OCR Page 1 of 2War:Reports Weekly statistical
SECRET ISSUED ESSIONO LOCKED
War
PSF
BE KEPTONOT IN
1° WHEN
OF
WEEKLY STATISTICAL REPORT
SUMMARY
RELEASED
No. 51
COL. LEONATISTICS
P. ATHES BRANCH
DIRECTOR.
Frankl in D. Roosevelt Library
DECLASSIFIED
DOD DIR. 5200.9 (9/27/58)
Date- 3-5-59
Signature-
Carl L. spicer
D
STATISTICS BRANCH
OFFICE OF THE ASSISTANT SECRETARY OF WAR
WAR DEPARTMENT
Copy No. SB-5141-1
Issued to
THE PRESIDENT
8. a. GOVERNMENT PRINTING OFFICE 273813
WEEKLY STATISTICAL REPORT
NO. 51
JUNE 21, 1941
GENERAL
Page
SIGNAL CORPS
page
Army Strength
1
Text Summary - Procurement Progress
32
Prices
2
Status of Signal Corps Procurement
33
Editorial Comment
3
Status of Signal Corps Procurement
34
Editorial Comment - Diagram
4
Diagrams: Ground Equipment
35
Commitments
5
Diagrams: Interphones (Vehicular)
36
Expediting Production
6
Diagrams: Radio - Command
37
Ships Operating
7
Diagrams: Marker Beacon, etc.
38
ORINANCE DEPARTMENT
CORPS OF ENGINEERS
Text Summary - Procurement Progress
8
Text Summary - Procurement Progress
39
Diagram: Index of Ordnance Procurement
9
Diagram: Searchlight Status
40
Tab. Sum. - Equipment Procurement
10
Diagram: Searchlight Procurement
41
Tab. Sum. - Tactical Equipment
11
Text Summary - Construction
42
Tab. Sun. - Ammunition Procurement
12
Text Summary - Construction
43
Aircraft Ammunition
13
Diagram: Construction
44
Small Arms and Miscellaneous
14
Antiaircraft and Artillery
15
MEDICAL DEPARTMENT
Text Summary
45
AIR CORPS
Diagram: # of Items & % Contracted
46
Text Summary - Airplane Procurement
16
Diagram: Behind and Ahead Schedule
47
Tab. Sum. - Air Corps Current Proc.
17
Diagram: Critical Items Behind Sched. 48
Diagrams: Airplanes & Engines
Bombers
18
CHEMICAL WARFARE SERVICE
Pursuit & Observation
19
Text Summary - Procurement Progress
49
Miscellaneous & Primary Trainer
20
Diagram: Progress of Deliveries
50
Basic & Advance Trainer
21
Diagram: Progress of Deliveries
51
Text Summary - Propeller Procurement
22
COAST ARTILLERY CORPS
QUARTERMASTER CORPS
Text Summary - Procurement Progress
52
Text Summary - Procurement of Q.M.Items 23
Tab. Summary - Procurement Progress
52
liagram: Group Procurement of Q.M.Items 24
Diagram: Procurement Progress
53
Diagrams: Critical Items
25
Diagrams: Critical Items
26
Text Summary - Proc. of Motor Vehicles 27
Fiscal Diagram: Proc. of Motor Vehicles 28
Diagram: Proc. of Motor Vehicles
29
Text Summary - Construction Progress
30
Diagram: Status of Q.M. Construction
31
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
BASIS OF REQUIREMENTS
The basis for computing requirements for many articles to be procured is the esti-
mated army strength by months. The data from July, 1940 through June, 1941 are shown
in the diagram and table. The figures subsequent to May 15 are of necessity only ap-
proximations and are subject to change. They refer to enlisted strength as of the end
of each month.
Source of Information: Statistics Branch, General Staff - June 15, 1941
ARMY ENLISTED STRENGTH
1,500,000
1,000,000
500,000
1940
1941
o
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Month
Total
July, 1940
268,941
Aug.
302,968
Sept.
407,613
Oct.
483,218
Nov.
540,695
Dec.
573,520
Jan., 1941
693,578
Feb.
873,667
Mar.
1,068,030
Apr.
1,205,873
May
1,291,028
June
1,418,097
Army Strength
STATISTICS BRANCH
1
OUSW - WAR DEPARTMENT
6-21-41
PRICES
A new high since the outbreak of the war was reached in the basic commodity prices
during the last week as the index rose to 146.2 percent of the August, 1939 average.
Prices of raw industrial materials increased slightly, to 140.6 during the past week,
while foodstuffs again had a sharp increase and the index is now 153.9.
Source of Information: Bureau of Labor Statistics
WHOLESALE PRICES: FOODSTUFFS AND RAW INDUSTRIAL
28 BASIC COMMODITIES
AUG. 1939 - 100
150
150
140
140
130
130
19 40
1941
120
120
RAW INDUSTRIAL
FOODSTUFFS
110
110
100
100
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
Prices
STATISTICS BRANCH
2
OUSW - WAR DEPARTMENT
6-21-41
TEXT SUMMARY - EDITORIAL COMMENT - Tallied from a uniform list of leading papers
in cities of the 12 Federal Reserve Districts, by weeks ended each Wednesday.
Source of Info.: Dept. Research & Economics - Cleveland Trust Co. June 18, 1941
The consensus of editorial opinion is that the sinking of the Robin
Moor does not call for shooting now. There is a disinclination to regard
as a casus belli the torpedoing of a single merchant ship, however tragic
and inexcusable the circumstances, but substantially all the commentators
assert that steps must be taken to convince the Axis powers that a repeti-
tion of the incident is ill-advised. At the time of the emergency procla-
mation, editorial opinion strongly backed the President's policy of free-
dom of the seas, and the attitude of the commentators now is a natural
outcome of their belief in that policy.
There is not as yet complete agreement as to the nature of the steps
which should be taken to insure the safety of our shipping. Opinion ranges
all the way from a belief that a firm attitude will be enough to a belief
that we should employ the full force of our Navy at once. The recommenda-
tions obviously depend on the writer's estimate of Germany's intentions.
In the past it has been generally assumed that Germany was not anxious to
precipitate trouble but, in view of her recent attitude of belligerency in
connection with the Robin Moor, this estimate of the situation is changing.
The line representing concern over labor problems has reached 189,
a new high point, the previous high point being 168 in April. Revision of
existing labor laws and new legislation are considered imperative. Nearly
half the editorials on labor questions discuss Communist influences, a
rapid change since April, when Communist elements received little attention.
TABULAR SUMMARY
HOURS, WAGES, LABOR
Tallies
HOURS, WAGES, LABOR cont.
TREND TOWARD WAR
Strikes must stop
32
For Army seizure of NA
11
We are trending
4
President being defied
5
Against a seizure policy
5
Govt. keeping us out
1
Unfair to draftees
2
Communists want seizure
7
Dont wait for incident
1
Violence must stop
4
For uniform standards
4
R M not an incident
3
Leaders to blame
12
Against rail wage rise
1
Revenge R M some day
1
N'l leaders cooperating
6
Nazi to blame
4
THE EMERGENCY
GENERAL COMMENDATION
Communists to blame
35
Unconstitutional
1
Handling of R M trouble 2
Oust Communists
20
Congress disregarded
2
General production speed9
Labor itself to blame
1
Foreign policy approved
7
Govt. labor policy
1
Mediation failing
2
Arm merchant ships
3
Mediation Board
4
Must accept mediation
3
Protect with Navy
4
Cancel deferments
6
Make seas safe
8 GENERAL CRITICISM
54
For a black list
2
For closing consulates
7 ORGANIZATION PROBLEMS
4
Revise Wagner Act
11
For fund freezing
2 GOVT. AND BUSINESS
17
For "cooling off" law
6
Stop gas to Japan
4 ECONOMICS, INFLATION
18
For Vinson Bill
1
Control subversives
3 AID FOR BRITAIN
10
Against anti-strike law
5
For seizure bill
3 ST LAWRENCE SEAWAY
9
For voluntary methods
2
Against seizure bill
1 MATERIAL SHORTAGES
3
Regulate unions
2
For RFC bill
1 LACK OF FACTS
9
STATISTICS BRANCH
Editorial Comment
OUSW - WAR DEPARTMENT
3
6-21-41
EDITORIAL COMMENT ON PROGRESS OF PREPAREDNESS - Tallied from a uniform list of papers
in large cities of the 12 Federal Reserve Districts by weeks ended each Wednesday.
Source of Information: Department of Research and Economics - Cleveland Trust Company
Hours, Wages, Labor Problems
Aid for England
200
200
109
168
164
155
150
150
100
93
100
95
95
81
83
79
84
66
50
64
62
68
50
65
55
42
49
48
R
55
52
34
35
40
44
37
88
39
10
Criticism of Slow Progress
Economics, Banking, Inflation
120
120
III
III
90
94
85
86
90
82
72
77
69
82
65
61
69
60
60
70
5+
54
49
44
44
30
44
48
"
31
30
30
28
21
30
25
22
18
17
II
General Commendation
Relations of Government to Business
30
30
22
20
20
20
13
8
16
13
12
14
17
5
7 7
7
15
10
10
10
6
a
6
9
22
2
9
П
7
2
5
I
9
Trend Toward War
Organization for Defense
x
30
t6
30
22
24
20
2)
26
21
20
19
19
20
17
48
17
17
21
14
10
15
15
17
is
10
10
12
15
14
n
7
++
6
8
4.
MAR.
APR.
MAY
JUNE
MAR.
APR.
MAY
JUNE
Editorial Comment
STATISTICS BRANCH
4
OUSN - WAR DEPARTMENT
6-21-41
COMMITMENTS FOR MUNITIONS AND FACILITIES
The War Department has placed 77.3 percent of approximately eleven billion
dollars worth of business.
Source of Information: Weekly Progress Report, OUSW, June 19, 1941
AVAILABLE FOR MUNITIONS AND FACILITIES
Percent
obligated
to June 18
AIR CORPS
$3,717,519,528
74.7
ORD. DEPT.
$2,741,659,091 (tentative)
88.9
Q.M.C.
$2,596,342,802
53.9
PRODUCTION
FACILITIES
$1,603,037,355
a/
99.1
SIGNAL CORPS
$217,274,460
79.9
CORPS OF ENG.
$100,015,200
88.2
CHEM. WAR SER.
0
$ 51,943,483
94.1
MED. DEPT.
I
$ 42,851,671
100.0
C.A.C.
$ 1,219,839
100.0
TOTAL
$11,071,863,429
77.3
NOTE: Specific appropriation, additional funds will be furnished from Navy and
S.A.S. (Includes M. A. Act, 1941, and Defense Aid Approp.)
NOTE: Figure revised by Service,
Commi tments
STATISTICS BRANCH
5
OUSW - WER DEPARTMENT
6-21-41
PROGRAM OF FACILITIES FOR EXPEDITING PRODUCTION - June 7, 1941
Source of Information: Construction Division Report, June 7, 1941
$1,801,781,362
$1,374,318,002
$1,246,840,092
$449,495,000
Available
Approved
Contracted for
Est. Complete
(184 projects)
(172 projects)
a
Includes Expediting Production Appropriation of $1,464,286,000; Military Appro-
priation Act 1941 of $44,275,000; Ordnance Service and Supply $196,644,007;
Chemical Warfare Service $500,000, and Navy Department $15,000,000; Defense Aid
Appropriation $81,076,355.
b/ Amount supplied by Supply Arms and Services.
Expediting Production
STATISTICS BRANCH
6
OUSW - WAR DEPARTMENT
6-21-41
PERCENT OF WORKERS EMPLOYED ON EACH SHIFT IN 602 DEFENSE PLANTS, MARCH 15, 1941
Source of Information: Bureau of Labor Statistics
Percent of Workers on:
Industry
First Shift
Second Shift Third Shift
Explosives
59
21
20
Ammunition
58
28
14
Chemicals
70
16
14
Steel
70
17
13
Aluminum
66
21
13
Brass, etc.
62
26
12
Airplanes
58
31
11
Engines
68
23
9
Electric
75
18
7
Machine Tools
72
23
5
Ships
78
18
4
All Industries
B
20
8
Shifts Operated
STATISTICS BRANCH
7
ousw - WAR DEPARTMENT
6-21-41
TEXT SUMMARY - JUNE 21, 1941
Source of Information: Ordnance Department and OUSW
GENERAL
The following table shows four of the principal bottlenecks restricting the
production of ordnance equipment and ammunition. The limited amount of skilled labor
is also an important delaying factor. Some of the principal ordnance items and ma-
terials affected are listed under the four limitations shown.
Materials
Machine
Machine Tools
Plant Capacity
Alloy Steel
Tools
Low Priority
Machinery
Brass
Aircraft Cannon
Machine Guns-
Small Arms Ammun-
Medium Tanks
20mm
Cal.50 W.C.& H.B.
ition
Small Arms Ammunition
37mm
Medium Tanks
T.N.T.
Ammunition
Ammunition
Guns, Tank & Antitank
Ammunition & Bombs
& Bombs
Antiaircraft
Brass
Field
Howitzers
Mortars
TANKS
In the first fifteen days of June, 101 light tanks, 10 were delivered from
the Berwick, Pennsylvania plant of the American Car & Foundry Company. These tanks
have gas engines. The St. Charles, Missouri plant of this company has delivered its
first model of the light tank, M3, powered with the Guieberson diesel engine and is
expected to deliver about 20 of these tanks in June and about 44 in July.
Initial production models of the medium tank, M3 of the Baldwin Locomotive
Works, the American Locomotive Company and the Pullman Standard Car Company are under-
going tests. It is expected that 40 will be produced in June.
AMMUNITION
An important factor limiting the production of small arms ammunition is the
inadequate existing capacity of brass fabricating plants. Additions to present capacity
of plants making sheet brass and gilding metal for small arms ammunition have been begun
by three fabricators. It is expected that presses will be installed in two of these
additions by January 1, 1942 and that casting equipment will be installed by April 1942.
Commencing in August, 1941 and continuing until these fabricating plants come into oper-
ation there is expected to be some shortage.
The diagrams on pages 13, 14 and 15 show the actual and scheduled production
of the principal items of ammunition by quarterly periods through June, 1942. Sched-
ules for bombs compare favorably with schedules for other ammunition items. The fab-
rication of metal components for bombs generally requires fewer machine operations than
in the case of artillery projectiles. In addition, high priorities have been given
to production of aircraft ammunition and bombs.
NEW FACILITIES
Eleven additions to new Ordnance plants already under construction and twelve
additional new Ordnance facilities have been approved. These facilities all provide
additional plant capacity for amminition and materials used in the production of ammu-
nition. They are all to be located in mid-western and southern states.
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
8
6-21-41
INDEX OF ORDNANCE PROCUREMENT - MAY 31, 1941
Source of Information: Production Branch, Ordnance Department and G-4
The indexes of equipment and ammunition represent the percentage completion
of the current procurement program, including quantities in the Defense Aid program
reported by the Ordnance Department and also the number of units of each item on hand
prior to current procurement.
Estimated schedules are not available for about one-tenth the equipment pro-
gram and approximately one-half the ammunition program. When schedules for the latter
are reported, the ammunition index in the first six months of 1942 should increase
substantially.
Scheduled
60
Equipment
40
Scheduled
20
amunition
Delivered
Delivered
J A S 0 N D J F M A M J J A S 0 N D J F M A M J
1940
1941
1942
CUM.
