OCR Page 1 of 2Bureau of Ships: Reports
2/1/42
T
THE WHITE HOUSE
WASHINGTON
February 26, 1942.
MEMORANDUM FOR THE PRESIDENT
The attached report of progress,
as of February 1, 1942, on Patrol Craft
under construction for the Navy is forwarded
for the information of the President.
Very respectfully,
John his and
JOHN L. McCREA
RESTRICTED
REPRODUCTION OF THIS MATERIAL
IN ANY FORM IS NOT AUTHORIZED
EXCEPT BY SPECIFIC APPROVAL OF
THE SECRETARY OF THE NAVY.
MONTHLY PROGRESS REPORT COMBATANT
VESSELS UNDER CONSTRUCTION
Distribution:
The President
The Secretary of the Navy
The Under Secretary of the Navy
The Assistant Secretary of the Navy
The Chief of Naval Operations
The Naval Aide to the President
The Chief of the Bureau of Ships
Senator David I. Walsh
Congressman Carl Vinson
Congressman William S. Jacobson
Congressman George J. Bates
Franklin D. Roosevelt Library
DECLASSIFIED
DOD DIR. 5200.9 (9/27/58)
Date-
3-11-59
Signature=
Carl L. Specer
AMOTHIOTED
Reproduction of this material in any
KATT DEPARTMENT
form is not authorized except by
BURRAU OF SHIPS
specific approval of the Secretary
WASHINGTON, D.C.
of the Navy
N.B.S.(745)
COMBATANT VESSELS UNDER CONSTRUCTION, UNITED STATES KAVI - REPORT OF PROGRESS AS OF FEBRUARY 1, 1942.
3-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
BATTLESHIPS
BB57
SOUTH DAKOTA
N.Y. S.B. Corp.
90.8
5.1
5/39
7/41
32-5/6
4/15/43
6/ 1/42
4/ 1/42
2+
BB58
INDIANA
N.N. S.B. & D.D. Co.
78.4
6.3
11/20/39
11/21/41
31
4/15/43
10/20/42
6/18/42
4+
BB59
MASSACHUSETTS
Beth. Fore River
57.6
4.2
7/20/39
9/23/41
33-5/6
7/15/43
11/ 1/42
5/16/42
5-1/2+
BB60
ALABAMA
Norfolk
67.0
4.7
2/ 1/40
34
8/ 1/43
10/ 1/43
12/ 1/42
10+
BB61
IOWA
New York
40.8
2.6
6/27/40
33
8/ 1/43
11/ 1/43
4/ 1/43
7+
BB62
NEW JERSEY
Philadelphia
29.3
1,6
9/16/40
33-1/2
5/ 1/44
1/44
7/ 1/43
10+
BB63
MISSOURI
New York
13.0
0.7
1/ 6/41
45-5/6
6/12/44
11/ 1/44
11/ 1/44
o
BB64
WISCONSIN
Philadelphia
7.5
0.5
1/25/41
43-1/5
6/12/45
6/12/45
9/ 1/44
9-1/3+
BB65
ILLINOIS
Philadelphia
34
5/ 1/46
5/ 1/46
10/ 1/45
7+
BB66
KENTUCKY
Norfolk
2.1
0.4
32-1/2
5/ 1/45
5/ 1/45
12/ 1/4
5+
BB67
MONTANA
Philadelphia
48
1/ 1/46
1/ 1/46
11/ 1/46
10-
BB68
CHIO
Philadelphia
48
11/ 1/46
11/ 1/46
5/ 1/47
6-
BB69
MAINE
New York
38
11/ 1/45
11/ 1/45
2/ 1/46
1
BB70
NEW HAMPSHIRE
New York
43
1/46
5/ 1/46
10/ 1/46
&
BB71
LOUISIANA
Norfolk
42
11/ 1/46
5/ 1/46
12/ 1/45
5+
AIRCRAFT CARRIERS
cv9
ESSEX
N.N. S.B. & D.D. Co.
19.0
3.8
4/28/41
20
4/15/44
1/15/44
12/31/42
12-1/2+
CV10
BON HOMME RICHARD
N.N. S.B. & D.D. Co.
13.2
3.2
12/ 1/41
15
9/15/44
4/15/44
2/28/43
13-1/2+
CV11
INTREPID
N.N. S.B. & D.D. Co.
7.2
1,8
12/ 1/41
17
2/15/45
7/15/44
4/30/43
14-1/2+
CV12
KEARSARGE
N.N. S.B. & D.D. Co.
3.2
0.6
18-1/2
7/15/45
10/15/44
9/30/43
12-1/2+
CV13
FRANKLIN
N.N. S.B. & D.D. Co.
1.2
0.2
17-3/5
12/15/45
6/ 1/45
12/31/43
17+
CV14
HANCOCK
N.N. S.B. & D.D. Co.
1.2
0.2
16-1/2
4/15/46
9/ 1/45
2/28/44
18+
CV15
RANDOLPH
N.N. S.B. & D.D. Co.
1,2
0,2
17-1/4
8/15/46
12/ 1/45
4/30/44
19+
CV16
CABOT
Beth. Fore River
14.2
2.8
7/15/41
18-1/2
5/15/44
2/15/44
1/31/43
12-1/2+
CV17
BUNKER HILL
Beth. Fore River
12.1
3.0
9/15/41
18-1/2
8/15/44
6/15/44
3/31/43
14-1/2+
CV18
CRISKANY
Beth. Fore River
1.3
0.0
20
2/15/46
11/ 1/45
11/30/43
23+
CV19
TICONDEROGA
Beth. Fore River
1.3
0,0
21-1/2
4/15/46
12/31/45
5/31/44
19+
CV20
New York
29
12/ 1/44
3/ 1/45
3-
CV21
N.N. S.B. & D.D. Co.
16-1/2
6/ 1/45#
6/30/44
11+
CV22
AMSTERDAM (c)
N.Y. S.B. Corp.
46.3
6.8
1/41
19
11/16/43
1/43
12/1/42
3+
CV23
TALLAHASSEE(,
N.Y. S.B. Corp.
36.2
5.1
6/ 2/41
20
3/16/44
6/ 1/43
2/ 1/43
4+
CV24
NEW HAVEN (f)
N.Y. S.B. Corp.
20.6
4.0
5/11/41
19-2/3
5/15/44
8/ 1/43
4/ 1/43
4+
(e) Former CL59. (e) Forner CL61. (f) Former CL76.
+ Ahead of contract completion date.
(+) Date reported 1/ 1/42, vessels awarded subsequent to 11/ 1/41.
- Behind contract completion date.
RESERICTED
N.B.S.(745)
Page 2
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
An Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Latd
Launched
Completion
Order
11-1-'11
Yard
Prediction
LARGE CRUISERS
CB1
ALASKA
N.Y. S.B. Corp.
3.7
1.8
12/17/41
30-1/2
4/ 1/45
1/ 1/45
7/ 1/44
6+
CB2
GUAM
N.Y. S.B. Corp.
2.7
1.6
2/ 2/42
31
8/ 1/45
31 1/45
9/ 1/44
6+
CB3
HAWAII
N.Y. S.B. Corp.
0.8
0.3
31
12/ 1/45
5/ 1/45
11/ 1/44
6+
CB4
PHILIPPINES
N.Y. S.B. Corp.
0.8
0.3
30
4/ 1/46
7/ 1/45
17 1/45
6+
CB5
PUERTO RICO
N.Y. S.B. Corp.
0.6
0,2
30-1/2
8/ 1/46
9/ 1/45
3/ 1/45
6+
CB6
SAMOA
N.Y. S.B. Corp.
0.6
0.2
29-1/2
12/ 1/46
11/ 1/45
5/ 1/45
6+
HEAVY CRUISERS
CA68
BALTIMORE
Beth. Fore River
27.2
7.4
5/26/41
21-1/6
6/14/43
4/ 1/43
36 1/43
1+
CA69
BOSTON
Beth. Fore River
24.8
5.9
6/30/41
21-1/2
8/14/43
6/ 1/43
4/15/43
1-1/2+
CA70
PITTSBURGH
Beth. Fore River
18.9
4.0
3/41
22
12/14/43
8/15/43
7/ 1/43
1-1/2+
CA71
ST. PAUL
Beth. Fore River
17.5
3.5
10/ 9/41
26-1/5
4/14/44
12/15/43
12/15/43
0
CA72
ALBANY
Beth. Fore River
3.0
0.4
23
7/14/45
12/ 1/44
9/ 1/44
3+
CA73
ROCHESTER
Beth. Fore River
2.9
0.3
22-1/2
8/14/45
1/15/45
10/ 1/44
3-1/2+
CA74
COLUMBUS
Beth. Fore River
2.9
0.3
21
9/14/45
3/ 1/45
12/15/44
2-1/2+
CA75
DES MOINES
Beth. Fore River
2.9
0.3
21
10/14/45
5/ 1/45
2/15/45
2-1/2+
LIGHT CRUISERS
(6000 ton)
0152
JUNEAU
Fed. S.B. & D.D. Co.
98.6
2.9
5/27/40
10/25/41
21
6/25/42
3/ 3/42
2/11/42
3/4+
0153
SAN DIEGO
Beth. Fore River
Delivered
and pla
saion 10 January 1942.
0154
SAN JUAN
Beth. Fore River
94.7
3.5
5/15/40
9/ 6/41
21-2/5
9. 25/42
4/ 1/42
2/28/42
1+
0195
OAKLAND
Beth. San Francisco
11.0
2.4
7/15/41
21-1/2
9/43
5/ 1/43
5/ 1/43
o
CL96
RENO
Beth. San Francisco
9.4
2.1
8/ 1/41
23
8/ 9/43
7/ 1/43
7/ 1/43
o
CL97
SPOKANE
Beth. San Francisco
3.1
0,6
21-1/2
10/ 9/44
8/ 1/44
8/ 1/44
o
0198
TUCSON
Beth. San Francisco
3.0
0.6
22
12/ 9/44
10/ 1/44
10/ 1/44
o
+ Ahead of contract completion date.
ANOTHIOTED
N.B.S.(745)
Page 3
As of February 1, 1942.
3-2
Percentage
Date of Completion
of Completion
Months
Feb.1
Gain for
No. of Mos.
As per
A.s. Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
LIGHT CRUISERS (10,000 ton)
CL55
CLEVELAND
N.Y. S.B. Corp.
71.5
4.5
1/40
11/ 1/41
24
3/23/43
1/42
1/42
o
0156
COLUMBIA
N.Y. S.B. Corp.
67.9
4.5
8/19/40
12/17/41
21-5/6
6/23/43
1/42
8/15/42
1/2+
0L57
MONTPELIER
N.Y. S.B. Corp.
57.4
3.3
12/ 2/40
22
6/27/43
11/ 1/42
10/ 1/42
1+
0L58
DENVER
N.Y. S.B. Corp.
52.7
2.7
12/26/40
22-2/3
9/27/43
12/30/43
11/15/42
13-1/2+
CL60
SANTA FE
N.Y. S.B. Corp.
39.1
5.5
6/ 7/41
19
1/16/44
4/15/43
1/10/43
3-1/6+
0L62
BIRMINGHAM
N.S. S.B. & D.D. Co.
49.2
5.9
2/17/41
20
3/ 3/43
3/ 3/43
11/20/42
3-1/2+
0L63
MOBILE
N.N. S.B. & D.D. Co.
38.3
6.1
4/14/41
22-1/6
6/ 3/43
6/ 3/43
2/19/43
3-1/2+
0L64
FLINT
Beth. Fore River
12.4
1.9
9/23/41
26-1/4
12/ 1/43
10/15/43
12/ 1/43
1-1/2-
CL65
PASADENA
Beth. Fore River
10.6
0.9
20-1/2
6/ 1/44
4/15/44
6/ 1/44
1-1/2-
CL66
SPRINGFIELD
Beth. Fore River
9.9
0.9
22
9/ 1/44
8/15/44
9/ 1/44
1/2-
CL67
TOPEKA
Beth. Fore River
9.7
0.8
21-1/2
11/ 1/44
10/15/44
11/ 1/44
1/2-
0177
HUNTINGTON
N.T. S.B. Corp.
16.5
3.1
11/17/41
31
7/ 1/45
10/ 1/43
6/20/43
3-1/3+
0L78
DATTON
N.Y. S.B. Corp.
11.4
3.2
12/29/41
19-2/3
9/ 1/45
12/31/43
8/20/43
4-1/3+
CL79
WILMINGTON
N.Y. S.B. Corp.
8.2
1.3
19-1/6
11/ 1/45
3/ 1/44
7/20/44
4-2/3-
CLSO
BILOXI
N.N. S.B. & D. D. Co.
27.3
5.8
7/ 9/41
22-2/5
11/ 9/43
9/ 3/43
5/21/43
3-1/30
CL81
VICKSBURG
N.N. S.B. & D. D. Co.
19.4
4.3
8/ 4/41
24-1/2
3/ 9/44
2/ 1/44
8/20/43
5-1/3+
CL82
PROVIDENCE
Beth. Fore River
2.4
0,0
21
12/ 9/45
11 1/45
3/15/45
3-1/2+
CL83
MANCHESTER
Beth. Fore River
2.4
0.0
21-1/2
2/ 9/46
9/ 1/45
10/ 1/45
1-
CL85
FARGO (1)
N.Y. S.B. Corp.
7.3
0.0
18-1/3
12/ 9/43
10/20/43
1-2/3+
CL86
CHEYENNE (c)
N.N. S.B. & D. D. Co.
5.4*
0.0
20-1/3
71 8/44
12/30/43
6-1/3+
CL87
DULUTH (e)
N.N. 8. 3. & D.D. Co.
5.4x
0.0
21
12/30/44
2/29/44
10+
CL89
MIAMI
Cramp S.B. Co.
25.5
8.7
8/ 2/41
24
1/ 1/44
11/ 1/43
8/ 1/43
3+
CL90
WILKES-BARRE
Cramp S.B. Co.
20.1
8.4
9/ 6/41
23-5/6
71 1/44
3/20/44
1/43
6-2/3+
CL91
OKLAHOMA CITY
Cramp S.B. Co.
8.1
3.6
24
1/ 1/45
8/15/44
11/ 1/44
2-1/2-
CL92
LITTLE ROCK
Cramp S.B. Co.
7.0
3.2
23
5/ 1/45
1/ 7/45
12/ 1/44
1-1/4+
CL93
GALVESTON
Cramp S. B. Co.
5.8
2.1
23
9/ 1/45
6/ 8/45
1/ 1/46
6-3/4-
CL94
YOUNGSTOWN
Cramp S.B. Co.
5.8
2.1
23
12/31/45
10/ 1/45
2/ 1/46
f
CL99
BUFFALO
N.Y.S.B. Corp.
5.2
1.1
19-1/3
12/30/45
10/15/44
9/10/44
1-1/6+
CL100
NEWARK
N.Y.S.B. Corp.
5.1
1.2
18-5/6
3/ 1/46
12/ 1/44
11/10/44
2/3+
CL101
N.N.S.B. & D.D. Co.
20-2/5
+
3/ 1/44
4/30/44
2-
CL102
N.N.S.B. & D.D. Co.
19-3/5
+
6/ 1/44
7/31/44
2-
+ Ahead of contract completion date.
-
Behind contract completion date.
Cruisers CL84 and 0188 cancelled 16 December 1940.
Percentage as of January 1941 for Federal 5.3. & D.D. Co.
"0159 converted to OV22.* *0161 converted to CV23."
None reported for N.T. S.3. Corp.
+ Date reported 1/ 1/42, vessels awarded subsequent to 11/ 1/41.
(e) Construction changed from Fed. 5.3. & D.D. Co. to Newport News 5.3. & D.D. Co.
*Percentage as of 1 January 1942 for Fed. 5.3. & D.D. Co.
(1) Construction changed from Fed. 5.3. & D.D. Do. to New York 5.3. Corp.
None reported by I.V. S.D. & D.D. Co.
4
Contract not yet prepared.
*Materials and equipment ordered prior to March 20, 1941 with
Priority A-1-0 assigned will hold that rating.
RESTRICTED
N.B.S.(745)
Page it
As of February 1, 1942
B-?
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
DESTROTERS (1620
and 1630 ton)
DD456
RODMAN
Fed. S.B. & D.D. Co.
Delivered 26 January 1942. Placed in commission 27 January 1942.
DD458
MACOMB
Bath Iron Wks.
Delivered and placed in commission 26 January 1942.
DD459
LAFFEY
Beth. San Francisco
86.0
5.0
1/13/41
10/30/41
14-3/5
3/ 1/42
4/ 1/42
4/ 1/42
o
DD460
WOODWORTH
Beth. San Francisco
78.5
3.4
1/13/41
11/29/41
15-3/5
4/ 1/42
5/ 1/42
5/ 1/42
o
DD461
FORREST ..
Boston
97.0
4.5
1/ 6/41
6/14/41
14-1/5
2/12/42
2/12/42
3/12/42
1-
DD462
FITCH ....
Boston
91.0
4.9
1/ 6/41
6/14/41
15
4/12/42
3/20/42
3/31/42
1/3-
DD463
CORRY
.
Charleston
98.0
5.8
4/40
7/28/41
18-1/4
2/12/42
2/12/42
3/12/42
1-
DD464
HOBSON ...
Charleston
94.0
5.6
11/14/40
9/ 8/41
17
4/12/42
3/12/42
4/12/42
1-
DD483
AARON WARD
Fed. S.B. & D.D. Co.
