard COASTAL MINESWEEPERS (180 ft.) AMcll5 (s) Tampa Shipbuilding Co. Inc. 9 12/19/42 AMc114 (s) Tampa Shipbuilding Co. Inc. 10 1/14/43 AMc115 (s) Tampa Shipbuilding Co. Inc. 9 1/28/43 AMcl16 (a) Tampa Shipbuilding Co. Inc. 10-1/3 2/11/43 AMcl17 (s) Tamps Shipbuilding Co. Inc. 8-4/5 2/25/43 AMc115 (s) Tamps Shipbuilding Co. Inc. 9-1/3 3/11/43 AMc119 (a) Tamps Shipbuilding Co. Inc. 9-1/3 3/25/43 AMcl20 (s) Tampa Shipbuilding Co. Inc. 9-4/5 4/8/43 AMc121 (a) Tampa Shipbuilding Co. Inc. 9 4/20/43 AMc122 (s) Tumps Shipbuilding Co. Inc. 9-1/3 5/2/43 AMc123 (s) Tampa Shipbuilding Co. Inc. 9-1/5 5/14/43 AMe124 (s) Tampa Shipbuilding Co. Inc. 9-3/5 5/26/43 AMc125 (a) Tamps Shipbuilding Co. Inc. 7-4/5 6/8/43 AMc12 (s) Tamps Shipbuilding Co. Inc. 8-1/6 6/20/43 AMc127 (s) Tampa Shipbuilding Co. Inc. 8 6/30/43 AMc128 (s) Tampa Shipbuilding Co. Inc. 8-1/3 7/10/43 AMc129 (s) Willamette Iron & Steel Corp. (h) 1/20/43 AMc13. (s) Willamette Iron & Steel Corp. (h) 2/1/43 AMc131 (s) Willamette Iron & Steel Corp. (h) 2/8/43 AMc132 (a) Willamette Iron & Steel Corp. (h) 2/15/43 AMc133 (s) Willamette Iron & Steel Corp. (h) 2/22/43 AMc134 (s) Willamette Iron & Steel Corp. (h) 3/1/43 AMc135 (s) Willamette Iron & Steel Corp. (h) 3/8/43 AMc136 (a) Willamette Iron & Steel Corp. (h) 3/16/43 AMc137 (s) Willamette Iron & Steel Corp. (h) 3/24/43 AMc138 (s) Willamette Iron & Steel Corp. (h) 4/1/43 AMc139 (s) Willamette Iron & Steel Corp. (h) 4/9/43 AMc140 (s) Willamette Iron & Steel Corp. (h) 4/17/43 AMc141 (s) Willamette Iron & Steel Corp. (h) 4/25/43 AMc142 (a) Willamette Iron & Steel Corp. (h) 1/43 (a) Steel Hulls (h) Keel Laying date not available. (e) Date of award. N.B.S.(745) As of February 1, 1942 Page 29 E.2 Percentage Date of Completion Months of Completion Ahead(t)or Feb. 1 Dain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-91 Yard MOTOR DRIVEN MINESWEEPERS YMS1 Wood Hull Henry B. Nevins, Inc. 91.1 8.5 4/41 1/10/42 12-2/3 10/10/41 1/5/42 3/24/42 2-2/3- " YMS2 Henry B. Nevins, Inc. 85.6 9.2 3/7/41 1/28/42 12-4/5 12/15/41 1/30/42 3/31/42 2- YMS3 " " Henry B. Nevins, Inc. 66.8 0.0 3/18/41 13-2/5 1/14/42 2/14/42 4/30/42 2-1/2- - = YMS4 Henry B. Nevins, Inc. 61.2 0.2 8/20/41 9-2/5 2/13/42 4/13/42 6/2/42 1-2/3- . # YMS5 Henry B. Nevins, Inc. 58.2 0.2 8/14/41 10-3/5 12/27/41 2/27/42 2/42 4-1/5- YMS6 # - Henry B. Nevins, Inc. 43.2 0.2 8/8/41 11-4/5 1/26/42 3/26/42 7/31/42 4-1/6- If - YMS7 Henry B. Nevins, Inc. 52.0 0.2 10/31/41 10 2/25/42 4/25/42 8/31/42 4-1/5- YMS8 # " Henry B. Nevins, Inc. 19.5 6.7 1/23/42 8-1/3 3/27/42 5/27/42 10/2/42 4-1/6- " " YMS9 Henry B. Nevins, Inc. 8.0 0.0 4/42 9 4/26/42 6/27/42 10/31/42 4- # " YMS10 Henry