DEL
6 7 7 8 8 9 10 10 " 13 14
EQUIP
SCH
6 6 7 7 8 9 9 10 11 12 15 17 20 24 28 32 37 40 45 49 53 57 61 64
AMN
DEL
4. 4. 4 4 5 5 5 5 6 6 7
SCH
4 4, 4 4 5 5 5 5 6 6 7 7 8 9 10 13 15 19 22 26 29 33 36 38
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
9
6-21-41
TABULAR SUMMARY - ORDNANCE EQUIPMENT PROCUREMENT - MAY 31, 1941
Source of Information: Office Asst. Chief, Ind. Service, Ord. Dept. (Production)
Total
Delivered
Percent of total program
Item
procurement
thru
Con-
Sched-
Deliv-
program
May 31
tracted
uled
Due
ered
Aircraft Armament
Machine gun, cal.30
90,148
6,1220
88
88#
76
76
Machine gun, cal.50
173,573
6,664$
80
80#
4$
4$
Gun, 20mm, automatic
44,747
0
100
80
o
o
Gun, 37mm, automatic
1,188
14
100
90
1
1
Combat Vehicles
Tank, light
3,527
8396
100
99
24$
24$
Tank, medium
4,596
666
54
54
10
1$
Scout car
2,733
2,633$
100
100
956
96%
Personnel carrier, 8-man
5,445
65
100
100
4
2
Personnel carrier, 13-man
4,302
1
100
91
4
I
Machine gun, cal.30, (Var.)
37,460a)
a
a
a
Machine gun, cal.50, (H.B.)
8,025a
a
a
Submachine gun, cal.45
241,065
14,620
100
100
8
6
Gun, 37mm, tank
6,040
1,022
100
99
14
17
Gun, 75mm, tank
2,513
4
100
100
0
-
Antiaircraft
Gun, 3"
152
70
100
100
36
46
Gun, 90mm
1,271
1
95
95
0
I
Gun, 37mm
3,195
362
100
100
11
11
Machine gun, cal.50 (W.C.)
13,245
346
28
46#
3
3
Artillery
Howitzer, 75mm
958
101
100
100
9
11
Howitzer, 105mm
3,286
8
83
83#
-
-
Gun, 155mm
492
9
80
68
2
2
Modernization - H.S.
Carriage, 75mm gun
1,330
445
100
100#
38
33
Carriage, 155mm howitzer
1,436
7866
100
100
44$
55$
Carriage, 155mm gun
927
62
71
71
7
7
Infantry Armament
Rifle, cal.30, In
897,805
181,4966
93
93
190
200
Machine gun, cal.30, (Var.)
93,003b
25,094b
100b
99b
27b
27b
Machine gun, cal.50, (H.B.)
23,305b
1,186b
53b
53b
5b
5b
Gun, 37mm, antitank
7,653
443
80
61
7
6
Mortar, 60mm
10,162
3,100$
100
100
296
310
Mortar, 81mm
3,773
655$
91
91
20$
17$
a
Included in Infantry Armament. Deliveries not reported separately.
b
Figures include Armament for Combat Vehicles.
#
Partly tentative.
$
Delivered thru June 15.
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
10
6-21-41
TABULAR SUMMARY - ORDNANCE - - TACTICAL EQUIPMENT - JUNE 17, 1941
Source of Information: Statistics Branch & G-4, General Staff
Requirements
Stocks
2,800,000
in hands of
Item
men
Field Service
Percent of requirements
% o
20
40
8
ao
100
Number
Number
Aircraft Armament
Machine gun, cal.30,fix.&fl.
49,638
8,472
17
Machine gun, cal.50,fix.&fl.
114,997
4,031
4
Gun, 20mm, automatic A.C.
2,775
o
0
Gun, 37mm, automatic A.C.
3,976
53
1
Combat Vehicles
Tank, light
4,412
513
12
Tank, medium
2,666
71
3
Scout car
3,944
2,689
68
Personnel carrier, 8-man
7,105
1
1
Personnel carrier, 13-man
6,017
0
o
Machine gun, cal.30 (Var.)
62,164a
-
Machine gun, cal.50 (H.B.)
11,704
328
3
Submachine gun, cal.45
39,000
8,000
21
Gun, 37mm, tank
7,271
851
12
Gun, 75mm, tank
2,764
0
0
Antiaircraft
Gun, 3"
484
1,766
}
27
Gun, 90mm
0
Gun, 37mm, A.A.
3,869
350
9
Machine gun, cal.50 (W.C.)
11,989
833
7
Artillery
Gun, 75mm (H.S.)
1,471
597
41
Howitzer, 75mm, field & pack
258
175
68
Howitzer, 105mm
3,200
35
1
Gun, 155mm
751
4
1
Oun, 155mm (H.S.)
903
144
16
Howitzer, 155mm (H.S.)
1,783
1,044
59
Unmodified & other models
Gun, 75mm
-
2,860
-
Gun, 155mm
---
825
-
Howitzer, 155mm
---
989
-
Infantry Armament
Rifle, cal.30, M, semiauto.
1,260,314
183,873
15
Machine gun, cal.30 (Var.)
96,609
25,146
26
Machine gun, cal.50 (H.B.)
17,555
1,601
9
Gun, 37mm, antitank
8,092
652
8
Mortar, 60mm
7,567
2,100
28
Mortar, 81mm
4,310
731
17
Included in Infantry Armament.
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
11
6-21-41
TABULAR SUMMARY - ORDNANCE - AMMUNITION PROCUREMENT - MAY 31, 1941
Source of Information: Office Asst. Chief, Ind. Service, Ord. Dept. (Production)
Total
Delivered
Percent of total program
Item
procurement
thru
Con-
Sched-
Deliv-
program
May 31
tracted
uled
Due
ered
(THOUSANDS)
(THOUSANOS)
Aircraft & Pyrotechnics
Bomb, frag., 20#
1,719
0
96
96
o
0
Bomb, demo., 100#,300#,500#
1,316
43
46
46
3
3
Bomb, demo., 1000#
15
2
73
73
13
13
Bomb, g & s, 30#,100#
351
3
17
17
1
1
Shot & shell, 20mm
32,500
0
0
0
0
o
Shell, H.E., 37mm
1,890
.2
57
57
-
-
Flares
877
144
31
31
15
15
Signals
2,057
457
33
33
22
22
Antiaircraft
Shell, 37mm, H.E.
11,786
22
33
33
-
-
Shell, 3", H.E.
2,216
69
58
58
3
3
Shell, 90mm, H.E.
3,053
o
54
54
o
0
Artillery
Shell, H.E., s c, 75mm gun
1,372
88
86
86
6
6
Shell, 8 & s, 75mm gun
1,108
5
63
63
1
1
Shot, A.P., 75mm gun
3,352
0
2
2
o
0
Shell, H.E., 75mm how.
4,279
206
59
59
5
5
Shell, H.E., 105mm how.
11,422
59
8
8
1
1
Shell, H.E., 155mm gun, MI
851
0
19
19
o
o
Charge, prop., 155mm gun
446
82
93
93
18
18
Shell, H.E., 155mm how.
4,299
5
36
36
-
-
Shell, 8 & s, 155mm how.
1,223
173
66
66
14
14
Charge, prop., 155mm how.
5,753
617
63
63
11
11
Primer, 21 gr.
6,653
299
100
100
4
4
Fuzes (All)
11,750
3,166
67
67
27
27
Infantry
Cartridge, cal.30
2,952,242
367,4696
100
100*
12$
126
Links,met. belt, cal.30
1,003,322
77,468
60
60
9
9
Cartridge, cal.45
606,476
90,820
84
84*
14
15
Cartridge, cal.50
863,940
44,504$
75
75*
50
50
Links, met. belt, cal.50
2,451,536
34,225
73
73*
2
1
Shot & shell, 37mm
26,688
168
14
14
1
1
Shell, H.E., 60mm
8,882
18
26
26
-
-
Shell, H.E., 8lmm
3,764
96
3
3
3
3
Shell, smoke, 8lmm
426
o
5
5
0
0
Grenade, H.E., frag.
1,561
71
100
100
5
5
Signal, ground
3,215
212
53
53
7
7
Mine, antitank
2,050
o
2
2
O
0
* Partly tentative.
& Delivered thru June 15.
STATISTICS BRANCH
Ordnance
OUSW - MR DEPARTMENT
12
6-21-41
AMMUNITION - DELIVERIES AND SCHEDULES OF SELECTED ITEMS - MAY 31, 1941
Source of Information: Office Asst. Chief, Ind. Service, Ord. Dept. (Production)
PRESENT AND PROJECTED PROGRESS OF TOTAL PROGRAM
CUMULATIVE
& OF
Delivered
Scheduled
NUMBER DUE
TOTAL
JUNE, 1942
PROGRAM
(THOU.)
100
Flares,
Aircraft
50
252
o
100
Signals,
Aircraft
50
672
Q
100
Shell, 37 MM
50
H.E., M54
0
1,080
100
Bomb, Practice
50
100#
0
3,232
100
50
Bomb, Frag.,
1,651
o
20#
100
Bomb, Demo.,
50
100#
382
o
100
50
Bomb, Demo.,
300#
o
151
100
Bomb, Demo.,
50
500#
78
o
100
Bomb, Demo.,
50
1000#
0
11
J F M A M J J A S OND J F M A M J
1941
1942
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
13
6-21-41
AMMUNITION - SMALL ARMS & MISCELLANEOUS - MAY 31, 1941
Source of Information: Office Asst. Chief, Ind. Service, Ord. Dept. (Production)
PRESENT AND PROJECTED PROGRESS OF TOTAL PROGRAM
CUMULATIVE
% OF
Delivered
Scheduled
NUMBER DUE
TOTAL
JUNE, 1942
PROGRAM
(THOUS,)
100
Cartridges,
50
Cal.30
1,812,963
0
100
Cartridges, 50
390,951
Cal.50
o
100
Shell, H.E.
50
60mm Mortar
1,845
o
100
Shell, H.E.
50
116
81mm Mortar
0
100
Shot & Shell
50
2,389
37mm t & at
0
100
Grenade,
50
1,561
Frag.
0
100
Mine,
50
50
Antitank
0
100
Signals,
50
1,715
Ground
0
J F M A M J J A S 0 N D J F M A M J
1941
1942
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
6-21-41
14
ANTIAIRCRAFT & ARTILLERY AMMUNITION - DELIVERIES & SCHEDULES - MAY 31, 1941
Source of Information: Office Asst. Chief, Ind. Service, Ord. Dept. (Production)
PRESENT AND PROJECTED PROGRESS OF TOTAL PROGRAM
CUMULATIVE
Delivered
Scheduled
& OF
NUMBER DUE
TOTAL
JUNE, 1942
PROGRAM
(THOUS.)
Shell, H.E.,
100
M54,
50
3,087
37mm, A.A.
o
100
Shell, H.E.,
50
1,187
M42,
3", A.A. M1918
o
100
Shell, H.E.,
50
M58,
1,300
90mm, A.A.
o
100
Shell, H.E.,
75mm,
50
2,451
how.
o
100
Shell, H.E.,
MI
50
924
105mm, how.
o
100
Shell, H.E.,
155mm
50
1,553
how.
o
100
Charge, prop.
155mm,
50
2,845
how.
o
100
Shell, H.E.,
155mm,
50
162
ML
o
100
Charge, prop.
155mm,
82
50
MI
0
JFM A is J JAS 0 N D J F M A M J
1941
1942
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
15
6-21-41
TEXT SUMMARY - AIRPLANE PROCUREMENT
Source of Information: Consolidated Statistical Report - Air Corps
GENERAL
with the placing of a contract with Douglas Aircraft Company, Incorporated,
for 27 transports, the percentage of planes in the current programs under contract
increases to 87.3. Of a total program of 32,059 planes, only 4,060 remain to be
awarded. This figure is made up of 1,000 trainers and 3,060 tactical types, and
contracts are being negotiated for all pending types.
It can be expected that engine awards to match the recent heavy airframe
awards will follow shortly, and the relationship of the progress of the two programs
will show a satisfactory balance.
DELIVERIES
The low trend of deliveries established during May has continued during the
first two quarters of June. To date no heavy or light bombers have been delivered.
Medium bombers show progress with 17 and 9 delivered the first and second
quarters of June respectively.
Only 4 pursuit type planes were delivered so far this month.
Although trainer deliveries maintain the level of last month, a slight
increase is needed to reach estimated monthly production.
DIFFICULTIES
Accompanying this reversal of progress in airplane productivity, come
reports of these factors in the situation:
Shortages of materials
Shortages of machine tools
Shortage of skilled labor
Planning errors
Strikes
Chains of troubles have developed, retarding fabricators, sub-contractors
and contractors until final assembly has been delayed or halted.
Republic Aviation shows shortages of aluminum rivets and forgings, explosive
rivets, steel bars and tubing. Of Republics' sub-contractors, 10 have failed recently
to meet needs for items like valves, struts, bumper cushions, tees, tapir pins and 80
on. Such delays have cumulative effect on the final assembly line.
The failure of Boeing to deliver any heavy bombers last month and 80 far
this month is an example of such a chain of circumstances.
The shut-down of North American due to strike shows immediate effect on
deliveries, but the full extent of the damage cannot be estimated yet.
STATISTICS BRANCH
Air Corps
OUSW - WAR DEPARTMENT
16
6-21-41
TABULAR SUMMARY - AIR CORPS CURRENT PROCUREMENT - JUNE 15, 1941
Source of Information: Consolidated Statistical Report - Air Corps
Percent of
Del-
Pending (less awards)
12,000
Current
Under
programs
ivered
F.Y. 1941
10,375
program
Item
programs
contract
under
6/15/41
"B" program
Fifth supp.
modified
(a)
contract
modified
modified
(b)
Airplanes
Heavy bomber
2,246
2,246
100
81
-
-
2,656
Medium homber
4,616
2,216
48
156
-
2,400
1,200
Light bomber
1,882
1,382
73
135
500
-
I
Pursuit, fighter
709
709
100
23
-
-
1,150
Pursuit, interceptor
4,394
4,394
100
670
-
-
4,850
Observation
533
533
100
50
-
-
-
Transport
1,118
958
86
29
52
108
240
Amphibian
74
74
100
0.
-
-
-
Reconnaissance
17
17
100
14
-
-
-
Total Tactical
15,589
12,529
80
1,158
552
2,508
10,096
Primary trainer
5,490
5,490
100
1,615
-
-
450
Basic trainer
5,051
5,051
100
974
-
-
900
Adv. trainer, 1-eng.
3,297
2,297
70
563
-
1,000
360
Adv. trainer, 2-eng.
2,632
2,632
100
62
-
-
1,050
Total Trainer
16,470
15,470
94
3,214
-
1,000
2,760
Grand Total
32,059
27,999
87
4,372
552
3,508
12,856
Engines
Heavy bomber
8,988
4,188
47
1,130
-
4,800
10,624
Medium bomber
9,232
4,432
48
735
-
4,800
3,200
Light bomber
3,576
2,476
69
623
1,100
-
-
Pursuit, fighter
1,420
1,394
98
62
26
-
2,300
Pursuit, interceptor
4,394
4,394
100
832
-
-
4,850
Observation
533
351
66
351
182
-
-
Transport
2,358
1,592
68
98
208
558
480
Amphibian
148
148
100
0
-
-
-
Reconnaissance
34
34
100
34
-
-
-
Total Tactical
30,683
19,009
62
3,865
1,516
10,158
21,454
Primary trainer
5,490
5,490
100
2,129
-
-
450
Basic trainer
5,051
3,051
60
1,192
-
2,000
900
Adv. trainer, 1-eng.