89.0
8.2
2/11/41
11/22/41
12-3/5
7/ 9/42
2/19/42
2/28/42
1/3-
DD484
BUCHANAN
Fed. S.B. & D.D. Co.
85.3
5.0
2/11/41
11/22/41
13-1/3
8/ 9/42
3/19/42
3/21/42
0
DD485
DUNCAN
Fed. S.B. & D.D. Co.
75.9
9.9
7/31/41
8-1/2
9/ 9/42
4/17/42
4/15/42
o
DD486
LANSDOWNE
Fed. S.B. & D.D. Co.
72.5
8.0
7/31/41
9
10/ 9/42
5/ 1/42
5/ 1/42
o
DD487
LARDNER
Fed. S.B. & D.D. Co.
62.5
3.0
9/15/41
8
11/ 9/42
5/22/42
5/15/42
1/4+
DD488
MC CALLA
Fed. S.B. & D.D. Co.
61.0
4.3
9/15/41
6-2/5
12/ 9/42
6/ 3/42
5/27/42
1/4+
DD489
MERVINE
Fed. S.B. & D.D. Co.
54.2
5.2
11/ 3/41
7-1/4
3/ 9/44
7/15/42
6/10/42
1-1/6+
DD490
QUICK
Fed. S.B. & D.D. Co.
51.0
6.3
11/3/41
8
4/ 9/44
8/ 1/42
7/ 3/42
1+
DD491
FARENHOLT
Beth. Staten Island
87.3
10.2
12/11/40
11/19/41
15-2/3
4/ 9/42
4/ 1/42
4/ 1/42
o
DD492
BAILEY
Beth. Staten Island
78.7
6.5
1/29/41
12/19/41
16
8/ 9/42
6/ 1/42
6/ 1/42
0
DD493
CARMICK
Seattle Tacoma S.B. Co.
48.1
9.6
5/29/41
17
2/ 1/43
11/ 2/42
11/ 2/42
0
DD494
DOYLE
Seattle Tacoma S.B. Co.
39.8
6.2
5/26/41
17-2/3
2/15/43
11/16/42
11/16/42
o
DD495
ENDICOTT
Seattle Tacoma S.B. Co.
33.2
5.0
1/41
19
3/ 1/43
11/28/42
11/28/42
O
DD496
MC COOK
Seattle Tacoma S.B. Co.
30.0
4.8
1/41
19-2/5
3/15/43
12/14/42
12/14/42
o
DD497
FRANKFORD
Senttle Tacoma S.B. Co.
26.4
3.6
6/ 5/41
18-4/5
3/31/43
12/29/42
12/29/42
o
DD598
BANCROFT
Beth. Fore River
66.7
5.7
1/41
12/31/41
11-1/3
11/ 1/42
7/ 1/42
4/15/42
2-1/2+
DD599
BARTON
Beth. Fore River
61.2
8.0
5/20/41
1/31/42
12
12/ 1/42
9/ 1/42
5/22/42
3-1/3+
DD600
BOYLE
Beth. Fore River
33.2
5.5
12/31/41
10-1/2
12/ 1/43
11/15/42
11/15/42
o
DD601
CHAMPLIN
Beth. Fore River
32.9
5.4
1/31/42
11
12/31/43
12/31/42
12/31/42
0
DD602
MEADE
Beth. Staten Island
53.5
8.5
3/25/41
16-1/5
9/15/42
8/ 1/42
8/ 1/42
o
DD603
MURPHT
Beth. Staten Island
43.0
6.6
5/19/41
15-5/6
11/ 1/42
9/15/42
9/15/42
o
DD604
PARKER
Beth. Staten Island
40.5
7.3
6/ 9/41
16-3/4
12/31/42
11/ 1/42
11/ 1/42
o
. Commissioned 18 December 1941
+ Ahead of contract completion date.
.. Commissioned 13 January 1942.
- Behind contract completion date.
... Commissioned 22 January 1942.
.... Commissioned 3 February 1942.
N.B.S.(745)
Page 5
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported
yBehind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-41
Yard
Prediction
DESTROYERS (1620
and 1630 ton) (Cont'd)
DD605
CALDWELL
Beth. San Francisco
61.7
8.5
3/24/41
1/15/42
14-2/3
8/ 1/42
6/15/42
6/15/42
o
DD606
COGHLAN
Beth. San Francisco
52.5
8.4
3/28/41
15-3/5
9/ 1/42
7/15/42
7/15/42
o
DD607
FRAZIER
Beth. San Francisco
47.7
5.1
7/ 5/41
14-1/3
10/ 1/42
9/15/42
9/15/42
o
DD608
GANSEVOORT
Beth. San Francisco
43.3
9.0
6/16/41
14
10/15/42
8/15/42
8/15/42
o
DD609
GILLESPIE
Beth. San Francisco
36.2
6.9
6/16/41
16
11/ 1/42
10/15/42
10/15/42
o
DD610
HOBBY
Beth. San Francisco
32.1
4.3
6/30/41
16-1/2
12/ 1/42
11/15/42
11/15/42
o
DD611
KALE
Beth. San Francisco
30.9
4.1
6/30/41
17-1/2
12/31/42
12/15/42
12/15/42
o
DD612
KENDRICK
Beth. San Pedro
48.0
8.5
5/1/41
17
11/1/42
10/1/42
10/1/42
o
DD613
LAUB
Beth. San Pedro
42.0
5.4
5/ 1/41
18
12/ 1/42
11/ 1/42
11/ 1/42
o
DD614
MAC KENZIE
Beth. San Pedro
34.5
7.3
5/29/41
18
1/15/43
12/ 1/42
12/1/42
o
DD615
He LANAHAN
Beth. San Pedro
32.5
7.0
5/29/41
19
2/15/43
12/28/42
12/28/42
o
DD616
NIELDS
Beth. Fore River (h)
13.9
1.9
10-1/3
6/15/43(x)
6/ 1/43
DD617
ORDRONAUX
Beth. Fore River (h)
13.9
1.9
10-1/3
7/15/43(x)
7/ 1/43
DD618
DAVISON
Fed. S.B. & D.D. Co.
17.8
3.3
7-2/3
12/31/43
10/30/42
10/15/42
1/2+
DD619
EDWARDS
Fed. S.B. & D.D. Co.
17.0
2.5
8-1/6
12/31/43
11/27/42
10/31/42
1+
DD620
GLENNON
Fed. S.B. & D.D. Co.
17.7
3.7
7-3/5
12/31/43
12/15/42
11/14/42
1+
DD621
JEFFERS
Fed. S.B. & D.D. Co.
16.7
2.9
8-1/6
12/31/43
12/31/42
12/1/42
1+
DD622
MADDOX
Fed. S.B. & D.D. Co.
16.6
2.8
7-1/3
12/31/43
2/20/43
12/15/42
2-1/6+
DD623
NELSON
Fed. S.B. & D.D. Co.
16.3
2.4
8
12/31/43
3/13/43
12/31/42
2-1/2+
DD624
BALDWIN
Seattle Tacona S.B. Co.
21.7
2,6
7/19/41
18
12/31/43
3/15/43
1/15/43
2+
DD625
HARDING
Seattle Tacoma S.B. Co.
19.1
2.6
7/22/41
18-1/4
12/31/43
4/1/43
1/30/43
2+
DD626
SATTERLEE
Seattle Tacoma S.B. Co.
16.5
2.3
9/10/41
17-1/6
12/31/43
4/15/43
2/15/43
2+
DD627
THOMPSON
Seattle Tacoma S.B. Co.
15.4
2.2
9/22/41
17-1/5
12/31/43
1/43
2/28/43
2+
DD628
WELLES
Seattle Tacoma S.B. Co.
13.8
2.2
9/27/41
17-3/5
12/31/43
5/15/43
3/15/43
2+
DD632
COWIE
Boston
61.8
6.7
3/18/41
9/27/41
15
8/ 1/42
6/15/42
6/15/42
o
DD633
ENIGHT
Boston
60.1
6.7
3/18/41
9/27/41
16
9/ 1/42
7/15/42
7/15/42
o
DD634
DORAN
Boston
42.1
4.2
6/14/41
12/10/41
15
12/ 1/42
9/15/42
9/15/42
o
DD635
EARLE
Boston
41.2
3.5
6/14/41
12/10/41
16
1/ 1/43
10/15/42
10/15/42
0
DD636
BUTLER
Philadelphia
22,4
10.0
9/16/41
14-1/2
4/ 1/43
12/ 1/42
12/1/42
0
DD637
GHERARDI
Philadelphia
22.4
10.0
9/16/41
15-1/2
5/ 1/43
12/31/42
12/31/42
o
DD638
HERNDOM
Norfolk
41.0
8.3
8/26/41
5/42
20-1/2
5/ 1/43
5/ 1/43
5/1/43
o
DD639
SHUBRICK
Norfolk
29.7
5.8
16-1/4
6/15/43
6/15/43
6/15/43
o
DD640
BEATTY
Charleston
64.3
7.0
5/ 1/41
12/20/41
14
7/ 1/42
7/ 1/42
11 1/42
o
DD641
TILLMAN
Charleston
58.3
5.5
5/ 1/41
12/20/41
16
9/ 1/42
9/ 1/42
1/42
o
DD645
STEVENSON
Fed. S.B. & D.D. Co.
4.7
0,2
6-2/5
2/15/44
5/12/43
3/15/43
2+
DD646
STOCKTON
Fed. S.B. & D.D. Co.
4.7
0.2
7
3/15/44
6/ 1/43
5/ 1/43
2+
DD647
THORN
Fed. S.B. & D.D. Co.
4.6
0.1
7
4/15/44
8/20/43
1/43
1/3-
DD648
TURNER
Fed. S.B. & D.D. Co.
4.6
0.1
7-1/3
5/15/44
9/9/ 43
9/15/43
1/5-
(h) DD616 and DD617 transferred from Beth. San Pedro to
+ Ahead of contract completion date.
Beth. Fore River October 7. 1941.
- Behind contract completion date.
(x) Contract completion dates of DD616 and DD617 changed
October 7. 1941.
N.B.S.(745)
Page 6
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
DESTROYERS
(2100 Ton)
DD445
FLETCHER
Fed. S.B. & D.D. Co.
44.9
9.2
10/ 2/41
8-2/3
6/ 9/43
8/19/42
6/22/42
2+
DD446
RADFORD
Fed. S.B. & D.D. Co.
41.5
9.6
10/ 2/41
9-2/5
7/ 9/43
9/15/42
7/15/42
2+
DD447
JENKINS
Fed. S.B. & D.D. Co.
33.4
8.5
11/27/41
8-3/5
8/ 9/43
10/15/42
8/15/42
2+
DD448
LA VALLETTE
Fed. S.B. & D.D. Co.
31.2
7.2
11/27/41
9-1/6
9/ 9/43
10/17/42
2/42
1-1/2+
DD449
NICHOLAS
Bath Iron Vks.
61.1
6.0
3/ 3/41
13-3/4
1/ 9/43
4/25/42
4/25/42
o
DD450
O'BANNON
Bath Iron Vks.
57.2
5.6
3/ 3/41
142/5
2/24/43
5/26/42
5/15/42
1/3+
DD451
CHEVALIER
Bath Iron Vks.
50.4
5.6
4/30/41
13-1/5
3/24/43
6/30/42
6/ 6/42
4/5+
DD452
PERSIVAL
Fed. S.B. & D.D. Co.
10
10/ 1/43
3/ 1/44
3/15/44
1/2-
DD465
SAUFLEY
Fed. S.B. & D.D. Co.
24.5
6.2
1/27/42
7-3/5
10/ 9/43
1/11/43
9/15/42
3-5/6+
DD466
WALLER
Fed. S.B. & D.D. Co.
23.3
5.7
7-1/2
11/ 9/43
1/30/43
10/ 1/42
4+
DD467
STRONG
Bath Iron Vks.
47.7
6.4
4/30/41
15
4/24/43
5/30/42
6/27/42
1-
DD468
TAYLOR
Bath Iron Vice.
41.8
7.6
8/28/41
10-3/5
6/ 9/43
6/30/42
7/15/42
1/2-
DD469
DE HAVEN
Bath Iron Vics.
38.7
6.2
9/27/41
10-1/3
8/ 9/43
7/30/42
R/ 6/42
1/5-
DD470
BACHE
Beth. Staten Island
12.8
3.2
11/19/41
16-2/5
8/ 1/43
4/ 1/43
4/ 1/43
o
DD471
BEALS
Beth. Staten Island
12.1
2.7
12/19/41
16-2/5
10/ 1/43
6/ 1/43
5/ 1/43
1+
DD472
GUEST
Boston
30.8
10.4
9/27/41
16
31 1/43
3/ 1/43
2/ 1/43
1+
DD473
BENNETT
Boston
10.3
3.0
12/10/41
14-2/3
5/ 1/43
5/ 1/43
31 1/43
2+
DD474
FULLAM
Boston
10.3
3.0
12/10/41
15-1/6
7/ 1/43
6/15/43
3/15/43
3+
DD475
HUDSON
Boston
6.2
1,0
14-1/3
9/ 1/43
8/ 1/43
5/ 1/43
3+
DD476
HUTCHINS
Boston
30.8
10.4
9/27/41
15
1/ 1/43
1/31/43
12/31/42
1+
DD477
PRINGLE
Charleston
22.3
5.5
7/31/41
16-1/2
1/ 1/43
1/ 1/43
12/15/42
1/2+
DD478
STANLY
Charleston
20.2
4.8
9/15/41
17
3/ 1/43
3/ 1/43
2/15/43
1/2+
DD479
STEVENS
Charleston
13.5
2.4
12/30/41
15
5/ 1/43
5/ 1/43
4/ 1/43
1+
DD480
HALFORD
Puget Sound
23.3
4.5
6/ 3/41
21
2/ 1/43
2/ 1/43
3/ 1/43
1-
DD481
LEUTZE
Puget Sound
23.3
4.5
6/ 3/41
22
4/ 1/43
4/ 1/43
4/ 1/43
o
DD482
WATSON
Fed. S.B. & D.D. Co.
11
11/ 1/43
4/ 1/44
4/15/44
1/2-
DD498
PHILIP
Fed. S.B. & D.D. Co.
9.9
1.6
8-1/4
6/ 9/44
4/ 2/43
1/15/43
2-1/2+
DD499
RENSHAW
Fed. S.B. & D.D. Co.
9.2
1.7
8-5/6
7/ 9/44
4/22/43
2/ 2/43
2-2/3+
DD500
RINGGOLD
Fed. S.B. & D.D. Co.
9.9
3.0
8-4/5
1/ 9/45
6/21/43
2/15/43
4-1/5+
DD501
SCHRONDER
Fed. S.B. & D.D. Co.
9.3
2.3
8-1/3
2/ 9/45
7/10/43
3/ 1/43
4-1/3+
DD502
SIGSHEE
Fed. S.3. & D.D. Co.
8.9
2.6
7-5/6
3/ 9/45
7/31/43
7/ 1/43
1+
Destroyers DD503 to DD506, inclusive, cancelled
10 February 1941.
+ Ahead of contract completion date.
- Behind contract completion date.
RESTRICTED
N.B.S.(745)
Page 7
As of February 1, 1942
3-2
Percentage
Date of Completion
Months
of Completion
Ahead(+)or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind(-)
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-91
Yard
DESTROTERS (2100
ton) (Cont'd)
DD507
CONWAT
Bath Iron Vice.
22.1
6.7
11/ 5/41
9-3/4
1/43
8/27/42
8/27/42
o
DD508
CONT
Bath Iron Vks.
21.2
6.1
12/24/41
9-1/5
4/ 1/43
9/30/42
9/30/42
o
DD509
CONVERSE
Bath Iron Vice.
14.3
4.2
8-2/5
10/ 1/43
10/30/42
10/30/42
o
DD510
EATON
Bath Iron Vice.
13.6
3.7
8-2/5
11/ 1/43
11/30/42
11/30/42
o
DD511
FOOTE
Bath Iron Vks.
11.8
2.3
8-1/2
12/31/43
12/30/42
12/30/42
0
DD512
SPENCE
Bath Iron Vks.
10.9
1.6
8-3/5
12/31/43
1/30/43
1/30/43
0
DD513
TERRY
Bath Iron Vks.
8.9
1.2
8-1/2
12/31/43
2/25/43
2/25/43
o
DD514
THATCHER
Bath Iron Vks.
8.8
1.3
8-3/4
12/31/43
3/30/43
3/30/43
o
DD515
ANTHONY
Bath Iron Vks.
8.6
1.3
8-5/6
12/31/43
4/30/43
4/30/43
o
DD516
WADSWORTH
Bath Iron Vks.
8.6
1.4
8-5/6
12/31/43
5/27/43
5/27/43
o
DD517
WALKER
Bath Iron Wks.