B. Nevins, Inc. 8.0 0.0 8-1/3 5/26/42 7/28/42 12/1/42 4. YMS11 " " Henry B. Nevins, Inc. 8.0 0.0 8-3/4 6/25/42 8/25/42 12/31/42 4-1/5- YMS12 # = Rice Bros. Corp. 78.0 23.0 4/21/41 11-1/3 1/ 1/42 3/16/42 3/30/42 1/2- - - YM313 Rice Eros. Corp. 72.0 22.0 4/21/41 11-1/2 2/ 1/42 3/23/42 4/6/42 1/2- - - YMS14 Rice Bros. Corp. 51.0 16.0 7/ 1/41 9-2/3 3/ 1/42 4/30/42 4/20/42 1/3+ . YM315 Rice Bros. Corp. 50.0 15.0 5/41 9-3/4 3/15/42 5/11/42 4/27/42 1/2+ H YMS16 " Rice Bros. Corp. 6.0 1.0 4 4/ 1/42 6/12/42 6/29/42 1/2- YMS17 H # Rice Bros. Corp. 6.0 1.0 3-4/5 4/15/42 6/26/42 7/ 6/42 1/3- YMS18 - - Herreshoff Mfg. Co. 60.0 6.0 6/6/41 12/8/41 9 12/12/41 2/42 3/9/42 1/4- - - YMS19 Herreshoff Mfg. Co. 53.0 4.0 6/27/41 12/27/41 10 2/25/42 4/24/42 1/42 1/4- YMS20 - - Greenport Basin & Cons. Co. 75.0 16.0 6/27/41 11/1/41 9 11/2/41 1/26/42 3/24/42 2- # # YMS21 Greenport Basin & Cons. Co. 70.0 12.0 6/28/41 11/25/41 9-1/3 11/16/41 2/5/42 7/42 2- . YMS22 Greenport Basin & Cons. Co. 46.0 11.0 7/8/41 12/31/41 10 12/15/41 3/10/42 5/ 5/42 1-5/6- = If YMS23 Greenport Basin & Cons. Co. 58.0 12.0 7/23/41 12/13/41 9 12/29/41 3/20/42 4/21/42 1- YMS24 " " Greenport Basin & Cons. Co. 46.0 11.0 11/6/41 1/10/42 6-2/5 1/28/42 5/42 5/19/42 1/2- # " YMS25 Greenport Basin & Cons. Co. 35.0 15.0 11/28/41 1/28/42 7 2/12/42 5/15/42 6/ 2/42 1/2- . - YMS26 Greenport Basin & Cons. Co. 26.0 10.0 12/15/41 6 3/15/42 6/20/42 6/16/42 0 . . YMS27 Greenport Basin & Cons. Co. 17.0 10.0 12/24/41 6-1/5 1/42 7/10/42 6/30/42 1/3+ YMS28 # # Greenport Basin & Cons. Co. 11.0 8.0 1/13/42 6 9/42 8/20/42 7/16/42 It " # YMS29 Greenport Basin & Cons. Co. 5.0 3.0 1/30/42 6 5/13/42 9/5/42 7/28/42 1-1/4+ # YMS30 Greenport Basin & Cons. Co. 2.0 0.0 5-1/4 6/16/42 10/20/42 8/11/42 2-1/3+ - . YMS31 Greenport Basin & Cons. Co. 2.0 0.0 5-1/2 7/20/42 11/25/42 8/25/42 3+ - YMS32 C. Hiltebrant D.D. Co. 75.0 5.0 7/41 1/41 10-3/5 10/18/41 12/30/41 3/24/42 2-4/5- # # YMS33 C. Hiltebrant D.D. Co. 70.0 5.0 5/8/41 10/8/41 11 11/12/41 1/10/42 7/42 3- # # YMS34 C. Hiltebrant D.D. Co. 67.0 5.0 5/13/41 10/21/41 11 12/7/41 4/42 4/13/42 2-1/3- - - YMS35 C. Hiltebrant D.D. Co. 58.0 3.0 5/17/41 11/7/41 11 1/42 2/28/42 4/20/42 1-2/3- . . YMS36 C. Hiltebrant D.D. Co. 40.0 10.0 10/6/41 1/21/42 8-3/5 3/27/42 5/25/42 6/23/42 1- # YMS37 C. Hiltebrant D.D. Co. 38.0 13.0 10/13/41 1/28/42 8-3/5 3/27/42 6/ 1/42 6/30/42 1- N.B.S.(745) As of February 1. 