3,297
2,297
70
1,047
-
1,000
360
Adv. trainer, 2-eng.
5,264
2,164
41
724
-
3,100
2,100
Total Trainer
19,102
13,002
68
5,092
-
6,100
3,810
Grand Total
49,785
32,011
64
8,957
1,516
16,258
25,264
(a) Project airplane contracts current June 30, 1940, with matching installation engine
contracts - plus F.Y. 1941 programs for project airplanes and installation engines.
(b) Not yet financed - not included in current program column.
STATISTICS BRANCH
Air Corps
OUSW - WAR DEPARTMENT
1%
6-21-41
AIRPLANES
ENGINES
2246 HEAVY BOMBER
4188 HEAVY BOMBER
13 by 1940 - - 453 in 1941 - 1780 in 1942-43
256 by 1940 - - 2186 in 1941 - - 1746 in 1942
PERIOD DELIVERIES
PER 100 DELIVERIES
1130
9
75
120
6
900
50
3
SCHEDULED
25
II
DELIVERED
APR, MAY JUNE
APR. MAY JUNE
80
600
81
SCHEDULED
40
300
DEL
VERED
J A S 0 N D J F M A M J
J A S o N D J F M A M J
2216 MEDIUM BOMBER
4432 MEDIUM BOMBER.
55 by 1940 - - 926 in 1941 - 1235 in 1942
314 by 1940 - 2130 in 1941 - 1988 in 1942
PERIOD DELIVERIES
PER 100 DELIVERIES
15
60
SCHEDULED
225
10
600
40
SCHEDULED
5
20
735
APR. MAY JUNE
APR. MAY JUNE
150
400
DEL
IVERED
156
75
200
DEL VERED
J A S o N D J F M A M J
J A S o N D J F M A M J
1382 LIGHT BOMBER
2476 LIGHT BOMBER
22 by 1940 - 709 in 1941 - 651 in 1942
377 by 1940 - 2059 in 1941 - 40 in 1942
PERIOD DELIVERIES
PERIOD DELIVERIES
15
45
225
10
1200
30
5
SCHEDULED
15
SCHEDULED
APR. MAY JUNE
APR. MAY JUNE
135
150
800
623
75
400
DEL VERED
DEL IVERED
J A $ o N D J F M A M J
J A s o N D J F M A M J
1940
1941
1940
1941
Air Corps
STATISTICS BRANCH
18
OUSW - WAR DEPARTMENT
6-21-41
AIRPLANES
ENGINES
709 PURSUIT FIGHTER
1394 PURSUIT FIGHTER
25 by 1940 - 524 in 1941 160 in 1942
180 by 1940 - 1214 in 1941
PERIOD DELIVERIES
PERIOD DELIVERIES
3
9
120
2
450
6
SCHEDULED
I
3
SCHEDULED
APR. MAY JUNE
APR. MAY JUNE
80
300
40
23
150
62
DEL IVERED
DEL
IVERED
J A S o N D J F M A M J
J A S o N D J F M A M J
4394 PURSUIT INTERCEPTOR
4394 PURSUIT INTERCEPTOR
305 by 1940 - 1835 in 1941 - 2254 in 1942
344 by 1940 - 2571 in 1941 - 1479 in 1942
PERIOD DELIVERIES
PERIOD DELIVERIES
SCHEDULED
45
75
900
30
900
50
832
15
SCHEDULED
670
25
APR, MAY JUNE
APR, MAY JUNE
DELIVERED
600
600
DELIVERED
300
300
J A S 0 N D J F M A M J
J A S 0 N D J F M A M J
533 OBSERVATION
351 OBSERVATION
27 by 1940 - 466 in 1941 - 40 in 1942
176 by 1940 175 in 1941
PER 100 DELIVERIES
PERIOD DELIVERIES
351
DELIVERED
6
SCHEDULED
21
225
4
300
14
2
7
APR. MAY JUNE
APR. MAY JUNE
150
200
SCHEDULED
75
50
100
DEL IVERED
J A S o N D J F M A M J
J A S o N D J F M A M J
1940
1941
1940
1941
Air Corps
STATISTICS BRANCH
19
OUSW - WAR DEPARTMENT
6-21-41
AIRPLANES
ENGINES
958 TRANSPORT
1592 TRANSPORT
13 by 1940 - 371 in 1941 - 574 in 1942-43
22 by 1940 - 242 in 1941 - 1328 in 1942
PERIOD DELIVERIES
PERIOD DELIVERIES
98
3
9
DELIVERED
45
2
90
6
I
3
APR. MAY JUNE
APR. MAY JUNE
29
30
60
SCHEDULED
DEL VERED
15
30
J A S o N D J F M A M J
J A S 0 N D J F M A M J
74 AMPHIBIAN
148 AMPHIBIAN
3 in 1941 - 71 in 1942
98 in 1941 - 50 in 1942
PER 100 DELIVERIES
PERIOD DELIVERIES
3
3
60
2
120
2
I
I
APR. MAY JUNE
APR. MAY JUNE
40
80
NONE
SCHEDULED
UNTIL
NOVEMBER
941
NONE SCHEDULED UNTIL OCTOBER 1941
20
40
J A S o N D J F M A M J
J A S 0 N D J F M A M J
5490 PRIMARY TRAINER
5490 PRIMARY TRAINER
645 by 1940 - 3075 in 1941 - 1770 in 1942
925 by 1940 - 3195 in 1941 - - 1370 in 1942
PERIOD DELIVERIES
PER 100 DELIVERIES
2129
SCHEDULED
75
105
DELIVERED
1500
50
1800
70
25
35
1615
APR, MAY JUNE
APR. MAY JUNE
SCHEDULED
1000
1200
DELIVERED
500
600
J A $ 0 N D J F M A M J
J A S 0 N D J F M A M J
1940
1941
1940
1941
Air Corps
STATISTICS BRANCH
20
OUSW WAR DEPARTMENT
6-21-41
AIRPLANES
ENGINES
5051 BASIC TRAINER
3051 BASIC TRAINER
500 by 1940 - 1787 in 1941 - 2764 in 1942
696 by 1940 - - 2220 in 1941 - - 135 in 1942
PERIOD DELIVERIES
PERIOD DELIVERIED
974
60
60
900
40
1500
40
SCHEDULED
20
20
SCHEDULED
APR. MAY JUNE
APR. MAY JUNE
DEL
VERED
600
1000
1192
DEL IVERED
300
500
J A S o N D J F M A M J
J A S 0 N 0 J F M A M J
2297 ADVANCE TRAINER, 1 ENGINE
2297 ADVANCE TRAINER, 1 ENGINE
94 by 1940 - 934 in 1941 - 1269 in 1942
197 by 1940 - 2078 in 1941 - - 22 in 1942
PERIOD DELIVERIES
563
PER 100 DELIVERIES
1047
45
90
450
30
900
60
15
DEL
IVERED
30
DELIVERED
APR. MAY JUNE
APR. MAY JUNE
300
600
SCHEDULED
150
300
SCHEDULED
J A S o N D J F M A M J
J A S o N 0 J F M A M J
2632 ADVANCE TRAINER, 2 ENGINE
2164 ADVANCE TRAINER, 2 ENGINE
8 by 1940 - 1267 in 1941 - 1357 in 1942
65 by 1940 - 2099 in 1941
PERIOD DELIVERIES
PERIOD DELIVERIES
9
120
375
6
1200
80
3
40
SCHEDULED
SCHEDULED
APR. MAY JUNE
APR. MAY JUNE
250
800
724
125
400
DEL IVERED
DEL
VERED
62
J A S o N D J F M A M J
J A S o N D J F M A M J
1940
1941
1940
1941
Air Corps
STATISTICS BRANCH
21
OUSW - WAR DEPARTMENT
6-21-41
TEXT SUMMARY - PROPELLER PROCUREMENT - MAY 31, 1941
Source of Information: Consolidated Statistical Report - Air Corps
The total installation propeller program, as revised to match the current air-
plane procurement program, now amounts to 49,781 units of which 30,450 or 61.2% are under
contract, and the balance of 19,331 or 38,8% are pending. The program reduction of 772
units since the report of April 30 is explained by referring to the revisions in the air-
plane program, in particular respect to the observation, transport, primary trainer and
advance trainer, 2-engine types. The amount under contract was increased by the addition
of two new contracts totalling 900 units for primary trainers.
Acceptances of installation propellers during May totalled 1,097 units, a drop
of 250 below the previous high record set in April. Tactical installations claimed 522
of these units for a new monthly record, whereas trainer acceptances dropped to 575 units.
The tactical record was helped by new highs for heavy bomber, medium bomber and transport
types.
In the propeller tables and diagrams which follow, Materiel Division estimates
or schedules computed by the Statistics Branch, OUSW, have been used except for pursuit
fighters, pursuit interceptors and observations for which complete installation propeller
contract schedules are available. Progress of procurement for the individual types of
planes is reflected in the table below.
Type of
Procurement
Under
Deliveries
Percent of Program
propeller
programs
contract
through
Con-
Due
De-
(a)
5/31/41
tracted
5/31/41
livered
Heavy bomber
8,984
4,184
949
46.6
10,6
10.6
Medium bomber
9,232
4,432
565
48.0
9.0
6.1
Light bomber
3,576
2,476
410
69.2
11.5
11.5
Pursuit fighter
1,420
1,394
180
98.2
25.4
12.7
Pursuit interceptor
4,394
3,917
829
89.1
26.9
18.9
Observation
533
351
264
65.9
46.7
49.5
Transport
2,358
1,562
542
66.2
21.9
23.0
Amphibian
148
148
20
100,0
13.5
13.5
Reconnaissance
34
34
34
100.0
100.0
100.0
Total Tactical
30,679
18,498
3,793
60.3
15.2
12.4
Primary trainer
5,490
4,440
2,052
80.9
41.6
37.4
Basic trainer
5,051
3,051
1,548
60.4
30.6
30.6
Adv. trainer, 1 eng.
3,297
2,297
805
69.7
24.4
24.4
Adv. trainer, 2 eng.
5,264
2,164
692
41.1
13.1
13.1
Total Trainer
19,102
11,952
5,097
62.6
27.9
26.7
Grand Total
49,781
30,450
8,890
61.2
20.1
17.9
(a) Matching project installation propeller contracts for airplane contracts current
June 30, 1940 plus all F.Y. 1941 procurement programs.
STATISTICS BRANCH
Air Corps
OUSW - WAR DEPARTMENT
22
6-21-41
TEXT SUMMARY - PROCUREMENT OF QUARTERMASTER ITEMS - June 19, 1941
Source of Information: Statistics Branch, OQMG
GENERAL - As of May 31, 1941, contract awards have been made on 132 of 134
critical and essential quartermaster items. Of the total programs of the 132 items
an average of ninety percent has been contracted and an average of sixty-eight
percent has been procured; the latter figure includes transfers from CCC stocks.
From a fiscal standpoint 89% has been contracted, 5% transferred from CCC; 5% is
on directive and 1% remains to be procured. Contracts awarded during the week
ended June 7, 1941 amounted to 13 million, of which 4 million were for motor
vehicles, 42 million for new construction of military posts and land acquisition,
and 3¢ million for clothing and equipage.
CONTRACTS - Including transfers from CCC stocks, the programs of eighty-cight
of the one hundred and thirty-four items have been completely contracted.
DELIVERIES - During the cuarter-monthly period ended May 31, 1941, deliveries
were effected on all but 52 of the 134 items; of these 19 items have been completely
procured; 17 are on schedule; 7 have no current schedule, and 9 are behind schedule.
SCHEDULES and DELINQUENCIES - Of the 134 basic items, 64 are on or ahead of
schedule; 8 have no current schedule; 62 are behind schedule. Items currently more
than 20% delinquent and also behind April 30 schedules are:
Chest, supply, pack
(84%)
Tent, storage
(29%)
Bag, cantle
(68%)
Breeches, wool
(25%)
Scabbard, subMG, cal. 45
(42%)
Belt, web, waist
(24%)
Can, milk
(38%)
Saddle,Phillips,cargo
(23%)
Cloth, cotton, wind resist. (30%)
Belt, cart., dsmtd.
(22%)
IABOR DIFFICULTIES - Strikes are presently affecting quartermaster procurement
as follows:
Man
Item affected
days
Contractor Name & Address
lost*
Undershirts & drawers
56,000
Standard Knitting Mills, Knoxville, Tenn.
Drawers & trousers
55,200
Reliance Mfg. Co., Michigan City, Indiana
Parts for CM laundries
34,800
Wilson Jones Co., Chicago, Illinois
Sheet, steel
24,700
Apollo Steel Corp., Apollo, Pennsylvania
Parts for Fargo trucks
8,000
Boston and Lockport Block Co., Boston, Mass.
Steel castings for trailors
6,000
Sivyer Steel Casting Co., Chicago, Illinois
Structural steel
5,400
St. Louis Steel Fabricating Co., St. Louis, Mo.
Undershirts & drawers
4,500
Fuld & Hatch Knitting Co., Cohoes, New York
Parts for Y.T.&C. trucks
3,850
Douglas & Lomason, Detroit, Michigan
Iron frames QM construction
805
New Jersey Galvanizing Co., New Jersey
Pillows, feather
unknown
Gaschwind Feather Co., Brooklyn, N. Y.
*Based on six working days per week
Quartermaster Corps
STATISTICS BRANCH
23
OUSW - WAR DEPARTMENT
6-21-41
STATUS OF Q.M. PROCUREMENT - Six major procurement groups based on total programs
of basic types in each group. Combined programs for each group is 100%.
Source of Information: Statistics Branch, OQMG - May 31, 1941
$
Critical - 17 basic types
$
Clothing - 61 basic types
100
100
SCHEDULED
UNITS
UNITS
SCHEDULED
DELIVERED
DELIVERED
DEL IVERED
75
TO
75
TO
DELIVERED
DATE
DATE
29,133,515
230,709,673
50
50
1940
1941
1940
1941
25
25
S o N D J F M A M J J A
SONDJFMAMJJA
$
Equipage - 45 basic types
%
General Supplies - 11 basic types
100
100
UNITS
SCHEDULED
UNITS
SCHEDULED
DEL IVERED
DEL IVERED
75
TO
75
TO
DATE
DATE
DELIVERED
DELIVERED
101,546,349
131,010
50
50
1940
1941
1940
1941
25
25
S o N D J F M A M J J A
$ 0 N D J F M A M J J A
$
Motor Vehicles - 172 basic types
%
Rail & Water Items - 67 basic types
100
100
UNITS
SCHEDULED
UNITS
OIL IVERED
DEL IVERED
75
TO
75
TO
DATE
DATE
SCHEDULED
94,020
542
DELIVERED
50
BELIVERED
50
1940
1944
1940
1941
25
25
$ o N D J F M A M J J A
$ o N D J F M A W J J A
Quartermaster Corps
24
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
6-21-41
QUARTERMASTER CORPS - PROCUREMENT OF CRITICAL ITEMS - MAY 31, 1941
Source of Information: Statistics Branch, OQMG
Cutter, wire M-38. Program-26,000
Belt,suspenders, M36. Program-156,256
106,656
SCHEDULED
1940
1941
SCHEDULED
1940
1941
21,000
90,000
del IVERED
14,000
60,000
7,700
7,000
30,000
DELIVERED
.