8.4
1,4
9
1/ 3/44
6/30/43
6/30/43
o
DD518
BROWNSON
Beth. Staten Island
4.1
1.9
16
11/15/43
7/15/43
6/15/43
1+
DD519
DALY
Beth. Staten Island
4.1
1.9
15
12/31/43
9/ 1/43
7/15/23
1-1/2+
DD520
ISHERWOOD
Beth. Staten Island
4.1
1.9
16
2/15/44
10/15/43
9/ 1/43
1-1/2+
DD521
KIMBERLY
Beth. Staten Island
2.1
0,6
16-1/4
7/ 1/44
12/ 1/43
12/ 1/43
o
DD522
LUCE
Beth. Staten Island
2.0
0.5
16-1/3
8/15/44
1/15/44
12/31/43
1/2+
DD526
ABNER READ
Beth. San Francisco
7.6
2.1-
10/30/41
16
7/ 1/43
3/ 1/43
3/ 1/43
o
DD527
AMMEN
Beth. San Francisco
7.1
1.8
11/29/41
16
7/15/43
4/ 1/43
4/ 1/43
o
DD528
MULLANT
Beth. San Francisco
4.6
1.7
1/15/42
16-1/2
8/15/43
6/ 1/43
67 1/43
0
DD529
BUSH
Beth. San Francisco
4.1
1.2
18-1/2
9/ 1/43
8/ 1/43
8/ 1/43
0
DD530
TRATHEN
Beth. San Francisco
3.8
1.1
17
10/ 1/43
9/ 1/43
9/ 1/43
0
DD531
HAZELWOOD
Beth. San Francisco
3.5
0,8
17-1/2
11/ 1/43
10/ 1/43
10/ 1/43
o
DD532
EXERMAN
Beth. San Francisco
3.5
0.9
18
11/15/43
11/ 1/43
11/ 1/43
o
DD533
HOEL
Beth. San Francisco
2.6
0.3
17-1/2
12/ 1/43
12/ 1/43
12/ 1/43
o
DD534
MC CORD
Beth. San Francisco
2,6
0,3
18
12/31/43
12/31/43
12/31/43
o
DD535
MILLER
Beth. San Francisco
2.4
0,4
16
6/ 1/44
2/ 1/44
21 1/44
o
DD536
OWEN
Beth. San Francisco
2.4
0.4
16
7/ 1/44
3/ 1/44
3/ 1/4
0
DD537
PUTNAM
Beth. San Francisco
2.3
0.3
15
8/ 1/44
4/ 1/44
4/ 1/4
o
DD538
STEPHEN POTTER
Beth, San Francisco
2.3
0.3
15-1/2
8/15/44
5/ 1/44
5/ 1/44
o
DD539
TINGEY
Beth. San Francisco
2.3
0.3
14
10/15/44
6/ 1/44
6/ 1/44
o
00540
TWINING
Beth. San Francisco
2.3
0.3
16
11/ 1/44
7/ 1/44
71 1/44
o
DD541
TARNELL
Beth. San Francisco
2.3
0.7
17-1/2
12/15/44
9/ 1/44
9/ 1/44
o
DD544
BOYD
Beth. San Pedro
2.5
0.6
17-1/2
4/ 1/44
10/ 1/43
10/ 1/43
0
DD545
BRADFORD
Beth. San Pedro
2.5
0.6
17-1/2
5/ 1/44
11/ 1/43
11/ 1/48
0
DD546
BROWN
Beth. San Pedro
2.0
0.1
17-1/2
12/15/43(x)
12/ 1/43
12/ 1/43
DD547
COVELL
Beth. San Pedro
2.0
0.1
17-1/2
1/15/44(x)
12/31/43
12/31/43
00
o
o
Destroyers DD523 to DD525, inclusive, DD542, DD543, DD548, and 00549 cancelled 16 December 1940. + Ahend of contract completion date.
(x) Contract completion dates of DD546 and DD547 changed October 7. 1941.
RECTRICTED
N.B.5.(745)
Page 8
As of February 1, 1942
B-2
Percentage
Date of Completion
Months
of Completion
Ahend(+)or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind(-)
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-41
Yard
DESTROYERS (2100
ton) (Cont'd)
DD550
CAPPS
Gulf S. 3. Co.
35.0
5.0
6/12/41
24
7/ 9/43
6/15/43
6/15/43
o
DD551
DAVID W. TAYLOR
Gulf 5. 3. Co.
29.0
6.0
6/12/41
26
1/ 9/44
8/15/43
8/15/43
o
DD552
EVANS
Gulf S. B. Co.
13.6
3.5
7/21/41
26-4/5
6/ 9/44
10/15/43
10/15/43
o
DD553
JOHN D. HENLEY
Gulf S.B. Co.
13.6
3.5
7/21/41
28-4/5
11/9/44
12/15/43
12/15/43
o
DD554
FRANKS
Senttle Tacoma S.B. Co.
7.2
2.1
16
6/30/43
10/15/43
8/ 1/43
2-1/2+
DD555
HAGGARD
Seattle Tacoma S.B. Co.
7.1
2.0
16
7/15/43
11/15/43
8/15/43
3+
DD556
HAILEY
Seattle Tacoma S.B. Co.
6.9
1.8
16
7/31/43
12/ 1/43
9/ 1/43
3+
DD557
JOHNSTON
Seattle Tacoma S.B. Co.
6.9
1.8
16
8/16/43
1/ 3/44
9/15/43
3-3/5+
DD558
LAWS
Seattle Incoma S.B. Co.
6.9
1.8
16
8/31/43
2/ 1/44
10/1/43
4+
DD559
LONGSHAW
Seattle Tacoma S.B. Co.
5.6
0.5
16-1/2
12/1/43
2/15/44
11/ 1/43
3-1/2+
DD560
MCRRISON
Seattle Tacoma S.B. Co.
5.6
0.5
16-1/2
12/15/43
3/15/44
11/15/43
4+
DD561
PRICHETT
Seattle Tacoma S.B. Co.
5.6
0.5
16-1/3
1/ 3/44
4/ 1/44
11/30/43
4+
DD562
ROBINSON
Seattle Tacoma S.B. Co.
5.6
0.5
15-5/6
1/15/44
5/ 1/44
12/15/43
4-1/2+
DD563
ROSS
Seattle Tacoma S.B. Co.
5.6
0.5
15-1/3
1/31/44
6/ 1/44
12/30/43
5+
DD564
ROWE
Seattle Tacoma S.B. Co.
5.6
0.5
15-1/2
10/31/44
6/ 15/44
6/15/44
0
DD565
SMALLEY
Seattle Tacoma S.B. Co.
5.6
0.5
16
11/15/44
7/15/44
7/15/44
0
DD566
STODDARD
Seattle Tacoma S.B. Co.
5.6
0.5
16-1/2
11/30/44
8/15/44
8/15/44
o
DD567
WATTS
Seattle Tacoma S.B. Co.
5.6
0.5
16-1/2
12/15/44
9/ 1/44
9/ 1/44
o
DD568
WREN
Seattle Tacoma S.B. Co.
5.6
0.5
17
12/30/44
10/ 2/44
10/ 2/44
o
DD569
AULICE
Con. Steel Corp. (Crange)
30.5
6.4
5/14/41
17-1/2
7/ 9/43
10/28/42
10/28/42
0
DD570
CHARLES AUSBURN
Con. Steel Corp. (Orange)
28.5
8.2
5/14/41
18
8/24/43
11/11/42
11/11/42
0
DD571
CLAXTON
Con. Steel Corp. (Orange)
23.3
5.2
6/25/41
17
10/ 9/43
11/24/42
11/24/42
0
DD572
DYSON
Con. Steel Corp. (Orange)
20.2
3.3
6/25/41
17-2/5
11/24/43
12/ 8/42
12/ 8/42
o
DD573
HARRISON
Con. Steel Corp. (Orange)
15.6
4.8
7/25/41
16-5/6
1/ 9/44
12/20/42
12/20/42
0
DD574
JOHN RODGERS
Con. Steel Corp. (Orange)
14.7
4.7
7/25/41
17-1/5
2/24/44
12/31/42
12/31/42
0
DD575
MC XXX
Con. Steel Corp. (Orange)
7.0
2.4
14
4/ 9/44
5/ 1/43
5/ 1/43
0
DD576
MURRAY
Con. Steel Corp. (Orange)
6.4
1.8
14
5/24/44
5/15/43
5/15/43
0
DD577
SPROSTON
Con. Steel Corp. (Orange)
5-7
1.7
14
7/ 9/44
6/ 1/43
6/ 1/43
0
DD578
WICKES
Con. Steel Corp. (Orange)
5.6
1.6
14
8/24/44
6/15/43
6/15/43
0
DD579
WILLIAM D. PORTER
Con. Steel Corp. (Orange)
5.5
1,6
14
10/ 9/44
7/ 1/43
7/ 1/43
0
DD580
TOUNG
Con. Steel Corp. (Orange)
5.4
1.5
14
11/24/44
7/15/43
7/15/43
o
Destroyers DD548 and DD549 cancelled 16 December 1940.
+ Ahead of contract completion date.
N.B.S.(745)
RESTRICTED
Page 9
As of February 1. 1942
3-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
DESTROYERS (2100
ton) (Cont'd)
DD581
CHARRETTE
Boston
3.8
1,0
14-5/6
11/ 1/43
9/ 1/43
5/15/43
3-1/2+
DD582
CONNER
Boston
3.0
0.5
14
1/ 2/44
10/ 1/43
7/ 1/43
3+
DD583
HALL
Boston
3.0
0.5
14-1/2
3/ 1/44
11/ 1/43
7/15/43
3-1/2+
DD584
HALLIGAN
Boston
2.7
0,2
14
5/ 1/44
12/1/43
9/ 1/43
3+
DD585
HARADEN
Boston
2.7
0,2
14-1/2
7/ 1/44
1/ 1/44
9/15/43
3-1/2+
DD586
NEWCOMB
Boston
2.7
0.2
14
9/ 1/44
2/ 1/44
11/ 1/43
3+
DD587
BELL
Charleston
11,0
4.4
12/30/41
16-1/2
8/ 1/43
7/ 1/43
5/15/43
1-1/2+
DD588
BURNS
Charleston
5.9
1.0
14
11/ 1/43
9/ 1/43
7/ 1/43
2+
DD589
IZARD
Charleston
6.3
1.5
15-1/2
2/ 1/44
11/ 1/43
8/15/43
2-1/2+
DD590
PAUL HAMILTON
Charleston
5.3
0.8
15
5/ 1/44
1/ 1/44
10/ 1/43
3+
DD591
TWIGGS
Charleston
4.9
0.5
16-1/2
8/ 1/44
3/ 1/44
11/15/43
3-1/2+
DD592
HOWORTH
Puget Sound
17.2
5.2
11/26/41
17-1/6
61 1/43
6/ 1/43
1/43
1+
DD593
KILLEN
Puget Sound
17.2
5.2
11/26/41
18-1/6
8/ 1/43
8/ 1/43
6/ 1/43
2+
DD594
MANSFIELD
Puget Sound
10.3
2.3
17-1/3
10/ 1/43
1/15/45
12/ 1/43
13-1/2+
DD595
METCALF
Puget Sound
10.3
2.3
18-1/3
12/ 1/43
3/15/45
1/ 1/44
14-1/2+
DD596
SHIELDS
Puget Sound
10.3
2.3
22-5/6
2/ 1/44
7/15/45
5/15/44
14+
DD597
WILEY
Puget Sound
10.3
2.3
23-5/6
4/ 1/44
9/15/45
6/15/44
15+
DD629
ABBOT
Bath Iron Vice.
4.6
0.6
9
2/ 1/44
7/30/43
7/30/43
o
DD630
BRAINE
Bath Iron Vks.
4.5
0.6
9-1/6
3/ 1/44
8/30/43
8/30/43
o
DD631
ERBEN
Bath Iron Wke.
4.5
0.6
9-1/4
4/ 1/44
9/30/43
9/30/43
o
DD642
HALE
Bath Iron Vice.
3.9
0.4
9-1/3
8/ 1/44
10/30/43
10/30/43
o
DD643
SIGOURNEY
Bath Iron Wks.
3.9
0.4
9-2/5
11/ 1/44
11/30/43
11/30/43
o
DD644
STEMBEL
Bath Iron Vice.
3.9
0.4
9-2/5
12/30/44
12/30/43
12/30/43
o
DD649
Charleston
0,2
0.2
13
1/ 1/444
1/1/44
0
DD650
Bath Iron Vice.
9-1/2
1/30/444
1/30/44
0
DD651
Bath Iron Vice.
9-1/2
2/27/44
2/27/44
o
DD652
Bath Iron Vice.
9-2/3
3/30/44*
3/30/44
o
DD653
Bath Iron Vks.
9-4/5
4/30/444
4/30/44
o
DD654
Gulf S.B. Corp.
0.2
0.1
21
3/ 1/44
1/44
o
DD655
Gulf S.B. Corp.
0,2
0.1
15-1/2
4/15/44*
4/15/44
o
DD656
Gulf S.B. Corp.
0.2
0.1
15
5/31/44#
5/31/44
o
DD657
Beth. Staten Island
16
2/15/44#
2/15/44
o
DD658
Staten Island
16-1/5
3/15/444
3/15/44
0
DD659
Fed. S.B. & D.D. Co.
8-1/3
7/15/43#
7/15/43
o
DD660
Fed. S.B. & D.D. Co.
7-1/2
9/ 1/434
3/ 2/43
1+
DD661
Fed. S.B. & D.D. Co.
8
9/ 1/434
8/16/43
1/2+
DD662
Boston
0.2
0.2
14-1/2
3/ 1/4/4
11/15/43
3-1/2+
DD663
Boston
0.2
0.2
13-1/2
4/ 1/4/4
12/15/43
3-1/2+
DD664
Boston
0.2
0,2
14
5/ 1/44
12/31/43
4+
DD665
Charleston
0.2
0,2
14-1/2
2/15/44
(#) Date reported 1/ 1/42. vessels awarded subsequent to 11/1/41.
+ Ahead of contract completion date.
N.B.S.(745)
Page 10
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Abead(+)or
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-41
Yard
Prediction
ESCORT VESSELS
DE 51
(*)
+
Bethlehes Steel Co.
DE 52
(a)
t
Bethlehem Steel Co.
DE 53
(*)
+
Bethlehem Steel Co.
DE 54
(*)
+
Bethlehem Steel Co.
DE 55
(a)
,
Bethlehem Steel Co.
DE 56
(*)
+
Bethlehem Steel Co.
DE 57
(*)
1
Bethlehem Steel Co.
DE 58
(*)
t
Bethlehem Steel Co.
DE 59
(a)
+
Bethlehem Steel Co.
DE 60
(s)
+
Bethlehem Steel Co.
DE 61
(*)
+
Bethlehem Steel Co.
DE 62
(*)
+
Bethlehem Steel Co.
DE 63
(s)
+
Bethlehem Steel Co.
DE 64
(s)
+
Bethlehem Steel Co.
DE 65
(*)
+
Bethlehem Steel Co.
DE 66
(*)
+
Bethlehem Steel Co.
DE 67
(a)
+
Bethlehem Steel Co.
DE 68
(*)
+
Bethlehem Steel Co.
DE 69
(*)
+
Bethlehem Steel Co.
DE 70
(*)
1
Bethlehem Steel Co.
DE 71
(*)
+
Bethlehem Steel Co.
DE 72
(*)
+
Bethlehem Steel Co.
DE 73
(a)
+
Bethlehem Steel Co.
DE 74
(*)
+
Bethlehem Steel Co.
DE 75
(*)
+
Bethlehem Steel Co.
DE 76
(*)
1
Bethlehem Steel Co.
DE 77
(*)
1
Bethlehem Steel Co.
DE 78
(a)
+
Bethlehem Steel Go.
DE 79
(a)
+
Bethlehem Steel Co.
DE 80
(a)
1
Bethlehem Steel Co.
DE 81
(*)
1
Bethlehem Steel Go.
(a) Steel Balls.
+ Being constructed under Emergency Authorization.
N.B.S.(745)
RESERVED
Page 11
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
ESCORT VESSELS (Cont'd)
DE82
(*)
+
Bethlehem Steel Co.
DE83
(*)
+
Bethlehem Steel Co.
DESL
(*)
+ Bethlehem Steel Co.
DE85
(*)
+ Bethlehem Steel Co.
DM86
(*)
+ Bethlehem Steel Co.
DM87
(*)
+
Bethlehem Steel Co.
DESE
(*)
+ Bethlehem Steel Co.
DE89
(*)
+ Bethlehem Steel Co.
DE90
(*)
+ Bethlehem Steel Co.
DE91
(*)
+ Bethlehem Steel Co.
DW92
(a)
+ Bethlehem Steel Co.
DE93
(a)
+ Bethlehem Steel Co.
DE94
(*)
+ Bethlehem Steel Co.
0895
(*)
+ Bethlehem Steel Co.
DW96
(*)
+ Bethlehem Steel Co.
DE97
(*)
+ Bethlehem Steel Co.
DE98
(*)
+ Bethlehem Steel Co.
DE99
(*)
t Dravo Corp.
DE100
(s)
+ Dravo Corp.
DE101
(*)
t Dravo Corp.
DE102
(*)
+ Dravo Corp.
DE103
(*)
1 Dravo Corp.
DW104
(*)
+ Dravo Corp.
DE105
(*)
+ Dravo Corp.
DE106
(*)
+ Dravo Corp.
DE107
(a)
+
Dravo Corp.
DE105
(1)
+ Dravo Corp.
DE109
(*)
+
Dravo Corp.
JE110
(*)
+ Dravo Corp.
DE111
(*)
+ Dravo Corp.
DE112
(*)
+ Dravo Corp.
DE113
(*)
+ Dravo Corp.
DE114
(a)
,
Drave Corp.
DE115
(a)
+ Dravo Corp.
DE116
(*)
+ Dravo Corp.
DE117
(a)
+
Dravo Corp.
DK118
(*)
+
Dravo Corp.
DELLY
(*)
+ Dravo Corp.
DE120
(a)
, Dravo Corp.
DX121
(*)
1 Dravo Corp.
DW122
(a)
+ Dravo Corp.
DE123
(a)
+
Dravo Corp.
(s) Steel Hulls
+ Being constructed under Emergency Authorization.