1942 Page 30 E-2 Percentage Date of Completion of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+) or Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by Behind (-) TOTAL TOTAL Keel to or Yard Building 11-1-41 Laid Launched Completion Order 11-1-11 Yard Prediction MOTOR DRIVEN MINESWEEPERS (Cont'd) YMS38 Wood Hull Robert Jacob Inc. # 84.0 # 9.0 5/2/41 1/24/42 11-1/4 12/27/41 1/30/42 4/10/42 2-1/3- YMS39 Robert Jacob, Inc. H # 96.0 11.0 5/23/41 9-1/3 1/26/42 1/15/42 4/42 YMS40 12/23/41 1-2/3- Robert Jacob Inc. YMS41 # # 72.0 10.0 6/19/41 10 2/10/42 2/10/42 4/16/42 2-1/5- Robert Jacob Inc. " - 68.0 10.0 6/28/41 11-3/5 2/25/42 2/25/42 6/16/42 3-2/3- YMS42 Wheeler S.B. Corp. YMS43 . " 80.0 15.0 6/6/41 10 9/28/41 2/42 4/42 2- Wheeler S.B. Corp. # " 65.0 15.0 6/12/41 10-2/5 10/28/41 2/16/42 4/25/42 2-1/3- YMS44 Wheeler S.B. Corp. 60.0 20.0 6/18/41 11/27/41 2/27/42 5/16/42 2-2/3- YMS45 If " 11 Wheeler S.B. Corp. # 50.0 15.0 6/20/41 11-4/5 12/27/41 3/13/42 6/13/42 3- YMS46 Wheeler S.B. Corp. # " 35.0 5.0 6/24/41 12 1/11/42 3/27/42 6/20/42 2-3/4- YMS47 Wheeler S.B. Corp. YMS48 " . 40.0 12.0 6/26/41 12-1/4 1/26/42 4/10/42 7/ 3/42 2-3/4- Wheeler S.B. Corp. " . 30.0 5.0 6/27/41 12-3/4 2/10/42 4/24/42 7/18/42 2-4/5- YMS49 Wheeler S.B. Corp. " . 28.0 3.0 6/30/41 12-5/6 2/25/42 8/42 7/25/42 2-1/2- YMS50 Wheeler S.B. Corp. # . 25.0 5.0 7/16/41 12-1/2 3/12/42 5/23/42 8/1/42 2-1/3- YMS51 Wheeler S.B. Corp. " . 25.0 5.0 7/16/41 12-3/4 3/27/42 6/5/42 8/8/42 2- YMS52 Wheeler S.B. Corp. YMS53 # - 25.0 5.0 8/5/41 12-1/3 4/11/42 6/19/42 8/15/42 2- Wheeler S.B. Corp. " . 25.0 5.0 8/25/41 12 4/26/42 7/3/42 8/25/42 1-3/4- YMS54 Gibbs Gas Engine Co. YMS55 H - Delivered 9 February 1942. Gibbs Gas Engine Co. " " 90.0 12.0 5/26/41 11/22/41 8-4/5 10/28/41 2/10/42 2/20/42 1/3- YMS56 Gibbs Gas Engine Co. - " 81.0 10.5 5/30/41 12/6/41 9-2/5 11/12/41 2/21/42 3/12/42 2/3- YMS57 Gibbs Gas Engine Co. - " 73.0 5.0 6/5/41 12/15/41 10 11/12/41 3/42 4/1/42 1- YMS58 Gibbs Gas Engine Co. YMS59 - . 70.0 5.0 6/19/41 12/22/41 10 11/27/41 3/20/42 4/21/42 1- Gibbs Gas Engine Co. " . 67.0 4.0 7/14/41 12/30/41 10 12/12/41 3/30/42 5/11/42 1-1/3- YMS60 Gibbs Oas Engine Co. " . 60.0 20.5 9/19/41 1/19/42 8-1/3 12/27/41 4/20/42 5/30/42 1-1/3- YMS61 Gibbs Gas Engine Co. YMS62 " . 47.5 10.0 9/23/41 9 1/11/42 4/30/42 6/20/42 1-2/3- Gibbs Gas Engine Co. YMS63 " 42.0 . 17.0 11/12/41 8 1/26/42 5/9/42 7/10/42 2- Gibbs Gas Engine Co. 35.0 12.5 11/26/41 8 YMS64 - # 2/10/42 5/20/42 7/30/42 2-1/3- Gibbs Gas Engine Co. - # 24.0 19.0 1/3/42 7-1/2 2/25/42 5/30/42 8/19/42 2-2/3- YMS65 Gibbs Gas Engine Co. 18.0 8 3/12/42 6/10/42 9/42 3- YMS66 - # 13.0 1/7/42 Weaver Shipyards . " 50.0 16.0 7/22/41 1/31/42 9-1/3 10/28/41 3/1/42 5/1/42 2- YM367 Weaver Shipyards . " 40.0 6.0 7/22/41 9-4/5 11/27/41 8/42 5/15/42 2-1/4- YMS68 Weaver Shipyards YMS69 - 40.0 # 11.0 7/22/41 10-1/3 12/27/41 3/13/42 6/1/42 2-3/5- Weaver Shipyards . # 35.0 6.0 7/22/41 10-3/5 1/26/42 3/20/42 6/10/42 2-2/3- YMS70 Weaver Shipyards 6.0 10-4/5 2/25/42 3/27/42 6/15/42 2-3/5- YMS71 . . 