NDJFMAWJJASO
NDJFMAMJJASO
Tent, storage. Program - 3,543
Overcoating,32 oz. Program-7,872,942
ORL IVERED
SCHEDULED
1940
1941
1940
7,363,471
1941
2,700
6,000,000
SCHEDULED
1,876
1,800
4,000,000
DEL IVERED
900
2,000,000
N D J F M A M J J A S 0
NDJFWAMJJASO
Cloth,wool,18 oz. Program-23,650,088
Leggings, dismtd. Program - 4,189,999
1940
18,408,469
1941
SCHECULED
1940
1941
5,000,000
3,600,000
SCHEDULED
DELIVERED
2,605,539
2,000,000
2,400,000
DELIVERED
6,000,000
1,200,000
N D J F M A M J J A S o
N 0 J F M A M J J A S o
Quartermaster Corps
STATISTICS BRANCH
25
OUSW - WAR DEPARTMENT
6-21-41
QUARTERMASTER CORPS - PROCUREMENT OF CRITICAL ITEMS - MAY 31, 1941
Source of Information: Statistics Branch, OQMG
Range,field,M1937. Program - 11,500
Saddle,Phillips,pack. Program-3,500
1940
1941
1940
1941
SCHEDULED
SCHÉDULED
9,000
3,000
6,000
2,000
3,620
3,000
1,000
DEL IVERED
DELIVERED
905
N D J F M A M J J A $ 0
N D J F M A M J J A S o
Saddle, Cavalry. Program - 5,828
Scabbard,subMG,cal.45. Program-18,338
SCHEDULED
1940
1941
SCHEDULED
1940
1941
3,000
15,000
10,592
2,000
2,117
10,000
DELIVERED
1,000
5,000
DELIVERED
N D J F M A M J J A S 0
N D J F M A M J J A S 0
Belt,cart.,dismtd. Program - 500,000
Tent, pyramidal. Program - 355,853
1940
1941
1940
1941
450,000
SCHEDULED
225,000
SCHEDULED
300,000
150,000
148,244
DELIVERED
150,000
75,000
135,520
DEL (VERID
N o J F M A M J J A S 0
N D J F M A M J J A S o
Quartermaster Gorps
STATISTICS BRANCH
26
OUSW-WAR DEPARTMENT
6-21-41
TEXT SUMMARY - MOTOR VEHICLE PROCUREMENT - June 8, 1941
Source: Statistics Branch, OQMG
GENERAL - As of June 8, 1941 contracts have been awarded for 195,131
vehicles of all types, obligating funds to the extent of 271 million
dollars. The combined programs are presently estimated to total 236,766
vehicles being procured by the Q.M.C. for the Supply Arms and Services,
funds for which have been made available by the branch for whom they are
obtained.
NEW CONTRACTS -- Contracts awarded during the past quarter-monthly
period provide for the procurement of 729 vehicles at a cost of 3,760,898
dollars. These vehicles consist of:
575 Trucks, 4-ton cargo w/w
125 Trucks, 4-ton wreckers w/w
15 Trucks, 1 ² ton Pickup w/cc
12 Trucks, 12-3 ton Chassis
2 Semi-Trailers
DELIVERIES - During the period ended June 8, 1941 deliveries were
reported on 4,723 vehicles of all types. This brings the cumulative
delivery figure to 98,743 or 42 percent of the combined programs.
SCHEDULES and DELINQUENCIES - Delivery schedules are based on
manufacturers' estimates and are not contractual obligations. On this
basis, 98,952 vehicles were scheduled for delivery by June 8, 1941.
This figure represents 42 percent of the current proposed procurement,
and is the same percentage as that for deliverico. There are, however,
certain delinquent contracts. In general, these delinquencies are not
confined to any specific type. Based on estimated schedules, 4,365
vehicles distributed among 14 manufacturers are behind schedule; 4,156
vehicles, however, have been delivered in advance of estimated schedules,
producing a net delinquency of 209 vehicles.
STATISTICS BRANCH
Quartermaster Corps
OUSW . WAR DEPARTMENT
27
6-21-41
QUARTERMASTER CORPS - PROCUREMENT OF MOTOR VEHICLES - FISCAL DIAGRAM - JUNE 8, 1941
Source of Information: OQMG - Statistics Branch, OUSW
This diagram is based on average unit costs of nine general types of
motor vehicles. Schedules from July 1941 to March 1942 have been adjust-
ed to cover estimated procurement of vehicles not under current contract;
quantities, types and corresponding values, therefore, are subject to mod-
ification. All schedules used as & basis for computation are manufacturers'
estimates and are not contractual obligations.
(MILLIONS)
320
SCHEDULED
$271,548,402
CONTRACTED
240
1940
1941
1942
160
$118,217,642
DELIVERED
80
J A 3 0 N D J 7 M A M J J A S 0 N D J F M
Quartermaster Corps
28
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
6-21-41
QUARTERMASTER CORPS - PROCUREMENT OF MOTOR VEHICLES BY TYPES - June 8, 1941
Source of Information: Statistics Branch, OQMG
Motorcycles. Program - 27,892
Passenger Care. Program - 4,578
DEL,3,915
SCHEDULED
SCHEDULED
4,500
DEL.
3,000
DELIVERED
3824
3,000
2,000
DEL VERED
1,500
1,000
J F M A M J J A S o N D
J F M A M J J A S 0 N D
Ambulances. Program - 5,313
Trucks (1-3 ton incl). Program-155,631
SCHEDULED
SCHEDULED
3,000
90,000
DEL.
DEL.
2,000
2235
60,000
69,536
DEL, IVERED
1,000
30,000
DELIVERED
J F M A M J J A $ 0 N D
J F W A M J J A S o N D
Trucks (4-ton & Heavier) Program- 7,163
Trai lers, Semi-Trai lers. Program- 36,189
4,500
30,000
SCHEDULED
CHEQULED
3,000
20,000
XL.
DEL.
2328
16,905
1,500
10,000
DEL VERED
DEL VERED
J F M A M J J A $ o N D
J F M A M J J A S o N D
Quartermaster Corps
STATISTICS BRANCH
29
OUSW - WAR DEPARTMENT
6-21-41
TEXT SUMMARY - STATUS OF QUARTERMASTER CONSTRUCTION - May 31, 1941
Source: Statistics Branch, OQMG - OUSW
Of 329 Q.M. construction projects, with a total estimated cost of $1,454,963,984:
Cost
316 projects are started
$1,418,755,672
(98% of total cost)
75 projects are completed
121,483,233
( 8% of total cost)
27 projects are ahead of schedule
156,221,590
(11% of total cost)
195 projects are on schedule*
1,013,261,427
(70% of total cost)
19 projects are behind schedule
127,789,422
( 9% of total cost)
13 projects are not started
36,208,312
( 2% of total cost)
Of the 27 projects ahead of schedule, with an estimated cost of $156,221,590:
13 are from 5-10% ahead
$104,027,117
(67% of $156,221,590)
6 are from 11-20% ahead
24,846,427
(16% of $156,221,590)
8 are over 20% ahead
27,348,046
(17% of $156,221,590)
Of the 19 projects behind schedule, with an estimated cost of $127,789,422:
14 are from 5-10% behind
$88,121,862
(69% of $127,789,422)
4 are from 11-20% behind
38,969,775
(30% of $127,789,422)
1 is over 20% behind
697,785
( 1% of $127,789,422)
Of the 329 Q.M. construction projects, 202 (61%) provide a troop housing capacity
of 1,270,936 at an estimated cost of $805,867,629 (55% of total estimated Q. M.
construction cost).
Of the 202 projects providing troop housing:
Capacity
201 projects are started
1,269,386
(99% of total)
66 projects are completed
348,050
(28% of total)
19 projects are ahead of schedule
144,003
(11% of total)
107 projects are on schedule*
739,124
(58% of total)
9 projects are behind schedule
38,209
( 3% of total)
Of the 9 projects behind schedule, with a troop capacity of 38,209:
7 are from 5-10% behind
37,351
(98% of 38,209)
2 are from 11-20% behind
858
( 2% of 38,209)
*Projects 1 to 43 behind schedule and 1 to 4% ahead of schedule are included in
"on schedule" data, due to difficulty in estimating within these limits.
STATISTICS BRANCH
Quartermaster Corps
OUSLY - WAR DEPARTMENT
30
6-21-41
TEXT SUMMARY - STATUS OF QUARTERMASTER CONSTRUCTION - May 31, 1941
Source: Statistics Branch, CQMG - OUSW
Of 329 Q.M. construction projects, with a total estimated cost of $1,454,963,984:
Cost
316 projects are started
$1,418,755,672
(98% of total cost)
75 projects are completed
121,483,233
( 8% of total cost)
27 projects are ahead of schedule
156,221,590
(11% of total cost)
195 projects are on schedule*
1,013,261,427
(70% of total cost)
19 projects are behind schedule
127,789,422
( 9% of total cost)
13 projects are not started
36,208,312
( 2% of total cost)
Of the 27 projects ahead of schedule, with an estimated cost of $156,221,590:
13 are from 5-10% ahead
$104,027,117
(67% of $156,221,590)
6 are from 11-20% ahead
24,846,427
(16% of $156,221,590)
8 are over 20% ahead
27,348,046
(17% of $156,221,590)
Of the 19 projects behind schedule, with an estimated cost of $127,789,422:
14 are from 5-10% behind
$88,121,862
(69% of $127,789,422)
4 are from 11-20% behind
38,969,775
(30% of $127,789,422)
1 is over 20% behind
697,785
( 1% of $127,789,422)
Of the 329 Q.M. construction projects, 202 (61%) provide a troop housing capacity
of 1,270,936 at an estimated cost of $805,867,629 (55% of total estimated Q. M.
construction cost).
Of the 202 projects providing troop housing:
Capacity
201 projects are started
1,269,386
(99% of total)
66 projects are completed
348,050
(28% of total)
19 projects are ahead of schedule
144,003
(11% of total)
107 projects are on schedule*
739,124
(58% of total)
9 projects are behind schedule
38,209
( 3% of total)
Of the 9 projects behind schedule, with a troop capacity of 38,209:
7 are from 5-10% behind
37,351
(98% of 38,209)
2 are from 11-20% behind
858
( 2% of 38,209)
*Projects 1 to 4% behind schedule and 1 to 4% ahead of schedule are included in
"on schedule" data, due to difficulty in estimating within these limits.
STATISTICS BRANCH
Quartermaster Corps
OUSLY - WAR DEPARTMENT
30
6-21-41
QUARTERMASTER CORPS - STATUS OF CONSTRUCTION - May 31, 1941
Source: Statistics Branch, OQMG - OUSW
COST IN
STATUS
%
MILLIONS
COMPLETED
122
8
AHEAD OF SCHEDULE
156
11
(Includes projects
(from 1 to 4% be-
ON SCHEDULE
(hind schedule and
1013
70
(1 to 4% ahead of
(schedule
BEHIND SCHEDULE
128
9
NOT STARTED
36
2
TOTAL
1455
100
Quartermaster Corps
31
STATISTICS BRANCH
CUSW - WAR DEPARTMENT
6-21-41
TEXT SUMMARY - PROCUREMENT OF SIGNAL CORPS ITEMS - JUNE 14, 1941
Source of Information: Office of the Chief Signal Officer, Supply Division
GENERAL - The basic concept of field communications of our Army has, in the
past, been a wire system augmented by other means, such as messengers, radio, signal
lamps, panels, pigeons, etc. Radio communication has been regarded as an emergency
means, except where used by the Air Corps, Cavalry and for communication between com-
bat vehicles.
Lessons being learned from combat operations in the European war, clearly indi-
cate the increasing importance of radio, as exemplified by the following:-
a. The only practical means of communication with aircraft is
radio and aircraft are being employed more extensively than
ever before.
b. The use of air-borne troops has come into being and parachu-
tists are proving effective in the destruction of wire commu-
nication.
C. Radio is necessary for communication between air-borne troops
and their bases.
d. Highly mobile mechanized troop units have participated in prac-
tically all ground operations. The impracticability of estab-
lishing wire communication between such units is obvious and
dependence must, therefore, be placed upon radio.
e. Radio aircraft warning devices are being used by the British
and radio equipment, as an aid in combating enemy aircraft,
has also been developed and is destined to play an important
role in the present war.
Radio equipment to meet these new requirements has been developed and many con-
tracts are being awarded for its procurement.
PRODUCTION - Deliveries of critical Signal Corps equipment continued in moder-
ate volume last week. While the lag in ground radio sets continues, deliveries were
made on three important aircraft warning sets. The production of these sets, however,
has been consistently behind estimated schedules.
Several ground radio sets remain delinquent due to the shortage of minor parts
and accessories. Contractors of certain of these items have promised prompt delivery,
contingent upon the availability of raw materials, notably aluminum and brass. Correc-
tive action now being taken indicates improvement in this situation within one month.
Three contracts for critical items were completed last week and contract awards
were made on four items on the Fifth Supplemental program. Two critical items were re-
moved from the delinquency list, leaving a total of 33 items behind schedule.
LABOR DIFFICULTIES - The strike at plant of General Ceramics Co., manufacturers
of insulators for the Signal Corps, has been settled. Strikes at New Jersey Galvanizing
Company and Karp Metal Products are still in progress. The threatened strike at American
Brass in Connecticut might seriously interfere with Signal Corps production, as a short-
age of brass is now delaying deliveries on two important radio sets. There is also the
possibility of a strike at Breeze Corporation in Newark. The latter company holds 1m-
portant Signal Corps subcontracts.
STATISTICS BRANCH
Signal Corps
OUSW - WAR DEPARTMENT
32
6-21-41
STATUS OF SIGNAL CORPS PROCUREMENT - SELECTED-CRITICAL ITEMS - JUNE 14, 1941
Source of Information: Office of the Chief Signal Officer, Supply Division
Not
Delivered
Contracted
Contracted
F.Y. 1941
XXX
program
Percentof Program
RADIO COMMUNICATION - GROUND
o
20
40
60
80
100
Head & chest set HS-19
31,122
Charging set SCR-169
1,395
Test set
4,843
X
Frequency meter set SCR-211
3,874
Radio set
38,443
Loudspeaker LS-3
2,900
MISCELLANEOUS EQUIPMENT
Wire W-110-B (miles)
113,180
Telephone EE-8
63,806 b/
Telegraph set TG-5
4,427
Reel unit RL-26-A
5,055
Signal lamp equipment EE-84
501
Sound ranging set GR-3-C
35
Interphones (vehicular)
3,492
Includes 8,000 miles for Marine Corps
Includes 5,068 for component parts of other critical items
All figures are cumulative
Signal Corps
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
33
6-21-41
STATUS OF SIGNAL CORPS PROCUREMENT - SELECTED-CRITICAL ITEMS - JUNE 14, 1941
Source of Information: Office of the Chief Signal Officer, Supply Division
Not
F.Y. 1941
Delivered
Contracted
Contracted
program
AIRCRAFT COMMUNICATION
Percent of Program
o
20
40
60
80
100
Microphone amplifying equip-
ment RC-19
3,000
XXI
Headset HS-23
40,000
Microphone T-20
4,500
Filter equipment RC-32
36,848
Interphone equipment
23,242
Radio sets
39,482*
Microphone T-30
64,560
Marker beacon receiving
equipment
9,346
Frequency meter set SCR-211
1,707
Radio compass
9,004
*
Includes 526 SCR-183 for Navy
All figures are cumulative
STATISTICS BRANCH
Signal Corps
OUSW - WAR DEPARTMENT
34
6-21-41
SIGNAL CORPS PROCUREMENT - SELECTED ITEMS, GROUND - STATUS AS OF JUNE 14, 1941
Source of Information: Supply Division, Office of the Chief Signal Officer
Radio Set
Field Wire
Program F.Y. 1940 & 1941 - 40,380
Program F.Y. 1940 & 1941 - 225,410 (miles)
750
6000
21,000
120,000
500
4000
250
SCHEDULED
2000
DEL.