N.B.5.(745)
RESTRICTIO
Page 12
As of February 1, 1942
B-2
Percentage
Date of Completion
Months
of Completion
Ahead(+)or
Feb.1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind(-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
-
Laid
Launched
Completion
Order
11-1-41
Yard
ESCORT VESSELS (Cont'd)
08124
(*)
+
Dravo Corp.
02125
(a)
+
Dravo Corp.
DE126
(a)
1
Dravo Corp.
DE127
(s)
1
Dravo Corp.
DE128
(*)
1
Dravo Corp.
DE129
(s)
+
Consolidated Steel Co.
DE130
(a)
1
Consolidated Steel Co.
DE131
(*)
+
Consolidated Steel Co.
DE132
(a)
+ Consolidated Steel Co.
DE133
(*)
+ Consolidated Steel Co.
DE134
(*)
1 Consolidated Steel Co.
DE135
(*)
+ Consolidated Steel Co.
DE136
(a)
t Consolidated Steel Co.
02137
(a)
, Consolidated Steel Co.
DE138
(*)
+ Consolidated Steel Co.
DE139
(a)
+ Consolidated Steel Co.
DE140
(*)
+ Consolidated Steel Co.
DE141
(*)
+
Consolidated Steel Co.
DE142
(*)
+ Consolidated Steel Co.
DE143
(*)
+
Consolidated Steel Co.
DE146
(*)
+ Consolidated Steel Co.
DE145
(*)
+ Consolidated Steel Co.
DE146
(*)
1 Consolidated Steel Co.
DM147
(*)
+ Consolidated Steel Co.
DE148
(*)
+ Consolidated Steel Co.
DE149
(*)
+ Consolidated Steel Co.
DE150
(*)
+ Consolidated Steel Co.
DE151
(*)
+ Consolidated Steel Co.
DE152
(*)
+ Consolidated Steel Co.
DE153
(a)
+
Norfolk Savy Tard
DE154
(*)
+
Norfolk Havy Tard
10/10/42
DE155
(*)
+
Norfolk Havy Tard
11/10/42
DE156
(*)
+
Norfolk Havy Tard
12/10/42
DE157
(*)
1
Norfolk Havy Tard
1/10/43
DE158
(*)
1
Norfolk Navy Tard
2/10/43
DE159
(*)
+
Norfolk Navy Tard
3/10/43
DE160
(*)
+
Norfolk Havy Tard
4/10/43
DB161
(*)
+
Norfolk Havy Tard
5/10/43
DM162
(*)
+
Federal 8.3. & D.D. Co.
6/10/43
DM163
(*)
+
Federal 5.3. & D.D. Oo.
DM164
(*)
+
Federal 5.3. & D.D. Co.
DB165
(*)
+
Federal 5.3. & D.D. Co.
(a) Steel Hulls
+ Being constructed under Emergency Authorization.
N.B.5.(745)
RESTRICTED
Page 13
As of February 1, 1942
B-2
Percentage
Date of Completion
Months
of Completion
Ahead(+)or
Feb.1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind(-)
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-11
Yard
ESCORT VESSELS (Cont'd)
DE166
(s)
+
Federal 5.3. & D.D. Co.
DE167
(*)
t
Federal 5.3. & D.D. Co.
DE168
(*)
1
Federal 3.3. & D.D: Co.
DE169
(*)
+
Federal 3.3. & D.D. Co.
DE170
(*)
1
Federal 8.3. & D.D. Co.
DE171
(*)
+
Federal S.B. & D.D. Co.
DE172
(*)
+
Federal S.B. & D.D. Co.
DE173
(*)
+ Federal S.B & D.D. Co.
DE174
(*)
+ Federal 5.3: & D.D. Co.
DE175
(*)
+ Federal 5.3 & D.D. Co.
DE176
(*)
+ Federal S.B. & D.D. Co.
DE177
(*)
, Federal 5.3. & D.D. Co.
DE178
(*)
1 Federal S.B. & D.D. Co.
DE179
(*)
+ Federal S.3. & D.D. Co.
DELSO
(a)
1 Federal S.3. & D.D. Co.
DE181
(a)
+ Federal S.3. & D.D. Co.
08152
(e)
1 Federal S.3. & D.D. Co.
DE183
(*)
+ Federal S.3. & D.D. Co.
DX184
(a)
+ Federal S.3. & D.D. Co.
DE185
(a)
+ Federal S.B. & D.D. Co.
DE186
(*)
t Federal 5.3. & D.D. Co.
DE187
(*)
1 Federal 5,3. & D.D. Co.
DE158
(a)
t Federal S.B. & D.D. Co.
DE189
(*)
1 Federal S.B. & D.D. Co.
DE190
(*)
1 Federal 5,3. & D.D. Co.
DE191
(*)
, Federal 5.3. & D.D. Co.
DE192
(*)
+ Federal S.B. & D.D. Co.
DE193
(*)
+ Federal S.B. & D.D. Co.
DE194
(*)
1 Federal S.3. & D.D. Co.
DE195
(*)
1 Federal 5,3. & D.D. Co.
DE196
(*)
+ Foieral 3.3. & D.D. Co.
DE197
(*)
1 Federal S.3. & D.D. Co.
DE198
(*)
1 Newport Neva S.B. & D.D. Co.
DE199
(*)
+ Newport News 5.3. & D.D. Co.
DE200
(*)
+ Nevport Neve S.B. & D.D. Co.
DE201
(*)
+ Newport News 5.3. & D.D. Co.
DE202
(*)
1 Newport News S.B. & D.D. Co.
DE203
(*)
+ Newport News 3.3. & D.D. Co.
DEP04
(a)
1 Newport News 5.3. & D.D. Co.
DE205
(*)
1 Newport Neve 5.3. & D.D. Co.
DE206
(*)
. Newport News 5.3. & D.D. Co.
DE207
(a)
1 Newport News 5.3. & D.D. Co.
DE205
(*)
+
Newport leve 5.3. & D.D. Co.
(a) Steel Hulls
1 being constructed under Emergency Authorization.
N.B.S. (745)
I
Page 14
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mes.
An per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Latd
Launched
Completion
Order
11-1-41
Yard
Prediction
ESCORT VESSELS (Cont'd)
DE209
C
+ Nevport News S.3. & D.D. Co.
DE210
(e)
+ Nevport News 3.3. & D.D. Co.
DK211
(a)
1 Nevoort News S.B. & D.D. Co.
DE212
(a)
1 Newoort Seve S.B. & D.D. Co.
DE213
(*)
+ Newport News 3.3. & D.D. Co.
DE214
(*)
, Newport News S.B. & D.D. Co.
DE215
(a)
, Newport News S.B. & D.D. Co.
DE216
(*)
1 Newport News S.B. & D.D. Co.
DE217
(a)
+ Newport News s.b. & D.D. Co.
DE218
(s)
+ Newport leve S.B. & D.D. Co.
DE219
(s)
+ Newport News S.B. & D.D. Co.
DE220
(a)
+ Newport lieve S.B. & D.D. Co.
DM221
(*)
+ Newport News S.B. & D.D. Co.
DE222
(*)
+ Newport Seve S.B. & D.D. Co.
DE223
(*)
1 Newport News S.B. & D.D. Co.
DE224
(a)
+ Newport News S.B. & D.D. Co.
DE225
(a)
1 Newport News S.B. & D.D. Co.
DE226
(a)
, Newport News S.B. & D.D. Co.
DE227
(a)
1 Newport News S.B. & D.D. Co.
DE228
(*)
+ Newport News S.B. & D.D. Co.
DE229
(*)
1 Newport News 5,3. & D.D. Co.
DE230
(a)
t Newport News S.B. & D.D. Co.
DE231
(a)
+ Newport News S.B. & D.D. Co.
DE232
(*)
1 Newport News S.3. & D.D. Co.
DE233
(s)
1 Newport Feve 5.3. & D.D. Co.
DE234
(*)
+ Newport News 5.3. & D.D. Co.
DE235
(*)
t Newport News S.B. & D.D. Co.
DE236
(*)
+ Newport Neve 5.3. & D.D. Co.
DB237
(*)
1 Newport News S.B. & D.D. Co.
DB238
(*)
+ Brown Shipbldg. Co.
DE239
(*)
+ Brown Shipbldg. Co.
DE240
(*)
t Brown Shipbldg. Co.
DE241
(*)
+ Brown Shipbldg. Co.
DM242
(a)
+ Brown Shipbldg. Co.
DM243
(a)
+ Brown Shipblig. Co.
DE244
(*)
1 Brown Shipbldg. Co.
DE245
(*)
+ Brown Shipbldg. Co.
DB246
(*)
+ Brown Shipbldg. Co.
DE247
(*)
+ Brown Shipbldg. Co.
08248
(*)
, Brown Shipbldg. Co.
DM249
(a)
+ Brown Shipbldg. Co.
DB250
(a)
+ Brown Shipbldg. Co.
DB251
(a)
.
Brown Shipblde. Co.
(a) Steel Hulls
1 Being constructed under Emergency Authorization.
N.B.3.(745)
RESERIOTED
Page 15
As of February 1, 1942
3-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-41
Yard
Prediction
ESCORT VESSELS (Cont'd)
DE252
C
+ Brown Shipbldg. Co.
DE253
(a)
1 Brown Shipbldg. Co.
DE254
(*)
+ Brown Shipbldg. Co.
08255
(s)
+ Brown Shipbldg. Co.
DE256
(*)
+ Boston Navy Yard
10/ 1/43
DE257
(*)
1 Boston Havy Yard
10/10/43
DE258
(*)
1 Boston Havy Yard
10/25/43
DE259
(a)
1 Boston Havy Yard
11/5/43
DE260
(*)
+ Boston Havy Yard
11/15/43
DE261
(*)
+ Boston Havy Tard
11/25/43
DE262
(*)
+ Boston Navy Yard
12/10/43
DE263
(a)
1 Boston Navy Yard
12/20/43
DE264
(a)
+ Boston Navy Yard
1/44
DE265
(a)
+ Boston Havy Yard
1/10/44
DE266
(a)
+ Boston Havy Tard
1/25/44
DE267
(*)
+ Boston Havy Yard
2/5/44
DE268
(*)
* Boston Navy Yard
2/15/44
DE269
(a)
+ Boston Havy Yard
2/25/44
DE270
(*)
+ Boston Navy Yerd
3/10/44
DE271
(a)
, Boston Havy Tard
3/20/44
DE272
(s)
+ Boston Navy Yard
4/ 1/44
08273
(a)
+ Boston Navy Tard
4/10/44
DM274
(a)
1 Boston Navy Yard
4/25/44
DE275
(*)
+ Boston Havy Yard
5/5/44
DX276
(a)
+ Boston Havy Yard
5/15/44
DE277
(a)
, Boston Havy Tard
5/25/44
08278
(a)
t Boston Havy Yard
6/10/44
DE279
(a)
t Boston Havy Yard
6/20/44
DE280
(a)
+ Boston Havy Tard
91 1/44
DE281
(a)
1 Charleston Savy Yard
DE282
(a)
+ Charleston Havy Tard
DE283
(a)
+ Charleston Havy Yard
DE284
(a)
+ Charleston Havy Yard
DE285
(a)
1 Charleston Havy Yard
DM286
(*)
1 Charleston Navy Yard
02287
(a)
+ Charleston Navy Yard
02288
(*)
+ Charleston Navy Tard
DE289
(a)
+ Charleston Navy Tard
DEP90
(*)
+ Charleston Navy Tard
DM291
(*)
1 Charleston Havy Yard
DE292
(a)
+ Charleston Havy Yard
DM293
(a)
t
Charleston Navy Yard
(a) Steel Fulls
1 being constructed under Emergency authorization.
N.B.S.(745)
RESTRICTED
Page 16
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb.1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-41
Yard
Prediction
ESCORT VESSELS (Cont'd)
DM294
(*)
, Charleston Navy Yard
DE295
(s)
+ Charleston Savy Yard
DE296
(a)
+ Charleaton Navy Yard
DE297
(a)
+ Charleston Navy Yard
DE298
(a)
+ Charleaton Savy Yard
DE299
(a)
1 Charleston Navy Yard
DE300
(*)
+
Charleston Navy Yard
(a) Steel Hulls.
1 Being constructed under Emergency Authorization.
N.B.S.(745)
B-2
Page 17
M of February 1. 1942
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
SUBMARINES (1526
ton)
$5213
GREENLING
Elec. Boat Co.
Delivered and placed in commission
21 January
1942.
SS214
GROUPER
Elec. Boat Co.
98.5
3.0
12/25/40
10/27/41
13-5/6
5/12/42
3/21/42
2/23/42
1+
88215
GROWLER
Elec. Boat Co.
94.8
4,2
2/10/41
11/22/40
13-1/3
7/16/42
4/21/42
3/21/42
1+
$8216
GRUNION
Elec. Boat Co.
89.5
5.0
1/41
12/22/41
13-2/3
9/ 1/42
5/20/42
4/20/42
1+
$$217
GUARDFISH
Elec. Boat Co.
83.8
6.1
4/ 1/41
1/20/42
13-2/3
10/16/42
6/20/42
5/20/42
1+
58218
ALBACORE
Elec. Boat Co.
76.6
8.2
4/21/41
13-5/6
12/1/42
7/14/42
6/17/42
1+
$9219
AMBERJACK
Elec. Boat Co.
69.4
7-9
5/15/41
13-2/3
1/16/43
6/42
6/42
1+
$8220
BARB
Elec. Boat Co.
62.7
6.4
6/ 7/41
13-5/6
1/43
9/1/42
8/3/42
1+
$8221
BLACKFISH
Elec. Boat Co.
56.7
6.0
7/ 1/41
13-2/3
4/16/43
9/21/42
5/21/42
1+
58222
BLUEFISH
Elec. Boat Co.
5.7
1.1
12-1/5
2/24/44
8/19/43
7/20/43
1+
$8223
BONEFISH
Elec. Bout Co.
5.7
1.1
13-1/4
3/24/44
9/21/43
8/21/43
1+
SS224
COD
Elec. Boat Co.
5.7
1.1
13-1/4
4/24/44
10/21/43
9/21/43
1+
38225
CERO
Elec. Boat Co.
5.7
1.1
13-1/4
5/24/44
11/20/43
10/21/43
1+
$8226
CORVINA
Elec. Boat Co.
5.7
1.1
13-1/5
6/24/44
12/21/43
11/20/43
1+
$$227
DARTER
Elec. Boat Co.
5.7
1.1
13-1/4
7/24/44
1/20/44
12/21/43
1+
$8229
FLYING FISH**
Portemouth
97.6
4.6
12/ 6/40
9/41
14
5/27/42
1/24/42
2/7/42
1/2-
$$230
FINBACK*
Portemouth
91.0
10.4
2/ 5/41
8/25/41
13-1/2
9/12/42
7/42
3/21/42
1/2-
$$231
HADDOCK
Portsmouth
78.0
12.0
3/31/41
10/20/41
12-4/5
11/12/42
4/25/42
4/25/42
o
$$232
HALIBUT
Portemouth
68.4
11.7
5/16/41
12/3/41
12-2/3
1/28/43
6/42
6/6/42
o
$8233
HERRING
Portemouth
54,6
10.6
7/14/41
1/15/42
12-1/3
4/12/43
7/25/42
7/25/42
o
SS234
KINGFISH
Portsmouth
42.6
10.5
8/29/41
12-1/5
6/28/43
5/42
5/42
o
88235
SHAD
Portsmouth
28.1
7.4
10/24/41
11-4/5
9/12/43
10/17/42
10/17/42
o
88236
SILVERSIDES***
Mare Island
94.8
5.8
11/ 4/40
8/26/41
15-1/3
5/28/42
2/15/42
2/14/42
o
S8237
TRIGGER****
Mare Island
88.2
4.5
2/ 1/41
10/22/41
14
8/28/42
4/ 1/42
4/ 1/42
0
58238
WAHOO
Mare Island
71.9
11.3
6/28/41
13
3/28/43
8/ 1/42
1/42
o
$$239
WHALE
Mare Island
58.3
6.4
6/28/41
14
6/28/43
1/42
1/42
o
SS240
ANGLER
Elec. Boat Co.
5.7
1.1
13-1/4
8/24/44
2/14/44
1/14/42
1+
88241
BASHAW
Elec. Boat Co.
5.7
1.1
13
9/24/44
3/ 7/44
2/ 7/44
1+
$5242
BLUEGILL
Elec. Boat Co.
5.7
1.1
13-1/3
10/24/44
4/ 1/44
1/44
1+
88243
BREAM
Elec. Bont Co.
5.7
1.1
13
11/24/44
4/19/44
3/20/44
1+
$8244
CAVALLA
Elec. Boat Co.
5.7
1.1
14-1/4
12/24/44
5/15/44
4/15/46
1+
$8245
COBIA
Elec. Boat Co.
5.7
1.1
13
1/24/45
6/ 7/44
5/ 6/44
1+
.. Commissioned 10, December 1941
+ Aheed of contract completion date.
... Commissioned 15 December 1941.
- Behind contract completion date.
.... Consissioned 31 January 1942
Commissioned 31 January 1942
N.B.5.(745)
REPRESED
Page 18
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mes.
As per
As Reported
As Last
Aheed(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Latd
Launched
Completion
Order
11-1-41
Yard
Prediction
SUBMARINES (Cont'd) (1526 ton)
85246
CROAKER
Elec. Boat Co.
5.7
1.1
13-1/5
2/24/45
7/ 6/44
6/ 7/44
1+
SS247
DACE
Elec. Boat Co.