35.0 7/22/41 Weaver Shipyards # # 40.0 6.0 7/22/41 11 3/27/42 4/ 4/42 6/20/42 2-1/2- YM372 Weaver Shipyards . . 35.0 7.0 7/22/41 11 4/11/42 4/11/42 6/25/42 2-1/2- YMS73 Weaver Shipyards YMS74 . # 35.0 7.0 7/22/41 11-1/4 4/26/42 4/26/42 6/30/42 2- Weaver Shipyards # . 30.0 2.0 7/22/41 11-2/5 5/26/42 5/26/42 7/5/42 1-1/3- YMS75 Weaver Shipyards 30.0 2.0 7/22/41 11-3/5 5/26/42 5/26/42 7/10/42 1-1/2- N.B.S.(745) RESTRICTED As of February 1, 1942 Page 31 E.2 Percentage Date of Completion of Completion Months Ahead(t)or Feb. 1 Gain for No. of Mos. As per As Reported As Last Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by Behind (-) 11-1-41 TOTAL TOTAL Keel to or Yard Building Laid Launched Completion 11-1-11 Prediction Order Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS76 Wood Hull Stadium Yacht Basin, Inc. 68.5 10.3 4/25/41 11/8/41 12-1/6 9/28/41 (x) 4/30/42 YMS77 " # Stadium Yacht Basin, Inc. 71.5 11.2 5/2/41 10/11/41 11-4/5 11/12/41 (x) 4/25/42 YMS78 " . Stadium Yacht Basin, Inc. 60.0 7.0 5/16/41 12/11/41 11-2/3 11/27/41 (x) 5/5/42 YMS79 " - Stadium Yacht Basin, Inc. 57.0 6.8 6/12/41 12/27/41 11 12/27/41 (x) 5/9/42 YMS80 " # Stadium Yacht Basin, Inc. 55.0 6.6 6/27/41 10-3/5 1/16/42 (x) 5/14/42 YMS81 " # Stadium Yacht B sin, Inc. 53.0 6.0 7/16/41 10 2/5/42 (x) 5/15/42 YMS82 # # Stadium Yacht Basin Inc. 44.0 8.5 10/24/41 7 2/25/42 (x) 5/23/42 YMS83 # # Stadium Yacht Basin, Inc. 39.0 5.5 11/24/41 6 3/17/42 (x) 5/25/42 YMS54 If # Henry C. Grebe & Co. 71.0 12.0 6/ 2/41 10-3/5 2/15/42 2/14/42 4/20/42 2-1/5- YMS85 " # Henry C. Grebe & Co. 68.0 10.0 6/ 2/41 10 3/17/42 3/14/42 5/5/42 1-2/3- YMS86 " # Al Larson Boat Shop, Inc 65.0 10.0 6/26/41 1/31/42 8-4/5 11/27/41 1/27/42 3/20/42 1-3/4- YMS87 " # Al Larson Boat Shop, Inc. 52.0 7.0 7/18/41 8-4/5 3/27/42 3/27/42 4/11/42 1/2- YMS88 # " South Coast Co. 68.5 12.5 6/20/41 10/18/41 9-2/3 1/16/42 3/16/42 4/11/42 5/6- YMS89 - # South Coast Co. 55.5 7.0 7/11/41 11/22/41 10-2/3 3/17/42 4/15/42 5/30/42 1-1/2- " YMS90 # South Coast Co. 48.5 5.0 7/24/41 12/19/41 11-1/5 4/26/42 5/15/42 6/30/42 1-1/2- - YMS91 " South Coast Co. 44.5 7.9 10/18/41 9-2/5 6/5/42 6/18/42 7/30/42 1-2/5- - YMS92 - South Coast Co. 38.5 9.0 11/21/41 9 6/20/42 6/25/42 8/18/42 1-4/5- - . YMS93 South Coast Co. 23.0 8.0 12/19/41 8-2/5 7/5/42 7/3/42 8/31/42 2- YMS94 # . Colberg Bt.Wks.& Stephens Bros 74.0 8.0 5/7/41 12/15/41 9 10/18/41 12/15/41 3/7/42 2-3/4- YMS95 " - Colberg Bt.Wks.& Stephens Bros 49.1 13.5 6/6/41 12/16/41 8-1/3 11/17/41 1/15/42 2/15/42 1- YMS96 " " Colberg Bt.Wks.