106,270
A
M
80,000
A
M
14,000
7,000
40,000
716
SCHEDULED
1940
1941
1942
1940
1941
1942
Telephone EE-8
Reel Unit
Program F.Y. 1940 & 1941 - 109,951
Program F.Y. 1940 & 1941 - 51,240
3750
900
90,000
2500
6co
15,000
DEL.
SCHEDULED
1250
70,611
300
A
M
J
SCHEDULED
A
E
c
DEL.
60,000
10,000
9,999
30,000
5,000
1940
1941
1942
1940
1941
1942
STATISTICS BRANCH
Signal Corps
OUSW - WAR DEPARTMENT
35
6-21-41
SIGNAL CORPS PROCUREMENT - SELECTED ITEMS, GROUND - STATUS AS OF JUNE 14, 1941
Source of Information: Supply Division, Office of the Chief Signal Officer
Interphones (vehicular)
Test Set
Program F.Y. 1940 & 1941 - 3,492
Program F.Y. 1940 & 1941 - 5,061
300
3,000
3,000
DEL
200
2,681
100
HEDULED
A
M
J
A
M
J
2,000
2,000
SCHEDULED
1,000
1,000
DEL
0
1940
1941
1942
1940
1941
1942
Telegraph Set TG-5
Charging Set SCR-169
Program F.Y. 1940 & 1941 - 4,427
Program F.Y. 1940 & 1941 - 1,395
300
300
3,000
200
1,200
200
100
100
DEL.
SCHEDULED
2,230
DEL.
A
M
J
A
M
J
0.98
2,000
800
SCHEDULED
1,000
400
1940
1941
1942
1940
1941
1942
STATISTICS DRV.CH
Signal Corps
OUSW - WR DEPARTMENT
36
6-21-41
SIGNAL CORPS PROCUREMENT - AIRCRAFT SIGNAL EQUIPMENT - JUNE 14, 1941
Source of Information: Supply Division, Office of the Chief Signal Officer
Radio Aircraft, Command
Radio Aircraft, Liaison
Program F. Y. 1940 & 1941 - 30,252
Program F.Y. 1940 & 1941 - 9,230
75
300
18,000
200
4,500
50
100
25
A
a
J
A
Lt
J
3,000
12,000
DEL.
SCHEOULED
SCHEDULED
6,373
DEL.
6,000
1,500
1,118
1940
1941
1942
1940
1941
1942
Radio Compass
Interphone Equipment - Aircraft
Program F.Y. 1940 & 1941 - 10,068
Program F.Y. 1940 & 1941 - 25,370
45
1,80
4,500
30
15,000
4,200
15
600
A
M
J
A
M
J
3,000
10,000
DEC.
0,161
SCHEDULED
SCHEDULED
DEL,
1,500
012'
5,000
1940
1941
1942
1940
1941
1942
Signal Corps
STATISTICS DRANCH
37
OUSI/ - LR DEPARTMENT
6-21-41
SIGNAL CORPS PROCUREMENT - AIRCRAFT SIGNAL EQUIPMENT - JUNE 14, 1941 (PAGE II)
Source of Information: Supply Division, Office of the Chief Signal Officer
Marker Beacon Receiving Equipment
Filter Equipment RC-32
Program F.Y. 1940 & 1941 - 11,196
Program F.Y. 1940 & 1941 - - 42,348
240
6,000
24,000
160
80
DEL.
SCHEDULED
16,800
A M J
A
M
J
16,000
4,000
JEL.
SCHEDULED
2,200
8,000
2,000
1940
1941
1942
1940
1941
1942
Frequency Meter Set SCR-211
Aircraft Microphones T-20 & T-30
Program F.Y. 1940 & 1941 - 7,459
Program F.Y. 1940 & 1941 - 71,370
4000
3000
75
6,000
50
30,000
2000
25
1000
SCHEDULED
SCHEDULED
A
M
J
A
E
J
4,000
20,000
DEL.
DEL.
2,550
13,310
2,000
10,000
1940
1941
1942
1940
1941
1942
Signal Corps
STATISTICS BRANCH
38
OUSW - WAR DEPARTMENT
6-21-41
TEXT SUMMARY - CORPS OF ENGINEERS - PROCUREMENT PROGRESS THROUGH JUNE 7, 1941
Source of Information: Supply Section, Office of the Chief of Engineers
Except for the 60" antiaircraft searchlight, no in-
formation is available with which to bring up to date our
report of June 14. The June 14 report showed all items as
of June 7 except searchlights for which the data were as of
May 31. This week's report therefore will deal only with
the new searchlight information.
Funds are appropriated for the purchase of 2485 search-
lights. Of this number 2156 are contracted for and on May
31 there were 1107 scheduled and 972 delivered. A diagram
on a following page shows that this shortage of 135 lights
can be made up by the expiration of the searchlight contracts
in November and December of this year if a rate of 186-188
lights per month is maintained through November and 67 more
are delivered in December. The reason for the Decembér
figure being different is that the Sperry Gyroscope Corpora-
tion is scheduled to complete its deliveries in November
while the General Electric Company is scheduled to complete
its work a month later. A rate of 186-188 is possible to
obtain since the deliveries for May were 260. This analysis
shows that the searchlight is under control until it is de-
cided that a larger number will be required.
The diagram on the second page following is the story
of recent deliveries on a weekly non-cumulative basis. It
shows that in every week except one since April 1 the schedule
has been exceeded. In the week ended June 7 there were 47
scheduled and 52 delivered. This brings the cumulative figures
to 1154 scheduled and 1024 delivered. The shortage of 130
lights is 11 percent of the number scheduled for this date.
Corps of Engineers
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
39
6-21-41
DIAGRAM - CORPS OF ENGINEERS - PROCUREMENT PROGRESS THROUGH MAY 31, 1941
Source of Information: Supply Section, Office of the Chief of Engineers
60" ANTIAIRCRAFT SEARCHLIGHTS
125
Sperry Corporation
100
75
50
25
125
General Electric
100
75
50
25
Total
250
200
150
100
50
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Scheduled
Delivered
Deliveries required
to complete schedules
on time
STATISTICS BRANCH
Corps of Engineers
OUSW - WAR DEPARTMENT
40
6-21-41
I7
UVM - MISNO
Corps of Engineers
HONYYYE
Scheduled
OE
23
ST
8
TE
23
ST
8
OE
22
ST
8
JUN
NNF
NNS
NNS
MAY
IVR
MAY
MAY
APR
APR
APR
APR
0
ot
200
OE
07
05
09
04
08
06
OOT
60" ANTIAIRCRAFT SEARCHLIGHTS
Source of Information: Supply Section, Office of the Chief of Engineers
DIAGRAM - CORPS OF ENGINEERS - PROCUREMENT PROGRESS THROUGH JUNE 7. 1941
CORPS OF ENGINEERS - CONSTRUCTION AT AIR CORPS STATIONS - MAY 31, 1941
Source of Information: Construction Section, Office of the Chief of Engineers
GENERAL
During the past period the estimated cost of construction at
Air Corps stations being done by the Corps of Engineers has
increased about 26.9 million dollars. This brings the total
estimated cost to 409.5 million. All of this increase was due
to new authorizations on old projects. Only one new project
was reported. This was for construction of temporary housing
and technical facilities at an existing G.H.Q. station at
Orlando, Florida. Information on this project is incomplete
pending approval of the plans by the Air Corps. The estimated
value of work in place is 173.0 million dollars, or 42 percent
of the total-an increase of 14.6 million over the last report.
The troop capacity is 211,731 men. On most of the projects
troop accommodations are complete, or nearly so.
Construction is divided into eight groups: G.H.Q. air force
stations, aircraft assembly plants, Air Corps depots, pilot
schools, engineering experimental depots, observation units,
technical schools, and replacement centers.
G. H. de AIR FORCE
The estimated cost of this group is 172.3 million dollars or
42 percent of the total. Of this, 101.3 million is in place.
This is 59 percent of the estimated cost of this group and 59
percent of all work in place.
AIRCRAFT ASSEMBLY PLANTS
This group is composed of four projects. The estimated cost is
67.8 million dollars and value of work in place is 5.4 million
or 8 percent of the cost. Technical facilities on three of the
four are scheduled for completion December 31, 1941, and the
other (Tulsa) is scheduled for one month later.
TECHNICAL SCHOOLS
The estimated cost of this group is 56.6 million dollars. The
work in place is 30.2 million. This is 53 percent of the esti-
mated cost and 17 percent of the total work in place.
STATISTICS BRANCH
Corps of Engineers
OUSW - WAR DEPARTMENT
6-21-41
42
AIR CORPS CONSTRUCTION - (Continued)
AIR CORPS DEPOTS
The estimated cost is 39.0 million dollars. The value of work
in place is 16.3 million, or 42 percent of the estimated cost.
PILOT SCHOOLS
In the last period the estimated cost has risen about 4.2
million dollars and is now 50.0 million. This is 12 percent
of the total. The value of work in place is 13.9 million or
28 percent of the estimated cost.
ENGINEERING EXPERIMENTAL DEPOTS
The estimated cost is 11.1 million dollars, about 3 percent of
the total. Of this, 4.5 million or 41 percent is in place.
OBSERVATION UNITS
The estimated cost is now 7.2 million dollars for this group,
which is 2 percent of the total cost. The value in place is
2.8 million or 39 percent of the estimated cost.
REPLACEMENT CENTER
There is only one project of this type-the Jefferson Barracks
located at St. Louis, Mo. The estimated cost is 5.5 million
dollars, and it has a troop capacity of 9,500 men. About 9
percent or0.5 million is in place.
DIAGRAM
On the following page there is a diagram reproduced from one made
by the Construction Section, Office of the Chief of Engineers.
It shows very aptly the growth of the construction program and
the amount of work in place for the last two months.
STATISTICS BRANCH
Corps of Engineers
OUSIV - WAR DEPARTMENT
43
6-21-41
CORPS OF ENGINEERS - CONSTRUCTION AT AIR CORPS STATIONS - MAY 31, 1941
Source of Information: Construction Section, Office of the Chief of Engineers
Total estimated cost
Value in place
409.5
400
400
382.6
347.8
315.7
300
291.6
300
200
200
173.0
158.4
145.7
134.7
100
120.2
100
Mar. 31
Apr. 15
Apr. 30
May 15
May 31
STATISTICS BRANCH
Corps of Engineers
OUSW - WAR DEPARTMENT
44
6-21-41
TEXT SUMMARY - MEDICAL DEPARTMENT - FOR WEEK ENDED JUNE 21, 1941
Source of Information: Finance & Supply Div. - Office of Surgeon General
There is no change in the status of surgical instruments
over last week's report. However, the delivery of basic material for this
equipment leads to an optimistic feeling that the behind schedule contrac-
tors will soon be making steady deliveries.
According to belated information received, the strike against
the Picker X-Ray Corporation of Cleveland, Ohio, was settled on June 8, 1941.
The company now promises early shipment of the new model Field X-Ray units,
which are much needed for distribution.
The selected items reported on, continue to show improvement.
The Procurement Progress Report for the first quarter of June shows eighteen
contracts completed during that period. The status of these items on May 31
and June 7 is as follows:
Ahead of
On
Behind
Schedule
Schedule
Schedule
Not contracted
May 31
14
34
21
2
June 7
17
40
14
0
The Torrington Company, Torrington, Connecticut, last week
completed delivery, ahead of schedule, on three items of Surgical Needles.
According to a summary of Weekly Vital Statistical Report
No. 23, June 12, 1941, published in the office of the Surgeon General, U. S.
Army, the percentage of sick for the Military Service in the United States
was 3.10. This percentage shows 2.78 remaining in hospitals and .32 in
quarters.
STATISTICS BRANCH
Medical Department
OUSIV - WAR DEPARTMENT
45
6-21-41
MEDICAL DEPARTMENT - PROCUREMENT STATUS OF CRITICAL AND SELECTED ITEMS - JUNE 7, 1941
Source of Information: Medical Department Procurement Progress Reports
NUMBER OF CRITICAL ITEMS AND PERCENT CONTRACTED
as of 5-31-41
Percent
contracted
Number of Items
100
12
75-99
18
50-74
22
25-49
8
1-24
0
0
1
NUMBER OF SELECTED ITEMS AND PERCENT CONTRACTED
as of 6-7-41
Percent
contracted
Number of Items
100
23
75-99
5
50-74
22
25-49
19
1-24
2
o
o
STATISTICS BRANCH
Medical Department
OUSW - WAR DEPARTMENT
46
6-21-41
MEDICAL DEPARTMENT - DELIVERY STATUS OF CRITICAL AND SELECTED ITEMS - JUNE 7. 1941
Source of Information: Medical Department Procurement Progress Reports
NUMBER OF ITEMS BEHIND, ON, AND AHEAD OF SCHEDULE
CRITICAL ITEMS
SELECTED ITEMS
as of 5-31-41
as of 6-7-41
40
25
19
17
16
14
Behind
On
Ahead of
Behind
On
Ahead of
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
STATISTICS BRANCH
Medical Department
OUSW - WAR DEPARTMENT
47
6-21-41
MEDICAL DEPARTMENT - SELECTED ITEMS BEHIND SCHEDULE - JUNE 7, 1941
Source of Information: Medical Department Procurement Progress Reports
Delivered
Due
Contracted
XXXXX
Con-
Percent of contract
Item
tracted
0
20
40
60
80
100
Bed, adjustable
21,927
Basic instrument set case, empty
3,200
Litter, aluminum pole
23,000
Bandage, gauze, compressed, 3"
80,150
Pajama coat, summer
929,953
Pajama trousers, summer
929,953
Cotton, absorbent, roll
742,000
Bed, folding
25,000
Quinine sulfate, 5 gr. tab.
80,000
Sheet
1,765,460
X
Gauze, plain, 100 yards
235,000
Mattress, cotton
67,515
Mattress, inner spring
24,980
El
Robe, bath
330,816
STATISTICS BRANCH
Medical Department
OUSW - WAR DEPARTMENT
48
6-21-41
TEXT SUMMARY - CHEMICAL WARFARE SERVICE - STATUS JUNE 13, 1941
Source of Information: Chemical Warfare Service Weekly Reports
The diagrams included in this report represent the total program for the fiscal years
1940 and 1941 including the figures on the Fifth Supplemental National Defense
Appropriation.
There is a slight improvement in the production of the Chemical Warfare materiel
this week in contrast with the downward trend over the past several weeks.