5.7
1.1
15-1/2
3/24/45
8/ 7/44
11/16/43
8-2/3+
SS248
DORADO
Elec. Boat Co.
5.7
1.1
15-1/4
4/24/45
9/ 7/44
11/29/43
9-1/3+
88249
FLASHER
Elec. Bont Co.
5.7
1.1
16
5/24/45
10/ 5/44
2/ 8/46
5+
88250
FLIER
Elec. Boat Co.
5.7
1.1
15-4/5
6/24/45
11/ 7/44
3/ 16/44
7-2/3+
SS251
FLOUNDER
Elec. Bont Co.
5.7
1.1
15-1/2
7/24/45
12/ 1/44
4/22/44
7-1/3+
$8252
GABILAN
Elec. Boat Co.
5.7
1.1
15-1/3
8/24/45
12/21/44
5/27/44
6-4/5+
88253
GUNNEL
Elec. Boat Co.
52.2
8.2
7/21/41
13-4/5
6/ 1/43
10/15/42
9/24/42
1+
88254
GURNARD
Elec. Boat Co.
46.7
7.6
9/ 2/41
13
7/16/43
11/ 5/42
10/ 6/42
1+
$$255
HADDO
Elec. Boat Co.
41.0
7.0
10/ 1/41
13-1/5
9/ 1/43
12/ 7/42
11/ 7/20
1+
$$256
HAKE
Elec. Boat Co.
34.6
4.7
11/ 1/41
13-1/5
10/16/43
1/ 7/43
12/ 7/42
1+
88257
HARDEN
Elec. Boat Co.
29.3
4,2
12/ 1/41
13-1/4
12/ 1/43
2/ 6/43
1/ 8/43
1+
88258
HOE
Elec. Boat Co.
24.3
3.3
1/ 2/42
13
1/16/44
6/43
2/ 6/43
1+
88259
JACK
Elec. Boat Co.
11.4
3.4
2/ 2/42
13
8/24/43
4/ 6/43
3/ 6/43
1+
85260
LAPON
Elec. Boat Co.
10,1
2.9
14-1/3
9/24/43
5/ 1/43
4/ 1/43
1+
SS261
MINGO
Elec. Boat Co.
8,8
2.6
13-1/4
10/24/43
5/20/43
4/21/43
1+
88262
MUSKALLUNGE
Elec. Boat Co.
7.8
2.0
13-1/4
11/24/43
6/15/43
5/15/43
1+
SS263
PADDLE
Elec. Boat Co.
7.0
1.7
13
12/24/43
7/ 6/43
6/ 5/43
1+
SS264
PARGO
Elec. Boat Co.
6.4
1.4
13-1/3
1/24/44
8/ 2/43
7/ 1/23
1+
88265
PETO
Manitowoc S.B. Co.
49.2
9.7
6/18/41
17-1/2
8/4/43
6/ 1/43
12/ 3/42
6+
S9266
POGY
Manitowoc S.B. Co.
31.9
5.9
9/15/41
17
11/ 4/43
9/ 1/43
2/15/43
6-1/2+
88267
POMPON
Manitowoc S.D. Co.
24.0
4.0
11/26/41
16-2/3
2/ 4/44
11/24/43
4/16/43
7-1/5+
88268
PUFFER
Manitowoc S.B. Co.
9.8
3.8
15-1/6
4/ 4/44
2/ 6/44
6/ 6/43
E+
ss269
RASHER
Manitowoc S.B. Co.
7.5
1.8
15-1/6
6/ 4/44
4/18/44
7/29/43
8-2/3+
88270
RATON
Manitowoc S.B. Co.
7.0
1.3
15
1/ 4/45
6/24/44
9/21/43
9+
$5271
RAY
Manitowoc S.B. Co.
7.0
1.3
15
3/ 4/45
1/44
11/18/43
9-1/2+
SS272
REDFIN
Manitowoc S.D. Co.
7.0
1.3
14-4/5
5/ 4/45
2/ 6/44
1/ 6/44
1+
88273
ROBALO
Manitowoc S.B. Co.
7.0
1.3
12-3/5
7/ 4/45
1/ 6/45
2/ 3/44
11+
SS274
ROCK
Manitowoc S.B. Co.
7.0
1.3
16-5/6
9/ 4/45
3/ 1/45
6/19/44
8-1/3+
$8275
HUNNER
Portsmouth
16.2
4,2
12/ 8/41
11-2/3
5/ 1/43
11/28/42
11/28/42
o
88276
SAMFISH
Portsmouth
9.5
2.4
1/20/42
11-2/3
7/ 1/43
1/ 9/43
1/ 9/43
o
SS277
SCAMP
Portsmouth
4.8
0.9
11-1/2
9/ 1/43
2/20/43
2/20/43
o
59278
SCORPION
Portsmouth
2.7
0.9
11-2/3
11/ 1/43
4/10/43
3/20/43
2/3+
88279
SNOOK
Portsmouth
2.1
0.6
11-1/2
1/2 /44
5/22/43
4/17/43
1-1/6+
38250
STEELHEAD
Portsmouth
1,6
0.2
11-4/5
31 1/44
6/26/43
5/15/43
1-1/3+
S8281
SUNFISH
Mare Island
35.7
5.3
9/25/41
12-2/3
10/ 1/43
10/15/42
10/15/42
o
88282
TUNNY
Mare Island
31.7
5.7
11/10/41
12-1/6
1/ 2/44
12/ 1/42
11/15/42
1/2+
88283
TINOSA
Mare Island
7.6
1.9
13-1/3
7/ 1/43
4/ 1/43
4/ 1/43
o
SS284
TULLIBEE
Mare Island
7.6
1.9
13
8/ 1/43
5/ 1/43
5/ 1/43
o
Based on completion by Manitovoe 5.3. Do. prior to operation by sub-contractor.
+ Ahead of contract completion date.
Electric Boat Go. preparatory to delivery to Government.
RESTRICTED
N.B.S.(745)
Price 19
As of February 1, 1942
B-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mcs.
As per
As Reported
As Last
Ahead(+)or
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-41
Yard
Prediction
SUBMARINES (Cont'd)(1526 ton)
33285
Portsmouth
11-2/3
6/ 1/434
6/ 1/43
o
SS286
Portsmouth
13-1/2
6/20/43#
6/19/43
o
55287
Portsmouth
11-1/2
7/15/43#
7/15/43
o
SS288
Portemouth
11-1/2
9/ 4/434
9/ 4/43
0
SS289
Portsmouth
11-2/5
10/ 3/434
10/ 2/43
o
ss290
Portemouth
11-2/5
11/ 2/434
10/15/43
1/2+
ss291
Portsmouth
11-2/3
11/24/43#
11/ 2/43
3/4+
$8292
Cramp S.B. Co.
0,2
0.2
20
11/ 1/43
$$293
Cramp S.B. Co.
0.1
0.1
20
12/31/43
$$294
Cramp S.B. Co.
0.1
0.1
20
3/ 1/44
$$295
Cramp S.B. Co.
0.1
0.1
20
5/ 1/44
$5296
Cramp S.B. Co.
0.1
0.1
18
6/15/44
$$297
Cramp S.B. Co.
0.1
0.1
18
8/ 1/44
$8298
Cramp S.B. Co.
0.1
0.1
18
9/15/44
ss299
Cramp S.B. Co.
0.1
0.1
18
11/ 1/44
SS300
Cramp S.B. Co.
0.1
0.1
16
12/ 1/44
ss301
Cramp S.B. Co.
0.1
0.1
16
12/31/44
88302
Cramp S.B. Co.
0.1
0.1
16
2/ 1/45
88303
Cramp S.B. Co.
0,1
0.1
16
3/ 1/45
58304
Mare Island
12
1/434
5/ 1/43
o
85305
Mare Island
12
6/ 1/434
6/ 1/43
o
$$306
Mare Island
12
10/ 1/434
10/ 1/43
o
88307
Mare Island
12
11/ 1/434
11/ 1/43
o
(#) Date reported 1/ 1/42, vessels awarded subsequent to 11/ 1/41.
Ahead of contract completion date.
RESTRICTED
REPRODUCTION OF THIS MATERIAL
IN ANY FORM IS NOT AUTHORIZED
EXCEPT BY SPECIFIC APPROVAL OF
THE SECRETARY OF THE NAVY.
MONTHLY PROGRESS REPORT MINE
CRAFT UNDER CONSTRUCTION
Distribution:
The President
The Secretary of the Navy
The Under Secretary of the Navy
The Assistant Secretary of the Navy
The Chief of Naval Operations
The Naval Aide to the President
The Chief of the Bureau of Ships
Senator David I. Walsh
Congressman Carl Vinson
Congressman William S. Jacobson
Congressman George J. Bates
Franklin D. Roosevelt Library
DECLASSIFIED
DOD DIR. 5200.9 (9/27/58)
Date- 3-11-59
care I. specer
RESTRICTED
NAVY DEPARTMENT
Reproduction of this material in any
BUREAU OF SHIPS
is not authorized except by specific
WASHINGTON, D.C.
of the Secretary of the Navy.
N.B.S.(745)
MINECRAFT UNDER CONSTRUCTION, UNITED STATES NAVY - REPORT OF PROGRESS AS OF PEBRUARY 1, 1942.
Page 20
B-2
Percentage
Date of Completion
Months
of Completion
Ahead(t)or
Feb. 1
Gain for
No. of Mcs.
As per
As Reported
As Last
Behind(-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-91
Yard
MINESWEEPERS (173 ft.)
AM82
ADROIT
(s) Commercial Iron Works
28.2
5.7
7/31/41
8-2/3
11/27/41
2/26/42
4/20/42
1-4/5-
AM83
ADVENT
(s) Commercial Iron Works
23.8
2.5
8/18/41
8-4/5
12/27/41
3/25/42
5/11/42
1-1/2-
AM84
ANNOY
(s) Commercial Iron Works
19.2
10.2
12/30/41
5
1/26/42
4/17/42
6/ 1/42
1-1/2-
AM85
CONFLICT
(s) Commercial Iron Works
12.8
4.2
1/28/42
4-3/5
2/25/42
5/7/42
6/15/42
1-1/4-
AM86
CONSTANT
(s) Commercial Iron Works
9.6
2.3
4-1/5
3/27/42
5/21/42
6/29/42
1-1/1-
AM87
DARING
(s) Commercial Iron Works
B.2
1.4
5
4/26/42
6/16/42
7/13/42
1-
AM88
DASH
(a) Commercial Iron Works
8.4
2.0
3-3/4
5/26/42
6/16/42
7/27/42
1-1/3-
AM89
DESPITE
(a) Dravo Corp.
42.5
18.0
11/24/41
5-5/6
6/10/42
6/9/42
5/19/42
2/31
AM90
DIRECT
(s) Dravo Corp.
40.9
18.5
12/26/41
5-2/5
7/25/42
7/24/42
6/ 9/42
1-1/2+
AM91
DYNAMIC
(s)
Dravo Corp.
33.3
11.3
1/16/42
5-1/2
9/8/42
7/42
6/30/42
2-1/5+
AM92
EFFECTIVE
(g) Dravo Corp.
32.5
10.5
5
10/8/42
10/7/42
7/21/42
2-1/2+
AM93
ENGAGE
(s)
Dravo Corp.
32.5
10.5
5-4/5
11/7/42
11/6/42
8/11/42
2-5/64
AM94
EXCEL
(s) Jakobson Shipyard, Inc.
11.2
4.4
12/19/41
9-3/4
1/19/42
1/42
10/10/42
2-1/3-
AM95
EXPLOIT
(s) Jakobson Shipyard, Inc.
7.3
2.3
9-2/3
4/ 1/42
10/1/42
12/29/42
3-
AM96
PIDELITY
(a) Nashville Bridge Co.
39.0
12.0
10/15/41
8
5/ 6/42
6/30/42
6/15/42
1/2+
AM97
FIERCE
(a) Nashville Bridge Co.
37.0
10.0
10/18/41
8
5/ 6/42
6/30/42
6/18/42
2/5+
AM98
FIRM
(s)
Penn-Jersey Corp.
22.0
9.4
10/21/41
9-4/5
1/16/42
4/20/42
8/15/42
3-5/6-
AM99
FORCE
(s)
Penn-Jersey Corp.
20.2
9.3
11/19/41
9
7/42
6/12/42
9/15/42
:-
MINESWEEPERS (160 ft.)
AM214
(a)
(b)
AM215
(s)
(b)
AM216
(s)
(b)
AM217
(s)
(b)
AM218
(s)
(b)
AM219
(a)
(b)
AM220
(s)
(b)
AM221
(s)
(b)
AM222
(s)
(b)
AM223
(s)
(b)
AM224
(s)
(b)
AM225
(s)
(b)
AN226
(s)
(b)
AM227
(s)
(b)
AM228
(a)
(b)
AM229
(a)
(b)
AM230
(a)
(b)
AM231
(s)
(b)
AM232
(a)
(b)
(=) Steel Hulls
(b) Assignment to Builder Pending
N.B.S.(745)
As of February 1, 1942
Page 21
Z-2
Percentage
of Completion
Date of Completion
Months
Ahead(t)or
Feb. 1
Gain for
No. of Mes.
As per
As Reported
As Last
Behind(-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-41
Yard
MINESWEEPERS (100 ft.) (Cont'd)
AM233
(a)
(b)
AM234
(s)
(b)
AM235
(s)
(b)
AM236
(a)
(b)
AM237
(a)
(b)
AM238
(s)
(b)
AM239
(a)
(b)
AM240
(s)
(b)
AM241
(s)
(b)
AM242
(s)
(b)
AM243
(s)
(b)
AM244
(s)
(b)
AM245
(s)
(b)
AM246
(a)
(b)
AM247
(a)
(b)
AM248
(s)
(b)
AM249
(s)
(b)
AM250
(s)
(b)
AM251
(s)
(b)
AM252
(s)
(b)
AM253
(s)
(b)
AM254
(s)
(b)
AM255
(s)
(b)
AM256
(a)
(b)
AM257
(s)
(b)
AM258
(a)
(b)
AM259
(s)
(b)
AM260
(s)
(b)
AM261
(s)
(b)
AM262
(s)
(b)
AM263
(s)
(b)
AM264
(s)
(b)
AM265
(s)
(b)
AM266
(a)
(b)
AM267
(s)
(b)
AM268
(s)
(b)
AM269
(s)
(b)
AM270
(a)
(b)
AM271
(s)
(b)
AM272
(s)
(b)
AM273
(s)
(b)
AM274
(a)
(b)
(a) Steel Hulls
(b) Assignment to Builder Pending.
N.B.5.(745)
As of February 1, 1942
Page 22
R2
Percentage
of Completion
Date of Completion
Months
Ahead(+) or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-41
Yard
MINES#EEPERS (130 ft.) (Contid)
AM275
(a)
(b)
AM276
(a)|
(b)
AM277
(a)
(b)
AM278
(s)
(b)
AM279
(s)
(b)
AM280
(a)
(b)
AM281
(a)
(b)
AM282
(s)
(b)
AM263
(s)
(b)
AM284
(s)
(b)
AM285
(s)
(b)
AM286
(c)
(b)
AM287
(s)
(b)
AM283
(s)
(b)
AM289
(a)
(b)
AX290
(s)
(b)
AM291
(s)
(b)
AM292
(a)
(b)
AM293
(s)
(b)
AM294
(a)
(b)
AM295
(s)
(b)
AM296
(a)
(b)
AM297
(s)
(b)
AM298
(a)
(b)
AX299
(s)
(b)
AM300
(s)
(b)
AM301
(s)
(b)
AM302
(s)
(b)
AH303
(n)
(b)
AM304
(s)
(b)
AM305
(a)
(b)
AM306
(s)
(b)
AM307
(s)
(b)
AM308
(a)
(b)
AN309
(s)
(b)
AM310
(a)
(b)
AM311
(a)
(b)
AM312
(s)
(b)
AM313
(s)
(b)
(a) Steel Hulls
(b) Assignment to Builder Pending
N.B.5.(745)
As of February 1, 1942
Page 23
-2
Percentage
of Completion
Date of Completion
Months
Ahead(t) or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-41
Yard
MINESWEEPERS (Plept Type)
AM57
AUX -
(s)
Norfolk
95.1
7.2
4/15/41
8/26/41
10-2/5
9/12/41
2/28/42
2/28/42
0
AM58
BROADBILL
(s) Defoe B. & M. Wks.
35.0
5.0
7/23/41
11-2/5
5/42
7/ 5/42
AM59
CHICKADEE
(s)
Defoe B. & M. Wks.
30.0
5.0
8/21/41
11-1/2
7/ 5/42
8/ 5/42
AM60
NUTHATCH
(s) Defoe B. & M. Wks.
11.5
0.0
6
9/5/42
5/42
AM61
PHEASANT
(s) Defoe B. & M. Wks.
10.5
0.0
7
11/ 5/42
11/5/42
AM62
SHELDRAKE
(s) General Eng. & D.D. Co.
44.2
7.8
6/24/41
12-1/5
5/42
6/30/42
6/30/42
o
AM63
SKYLARK
(s) General Eng. & D.D. Co.
33.1
5.9
7/9/41
12-3/4
7/ 5/42
7/30/42
7/30/42
o
AM64
STARLING
(s) General Eng. & D.D. Co.
26.3
3.3
7/11/41
13-2/3
5/42
8/30/42
8/30/42
0
AM65
SWALLOW
(a) General Eng. & D.D. Co.
22.7
2.5
7/19/41
14-1/3
11/ 5/42
9/30/42
9/30/42
o
AM100
HEED
(a) General Eng. & D.D. Co.