& Stephens Bros 65.0 5.0 6/11/41 9-2/3 12/17/41 1/15/42 4/1/42 2-1/2- YMS97 " " Colberg Bt.Wks.& Stephens Bros 38.1 4.1 6/6/41 9 1/16/42 2/15/42 3/10/42 5/6- YMS98 " " Colberg Bt.Wks.& Stephens Bros 57.0 5.0 6/12/41 12/31/41 10 2/15/42 2/15/42 4/15/42 2- " YMS99 " Colberg Bt. Wks.& StephensBros 35.4 1.9 6/6/41 10 3/17/42 3/15/42 4/10/42 5/6- YMS100 # . Astoria Marine Construction Co 60.0 10.0 7/15/41 9 12/17/41 1/42 4/13/42 1-2/5- YMS101 R . Astoria Marine Construction Co 50.0 10,0 7/22/41 9-1/2 2/15/42 4/ 1/42 5/8/42 1-1/4- YMS102 " # Astoria Marine Construction Co 40.0 10.0 6/26/41 11-1/6 4/16/42 5/ 1/42 6/1/42 1- YMS103 II " Astoria Marine Construction Co 35.0 5.0 7/22/41 11-1/3 5/26/42 6/ 1/42 7/1/42 1- YMS104 . " Frank L. Sample, Jr. Inc. 73.0 23.0 5/21/41 10-1/3 12/17/41 3/31/42 3/30/42 o YMS105 # " Frank L. Sample Jr. Inc. 68.0 23.0 5/13/41 11-1/2 1/17/42 4/27/42 4/27/42 o YMS106 . - Frank L. Sample Jr. Inc. 60.0 20.0 5/21/41 12 2/ 2/42 5/30/42 5/25/42 1/6+ YMS107 . . Burger Bost Co. 59.1 9.8 5/13/41 13-3/5 11/12/41 3/15/42 7/1/42 3-1/2- YMS108 # . Burger Boat Co. 53.1 9.0 5/15/41 14-1/2 12/27/41 4/15/42 8/1/42 3-1/2- YMS109 # . Burger Boat Co. 46.9 6.4 5/21/41 14-4/5 1/26/42 5/15/42 8/15/42 3- YMS110 # . Burger Boat Co. 41.8 5.9 8/25/41 12-1/5 2/25/42 6/15/42 9/1/42 2-1/2- YMS111 # # Burger Boat Co. 39.4 6.0 8/27/41 12-3/5 3/27/42 7/15/42 9/15/42 2- YMS112 # # Burger Boat Co. 37.3 6.4 8/29/41 13 4/26/42 8/15/42 10/1/42 1-1/2- (x) No estimated completion date reported by supervisor. N.B.3.(745) RESTRICTED As of February 1, 1942. Page 32 E-2 Percentage Date of Completion Months of Completion thead(t) or Feb. 1 Dain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-11 Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS113 Wood Hull San Diego Marine Constr. Co. 52.0 6.0 6/4/41 12/17/41 5/20/42 5/20/42 o YMS114 - # San Diego Marine Constr. Co. 49.0 8.0 6/26/41 2/15/42 5/31/42 5/31/42 0 YMS115 " # San Diego Marine Constr. Co. 43.0 10.0 6/26/41 4/16/42 6/20/42 6/20/42 o YMS116 . " San Diego Marine Constr. Co. 42.0 15.0 6/26/41 6/5/42 7/20/42 7/20/42 o YMS117 . If Harbor Boat Bldg. Co. 95.0 15.0 5/8/41 8/23/41 1/26/42 1/15/42 3/4/42 1-2/3- YMS118 - " Harbor Boat Bldg. Co. 88.5 11.5 5/14/41 10/27/41 3/12/42 1/31/42 3/20/42 1-2/3- YMS119 - # Harbor Boat Bldg. Co. 70.5 11.3 7/15/41 4/26/42 2/25/42 4/21/42 2- YMS120 . " Harbor Boat Bldg. Co. 62.0 4.0 8/23/41 6/10/42 3/25/42 5/21/42 2- YMS121 - # Kruse & Banks S.B. Co. Inc. 48.0 4.0 5/15/41 11/27/41 3/15/42 5/1/42 1-1/2- YMS122 . # Kruse & Banks S.B. Co. Inc. 34.0 4.0 5/15/41 1/26/42 4/15/42 5/15/42 1- YMS123 . # Kruse & Banks S.B. Co. Inc. 42.0 4.0 7/2/41 3/27/42 6/1/42 6/1/42 o YMS124 . # Kruse & Banks S.B. Co. inc. 18.0 11.0 12/4/41 5/26/42 8/1/42 8/1/42 o YMS125 " " J. M. Martinac S.B. Corp. 62.0 8.0 6/2/41 12/18/41 11/27/41 2/1/42 4,10,42 2-1/3- YMS126 " # J. M. Martinac S.B. Corp. 51.0 7.0 7/3/41 1/26/42 4/1/42 4/25/42 4/5- YMS127 " " J. M. Martinac S.B. Corp. 41.0 11.0 10/10/41 3/27/42 6/1/42 6/1/42 o YMS128 " " J. M. Martinac S.B. Corp. 21.0 7.0 12/26/43 5/26/42 8/1/42 8/1/42 o YMS129 . " Tacoma Boat Building Co. 60.0 5.0 5/27/43 12/18/41 11/27/41 2/1/42 4/10/42 2-1/3- YMS130 . " Tacoma Boat Building Co. 53.0 3.0 6/20/41 12/18/41 1/26/42 3/1/42 4/20/42 1-2/3- YMS131 - " Tacoma Boat Building Co. 44.0 10.0 7/12/41 3/27/42 4/1/42 5/10/42 1-1/3- YMS132 - " Tacoma Boat Building Co. 33.0 8.0 7/12/41 5/26/42 6/1/42 6/20/42 2/3- YMS133 - " Western Boat Building Co. 55.0 4.0 7/14/41 12/18/41 12/17/41 3/20/42 4/10/12 2/3- YMS134 . # Western Boat Building Co. 51.0 9.0 8/13/41 3/17/42 5/20/42 5/20/42 0 YMS135 # # (b) YMS136 # . (b) YMS137 # . (b) YMS138 # . (b) YMS139 If . (b) YMS140 " . (b) YMS141 " . (b) YMS142 If . (b) YMS143 # " (b) YMS144 # - (b) YMS145 # - (b) YMS146 # . (b) YMS147 # . (b) YMS148 # . (b) YMS149 - - (b) YMS150 - " (b) YMS151 - " (b) YMS152 " " (b) YMS153 " " (b) YMS154 " . (b) (b) Assignment to builder pending. N.B.3.(745) RESTRICTED As of February 1, 1942 Page 33 E.2 Percentage Date of Completion of Completion Months Ahead(+) or Feb. 1 Oain for No. of Mes. As per Aa Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jun. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-11 Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS155 Wood Hull (b) YMS156 " " (b) YMS157 - " (b) YMS158 . " (b) YMS159 . " (b) YMS160 - " (b) YMS161 - " (b) YMS162 . " (b) YMS163 . " (b) YMS164 " . (b) YMS165 " # (b) TMS166 # . (b) YMS167 " . (b) YMS168 # . (b) YMS169 # . (b) YMS170 II . (b) YMS171 # . (b) YMS172 # . (b) YMS173 " . (b) YMS174 " . (b) YMS175 " . (b) YMS176 # - (b) YMS177 " . (b) YMS178 " . (b) YMS179 # - (b) YMS180 " . (b) YMS181 " . (b) YMS182 " - (b) YMS183 " . (b) YMS184 " . (b) YMS185 " - (b) YMS186 " - (b) YMS187 " - (b) YMS188 " # (b) YMS189 # # (b) YMS190 # # (b) YMS191 " # (b) YMS192 . " (b) YMS193 - # (b) YMS194 . . (b) YMS195 . - (b) YMS196 # . (b) (b) Assignment to builder pending. N.B.S.(745) RESTRICTED As of February 1, 1942 Page 34 E-2 Percentage of Completion Date of Completion Months Feb. 1 Gain for No. of Mos. As per As Reported As Last Ahead(+) or Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by Behind (-) TOTAL TOTAL Keel 11-1-41 to or Yard Building Latd Launched Completion Order 11-1-41 Prediction Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS197 Wood Hull (b) YMS198 " " (b) YMS199 # # (b) YMS200 # If (b) YMS201 # If (b) YMS202 . " (b) YNS203 - " (b) YMS204 . " (b) YMS205 . " (b) YMS206 - " (b) YMS207 . - (b) YMS208 # . (b) YMS209 " - (b) YMS210 H - (b) YMS211 " # (b) YMS212 " " (b) YMS213 " " (b) YAS214 " " (b) YMS215 - If (b) YMS216 - " (b) YMS217 If - (b) YMS218 " - (b) YMS219 " . (b) YMS220 # A (b) YMS221 . " (b) YMS222 . # (b) YMS223 . " (b) YMS224 . # (b) YMS225 # F (b) YMS226 # - (b) YM3227 # - (b) YMS228 # # (b) YM8229 # # (b) YMS230 " " (b) YMS231 " If (b) YMS232 " " (b) YHS233 " " (b) YMS234 # " (b) YMS235 " If (b) YMS236 " " (b) YMS237 " " (b) YM8238 " " (b) (b) Assignment to builder pending. N.B.S.(745) I As of February 1, 1942 Ce 35 E-2 Percentage Date of Completion of Completion Months Ahead(t) or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Loid Launched Completion Order 11-1-91 Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS239 Wood Hull (b) YMS240 # # (b) YMS241 # " (b) YMS242 . # (b) YMS243 . # (b) YMS244 . If (b) YMS245 # . (b) YMS246 # - (b) YMS247 " - (b) YMS248 " # (b) YMS249 " " (b) YMS250 . " (b) YM3251 - " (b) YM8252 . If (b) YMS253 - # (b) YMS254 = # (b) YMS255 # # (b) YMS256 " # (b) YMS257 # . (b) YMS258 " . (b) YMS259 " . (b) YMS260 " . (b) YMS261 " . (b) YMS262 " . (b) YMS263 " . (b) YMS264 " # (b) YMS265 " # (b) YMS266 " " (b) YMS267 . " (b) YMS268 . # (b) YMS269 . " (b) YMS270 . # (b) YMS271 . If (b) YMS272 " # (b) YMS273 " - (b) YMS274 " . (b) YMS275 " - (b) YMS276 " - (b) YMS277 If . (b) YMS278 If . (b) YMS279 # # (b) YMS280 . # (b) (b) Assignment to builder pending. N.B.S.(745) As of February 1, 1942 Page 36 E-2 Percentage Date of Completion Months of Completion Ahead(+) or Feb. 1 Gain for No. of Mos. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-11 Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS281 Wood Hull (b) YM3282 . " (b) YMS283 . " (b) YMS284 " II (b) YMS285 # # (b) YMS286 " . (b) YMS287 " . (b) YMS288 . " (b) YMS289 - " (b) YMS290 # " (b) YMS291 " IF (b) YMS292 " . (b) YMS293 " . (b) YMS294 - " (b) YMS295 . " (b) YMS296 " " (b) YMS297 " # (b) YMS298 # # (b) YMS299 " - (b) YMS300 # . (b) YMS301 . . (b) YMS302 . " (b) YMS303 . " (b) YKS304 . " (b) YMS305 # # (b) YMS306 # # (b) YMS307 # - (b) YMS308 # - (b) YM3309 # . (b) YMS310 - " (b) YMS311 . " (b) YMS312 " " (t) YMS313 # # (b) YMS314 # # (b) YMS315 - - (b) YMS316 - # (b) YMS317 " " (b) YMS318 # # (b) YMS319 # . (b) YMS320 - - (b) YMS321 # " (b) (b) Assignment to builder pending. H.B.S.