Specifications are being prepared for certain equipment utilized in England for the
detection of toxic gases and other devices in connection with the protection of
individuals against vesicant gases.
The gas mask canister situation is rather grave due to a definite shortage of
whetlerite. This compound is an impregnated charcoal utilized in the canister for the
absorption of toxic gases. Most of the charcoal is obtained from imported coconut
shells and because of the lack of adequate ships it is difficult to obtain the neces-
sary supply of this basic raw material. However, there are 4 plants under construction
for the manufacture of charcoal from substances other than coconut shell and these
facilities are expected to be in operation some time in the latter part of August 1941
provided the Chemical Warfare Service can get a priority rating of "A-1-b" on the
necessary equipment for those plants.
The aluminum situation has now cleared and the Chemical Warfare Service is receiving
its allotted share, thus, the production of gas mask parts from this element is pro-
gressing satisfactorily.
There is still a definite shortage of white phosphorus but the first shipments are
expected to arrive at Edgewood Arsenal during the coming week. It is reported that
additional contracts have been let for phosphorus amounting to approximately 5,000 tons.
GAS MASK DELIVERIES
Percentage Increase
Type
Last Week
This Week
or Decrease
Service Masks
29,376
34,236
+ 17
Diaphragm Masks
51,946
66,320
+ 28
Optical Masks
None
None
Training Masks
59,597
53,121
- 11
Extra Gas Mask Canisters:-There were no deliveries of Extra Gas Mask Canisters
reported during the week because of the shortage of whetlerite. All canisters produced
are being used in the assembly of the Diaphragm and Service Gas Masks.
Mustard Gas:-The production of Mustard Gas reported this week amounted to 81 tons
while the previous week's production was 84 tons.
Impregnite "I":--The production of Impregnite "I" amounted to 13.1 tons of which
10.6 tons were delivered and 2.5 tons are in the process of being inspected.
Impregnite "S":--The first deliveries of Impregnite "S" (shoe) have been reported
this week. This type of impregnite is used to make shoes impervious to vesicant gases.
It is packed in 8-ounce tubes of which 66,000 were delivered to Edgewood Arsenal.
STATISTICS BRANCH
Chemical Warfare Service
OUSW - WAR DEPARTMENT
49
6-21-41
PERCENTAGE PROGRESS OF DELIVERIES OF MAJOR
CHEMICAL WARFARE ITEMS FOR FISCAL YEARS 1940-41
Source of Information: Chemical Warfare Service
June 13, 1941
TOTAL PROGRAM
0,5
10
20
30
40
50
60
70
80
90
100
716
MASKS, GAS, SERVICE
75%
MASKS, GAS, DIAPHRAGM
35%
MASKS, GAS, OPTICAL
89%
MASKS, GAS, TRAINING
MASKB, GAS, HORSE
24%
CANISTERS, SERVICE
18%
CANISTERS, DIAPHRAGM
40%
CANISTERS, OPTICAL
1006
IRRITANT GAS (TONS)
100%
SCREENING SMOKE, FS (TONS)
876
MUSTARD GAS (TONS)
186
IRRITANT CANDLED, D.M.
WHITE PHOSPHORUS (TONS)
376
SMOKE POTS
21%
GAS IDENTIFICATION SETS
(DETONATION)
1006
CAPSULES, C.N.
DELIVERED
/////
UNDER CONTRACT
NOT UNDER CONTRACT
STATISTICS BRANCH
Chemical Warfare Service
OUSW - WAR DEPARTMENT
50
6-21-41
PERCENTAGE PROGRESS OF DELIVERIES OF MAJOR
CHEMICAL WARFARE ITEMS FOR FISCAL YEARS 1940-41
Source of Information: Chemical Warfare Service
June 13, 1941
TOTAL PROGRAM
%
10
20
30
40
50
60
7.º
80
90
100
16%
PORTABLE CYLINDERS
100%
LAND MINES, CHEMICAL
89%
/////
CONTAINERS, STEEL, I TON
66
31%
SHELLS, C.M.
SHELLS, L.P.
176
IMPREGNITE I (TONS)
16
IMPREGNITE 8 (TONS)
-
100%
ALARMS, GAS
34%
CINTUENT, PROTECTIVE
99%
/
ANTI-DIM, SETS
34%
REGIMENTAL GAS MASK
REPAIR KITS, SERVICE
100%
DECONTAMINATING EQUIP.
(3 GAL)
100%
DECONTAMINATING EQUIP.
(i) QT)
20%
AIRPLANE CHEMICAL
SPRAY TANKS
536
DUST RESPIRATORS
FIELD LABORATORIES
DELIVERED
/////
UNDER CONTRACT
NOT UNDER CONTRACT
STATISTICS BRANCH
Chemical Warfare Service
OUSW - WAR DEPARTMENT
51
6-21-41
TEXT SUMMARY - COAST ARTILLERY CORPS - PROCUREMENT PROGRESS THROUGH JUNE 15, 1941
Source of Information: Office, Chief of Coast Artillery
CONTROL PANELS, M-3
The procurement of the control panels for the mine field groups
is progressing ahead of schedule. On June 15 there were 73
scheduled and 100 delivered. Deliveries now are 28 more than
the schedule and 72 percent of the total program of 138.
The diagram on the following page shows the distribution by
locations and the scheduled dates of completion.
SUBMARINE MINE CABLE - BEHIND SCHEDULE
This item is being procured for the Coast Artillery by the Signal
Corps. During the past week 180,000 feet were delivered. Deliv-
eries to date are 2,845,300 feet, or 78 percent of the program.
TABULAR SUMMARY - COAST ARTILLERY CORPS - PROCUREMENT PROGRESS THROUGH JUNE 15, 1941
Source of Information: Office, Chief of Coast Artillery
Current program
Deliveries
Percent of program
Item
Appro-
Con-
Sched-
Actual
Con-
De-
priated
tracted
uled
June 15
tracted
livered
Group control panels, 1:-3
138
138
73
100
100
62
STATISTICS BRANCH
Coast Artillery Corps
OUSIN - WAR DEPARTMENT
52
6-21-41
SUMMARY - COAST ARTILLERY CORPS - PROCUREMENT THROUGH JUNE 15, 1941
Source of Information: Office of the Chief of Coast Artillery
Group control panels, M-3
Program: 138
1940
1941
100
DELIVERED
50
SCHEDULED
JUL AUG SEP OCT NCV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Delivery schedule
1940
1941
Harbor defense of:
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Boston
5#
4#
Sandy Hook
23#
Columbia River
7#
Southern New York
4
Portsmouth
6#
Chesspeake Bay
28#
Narragansett Bay
12#
Portland
10#
Delaware Bay
25
San Francisco Bay
14
Total scheduled
5
11
11
11
34
34
34
62
73
73
85
99
99
99
124
138
Actual deliveries
5
11
11
11
34
47
47
69
85
# delivered
* 5 of 25 delivered
STATISTICS BRANCH
Coast Artillery Corps
OUSW - WAR DEPARTMENT
53
6-21-41
PSF
-
War
July 5, 1941
MEMORANDUM FOR THE PRESIDENT:
Herewith copies No. 52 and No. 1 of
the Weekly Statistical Report Summary.
SECRET THE ISSUED AND LOCKED
War
PSF
T° st KEPTOMOT WHEN
38
WEEKLY STATISTICAL REPORT
No. 52
RELEASED PAYMES
DIRECTOR. COL.
SUMMARY
DECLASSIFIED
Library
DOD DIR. 5200.9 (9/27/58)
Date- 3-5-59
Signature-
STATISTICS BRANCH
OFFICE OF THE UNDER SECRETARY OF WAR
WAR DEPARTMENT
Copy No. SB-5241-1
Issued to
THE PRESIDENT
a. a. - PRINTURE - 217148
WEEKLY STATISTICAL REPORT
No. 52
JUNE 28, 1941
GENERAL
Page
SIGNAL CORPS
Page
Army Strength
1
Text Summary - Signal Corps Proc.
31
Prices
2
Status of Signal Corps Procurement
32
Editorial Comment
3
Status of Signal Corps Procurement
33
Editorial Comment - Diagram
4
Diagram: Radio Set, etc.
34
Commitments
5
Diagram: Interphones (Vehicular)etc. 35
Expediting Production
6
Diagram: Radio Aircraft, Command, etc. 36
Diagram: Marker Deacon Receiving Eqpt37
ORDNANCE DEPARTMENT
Text Summary - Procurement Progress
7
CORPS OF ENGINEERS
Comparison of Completion Dates
8
Text Sunnary -- Procurement Progress
38
Equipment Procurement
9
Text Summary - Procurement Progress
39
Tactical Equipment
10
Diagram: Completion Percentages
40
Ammunition Procurement
11
Diagram: Searchlight Procurement
D
New Facilities - Equipment
12
New Facilities - Ammunition
13
MEDICAL DEPARTMENT
New Facilities - Ammunition
14
Text Summary - Procurement Progress
42
New Facilities and Additions
15
Diagram: No. of Items & se Contracted
43
Diagram: Behind, On and Ahead Sched. 44
AIR CORPS
Diagram: Critical Items Behind Sched, 45
Text Summary - Aircraft Procurement
16
Diagram: Selected Items Behind Sched. 46
Tab. Sun. - Air Corps Current Proc.
17
Text Summary - Aircraft Plant Shifts
18
CHEMICAL WARFARE SERVICE
Diagram: Aircraft Plant Shifts
19
Text Summary - Procurement Progress
47
Diagrams: New Aircraft Workers
Diagram: Progress of Deliveries
48
Airplane Plants
20
Diagram: Progress of Deliveries
49
Engine Plants
21
Tab. Sum. - Status of Gas Mask Program50
Diagram: Aircraft Labor Requirements 22
COAST ARTILLERY CORPS
QUARTERMASTER CORPS
Text Summary - Procurement Progress
51
Text Summary - Proc. of Q.M. Items
23
Tab. Sun. - Procurement Progress
51
Diagram: Overall Fiscal Index
24
Diagran: Procurement Progress
52
Diagram: Group Proc. of Q.M. Items
25
Text Summary - Proc. of Motor Vehicles26
Fiscal Diagram: Proc.of Motor Vehicles27
Diagram: Proc. of Motor Vehicles
28
Text Summary - Construction Progress
29
Diagram: Status of Q.V. Construction 30
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
BASIS OF REQUIREMENTS
The basis for computing requirements for many articles to be procured is the esti-
mated army strength by months. The data from July, 1940 through June, 1941 are shown
in the diagram and table. The figures subsequent to May 15 are of necessity only ap-
proximations and are subject to change. They refer to enlisted strength as of the end
of each month.
Source of Information: Statistics Branch, General Staff - June 15, 1941
ARMY ENLISTED STRENGTH
1,500,000
1,000,000
500,000
1940
1941
o
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
Month
Total
July, 1940
268,941
Aug.
302,968
Sept.
407,613
Oct.
483,218
Nov.
540,695
Dec.
573,520
Jan., 1941
693,578
Feb.
873,667
Mar.
1,068,030
Apr.
1,205,873
May
1,291,028
June
1,418,097
Army Strength
STATISTICS BRANCH
1
OUSW - WAR DEPARTMENT
6-28-41
PRICES
Prices of the 28 basic commodities continued to rise, and are now 148.2 percent
of the August 1939 level. Foodstuffs have increased 47.6 percent since July 1, 1940,
while raw industrial commodities increased 25.4 percent during the past 12 months.
Price ceilings on certain basic commodities tend to hold in check the rise in the
index from week to week.
Source of Information: Bureau of Labor Statistics
WHOLESALE PRICES: FOODSTUFFS AND RAW INDUSTRIAL
28 BASIC COMMODITIES
AUG. 1939 - 100
150
150
140
140
130
130
19
40
1941
120
120
RAW INDUSTRIAL
FOODSTUFFS
110
110
100
100
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
Prices
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
2
6-28-41
TEXT SUMMARY - EDITORIAL COMMENT - Tallied from a uniform list of leading papers
in cities of the 12 Federal Reserve Districts, by weeks ended each Wednesday.
Source of Info.: Dept. Research & Economics - Cleveland Trust Co. June 25, 1941
Since the passage of H R 1776 there have been several occasions
when the turn of events offered editorial opinion an opportunity to
choose between advocating restriction of our activities to the limits of
our defense program or extending our aid and strengthening our foreign
policy. On each occasion editorial opinion has chosen the latter course.
The Russo-German war, by lifting the immediate threat of invasion of
England, has presented the opportunity to make that choice once more.
Only a small minority sees in the Russo-German developments reason
to relax our efforts and discontinue our aid. The great majority not
only has reaffirmed belief in a strong foreign policy and continued aid,
but urges that this opportunity be seized to enlarge our activity. This
group does not urge war now, but such phrases as "aggressive action" and
"full use of our Navy" are common.
Nevertheless, the thought of giving lease-lend aid to Russia is
obviously perturbing. Although trends of thought on this subject are not
yet clear, there are indications that editorial opinion would support the
sending of aid to Russia. If this development occurs, it will mean that
the old concept of aid as a means of saving England has progressed into
the concept of aid used as a means of defeating Hitler.
TABULAR SUMMARY
THE EMERGENCY
Tallies
TREND TOWARD WAR
HOURS, WAGES, LABOR
For aid to Russia
3
We are trending
4
Strikes must stop
8
Against aid to Russia
2
Govt. wants war
2
Strikes help Hitler
1
Use opportunity somehow
14
R Moor brings us closer
1
Communists to blame
18
R-G war ends emergency
1
We are unprepared
3
They must be ousted
10
Arm merchant ships
2
Do not go to war
2
Oust all subversives
5
Make the seas safe
4
We are in the war
4
Rank and file loyal
7
For full Navy protection
5
For naval action now
1
Criticism of Mr Murray
7
Repeal Neutrality Act
1
For full participation
2
Situation improving
2
For German exit ban
3
Protect right to work
1
For closing consulates
18
ST LAWRENCE SEAWAY
For "cooling off" laws
6
For Axis fund freezing
8
For the project
9
Revise existing laws
4
Message to Cong. approved 7
Against the project
6
Extend anti-trust laws
1
Cong. not disregarded
2
Regulate unions by law
1
Stop Red sabotage
1
GENERAL COMMENDATION
5
Stop mass picketing
3
Spread Am. propaganda
1
GENERAL CRITICISM
37
For a labor code
1
Against gas-less Sundays
1
ORGANIZATION PROBLEMS
5
Army NA seizure approved1
For ration instead
1
GOVT. AND BUSINESS
3
Labor must not profit
1
Stop sending Japan gas
2
ECONOMICS, INFLATION
21
For employer NLRB rightsl
Stop tin plate exports
4
AID FOR BRITAIN
14
Approval of Ford peace 3
Stop auto exports
4
MISCELLANEOUS
6
Transfer WPA to jobs
2
Editorial Comment
STATISTICS BRANCH
OUSV - WAR DEPARTMENT
3
6-28-41
EDITORIAL COMMENT ON PROGRESS OF PREPAREDNESS - - Tallied from a uniform list of papers
in large cities of the 12 Federal Reserve Districts by weeks ended each Wednesday.