11.0
0.8
8-3/4
6/25/42
11/7/42
11/7/42
o
AM101
HERALD
(a) General Eng. & D.D. Co.
10.0
0.3
9
7/25/42
11/30/42
11/30/42
o
AM102
MOTIVE
(s) General Eng. & D.D. Co.
9.6
0.3
8-2/3
10/23/42
12/21/42
12/21/42
o
AM103
ORACLE
(s) General Eng. & D.D. Co.
8.2
0.4
8
11/22/42
1/15/43
12/30/42
1/2t
AM104
PILOT
(s) Pennsylvania S.Y., Inc.
15.5
2.5
10/27/41
11-1/3
10/8/42
10/8/42
10/8/42
o
AM105
PIONEER
(a) Pennsylvania S.Y., Inc.
15.0
3.0
10/30/41
11-4/5
10/23/42
10/23/42
10/23/42
o
AM106
PORTENT
(s) Pennsylvania S.Y., Inc.
14.0
3.0
11/15/41
11-3/4
11/7/42
11/7/42
11/7/42
0
AM107
PREVAIL
(s) Pennsylvania S.Y., Inc.
13.5
2.5
11/15/41
12-1/4
11/22/42
11/22/42
11/22/42
0
AM108
PURSUIT
(s)
Winslow Marine Ry. & S.B. Co.
16.6
6.2
11/12/41
9-3/4
9/ 3/42
3/42
9/3/42
0
AM109
REQUISITE
(e) Vinalew Marire Rs. & S.B. Co.
14.1
5.1
11/12/41
10-1/3
9/23/42
9/23/42
o
AM110
9/23/42
RIGHT
(s) Winslow Mar. R;, & S.B. Co.
3.0
1.0
5-1/4
AM111
SAGE
10/23/42
(s)
10/23/42
Winslow Mar. Ry, & S.B. Co.
10/23/42
o
3.0
1.0
5-1/4
AM112
SEER
11/22/42
(s)
11/22/42
11/22/42
0
American S.B. Co.
27.5
3.0
11/28/41
11
AM113
10/17/42
SENTINEL
(s)
American S.B. Co.
10/26/42
26.5
3.1
11/28/41
11
AM114
10/17/42
STAFF
(s)
American S.B. Co.
10/26/42
25.8
3.5
11/28/41
AM115
11-2/5
11/2/42
SKILL
(s)
11/11/42
American S.B. Co.
25.0
3.8
11/28/41
AM116
11-2/5
11/2/42
SPEED
(a)
11/11/42
American S.B. Co.
34.7
14.1
11/17/41
AM117
11-4/5
11/2/42
STRIVE
(a)
11/11/42
American S.B. Co.
33.5
14.0
11/17/41
AM118
12-1/4
11/16/42
STEADY
(s)
11/25/42
American S.B. Co.
32.1
13.7
11/17/41
12-1/4
11/16/42
AM119
SUSTAIN
(s)
11/25/42
American S.B. Co.
31.5
14.2
11/17/41
12-1/4
11/16/42
AM120
SWAY
(s)
John H. Mathis Co.
11/25/42
4.7
1.1
11/18/41
13-2/5
3/22/42
AM121
SWERVE
(a)
12/30/42
John H. Mathis Co.
1.6
0.2
(h)
AM122
6/20/42
SWIFT
(s)
1/20/43
John H. Mathis Co.
1,6
0.2
(h)
9/18/42
2/28/43
(a) Steel hulls.
(h) Keel laying date not available.
Placed in commission 15 January 1941.
N.B.S.(745)
As of February 1, 1942
Page 24
7-2
Percentage
Date of Completion
Months
of Completion
Ahead(+ or
Feb. 1
Gain for
No. of Mes.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-91
Yard
MINESWEEPERS (Fleet Type) (Cont'd)
AX123
SYMBOL
(s)
Savannah Mach. & Foundry Co.
14.0
3.0
11/18/41
8-1/5
7/25/42
7/24/42
7/24/42
o
AM124
THREAT
(s)
Savannah Mach. & Foundry Co.
12.0
3.0
12/15/41
8-1/3
10/23/42
10/22/42
8/26/42
1-5/6+
AM125
TIDE
(s)
Savannah Mach. & Foundry Co.
8.0
1.0
8
1/21/43
1/19/43
11/ 2/42
2-1/21
AM126
TOKEN
(s)
Gulf S.B. Co.
33.6
12.0
7/21/41
14-1/4
9/29/42
9/29/42
9/29/42
o
AM127
TUMULT
(s)
Gulf S.B. Co.
32.6
11.0
7/21/41
15-1/4
10/29/42
10/29/42
10/29/42
o
AM128
VELOCITY
(a)
Oulf S.B. Co.
27.5
9.5
7/21/41
16-1/4
11/28/42
11/28/42
11/28/42
o
AM129
VITAL
(a)
Gulf S.B. Co.
9.1
6.0
1/ 1/42
11-3/5
12/18/42
12/18/42
12/18/42
o
AM130
USAGE
(a)
Gulf S.B. Co.
9.1
6.0
1/ 1/42
12-1/5
1/7/43
1/ 7/43
1/ 7/43
o
AM131
ZEAL
(s)
Gulf 3.B. Co.
9.1
6.0
1/12/42
12-1/2
1/27/43
1/27/43
1/27/43
o
AM166
(a)
(b)
AMIC7
(a)
(b)
AM168
(s)
(b)
AM169
(s)
(b)
AMITO
(s)
(b)
AM171
(s)
(b)
AM172
(s)
(b)
AM173
(s)
(b)
AM174
(a)
(b)
AM175
(s)
(b)
AM176
(s)
(b)
AM177
(a)
(b)
AM173
(s)
(b)
AM179
(s)
(b)
AM180
(s)
(b)
AM161
(s)
(b)
AM182
(s)
(b)
AM133
(s)
(b)
AM184
(s)
(b)
AM185
(s)
(b)
(a) Steel Hulls
(b) Assignment to Builder Pending.
N.B.S.(745)
As of February 1, 1942
Page 25
E-2
Percentage
Date of Completion
of Completion
Months
Ahend(+) or
Feb. 1
Gain for
No. of Mes.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-11
Yard
MINESWEEPERS (Fleet Type) (Cont'd)
AM186
(s)
(b)
AM187
(s)
(b)
AM188
(s)
(b)
AM189
(a)
(b)
AM190
(s)
(b)
AM191
(s)
(b)
AM192
(s)
(b)
AM193
(s)
(b)
AM194
(s)
(b)
AM195
(s)
(b)
AM196
(s)
(b)
AM197
(s)
(b)
AM198
(s)
(b)
AM199
(s)
(b)
AM200
(s)
(b)
AM201
(s)
(b)
AM202
(s)
(b)
AM203
(s)
(b)
AM204
(s)
(b)
AM205
(a)
(b)
AM206
(a)
(b)
AM207
(a)
(b)
AM208
(a)
(b)
AM209
(s)
(b)
AM210
(s)
(b)
AM211
(s)
(b)
AM212
(s)
(b)
AM213
(a)
(b)
COASTAL MINESWEEPERS (97 ft.)
AMo65
ASSERTIVE
(w)
Bristol Yacht Building Co.
99.0
4.0
4/ 5/41
11/19/41
11
7/15/41
2/ 2/42
3/ 2/42
1-
AMc66
AVENGE
(w)
Bristol Yacht Building Co.
85.0
10,0
8/41
10-1/5
10/ 2/41
3/ 9/42
3/14/42
1/6-
AMc67
BOLD
(w)
Bristol Yacht Building Co.
50.0
15.0
8/27/41
8
11/12/41
5/ 4/42
4/29/42
1/5+
AMc68
BULWARK
(w)
Hodgdon Bros.& Goudy & Stevens
Delivered 22 January 1942
Placed
in Service
5 February
1942.
AMc69
COMBAT
(w)
Hodgdon Bros.& Goudy & Stevens
Delivered 4 February 1942.
AMc70
CONQUEROR
(w)
Warren Fish Co.
95.0
7.0
8/41
8/20/41
9
10/28/41
12/12/41
3/ 3/42
2-2/3-
AMc71
CONQUEST
(w)
Warren Fish Co.
93.0
7.0
5/ 8/41
8/25/41
9-1/3
11/17/41
12/26/41
3/ 5/42
2-1/3-
AMc80
FEARLESS
(w)
W, A. Robinson, Inc.
Delivered 4 February 1942
AMc81
PORTITUDE
(w)
W. A. Robinson, Inc.
88.0
23.0
8/14/41
12/2/41
6-1/4
9/22/41
1/ 9/42
2/21/42
1-2/5-
(a) Steel Hull,
(w) Wood Hull.
(b) Assignment to Builder Pending.
N.B.S.(745)
ADDIRICTED
As of February 1 1942
Page 26
E-2
Percentage
Date of Completion
Months
of Completion
Ahead(t)or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-91
Yard
COASTAL MINESWEEPERS (97 t.)(Cont'd)
AMo82
GOVERNOR
(w)
Camden S.B. & Marine Ry. Co.
Delivered
13
January
1942.
Placed
in
Service
29
January
1942.
AMc83
QUIDE
(w)
Camden S.B. & Marine Ry, Co.
90.0
7.0
9/41
9/20/41
9-1/2
8/29/41
2/2/42
2/25/42
3/4-
AMc84
HEROIC
(w)
Warren Boat Yard, Inc.
94.0
8.0
5/41
8/30/41
9-4/5
7/15/41
12/8/41
2/28/42
2-2/3-
AMc85
IDEAL
(w)
Warren Boat Yard, Inc.
74.0
4.0
6/ 4/41
9/20/41
9-1/5
10/18/41
1/5/42
3/10/42
2-1/6-
AMc87
LIBERATOR
(w)
F. L. Fulton
96.0
9.0
5/41
9/ 6/41
9
9/28/41
1/24/42
2/12/42
2/3-
AMc88
LOYALTY
(w)
F. L. Fulton
Delivered
16
January
1942.
Placed
in Service
16 January
1942.
AMc89
MEMORABLE
(w)
F. L. Pulton
90.0
13.0
7/31/41
12/24/41
6-4/5
6/42
2/24/42
2/24/42
0
AMc90
MERIT
(w)
F. L. Fulton
85.0
8.0
8/15/41
1/ 4/42
6-3/4
2/15/42
3/24/42
3/7/42
1/2+
AMc91
OBSERVER
(w)
F. L. Pulton
80.0
7.0
6/41
1/15/42
6-2/3
3/27/42
4/24/42
3/25/42
It
AMc93
PEERLESS
(w)
Delaware Bay S.B. Co. Inc.
95.0
5.0
4/14/41
9/ 6/41
10-1/3
11/7/41
1/5/42
2/25/42
1-2/3-
AMc94
PLUCK
(w)
Noank S.B. Co.
55.0
3.0
6/ 7/41
9-1/2
7/30/41
1/31/42
3/21/42
1-2/3-
AMc95
POSITIVE
(w)
Noank S.B. Co.
59.0
6.5
6/ 7/41
8-2/3
8/20/41
2/15/42
2/28/42
1/2-
AMc96
POWER
(w)
Noank S.B. Co.
52.0
3.0
6/ 7/41
10
9/10/41
3/42
4/11/42
1-1/4-
AMc98
PROGRESS
(w)
Anderson & Cristofani
Delivered
23
January 1942.
Placed
in Service
23 January
1942.
AMc99
RADIANT
(w)
Anderson & Cristofani
96.0
14.0
6/26/41
9/27/41
7-1/3
11/7/41
12/11/41
2/5/42
1-4/5-
AMc100
RELIABLE
(w)
Anderson & Cristorani
75.0
11.0
8/18/41
11/1/41
6-2/5
12/27/41
2/5/42
3/1/42
5/6-
AMc101
ROCKET
(w)
Anderson & Cristofani
64.0
11.0
6/41
6-2/3
2/15/42
2/28/42
3/25/42
1-
AMc102
ROYAL
(w)
Anderson & Cristofani
60.0
12.0
11/1/41
4-5/6
3/27/42
3/31/42
3/27/42
o
AMc103
SECURITY
(w)
H. G. Marr
95.0
10.0
4/29/41
9/27/41
9-2/3
9/28/41
12/22/41
2/20/42
2-
AMc104
SKIPPER
(w)
E. 0. Marr
55.0
20.0
5/21/41
1/16/42
10-1/2
11/27/41
3/16/42
6/42
2/3-
AMc105
STALWART
(w)
Snow Shipyards
Delivered 8 January 1942.
Placed
in
Service
22
January
1942.
AMc106
SUMMIT
(w)
Snow Shipyards
Delivered 16 January 1942
Placed
in
Service
29
January
1942.
AM:107
TRIDENT
(w)
Snow Shipyards
Delivered 2 February 1942,
AMc108
VALOR
(w)
Snow Shipyards
90.0
10.0
5/27/41
11/ 8/41
9-1/6
11/12/41
1/12/42
2/42
1-2/3-
AMc109
VICTOR
(w)
Snow Shipyards
75.0
15.0
7/14/41
12/ 6/41
8-1/3
11/27/41
2/6/42
3/23/42
1-1/2-
AMcll0
VIGOR
(w)
Snow Shipyards
55.0
30.0
8/ 6/41
1/19/42
7-4/5
12/12/41
2/23/42
3/30/42
1-1/4-
AMc150
(w)
(b)
AMc1'1
(w)
(b)
AMc152
(w)
(b)
AMc153
(w)
(b)
AMc154
(w)
(b)
AMc155
(w)
(b)
AMc156
(w)
(b)
AMc1:7
(w)
(b)
AMc158
(w)
(b)
AMc199
(w)
(b)
AMc160
(w)
(b)
AMcl 1
(w)
(b)
AMc162
(w)
(b)
AMc163
(w)
(b)
AMc164
(w)
(b)
AMc165
(w)
(b)
AMeloo
(w)
(b)
AM0167
(v)
e
(w) Wood Hulls
(b) Assignment to Builder Pending
N.B.S.(745)
I
As of February 1, 1942
Page 27
Z.2
Percentage
of Completion
Date of Completion
Months
Ahead(+) or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-11
Yard
COASTAL MINESWEEPERS (97 ft, (Cont'd)
AMa169
(w)
(b)
AMc169
(w)
(b)
AMc170
(w)
(b)
AMc171
(w)
(b)
AMc172
(w)
(b)
AMc173
(w)
(b)
AMc174
(w)
(b)
AMc175
(w)
(b)
AMc176
(w)
(b)
AMc177
(w)
(b)
AMc178
(w)
(b)
AMc179
(w)
(b)
AMc180
(w)
(b)
AMc181
(w)
(b)
AMe182
(w)
(b)
AMc183
(w)
(b)
AMc184
(w)
(b)
AMc185
(w)
(b)
AMc186
(w)
(b)
AMc187
(w)
(b)
AMc188
(w)
(b)
AMc189
(w)
(b)
AMc190
(w)
(b)
AMc191
(w)
(b)
AMc192
(w)
(b)
AMc193
(w)
(b)
AMc194
(w)
(b)
AMc195
(w)
(b)
AMc196
(w)
(b)
AMc197
(w)
(b)
AMc198
(w)
(b)
AMc199
(w)
(b)
(w) Wood Hulls.
(b) Assignment to Builder Pending.
N.B.5.(745)
|
As of Februar 1 1942
Page 28
E-2
Percentage
Date of Completion
of Completion
Months
Ahead(+) or
Feb.1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan.1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-41
Yard
COASTAL MINESWEEPERS (180 ft.)
AMcll5
(s)
Tampa Shipbuilding Co. Inc.
9
12/19/42
AMc114
(s)
Tampa Shipbuilding Co. Inc.
10
1/14/43
AMc115
(s)
Tampa Shipbuilding Co. Inc.
9
1/28/43
AMcl16
(a)
Tampa Shipbuilding Co. Inc.
10-1/3
2/11/43
AMcl17
(s)
Tamps Shipbuilding Co. Inc.
8-4/5
2/25/43
AMc115
(s)
Tamps Shipbuilding Co. Inc.
9-1/3
3/11/43
AMc119
(a)
Tamps Shipbuilding Co. Inc.
9-1/3
3/25/43
AMcl20
(s)
Tampa Shipbuilding Co. Inc.
9-4/5
4/8/43
AMc121
(a)
Tampa Shipbuilding Co. Inc.
9
4/20/43
AMc122
(s)
Tumps Shipbuilding Co. Inc.
9-1/3
5/2/43
AMc123
(s)
Tampa Shipbuilding Co. Inc.
9-1/5
5/14/43
AMe124
(s)
Tampa Shipbuilding Co. Inc.
9-3/5
5/26/43
AMc125
(a)
Tamps Shipbuilding Co. Inc.
7-4/5
6/8/43
AMc12
(s)
Tamps Shipbuilding Co. Inc.
8-1/6
6/20/43
AMc127
(s)
Tampa Shipbuilding Co. Inc.
8
6/30/43
AMc128
(s)
Tampa Shipbuilding Co. Inc.
8-1/3
7/10/43
AMc129
(s)
Willamette Iron & Steel Corp.
(h)
1/20/43
AMc13.
(s)
Willamette Iron & Steel Corp.
(h)
2/1/43
AMc131
(s)
Willamette Iron & Steel Corp.
(h)
2/8/43
AMc132
(a)
Willamette Iron & Steel Corp.
(h)
2/15/43
AMc133
(s)
Willamette Iron & Steel Corp.
(h)
2/22/43
AMc134
(s)
Willamette Iron & Steel Corp.