(745) As of Fetruary 1, 2942. Page 37 T.2 Percentage Date of Completion Months of Completion Ahead(+) or Feb. 1 Jain for No. of Mes. As per As Reported As Last Behind (-) Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Latd Launched Completion Order 11-1-51 Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS322 Wood Hull (b) YMS323 - " (b) YMS324 " " (b) YMS325 # " (b) YMS326 " " (b) YMS327 " " (b) YMS328 " (b) YMS329 " (b) YMS330 " (b) YMS331 - (b) YMS332 . - (b) YMS333 . (b) YMS334 . " (b) YMS335 . " (b) YMS336 . " (b) YMS337 . " (b) YMS338 . " (b) YMS339 . " (b) YMS340 . " (b) YMS341 " " (b) YMS342 . " (b) YMS343 . If (b) YMS344 If # (b) YMS345 # # (b) YMS346 # # (b) YMS347 " # (b) YMS348 " # (b) YMS349 If # (b) YMS350 " # (b) YMS351 " # (b) YMS352 " . (b) YMS353 # . (b) YMS354 # . (b) YMS355 . . (b) YMS356 . # (b) YMS357 - # (b) YMS358 # " (b) YM8359 " # (b) YMS360 " . (b) YMS361 # . (b) YMS362 . . (b) YMS363 . # (b) (b) Assignment to builder pending. N.B.S.(745) RESERICTION As of February 1, 1942. Page 38 E-2 Percentage Date of Completion Months of Completion Ahead(+) or Peb. 1 Gain for No. of Mos. As per As Reported As Last Behind (-) Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by 11-1-41 TOTAL TOTAL Keel to or Yard Building Prediction Laid Launched Completion Order 11-1-91 Yard MOTOR DRIVEN MINE SWEEPERS (Cont'd) YMS364 Wood Hull (b) YMS365 " (b) YMS366 . # (b) YMS367 # # (b) YMS368 # " (b) YMS369 If # (b) YMS370 # - (b) YMS371 # - (b) YMS372 # - (b) YMS373 . " (b) YMS374 - # (b) YKS375 # " (b) YMS376 If # (b) YMS377 If # (b) YMS378 " " (b) YM3379 # # (b) YMS380 " # (b) YMS381 y " (b) YMS382 # - (b) YMS383 # . (b) YMS384 " - (b) YMS385 " - (b) YM3386 # - (b) YMS387 # . (b) YMS388 # - (b) YM8389 . # (b) YMS390 - . (b) YMS391 - . (b) YMS392 - " (b) YMS393 . " (b) YXS394 - # (b) YXS395 " " (b) YMS396 " If (b) YMS397 " # (b) YMS396 # - (b) YMS399 . " (b) YMS400 . " (b) YHS401 # # (b) YMS402 # # (b) YM8403 If - (b) YMS404 I # (b) YX8405 " # (b) (b) Assignment to builder pending. N.B.S.(745) As of February 1, 1942 Page 39 E-2 Percentage Date of Completion or Completion Months Feb. 1 Gain for No. of Mcs. As per As Reported As Last Ahead(t)or Type, Number and Name Contractor 1942 Jan. 1942 Keel Laying Contract by Building Reported by Behind(-) TOTAL TOTAL 11-1-41 Keel to or Yard Building Laid Launched Completion Order 11-1-11 Yard Prediction MOTOR DRIVEN XINE SWEEPERS (Cont:d) YMS406 Wood Hull (b) YM3407 , " (b) YKS408 . " (b) YMS409 . " (b) MINELAYERS CM5 TERROR (a) Philadelphia 69.0 4.0 9/ 3/40 6/ 6/41 23 9/ 1/42 7/ 1/42 8/ 1/42 1- C006 CATSKILL (s) Willumette I. & S. Corp. 19.0 4.8 7/12/41 26-4/5 10/ 6/43 10/ 6/43 10/ 6/43 0 CM7 OZARK (a) Willamette I. & 3. Corp. 16.7 3.4 7/12/41 27-4/5 12/ 6/43 12/ 6/43 11/ 6/43 It (b) Assignment to builder pending. (a) Steel Hulls