Source of Information: Department of Research and Economics - Cleveland Trust Company
Hours, Wages, Labor Problems
Aid for England
200
200
189
164
168
155
150
150
100
95
93
100
95
81
83
79
83
84
66
50
64
62
68
50
65
55
42
55
52
R
49 48
34
35
40
37
39
44
14
88
10
Criticism of Slow Progress
Economics, Banking, Inflation
120
120
III
III
90
94
85
86
90
82
72
77
69
65
82
61
69
60
St
60
70
54
44
44
49
30
44
48
37
"
31
30
30
28
27
30
21
25
22
17
II
18
General Commendation
Relations of Government to Business
30
30
zz
20
20
20
13
8
16
13
12
14
17
10
5
7
7
7
15
10
10
6
8
22
2
9
5
6
9
n
5
7
2
-
9
,
Trend Toward War
Organization for Defense
32
30
24
26
30
22
26
20
25
21
20
19
19
19
17
20
18
21
17
17
14
10
15
15
17
15
10
12
10
15
14
TT
7
11
6
,
8
MAR.
APR.
MAY
JUNE
MAR.
APR.
MAY
JUNE
Editorial Comment
STATISTICS BRANCH
4
OUSW - WAR DEPARTMENT
6-28-41
COMMITMENTS FOR MUNITIONS AND FACILITIES
The War Department has placed 75.1 percent of approximately eleven billion
dollars worth of business.
Source of Information: Weekly Progress Report, OUSW, June 26, 1941
AVAILABLE FOR MUNITIONS AND FACILITIES
Percent
obligated
to June 25
AIR CORPS
$3,646,538,963
a/
76.8
ORD. DEPT.
$2,741,659,091 (tentative)
91.1
Q. M. C.
$2,290,871,609
a/
62.1
PRODUCTION
FACILITIES
$1,899,428,928
59.8
SIGNAL CORPS
$223,265,460
98.5
CORPS OF ENG.
98,268,961
93.5
CHEM. WAR. SER.
I
54,483,184
90.5
MED. DEPT.
I
$ 42,851,671
100.0
C. A. C.
I
$ 1,219,839
100.0
TOTAL
$10,998,587,706
75.1
NOTE: Figure revised by Service.
NOTE: Specific appropriation - additional funds were furnished from Navy and
S.A.S.
Commitments
STATISTICS BRANCH
OUSW - M DEPARTMENT
5
6-28-41
PROGRAM OF FACILITIES FOR EXPEDITING PRODUCTION - June 21, 1941
Source of Information: Construction Division Report, June 21, 1941
$1,899,428,928 a/
$1,821,994,007
$1,136,345,690
$463,495,000
Available
Approved
Contracted for
Est. Complete
(186 projects)
(174 projects)
Includes Expediting Production Appropriation of $1,464,286,000; Military Appro-
priation Act 1941 of $44,275,000; Ordnance Service and Supply $196,644,007;
Chemical Warfare Service $500,000, and Navy Department $15,000,000; Defense Aid
Appropriation $178,723,921.
Expediting Production
STATIST ICS BRANCH
6
OUST - WAR DEPARTMENT
6-28-41
TEXT SUMMARY - JUNE 28, 1941
Source of Information: Ordnance Department
DAILY CONTRACT AWARDS
Comparison of daily contract awards reported for the first 25 days of June with
those for the months of April and May is as follows:
To
To Arsenals & New
For
Industry
Ordnance Facilities
New Facilities
(THOUSANDS)
(THOUSANDS)
(THOUSANDS)
April
$ 56,639
$ 8,888
$ 1,000
May
37,394
103,783
0
June
94,086
283,544
30,133
Currilative total,
Fiscal Year 1941
through June 25
1,509,606
968,901
576,236
The awards to industry include a substantial part of the orders for manufacture
by arsenals and by new ordnance facilities, which are purchased from subcontractors.
ALLOCATIONS AND OBLIGATIONS
The break down of the allocated funds available for Ordnance services and sup-
plies in the 1941 fiscal year with the corresponding obligations, as of May 31, 1941, is
shown below:
(THOUSANDS)
Percent of
Name
Total Available
Obligations
Total
Small Arms Materiel
$ 270,106
$ 174,623
65
Small Arms Ammunition
308,738
233,363
76
Artillery Materiel
257,262
172,945
67
Fire Control Equipment
92,949
87,522 #
94
Automotive Equipment
464,347
345,598
74
Artillery Ammunition
1,301,694
567,338
44
Bombs
214,686
58,152
27
Pyrotechnics
13,842
9,152
72
* Part of available funds included in other items.
Included in the total funds available are Coast Artillery Corps 1940 fiscal
year funds.
ORDERS
The following important orders are reported to have been placed in the first
15 days of June:
Number
Item
Number
Item
11,891
Machine Gun, Cal.30, A.C.
108,602,000
Cartridge, Cal.50
12,000
Machine Gun, Cal.50, A.C.
1,039
Mortar, 81mm, in
6,574
Machine Gun, Cal.50, H.B.
2,141
Aiming Circle, in
5,752
Machine Gun, Cal.30, M1919A4
4,552
Gunners, quadrant
9,958
Machine Gun, Cal.30, M1917A1
68
Ammunition cars, 8"
27,711
Mounts, Truck Pedestal
29
Fire Control cars
15,886
Rifle, Cal.30, ML
563
Light Tanks, M3
6,060
Rifle, auto., Cal.30, M1918A2
2,252
Medium Tanks, M3
5,390
Submachine Gun, Cal.45
2,814
Engines for medium tanks
844,462,000
Cartridge, Cal.30
3,400
Universal Carriers
100,000,000
Cartridge, Cal.45
491
Bomb Service Trucks
STATISTICS BRANCH
Ordnance
CUSV - WAR DEPARTMENT
7
6-28-41
COMPARYSON OF INDIVIDUAL COMPLETION DATES - JUNE 15, 1941
Source of Information: Office hour, Ohiof, Ind. Service, Ord. Dept. (production)
(BASIS: ACTUAL & ESTIMATED DELIVERY SCHEDULES)
NUMBER $ OF TOTAL
SCHEDULED
1941
1942
1943
PROGRAM
SCOUT CR, M3A1
2,773
100
as, 7 main, 143
452
100
SUBMACHING as, CAL.45
246,455
199
CARRIAGE, 155.0 as, ILS.
654
99
WORT..., 012, 21
3,419
77
3,400
85
CARRIAGE, 75.10 Ji, II.S.
1,330
100
CARRINGE, 155% 107., H.S.
1,436
100
an, 155.00, of
337
68
GJ., 75M, Two, T7
2,393
98
HO.., 105 Li, 12.1
4,728
53
PERSOTEL, CARIER, 13-mi
3,902
91
GUN, 37MM, A.T.,13
4,646
64
M.G., CAL.50,N.C., 42
6,981
49
LORTAR, 60MM, 1.2
10,162
100
HO.., 75173, FIELD & PACK
950
100
PERSONNEL CARRIER, 8-MAN
5,445
400
as, 37. Two, 115 1. MS
6,004
71
N.G., CAL.30,VAR.
100,560
90
are, good, American
1,203
95
M.G., CAL. 30,A.C.,NR
05,340
95
CUN, 20M, A.C., un
35,747
80
111, 37. A.C., 114
1,068
90
L.G., C.L. 50, 11.0.,02
18,888
63
RIFLE, C.J. 30, MI
853,691
93
TANK, REDIUM
2,496
53
221, 37%, A
3,195
100
M.G., CAL. 50, A.C.,M2
150,203
92
JAS ONDJFMAMJJASOND JFMAMJJASOND
1941
1942
1943
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
8
6-28-41
TABULAR SUMMARY - ORDNANCE - EQUIPMENT PROCUREMENT - JUNE 15, 1941
Source of Information: Office Asst. Chief, Ind. Service, Ord. Dept. (Production)
Total
Delivered
Percent of total program
Item
procurement
thru
con-
Sched-
Deliv-
program
June 15
tracted
uled
Due
ered
Aircraft Armament
Machine gun, cal.30
90,148
6,122
95
95#
7
7
Machine gun, cal.50
163,573
6,664
92
92#
5
4
Gun, 20mm, automatic
44,747
0
100
80
o
O
Gun, 37m, automatic
1,188
18
100
90
2
2
Combat Vehicles
Tank, light
4,090
839
100
85
21
21
Tank, medium
4,748
66
100
53
1
1
Scout car
2,733
2,633
100
100
95
96
Personnel carrier, 8-man
5,445
206
100
100
7
4
Personnel carrier, 13-man
4,302
2
100
91
6
-
Machine gun, cal.30 (Var.)
37,460a
a
a
a
a
Machine gun, cal.50 (H.B.)
8,025a
a
a
a
a
a
Submachine gun, cal.45
246,455
14,620
100
100#
10
6
Gun, 37mm, tank
8,427
1,248
72
71
13
15
Gun, 75mm, tank
2,564
26
100
98
o
1
Antiaircraft
Gun, 3"
152
112
100
100
70
74
Gun, 90mm
1,271
1
95
95#
o
-
Gun, 37m
3,195
396
100
100
12
12
Machine gun, cal.50 (W.C.)
14,168
405
33
49 *
4
3
Artillery
Howitzer, 75m
958
102
100
100
10
11
Howitzer, 105m
3,286
8
83
53
1
-
Gun, 155mm
492
11
80
68
2
2
l'odernization - II.S.
Carriage, 75mm [un
1,330
476
100
100#
41
36
Carriage, 155m howitzer
1,436
786
100
100
44
55
Carriage, 155mm gun
660
62
100
99
9
9
Infantry Armanent
Rifle, cal.30, 11
913,691
181,496
93
93 #
19
20
Machine gun, cal.30 (Var.)
111,518b
28,447b
100b
90b/#
26b
26b
Machine cun, cal.50 (H.B.)
29,879b
1,186b
63b
63b hi
4b
4b
Gun, 37mm, antitank
7,653
443
80
61
9
6
Mortar, 60mm
10,162
3,100
100
100
29
31
Mortar, 81mm
4,458
655
100
77
17
15
a
Included in Infantry Armanent. Deliveries not reported separately.
b
Figures include Armament for Combat Vehicles.
#
Partly tentative.
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
9
6-28-41
TABULAR SUMMARY - ORDNANCE - TACTICAL EQUIPMENT - JUNE 23, 1941
Source of Information: Statistics Branch & G-4, General Staff
Requirements
Stocks
2,800,000
in hands of
Item
men
Field Service
Percent of requirements
Number
Number
we
o
20
40
60
80
100
Aircraft Armament
Machine gun, cal.30,fix.&fl.
49,638
8,472
17
Machine gun, cal.50,fix.&fl.
114,997
4,031
4
Gun, 20mm, automatic A.C.
2,775
o
0
Gun, 37mm, automatic A.C.
3,976
53
1
Combat Vehicles
Tank, light
4,412
527
12
Tank, medium
2,666
76
3
Scout car
3,944
2,693
68
Personnel carrier, 8-man
7,105
80
1
Personnel carrier, 13-man
6,017
0
0
Machine gun, cal.30 (Var.)
62,164a
-
Machine gun, cal.50 (H.B.)
11,704
328
3
Submachine gun, cal.45
39,000
8,096
21
Gun, 37m, tank
7,271
851
12
Gun, 75mm, tank
2,764
0
0
Antiaircraft
Gun, 3"
}
1,766
484
}
27
Gun, 90mm
0
Gun, 37mm, A.A.
3,869
350
9
Machine gun, cal.50 (W.C.)
11,989
833
7
Artillery
Gun, 75mm (H.S.)
1,471
602
41
Howitzer, 75mm, field & pack
258
198
77
Howitzer, 105mm
3,200
51
2
Gun, 155mm
751
4
1
Gun, 155mm (H.S.)
903
144
16
Howitzer, 155mm (H.S.)
1,783
1,070
60
Unmodified & other models
Gun, 75mm
-
2,846
-
Gun, 155mm
-
825
-
Howitzer, 155mm
--
939
-
Infantry Armament
Rifle, cal.30, M, semiauto.
1,260,314
188,373
15
Machine gun, cal.30 (Var.)
96,609
25,593
26
Machine gun, cal.50 (H.B.)
17,555
1,601
9
Gun, 37m, antitank
8,092
677
8
Mortar, 60mm
7,567
2,559
34
Mortar, 8lmm
4,310
731
17
Included in Infantry Armanent.
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
10
6-28-41
TABULAR SUIDARY - ORDNANCE - AMMUNITION PROCUREMENT - JUNE 15, 1941
Source of Information: Office Asst. Chief, Ind. Service, Ord. Dept. (Production)
Total
Delivered
Percent of total program
Item
procurement
thru
Con-
Sched-
Deliv-
program
June 15
tracted
uled
Due
ered
(THOUSANDS)
(THOUSANDS)
Aircraft & Pyrotechnics
Bomb, frag., 20#
1,719
28
94
94
0
2
Bomb, deno., 100#,300,500#
1,315
54
47
47
4
4
Bomb, demo., 1000#
15
2
72
72
0
12
Bomb, e & s, 30#, 100#
376
3
16
16
1
1
Shot & shell, 20m
32,502
0
0
o
0
o
Shell, H.E., 37mm
1,890
20
62
62
-
1
Flares
874
139
30
30
18
16
Signals
2,057
517
33
33
24
25
Antiaircraft
Shell, 37mm, H.E.
11,786
22
34
34
-
-
Shell, 3", H.E.
2,267
69
57
57
3
3
Shell, 90mm, H.E.
3,053
0
54
54
o
o
Artillery
Shell, H.E., s c, 75mm gun
1,372
97
86
86
7
7
Shell, E & s, 75mm gun
1,108
5
98
98
-
-
Shot, A.P., 75m gun
3,956
0
2
2
o
o
Shell, H.E., 75mm how.
4,279
216
59
59
5
5
Shell, H.E., 105m how.
11,793
59
8
8
-
-
Shell, H.E., 155mm gun, 11
1,001
0
16
16
o
o
Charge, prop., 155mm gun
446
82
80
51
18
18
Shell, H.E., 155mm how.
4,299
5
36
36
-
-
Shell, E & s, 155mm how.
1,224
249
66
66
14
20
Charge, prop., 155mm how.
5,753
636
69
69
12
11
Primer, 21 gr.
8,153
299
82
82
4
4
Fuzes (All)
14,005
3,714
62
62
26
27
Infantry
Cartridge, cal.30
3,789,704
383,457**
100
100#
9
10**
Links, met. belt, cal.30
1,003,322
80,288
76
76#
9
9
Cartridge, cal.45
606,476
104,920
100
100#
15
17
Cartridge, cal.50
905,459
45,800**
94
94*
5
5**
Links, met. belt, cal.50
2,452,452
37,927
89
89#
2
2
Shot & shell, 37mm
28,688
168
13
13
1
1
Shell, H.E., 60mm
8,882
18
31
31
o
-
Shell, H.E., 81mm
3,764
96
3
3
3
3
Shell, smoke, 81m
426
0
0
o
o
o
Grenade, H.E., frag.
1,561
71
100
100
5
5
Signal, ground
3,215
279
53
53
10
9
Mine, antitank
2,050
0
2
2
O
o
# Partly tentative.
# Delivered thru June 23, 1941
STATISTICS BRANCH
Ordnance
OUBW . WAR DEPARTMENT
11
6-28-41
CILITIES - PROGRESS AS OF JUNE 15, 1941
Arce of Information: Ordnance Department & Production Branch, OUSW
Construction
Equipment
Facility
Percent completed
Percent delivered
%
o
20
40
60
80
100
di
0
20
40
60
80
100
General Motors Corp.