(h)
3/1/43
AMc135
(s)
Willamette Iron & Steel Corp.
(h)
3/8/43
AMc136
(a)
Willamette Iron & Steel Corp.
(h)
3/16/43
AMc137
(s)
Willamette Iron & Steel Corp.
(h)
3/24/43
AMc138
(s)
Willamette Iron & Steel Corp.
(h)
4/1/43
AMc139
(s)
Willamette Iron & Steel Corp.
(h)
4/9/43
AMc140
(s)
Willamette Iron & Steel Corp.
(h)
4/17/43
AMc141
(s)
Willamette Iron & Steel Corp.
(h)
4/25/43
AMc142
(a)
Willamette Iron & Steel Corp.
(h)
1/43
(a) Steel Hulls
(h) Keel Laying date not available.
(e) Date of award.
N.B.S.(745)
As of February 1, 1942
Page 29
E.2
Percentage
Date of Completion
Months
of Completion
Ahead(t)or
Feb. 1
Dain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-91
Yard
MOTOR DRIVEN MINESWEEPERS
YMS1
Wood Hull
Henry B. Nevins, Inc.
91.1
8.5
4/41
1/10/42
12-2/3
10/10/41
1/5/42
3/24/42
2-2/3-
"
YMS2
Henry B. Nevins, Inc.
85.6
9.2
3/7/41
1/28/42
12-4/5
12/15/41
1/30/42
3/31/42
2-
YMS3
"
"
Henry B. Nevins, Inc.
66.8
0.0
3/18/41
13-2/5
1/14/42
2/14/42
4/30/42
2-1/2-
-
=
YMS4
Henry B. Nevins, Inc.
61.2
0.2
8/20/41
9-2/5
2/13/42
4/13/42
6/2/42
1-2/3-
.
#
YMS5
Henry B. Nevins, Inc.
58.2
0.2
8/14/41
10-3/5
12/27/41
2/27/42
2/42
4-1/5-
YMS6
#
-
Henry B. Nevins, Inc.
43.2
0.2
8/8/41
11-4/5
1/26/42
3/26/42
7/31/42
4-1/6-
If
-
YMS7
Henry B. Nevins, Inc.
52.0
0.2
10/31/41
10
2/25/42
4/25/42
8/31/42
4-1/5-
YMS8
#
"
Henry B. Nevins, Inc.
19.5
6.7
1/23/42
8-1/3
3/27/42
5/27/42
10/2/42
4-1/6-
"
"
YMS9
Henry B. Nevins, Inc.
8.0
0.0
4/42
9
4/26/42
6/27/42
10/31/42
4-
#
"
YMS10
Henry B. Nevins, Inc.
8.0
0.0
8-1/3
5/26/42
7/28/42
12/1/42
4.
YMS11
"
"
Henry B. Nevins, Inc.
8.0
0.0
8-3/4
6/25/42
8/25/42
12/31/42
4-1/5-
YMS12
#
=
Rice Bros. Corp.
78.0
23.0
4/21/41
11-1/3
1/ 1/42
3/16/42
3/30/42
1/2-
-
-
YM313
Rice Eros. Corp.
72.0
22.0
4/21/41
11-1/2
2/ 1/42
3/23/42
4/6/42
1/2-
-
-
YMS14
Rice Bros. Corp.
51.0
16.0
7/ 1/41
9-2/3
3/ 1/42
4/30/42
4/20/42
1/3+
.
YM315
Rice Bros. Corp.
50.0
15.0
5/41
9-3/4
3/15/42
5/11/42
4/27/42
1/2+
H
YMS16
"
Rice Bros. Corp.
6.0
1.0
4
4/ 1/42
6/12/42
6/29/42
1/2-
YMS17
H
#
Rice Bros. Corp.
6.0
1.0
3-4/5
4/15/42
6/26/42
7/ 6/42
1/3-
YMS18
-
-
Herreshoff Mfg. Co.
60.0
6.0
6/6/41
12/8/41
9
12/12/41
2/42
3/9/42
1/4-
-
-
YMS19
Herreshoff Mfg. Co.
53.0
4.0
6/27/41
12/27/41
10
2/25/42
4/24/42
1/42
1/4-
YMS20
-
-
Greenport Basin & Cons. Co.
75.0
16.0
6/27/41
11/1/41
9
11/2/41
1/26/42
3/24/42
2-
#
#
YMS21
Greenport Basin & Cons. Co.
70.0
12.0
6/28/41
11/25/41
9-1/3
11/16/41
2/5/42
7/42
2-
.
YMS22
Greenport Basin & Cons. Co.
46.0
11.0
7/8/41
12/31/41
10
12/15/41
3/10/42
5/ 5/42
1-5/6-
=
If
YMS23
Greenport Basin & Cons. Co.
58.0
12.0
7/23/41
12/13/41
9
12/29/41
3/20/42
4/21/42
1-
YMS24
"
"
Greenport Basin & Cons. Co.
46.0
11.0
11/6/41
1/10/42
6-2/5
1/28/42
5/42
5/19/42
1/2-
#
"
YMS25
Greenport Basin & Cons. Co.
35.0
15.0
11/28/41
1/28/42
7
2/12/42
5/15/42
6/ 2/42
1/2-
.
-
YMS26
Greenport Basin & Cons. Co.
26.0
10.0
12/15/41
6
3/15/42
6/20/42
6/16/42
0
.
.
YMS27
Greenport Basin & Cons. Co.
17.0
10.0
12/24/41
6-1/5
1/42
7/10/42
6/30/42
1/3+
YMS28
#
#
Greenport Basin & Cons. Co.
11.0
8.0
1/13/42
6
9/42
8/20/42
7/16/42
It
"
#
YMS29
Greenport Basin & Cons. Co.
5.0
3.0
1/30/42
6
5/13/42
9/5/42
7/28/42
1-1/4+
#
YMS30
Greenport Basin & Cons. Co.
2.0
0.0
5-1/4
6/16/42
10/20/42
8/11/42
2-1/3+
-
.
YMS31
Greenport Basin & Cons. Co.
2.0
0.0
5-1/2
7/20/42
11/25/42
8/25/42
3+
-
YMS32
C. Hiltebrant D.D. Co.
75.0
5.0
7/41
1/41
10-3/5
10/18/41
12/30/41
3/24/42
2-4/5-
#
#
YMS33
C. Hiltebrant D.D. Co.
70.0
5.0
5/8/41
10/8/41
11
11/12/41
1/10/42
7/42
3-
#
#
YMS34
C. Hiltebrant D.D. Co.
67.0
5.0
5/13/41
10/21/41
11
12/7/41
4/42
4/13/42
2-1/3-
-
-
YMS35
C. Hiltebrant D.D. Co.
58.0
3.0
5/17/41
11/7/41
11
1/42
2/28/42
4/20/42
1-2/3-
.
.
YMS36
C. Hiltebrant D.D. Co.
40.0
10.0
10/6/41
1/21/42
8-3/5
3/27/42
5/25/42
6/23/42
1-
#
YMS37
C. Hiltebrant D.D. Co.
38.0
13.0
10/13/41
1/28/42
8-3/5
3/27/42
6/ 1/42
6/30/42
1-
N.B.S.(745)
As of February 1. 1942
Page 30
E-2
Percentage
Date of Completion
of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+) or
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
Behind (-)
TOTAL
TOTAL
Keel
to
or
Yard
Building
11-1-41
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
MOTOR DRIVEN MINESWEEPERS (Cont'd)
YMS38
Wood Hull
Robert Jacob Inc.
#
84.0
#
9.0
5/2/41
1/24/42
11-1/4
12/27/41
1/30/42
4/10/42
2-1/3-
YMS39
Robert Jacob, Inc.
H
#
96.0
11.0
5/23/41
9-1/3
1/26/42
1/15/42
4/42
YMS40
12/23/41
1-2/3-
Robert Jacob Inc.
YMS41
#
#
72.0
10.0
6/19/41
10
2/10/42
2/10/42
4/16/42
2-1/5-
Robert Jacob Inc.
"
-
68.0
10.0
6/28/41
11-3/5
2/25/42
2/25/42
6/16/42
3-2/3-
YMS42
Wheeler S.B. Corp.
YMS43
.
"
80.0
15.0
6/6/41
10
9/28/41
2/42
4/42
2-
Wheeler S.B. Corp.
#
"
65.0
15.0
6/12/41
10-2/5
10/28/41
2/16/42
4/25/42
2-1/3-
YMS44
Wheeler S.B. Corp.
60.0
20.0
6/18/41
11/27/41
2/27/42
5/16/42
2-2/3-
YMS45
If
"
11
Wheeler S.B. Corp.
#
50.0
15.0
6/20/41
11-4/5
12/27/41
3/13/42
6/13/42
3-
YMS46
Wheeler S.B. Corp.
#
"
35.0
5.0
6/24/41
12
1/11/42
3/27/42
6/20/42
2-3/4-
YMS47
Wheeler S.B. Corp.
YMS48
"
.
40.0
12.0
6/26/41
12-1/4
1/26/42
4/10/42
7/ 3/42
2-3/4-
Wheeler S.B. Corp.
"
.
30.0
5.0
6/27/41
12-3/4
2/10/42
4/24/42
7/18/42
2-4/5-
YMS49
Wheeler S.B. Corp.
"
.
28.0
3.0
6/30/41
12-5/6
2/25/42
8/42
7/25/42
2-1/2-
YMS50
Wheeler S.B. Corp.
#
.
25.0
5.0
7/16/41
12-1/2
3/12/42
5/23/42
8/1/42
2-1/3-
YMS51
Wheeler S.B. Corp.
"
.
25.0
5.0
7/16/41
12-3/4
3/27/42
6/5/42
8/8/42
2-
YMS52
Wheeler S.B. Corp.
YMS53
#
-
25.0
5.0
8/5/41
12-1/3
4/11/42
6/19/42
8/15/42
2-
Wheeler S.B. Corp.
"
.
25.0
5.0
8/25/41
12
4/26/42
7/3/42
8/25/42
1-3/4-
YMS54
Gibbs Gas Engine Co.
YMS55
H
-
Delivered 9 February 1942.
Gibbs Gas Engine Co.
"
"
90.0
12.0
5/26/41
11/22/41
8-4/5
10/28/41
2/10/42
2/20/42
1/3-
YMS56
Gibbs Gas Engine Co.
-
"
81.0
10.5
5/30/41
12/6/41
9-2/5
11/12/41
2/21/42
3/12/42
2/3-
YMS57
Gibbs Gas Engine Co.
-
"
73.0
5.0
6/5/41
12/15/41
10
11/12/41
3/42
4/1/42
1-
YMS58
Gibbs Gas Engine Co.
YMS59
-
.
70.0
5.0
6/19/41
12/22/41
10
11/27/41
3/20/42
4/21/42
1-
Gibbs Gas Engine Co.
"
.
67.0
4.0
7/14/41
12/30/41
10
12/12/41
3/30/42
5/11/42
1-1/3-
YMS60
Gibbs Oas Engine Co.
"
.
60.0
20.5
9/19/41
1/19/42
8-1/3
12/27/41
4/20/42
5/30/42
1-1/3-
YMS61
Gibbs Gas Engine Co.
YMS62
"
.
47.5
10.0
9/23/41
9
1/11/42
4/30/42
6/20/42
1-2/3-
Gibbs Gas Engine Co.
YMS63
"
42.0
.
17.0
11/12/41
8
1/26/42
5/9/42
7/10/42
2-
Gibbs Gas Engine Co.
35.0
12.5
11/26/41
8
YMS64
-
#
2/10/42
5/20/42
7/30/42
2-1/3-
Gibbs Gas Engine Co.
-
#
24.0
19.0
1/3/42
7-1/2
2/25/42
5/30/42
8/19/42
2-2/3-
YMS65
Gibbs Gas Engine Co.
18.0
8
3/12/42
6/10/42
9/42
3-
YMS66
-
#
13.0
1/7/42
Weaver Shipyards
.
"
50.0
16.0
7/22/41
1/31/42
9-1/3
10/28/41
3/1/42
5/1/42
2-
YM367
Weaver Shipyards
.
"
40.0
6.0
7/22/41
9-4/5
11/27/41
8/42
5/15/42
2-1/4-
YMS68
Weaver Shipyards
YMS69
-
40.0
#
11.0
7/22/41
10-1/3
12/27/41
3/13/42
6/1/42
2-3/5-
Weaver Shipyards
.
#
35.0
6.0
7/22/41
10-3/5
1/26/42
3/20/42
6/10/42
2-2/3-
YMS70
Weaver Shipyards
6.0
10-4/5
2/25/42
3/27/42
6/15/42
2-3/5-
YMS71
.
.
35.0
7/22/41
Weaver Shipyards
#
#
40.0
6.0
7/22/41
11
3/27/42
4/ 4/42
6/20/42
2-1/2-
YM372
Weaver Shipyards
.
.
35.0
7.0
7/22/41
11
4/11/42
4/11/42
6/25/42
2-1/2-
YMS73
Weaver Shipyards
YMS74
.
#
35.0
7.0
7/22/41
11-1/4
4/26/42
4/26/42
6/30/42
2-
Weaver Shipyards
#
.
30.0
2.0
7/22/41
11-2/5
5/26/42
5/26/42
7/5/42
1-1/3-
YMS75
Weaver Shipyards
30.0
2.0
7/22/41
11-3/5
5/26/42
5/26/42
7/10/42
1-1/2-
N.B.S.(745)
RESTRICTED
As of February 1, 1942
Page 31
E.2
Percentage
Date of Completion
of Completion
Months
Ahead(t)or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
Behind (-)
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Laid
Launched
Completion
11-1-11
Prediction
Order
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS76
Wood Hull
Stadium Yacht Basin, Inc.
68.5
10.3
4/25/41
11/8/41
12-1/6
9/28/41
(x)
4/30/42
YMS77
"
#
Stadium Yacht Basin, Inc.
71.5
11.2
5/2/41
10/11/41
11-4/5
11/12/41
(x)
4/25/42
YMS78
"
.
Stadium Yacht Basin, Inc.
60.0
7.0
5/16/41
12/11/41
11-2/3
11/27/41
(x)
5/5/42
YMS79
"
-
Stadium Yacht Basin, Inc.
57.0
6.8
6/12/41
12/27/41
11
12/27/41
(x)
5/9/42
YMS80
"
#
Stadium Yacht Basin, Inc.
55.0
6.6
6/27/41
10-3/5
1/16/42
(x)
5/14/42
YMS81
"
#
Stadium Yacht B sin, Inc.
53.0
6.0
7/16/41
10
2/5/42
(x)
5/15/42
YMS82
#
#
Stadium Yacht Basin Inc.
44.0
8.5
10/24/41
7
2/25/42
(x)
5/23/42
YMS83
#
#
Stadium Yacht Basin, Inc.
39.0
5.5
11/24/41
6
3/17/42
(x)
5/25/42
YMS54
If
#
Henry C. Grebe & Co.
71.0
12.0
6/ 2/41
10-3/5
2/15/42
2/14/42
4/20/42
2-1/5-
YMS85
"
#
Henry C. Grebe & Co.
68.0
10.0
6/ 2/41
10
3/17/42
3/14/42
5/5/42
1-2/3-
YMS86
"
#
Al Larson Boat Shop, Inc
65.0
10.0
6/26/41
1/31/42
8-4/5
11/27/41
1/27/42
3/20/42
1-3/4-
YMS87
"
#
Al Larson Boat Shop, Inc.
52.0
7.0
7/18/41
8-4/5
3/27/42
3/27/42
4/11/42
1/2-
YMS88
#
"
South Coast Co.
68.5
12.5
6/20/41
10/18/41
9-2/3
1/16/42
3/16/42
4/11/42
5/6-
YMS89
-
#
South Coast Co.
55.5
7.0
7/11/41
11/22/41
10-2/3
3/17/42
4/15/42
5/30/42
1-1/2-
"
YMS90
#
South Coast Co.
48.5
5.0
7/24/41
12/19/41
11-1/5
4/26/42
5/15/42
6/30/42
1-1/2-
-
YMS91
"
South Coast Co.
44.5
7.9
10/18/41
9-2/5
6/5/42
6/18/42
7/30/42
1-2/5-
-
YMS92
-
South Coast Co.
38.5
9.0
11/21/41
9
6/20/42
6/25/42
8/18/42
1-4/5-
-
.
YMS93
South Coast Co.
23.0
8.0
12/19/41
8-2/5
7/5/42
7/3/42
8/31/42
2-
YMS94
#
.
Colberg Bt.Wks.& Stephens Bros
74.0
8.0
5/7/41
12/15/41
9
10/18/41
12/15/41
3/7/42
2-3/4-
YMS95
"
-
Colberg Bt.Wks.& Stephens Bros
49.1
13.5
6/6/41
12/16/41
8-1/3
11/17/41
1/15/42
2/15/42
1-
YMS96
"
"
Colberg Bt.Wks.& Stephens Bros
65.0
5.0
6/11/41
9-2/3
12/17/41
1/15/42
4/1/42
2-1/2-
YMS97
"
"
Colberg Bt.Wks.& Stephens Bros
38.1
4.1
6/6/41
9
1/16/42
2/15/42
3/10/42
5/6-
YMS98
"
"
Colberg Bt.Wks.& Stephens Bros
57.0
5.0
6/12/41
12/31/41
10
2/15/42
2/15/42
4/15/42
2-
"
YMS99
"
Colberg Bt. Wks.& StephensBros
35.4
1.9
6/6/41
10
3/17/42
3/15/42
4/10/42
5/6-
YMS100
#
.
Astoria Marine Construction Co
60.0
10.0
7/15/41
9
12/17/41
1/42
4/13/42
1-2/5-
YMS101
R
.
Astoria Marine Construction Co
50.0
10,0
7/22/41
9-1/2
2/15/42
4/ 1/42
5/8/42
1-1/4-
YMS102
"
#
Astoria Marine Construction Co
40.0
10.0
6/26/41
11-1/6
4/16/42
5/ 1/42
6/1/42
1-
YMS103
II
"
Astoria Marine Construction Co
35.0
5.0
7/22/41
11-1/3
5/26/42
6/ 1/42
7/1/42
1-
YMS104
.
"
Frank L. Sample, Jr. Inc.
73.0
23.0
5/21/41
10-1/3
12/17/41
3/31/42
3/30/42
o
YMS105
#
"
Frank L. Sample Jr. Inc.
68.0
23.0
5/13/41
11-1/2
1/17/42
4/27/42
4/27/42
o
YMS106
.
-
Frank L. Sample Jr. Inc.
60.0
20.0
5/21/41
12
2/ 2/42
5/30/42
5/25/42
1/6+
YMS107
.
.
Burger Bost Co.
59.1
9.8
5/13/41
13-3/5
11/12/41
3/15/42
7/1/42
3-1/2-
YMS108
#
.
Burger Boat Co.
53.1
9.0
5/15/41
14-1/2
12/27/41
4/15/42
8/1/42
3-1/2-
YMS109
#
.
Burger Boat Co.
46.9
6.4
5/21/41
14-4/5
1/26/42
5/15/42
8/15/42
3-
YMS110
#
.
Burger Boat Co.
41.8
5.9
8/25/41
12-1/5
2/25/42
6/15/42
9/1/42
2-1/2-
YMS111
#
#
Burger Boat Co.
39.4
6.0
8/27/41
12-3/5
3/27/42
7/15/42
9/15/42
2-
YMS112
#
#
Burger Boat Co.
37.3
6.4
8/29/41
13
4/26/42
8/15/42
10/1/42
1-1/2-
(x) No estimated completion date reported by supervisor.
N.B.3.(745)
RESTRICTED
As of February 1, 1942.
Page 32
E-2
Percentage
Date of Completion
Months
of Completion
thead(t) or
Feb. 1
Dain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-11
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS113
Wood Hull
San Diego Marine Constr. Co.
52.0
6.0
6/4/41
12/17/41
5/20/42
5/20/42
o
YMS114
-
#
San Diego Marine Constr. Co.
49.0
8.0
6/26/41
2/15/42
5/31/42
5/31/42
0
YMS115
"
#
San Diego Marine Constr. Co.
43.0
10.0
6/26/41
4/16/42
6/20/42
6/20/42
o
YMS116
.
"
San Diego Marine Constr. Co.
42.0
15.0
6/26/41
6/5/42
7/20/42
7/20/42
o
YMS117
.
If
Harbor Boat Bldg. Co.
95.0
15.0
5/8/41
8/23/41
1/26/42
1/15/42
3/4/42
1-2/3-
YMS118
-
"
Harbor Boat Bldg. Co.
88.5
11.5
5/14/41
10/27/41
3/12/42
1/31/42
3/20/42
1-2/3-
YMS119
-
#
Harbor Boat Bldg. Co.
70.5
11.3
7/15/41
4/26/42
2/25/42
4/21/42
2-
YMS120
.
"
Harbor Boat Bldg. Co.
62.0
4.0
8/23/41
6/10/42
3/25/42
5/21/42
2-
YMS121
-
#
Kruse & Banks S.B. Co. Inc.
48.0
4.0
5/15/41
11/27/41
3/15/42
5/1/42
1-1/2-
YMS122
.
#
Kruse & Banks S.B. Co. Inc.
34.0
4.0
5/15/41
1/26/42
4/15/42
5/15/42
1-
YMS123
.
#
Kruse & Banks S.B. Co. Inc.
42.0
4.0
7/2/41
3/27/42
6/1/42
6/1/42
o
YMS124
.
#
Kruse & Banks S.B. Co. inc.
18.0
11.0
12/4/41
5/26/42
8/1/42
8/1/42
o
YMS125
"
"
J. M. Martinac S.B. Corp.
62.0
8.0
6/2/41
12/18/41
11/27/41
2/1/42
4,10,42
2-1/3-
YMS126
"
#
J. M. Martinac S.B. Corp.
51.0
7.0
7/3/41
1/26/42
4/1/42
4/25/42
4/5-
YMS127
"
"
J. M. Martinac S.B. Corp.
41.0
11.0
10/10/41
3/27/42
6/1/42
6/1/42
o
YMS128
"
"
J. M. Martinac S.B. Corp.
21.0
7.0
12/26/43
5/26/42
8/1/42
8/1/42
o
YMS129
.
"
Tacoma Boat Building Co.
60.0
5.0
5/27/43
12/18/41
11/27/41
2/1/42
4/10/42
2-1/3-
YMS130
.
"
Tacoma Boat Building Co.
53.0
3.0
6/20/41
12/18/41
1/26/42
3/1/42
4/20/42
1-2/3-
YMS131
-
"
Tacoma Boat Building Co.
44.0
10.0
7/12/41
3/27/42
4/1/42
5/10/42
1-1/3-
YMS132
-
"
Tacoma Boat Building Co.
33.0
8.0
7/12/41
5/26/42
6/1/42
6/20/42
2/3-
YMS133
-
"
Western Boat Building Co.
55.0
4.0
7/14/41
12/18/41
12/17/41
3/20/42
4/10/12
2/3-
YMS134
.
#
Western Boat Building Co.
51.0
9.0
8/13/41
3/17/42
5/20/42
5/20/42
0
YMS135
#
#
(b)
YMS136
#
.
(b)
YMS137
#
.
(b)
YMS138
#
.
(b)
YMS139
If
.
(b)
YMS140
"
.
(b)
YMS141
"
.
(b)
YMS142
If
.
(b)
YMS143
#
"
(b)
YMS144
#
-
(b)
YMS145
#
-
(b)
YMS146
#
.
(b)
YMS147
#
.
(b)
YMS148
#
.
(b)
YMS149
-
-
(b)
YMS150
-
"
(b)
YMS151
-
"
(b)
YMS152
"
"
(b)
YMS153
"
"
(b)
YMS154
"
.
(b)
(b) Assignment to builder pending.
N.B.3.(745)
RESTRICTED
As of February 1, 1942
Page 33
E.2
Percentage
Date of Completion
of Completion
Months
Ahead(+) or
Feb. 1
Oain for
No. of Mes.
As per
Aa Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jun. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-11
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS155
Wood Hull
(b)
YMS156
"
"
(b)
YMS157
-
"
(b)
YMS158
.
"
(b)
YMS159
.
"
(b)
YMS160
-
"
(b)
YMS161
-
"
(b)
YMS162
.
"
(b)
YMS163
.
"
(b)
YMS164
"
.
(b)
YMS165
"
#
(b)
TMS166
#
.
(b)
YMS167
"
.
(b)
YMS168
#
.
(b)
YMS169
#
.
(b)
YMS170
II
.
(b)
YMS171
#
.
(b)
YMS172
#
.
(b)
YMS173
"
.
(b)
YMS174
"
.
(b)
YMS175
"
.
(b)
YMS176
#
-
(b)
YMS177
"
.
(b)
YMS178
"
.
(b)
YMS179
#
-
(b)
YMS180
"
.
(b)
YMS181
"
.
(b)
YMS182
"
-
(b)
YMS183
"
.
(b)
YMS184
"
.
(b)
YMS185
"
-
(b)
YMS186
"
-
(b)
YMS187
"
-
(b)
YMS188
"
#
(b)
YMS189
#
#
(b)
YMS190
#
#
(b)
YMS191
"
#
(b)
YMS192
.
"
(b)
YMS193
-
#
(b)
YMS194
.
.
(b)
YMS195
.
-
(b)
YMS196
#
.
(b)
(b) Assignment to builder pending.
N.B.S.(745)
RESTRICTED
As of February 1, 1942
Page 34
E-2
Percentage
of Completion
Date of Completion
Months
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Ahead(+) or
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
Behind (-)
TOTAL
TOTAL
Keel
11-1-41
to
or
Yard
Building
Latd
Launched
Completion
Order
11-1-41
Prediction
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS197
Wood Hull
(b)
YMS198
"
"
(b)
YMS199
#
#
(b)
YMS200
#
If
(b)
YMS201
#
If
(b)
YMS202
.
"
(b)
YNS203
-
"
(b)
YMS204
.
"
(b)
YMS205
.
"
(b)
YMS206
-
"
(b)
YMS207
.
-
(b)
YMS208
#
.
(b)
YMS209
"
-
(b)
YMS210
H
-
(b)
YMS211
"
#
(b)
YMS212
"
"
(b)
YMS213
"
"
(b)
YAS214
"
"
(b)
YMS215
-
If
(b)
YMS216
-
"
(b)
YMS217
If
-
(b)
YMS218
"
-
(b)
YMS219
"
.
(b)
YMS220
#
A
(b)
YMS221
.
"
(b)
YMS222
.
#
(b)
YMS223
.
"
(b)
YMS224
.
#
(b)
YMS225
#
F
(b)
YMS226
#
-
(b)
YM3227
#
-
(b)
YMS228
#
#
(b)
YM8229
#
#
(b)
YMS230
"
"
(b)
YMS231
"
If
(b)
YMS232
"
"
(b)
YHS233
"
"
(b)
YMS234
#
"
(b)
YMS235
"
If
(b)
YMS236
"
"
(b)
YMS237
"
"
(b)
YM8238
"
"
(b)
(b) Assignment to builder pending.
N.B.S.(745)
I
As of February 1, 1942
Ce 35
E-2
Percentage
Date of Completion
of Completion
Months
Ahead(t) or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Loid
Launched
Completion
Order
11-1-91
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS239
Wood Hull
(b)
YMS240
#
#
(b)
YMS241
#
"
(b)
YMS242
.
#
(b)
YMS243
.
#
(b)
YMS244
.
If
(b)
YMS245
#
.
(b)
YMS246
#
-
(b)
YMS247
"
-
(b)
YMS248
"
#
(b)
YMS249
"
"
(b)
YMS250
.
"
(b)
YM3251
-
"
(b)
YM8252
.
If
(b)
YMS253
-
#
(b)
YMS254
=
#
(b)
YMS255
#
#
(b)
YMS256
"
#
(b)
YMS257
#
.
(b)
YMS258
"
.
(b)
YMS259
"
.
(b)
YMS260
"
.
(b)
YMS261
"
.
(b)
YMS262
"
.
(b)
YMS263
"
.
(b)
YMS264
"
#
(b)
YMS265
"
#
(b)
YMS266
"
"
(b)
YMS267
.
"
(b)
YMS268
.
#
(b)
YMS269
.
"
(b)
YMS270
.
#
(b)
YMS271
.
If
(b)
YMS272
"
#
(b)
YMS273
"
-
(b)
YMS274
"
.
(b)
YMS275
"
-
(b)
YMS276
"
-
(b)
YMS277
If
.
(b)
YMS278
If
.
(b)
YMS279
#
#
(b)
YMS280
.
#
(b)
(b) Assignment to builder pending.
N.B.S.(745)
As of February 1, 1942
Page 36
E-2
Percentage
Date of Completion
Months
of Completion
Ahead(+) or
Feb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-11
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS281
Wood Hull
(b)
YM3282
.
"
(b)
YMS283
.
"
(b)
YMS284
"
II
(b)
YMS285
#
#
(b)
YMS286
"
.
(b)
YMS287
"
.
(b)
YMS288
.
"
(b)
YMS289
-
"
(b)
YMS290
#
"
(b)
YMS291
"
IF
(b)
YMS292
"
.
(b)
YMS293
"
.
(b)
YMS294
-
"
(b)
YMS295
.
"
(b)
YMS296
"
"
(b)
YMS297
"
#
(b)
YMS298
#
#
(b)
YMS299
"
-
(b)
YMS300
#
.
(b)
YMS301
.
.
(b)
YMS302
.
"
(b)
YMS303
.
"
(b)
YKS304
.
"
(b)
YMS305
#
#
(b)
YMS306
#
#
(b)
YMS307
#
-
(b)
YMS308
#
-
(b)
YM3309
#
.
(b)
YMS310
-
"
(b)
YMS311
.
"
(b)
YMS312
"
"
(t)
YMS313
#
#
(b)
YMS314
#
#
(b)
YMS315
-
-
(b)
YMS316
-
#
(b)
YMS317
"
"
(b)
YMS318
#
#
(b)
YMS319
#
.
(b)
YMS320
-
-
(b)
YMS321
#
"
(b)
(b) Assignment to builder pending.
H.B.S.(745)
As of Fetruary 1, 2942.
Page 37
T.2
Percentage
Date of Completion
Months
of Completion
Ahead(+) or
Feb. 1
Jain for
No. of Mes.
As per
As Reported
As Last
Behind (-)
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Latd
Launched
Completion
Order
11-1-51
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS322
Wood Hull
(b)
YMS323
-
"
(b)
YMS324
"
"
(b)
YMS325
#
"
(b)
YMS326
"
"
(b)
YMS327
"
"
(b)
YMS328
"
(b)
YMS329
"
(b)
YMS330
"
(b)
YMS331
-
(b)
YMS332
.
-
(b)
YMS333
.
(b)
YMS334
.
"
(b)
YMS335
.
"
(b)
YMS336
.
"
(b)
YMS337
.
"
(b)
YMS338
.
"
(b)
YMS339
.
"
(b)
YMS340
.
"
(b)
YMS341
"
"
(b)
YMS342
.
"
(b)
YMS343
.
If
(b)
YMS344
If
#
(b)
YMS345
#
#
(b)
YMS346
#
#
(b)
YMS347
"
#
(b)
YMS348
"
#
(b)
YMS349
If
#
(b)
YMS350
"
#
(b)
YMS351
"
#
(b)
YMS352
"
.
(b)
YMS353
#
.
(b)
YMS354
#
.
(b)
YMS355
.
.
(b)
YMS356
.
#
(b)
YMS357
-
#
(b)
YMS358
#
"
(b)
YM8359
"
#
(b)
YMS360
"
.
(b)
YMS361
#
.
(b)
YMS362
.
.
(b)
YMS363
.
#
(b)
(b) Assignment to builder pending.
N.B.S.(745)
RESERICTION
As of February 1, 1942.
Page 38
E-2
Percentage
Date of Completion
Months
of Completion
Ahead(+) or
Peb. 1
Gain for
No. of Mos.
As per
As Reported
As Last
Behind (-)
Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
11-1-41
TOTAL
TOTAL
Keel
to
or
Yard
Building
Prediction
Laid
Launched
Completion
Order
11-1-91
Yard
MOTOR DRIVEN MINE SWEEPERS (Cont'd)
YMS364
Wood Hull
(b)
YMS365
"
(b)
YMS366
.
#
(b)
YMS367
#
#
(b)
YMS368
#
"
(b)
YMS369
If
#
(b)
YMS370
#
-
(b)
YMS371
#
-
(b)
YMS372
#
-
(b)
YMS373
.
"
(b)
YMS374
-
#
(b)
YKS375
#
"
(b)
YMS376
If
#
(b)
YMS377
If
#
(b)
YMS378
"
"
(b)
YM3379
#
#
(b)
YMS380
"
#
(b)
YMS381
y
"
(b)
YMS382
#
-
(b)
YMS383
#
.
(b)
YMS384
"
-
(b)
YMS385
"
-
(b)
YM3386
#
-
(b)
YMS387
#
.
(b)
YMS388
#
-
(b)
YM8389
.
#
(b)
YMS390
-
.
(b)
YMS391
-
.
(b)
YMS392
-
"
(b)
YMS393
.
"
(b)
YXS394
-
#
(b)
YXS395
"
"
(b)
YMS396
"
If
(b)
YMS397
"
#
(b)
YMS396
#
-
(b)
YMS399
.
"
(b)
YMS400
.
"
(b)
YHS401
#
#
(b)
YMS402
#
#
(b)
YM8403
If
-
(b)
YMS404
I
#
(b)
YX8405
"
#
(b)
(b) Assignment to builder pending.
N.B.S.(745)
As of February 1, 1942
Page 39
E-2
Percentage
Date of Completion
or Completion
Months
Feb. 1
Gain for
No. of Mcs.
As per
As Reported
As Last
Ahead(t)or
Type, Number and Name
Contractor
1942
Jan. 1942
Keel Laying
Contract
by Building
Reported by
Behind(-)
TOTAL
TOTAL
11-1-41
Keel
to
or
Yard
Building
Laid
Launched
Completion
Order
11-1-11
Yard
Prediction
MOTOR DRIVEN XINE SWEEPERS (Cont:d)
YMS406
Wood Hull
(b)
YM3407
,
"
(b)
YKS408
.
"
(b)
YMS409
.
"
(b)
MINELAYERS
CM5
TERROR
(a)
Philadelphia
69.0
4.0
9/ 3/40
6/ 6/41
23
9/ 1/42
7/ 1/42
8/ 1/42
1-
C006
CATSKILL
(s)
Willumette I. & S. Corp.
19.0
4.8
7/12/41
26-4/5
10/ 6/43
10/ 6/43
10/ 6/43
0
CM7
OZARK
(a)
Willamette I. & 3. Corp.
16.7
3.4
7/12/41
27-4/5
12/ 6/43
12/ 6/43
11/ 6/43
It
(b) Assignment to builder pending.
(a) Steel Hulls