Saginaw
-
None required
66
Flint
-
None required
85
Dayton
-
None required
68
Syracuse
-
None required
70
Savage Arms Company
-
None required
44
Colt (Machine Gun)
-
None required
63
Detroit Tank Arsenal
100
85
Disston & Sons
100
75
Mesta Machine Co.
-
None required
90
Colt (37mm Gun)
-
None required
61
Bendix Aviation Corp.
90
95
Estimated Cost
Planned
May 31, 1941
Estimated Month
Capacity
% Obli-
Initial
Completion
Facility
Location
(Monthly)
Total
gated
Operation
of Plant
(THOUSANDO)
Machine Gun
General Motors Corp.
Saginaw, Mich.
1,680
4-41
*
Flint, Mich
2,100
4-41
*
2,100
$20,251
82
6-41
12-41
Dayton, Ohio
*
Syracuse, N. Y.
840
8-41
*
Savage Arms Co.
Utica, N. Y.
3,200
16,717
79
7-41
12-41 #$
Colt Patent F.A. Co.
Hartford, Conn.
3,800
4,818
69
-
1-42 *
Tank
Detroit Tank Arsenal
Detroit, Mich.
100
18,131
87
7-41
10-41 $
Armor Plate Plant
Disston & Sons
Philadelphia, Pa.483 Tons
1,192
99
4-41
4-41
155mm Gun
Mesta Machine Co.
W. Homestead, Pa.
44
1,780
101
5-41
1-42 #$
37:m Gun
Colt Patent F.A. Co.
Hartford, Conn.
200
3,940
86
-
3-42 #
20m Gun
Bendix Aviation Corp.
Elmira, N. Y.
200
1,000
-
4-41
7-41 $
# Plant equipment only.
$ Full Operation.
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
12
6-28-41
NEW FACILITIES - PROGRESS AS OF JUNE 15, 1941
Source of Information: Ordnance Department & Production Branch, OUSW
Construction
Equipment
Facility
Percont completed
Percent delivered
=
o
20
40
Go
80
100
%
0
20
40
60
80
100
Radford Ord. Works
83
84
Indiana Ord. Works
76
75
Alabama Ord. Works
1
1
Kankakee Ord. Works
50
53
Weldon Spring Ord. Wks.
37
20
Plum Brook Ord. Works
8
0
Baytown Ord. Works
65
75
Morgantown Ord. Works
26
21
Ohio River Ord. Plant
3
1
T. V. A.
-
Started
-
Estimated Cost
Planned
May 31, 1941
Estimated Month
Capacity
s Obli-
Initial
Completion
Facility
Location
Monthly
Total
gated
Operation
of Plant
THOUS.-TONS)
(THOUS.)
Smokeless Powder
Radford Ord. Works
Radford, Va.
3.8
$52,500
84
3-41
9-41
Indiana Ord. Works
Charlestown, Ind.
7.8
91,200
90
4-41
12-/1
Alabana Ord. Works
Sylacauga, Ala.
3.8
49,453
5
5-42
4-42
T.N.T. & D.N.T.
Kankakee Ord. Works
Wilmington, Ill.
7.7
47,328
57
5-41
12-/1
Weldon Spring Ord. Wks
Weldon Spring, No.
3.3
39,311
16
10-41
9-41
Plum Brook Ord. Works
Sandusky, Ohio
3.1
33,104
6
11-41
2-42
Toluol
Baytown Ord. Works
Baytown, Texas
2,446*
12,417
63
7-41
9-41
Ammonia
Morgantown Ord. Works
Morgantown, W. Va.
8.1
21,205
74
11-41
5-42
Ohio River Ord. Plant
W. Henderson, Ky.
4.5
14,721
8
-
8-42
T. V. A.
Muscle Shoals, Ala.
4.5
---
-
11-41
3-42$
Ammonium Nitrate
T. V. A.
Muscle Shoals, Ala.
9.0
6,500
-
7-41
3-420
45- Gallons
ø
Full Operation
STATISTICS BRANCH
Ordnance
OUS.V - AR DEPARTMENT
13
6-28-41
NEW FACILITIES - PROGRESS AS OF JUNE 15, 1941
Source of Information: Ordnance Department & Production Branch, OUSW
Construction
Equipment
Percent completed
Percent delivered
Facility
:
o
20
40
60
80
100
:
0
20
40
60
80
100
Hoosier Ord. Plant
13
0
New River Ord. Plant
21
2
Coosa River Ord. Plant
0
Not started
0
Gadsden Ord. Plant
76
53
Elwood Ord. Plant
59
34
Ravenna Ord. Plant
51
15
Kingsbury Ord. Plant
55
10
Iowa Ord. Plant
52
31
Wolf Creek Ord. Plant
35
15
St. Louis Ord. Plant
10
0
Lake City Ord. Plant
34
3
Denver Ord. Plant
43
0
Estimated Cost
Planned
May 31, 1941
Estimated Month
Capacity
: Obli-
Initial
Completion
Facility
Location
Monthly
Total
gated
Operation
of Plant
(THOUSANDS)
(THOUGANDS)
Bag Loading
lloosier Ord. Plant
Charlestown, Ind.
4.1 Tons
$20,382
19
-
9-41
New River Ord. Plant
Pulaski, Va.
2.7 Tons
11,850
36
-
9-41
Coosa River Ord. Plant
Sylacauga, Ala.
2.7 Tons
11,736
-
-
11-41
Shell Mach. & Forging
Gadsden Ord. Plant
Gadsden, Ala.
210
6,231
65
9-41
12-41
Shell Loading
Elwood Ord. Plant
Wilmington, Ill.
3 Lines
34,591
56
7-41
9-41
Ravenna Ord. Plant
Ravenna, Ohio
3 Lines
34,053
66
7-41
9-41
Kingsbury Ord. Plant
LaPorte, Ind.
5 Lines
27,078
45
7-41
11-41
Iowa Ord. Plant
Burlington, Ia.
3 Lines
29,355
44
9-41
9-41
Wolf Creck Ord. Plant
Milan, Tenn.
4 Lines
25,459
39
8-41
12-41
Small Arms Ammunition
St. Louis Ord. Plant
St. Louis, Mo.
80,000 Rds.
39,337
40
8-41
9-410
Lake City Ord. Plant
Lake City, No.
65,000 Rds.
29,942
61
7-41
9-416
Denver Ord. Plant
Denver, Colo.
100,000 Rds.
31,877
48
9-41
9-410
$ Full Operation.
STATISTICS BRANCH
Ordnance
OUSM - MAR D6 ARTMENT
14
6-28-41
NEW FACILITIES - PROGRESS AS OF JUNE 15, 1941
Source of Information: Ordnance Department & Production Branch, OUSW
Facility
Location
Capacity per day
Estimated
Cost
New
T.N.T. & D.N.T.
Volunteer Ord. Wks.
Chattanooga, Tenn.
400,000# T.N.T.;40,000# D.N.T.
$39,000,000
Ammonia
Missouri Ord. Wks.
Louisiana, Mo.
150 Tons
15,750,000
Dixie Ord. Wks.
Monroe, La.
150 Tons
16,750,000
Ammonia Picrate
Maumelle Ord. Wks.
Marche, Ark.
75,000 #
8,000,000
Bag Loading
Wabash River Ord. Plant
Terre Haute, Ind.
120,000 #
14,500,000
Shell Loading
Arkansas Ord. Plant
Jacksonville, Ark.
195,000 Fuzes
33,500,000
Kansas Ord. Plant
Parsons, Kans.
24,000 105mm; 8,400 155mm;
2,800 100# Bombs
35,000,000
Lone Star Ord. Plant
Texarkana, Texas
96,000 20mm; 32,400 105mm;
2,880 100# Bombs
45,500,000
Louisiana Ord. Plant
Minden, La.
96,000 20mm; 8,400 105mm;
2,880 100# Bombs
29,000,000
Small Arms Ammunition
St. Paul Ord. Plant
St. Paul, Minn.
2MM Cal.30; 600M Cal.50
30,000,000
Des Moines Ord. Plant
Des Moines, Ia.
2MM Cal.30; 600M Cal.50
30,000,000
Salt Lake City Ord. Plant
Salt Lake City, Utah
2MM Cal.30; 600M Cal.50
30,000,000
Additions
T.N.T., D.N.T. & Tetryl
Alabama Ord. Wks.
Sylacauga, Ala.
157,000# T.N.T.,D.N.T.,&Tetry1
14,805,000
Plum Brook Ord. Wks.
Sandusky, Ohio
20,297,000
Kankakee Ord. Wks.
Wilmington, Ill.
1100# Lead & Sodium Azide
8,500,000
Weldon Springs Ord. Wks.
Weldon Springs, Mo.
25,410,000
Ammonia
Morgantown Ord. Wks.
Morgantown, W. Va.
162 Tons
24,095,920
Shell Loading
Elwood Ord. Plant
Wilmington, Ill.
15,515,000
Iowa Ord. Plant
Burlington, Ia.
2,500 100# Bombs; 500,000 Per-
cussion Elements
19,580,000
Kingsbury Ord. Plant
La Porte, Ind.
48,000 20mm Shells or Equiv.
18,487,000
Ravenna Ord. Plant
Ravenna, Ohio
9,730,000
Wolf Creek Ord. Plant
Milan, Tenn.
10,760,000
Small Arms Ammunition
St. Louis Ord. Plant
St. Louis, Mo.
3MM Cal.30; 1800M Cal.50
70,850,000
STATISTICS BRANCH
Ordnance
OUSW - WAR DEPARTMENT
15
6-28-41
TEXT SUMMARY - AIRCRAFT PROCUREMENT
Source of Information: Consolidated Statistical Report - Air Corps
GENERAL
There were three important recent awards. The first covered 7 of the C-57
model to be manufactured by Lockheed. The second covered 92 of the C-53 series to be
made by Douglas. An award was likewise made for 246 Lycoming engines, 182 to be installed
in observation units of the 0-49 series and 64 to be assigned as spares. Schedules for
these three contracts will be incorporated in our regular current procurement studies
with the next issue of this report.
AIRPLANE DELIVERIES
The downward trend in deliveries which occurred during May has continued during
the first three quarters of June. During the first three quarters of May 436 units were
accepted and 20 less than this number were delivered during the first three quarters of
June.
The bomber picture improved during the third quarter of this month, however,
with 4 heavy bombers, 12 medium bombers, and 8 light bombers being accepted to make a
total of 24 units. The 4 heavy bombers were from Consolidated.
Boeing has still made no June delivery of heavy bombers. While this company
is receiving its tonnage requirements of aluminum, an excess of some items is being
received, whereas a shortage is prevalent on other needed items.
Only 7 pursuits were accepted during the third quarter of June. This makes
11 so far this month in contrast to 28 during the first three quarters of May, 143 during
the first three quarters of April and 82 during the first three quarters of March. This
sharp decline in pursuit acceptances is due to the fact that Curtiss, which has been the
heavy producer of pursuits during this fiscal year, is not currently scheduled to make
large deliveries. With Curtiss out of the pursuit production picture, it becomes more
evident that Republic and especially Bell and Lockheed, have thus far not made substantial
deliveries of pursuits to the Army.
Lockheed has not only been badly behind contract schedule, but it has also
erred generally on its month-to-month Army estimates. With only 3 June pursuit deliveries
to date, it does not appear likely that Lockheed will meet its June estimate of 23
deliveries.
Bell, as of June 1, was 170 units behind on P-39's on the basis of its original
contractual promises, and its month-to-month manufacturers' estimates have likewise been
far in excess of its actual deliveries. Bell estimated 17 P-39's for June, but during
the first three quarters, has made no deliveries.
Republic has completed its first fiscal year '41 contract for 60 P-35A's,
largely Swedish requisitions, but is badly behind contract schedule on its P-43's, P-43A's
and P-47B's. It made a June estimate of 19 units, but has delivered only 8 during the
first three quarters of the month.
STATISTICS BRANCH
Air Corps
CUSW - WAR DEPARTMENT
16
6-28-41
TABULAR SUMMARY - AIR CORPS CURRENT PROCUREMENT - JUNE 23, 1941
Source of Information: Consolidated Statistical Report - Air Corps
Percent of
Del-
Pending (less awards)
12,000
Current
Under
programs
ivered
F.Y. 1941
10,375
program
Item
programs
contract
under
6/23/41
"B" program
Fifth supp.
modified
(a)
contract
modified
modified
(b)
Airplanes
Heavy bomber
2,246
2,246
100
85
-
-
2,656
Medium bomber
4,616
2,216
48
168
-
2,400
1,200
Light bomber
1,882
1,382
73
143
500
-
-
Pursuit, fighter
709
709
100
25
-
-
1,150
Pursuit, interceptor
4,394
4,394
100
675
-
-
4,850
Observation
533
533
100
59
-
-
-
Transport
1,118
958
86
30
52
108
240
Amphibian
74
74
100
O
-
-
-
Reconnaissance
17
17
100
14
-
-
-
Total Tactical
15,589
12,529
80
1,199
552
2,508
10,096
Primary trainer
5,490
5,490
100
1,651
-
-
450
Basic trainer
5,051
5,051
100
1,008
-
-
900
Adv. trainer, 1-eng.
3,297
2,297
70
589
-
1,000
360
Adv. trainer, 2-eng.
2,632
2,632
100
69
-
-
1,050
Total Trainer
16,470
15,470
94
3,317
-
1,000
2,760
Grand Total
32,059
27,999
87
4,516
552
3,508
12,856
Engines
Heavy bomber
8,988
4,188
47
1,220
-
4,800
10,624
Medium bomber
9,232
4,432
48
791
-
4,800
3,200
Light bomber
3,576
2,576
72
647
1,000
-
-
Pursuit, fighter
1,420
1,394
98
86
26
-
2,300
Pursuit, interceptor
4,394
4,394
100
897
-
-
4,850
Observation
533
391
73
376
142
-
-
Transport
2,358
1,592
68
102
208
558
480
Amphibian
148
148
100
0
-
-
-
Reconnaissance
34
34
100
34
-
-
-
Total Tactical
30,683
19,149
62
4,153
1,376
10,158
21,454
Primary trainer
5,490
5,490
100
2,201
-
-
450
Basic trainer
5,051
3,051
60
1,245
-
2,000
900
Adv. trainer, 1-eng.
3,297
2,297
70
1,120
-
1,000
360
Adv. trainer, 2-eng.
5,264
2,164
41
724
-
3,100
2,100
Total Trainer
19,102
13,002
68
5,290
-
6,100
3,810
Grand Total
49,785
32,151
65
9,443
1,376
16,258
25,264
(a) Project airplane contracts current June 30, 1940, with matching installation engine
contracts - plus F.Y. 1941 programs for project airplanes and installation engines.
(b) Not yet financed - not included in current program column.
STATISTICS BRANCH
Air Corps
OUSW - WAR DEPARTMENT
17
6-28-41
TEXT SUISARY - AIRCRAFT PLANT SHIFTS - MAY 1941
Source of Information: Bureau of Labor Statistics, Labor Department
In order to determine to what extant the various shifts in aircraft plants were
manned, the number of productive workers attached to the soveral shifts was tabulated for
a selected week in May 1941. À marked variation appeared when the over-all picture of both
branches of the industry was compared.
In airframe manufacture, slightly less than twice as many nen were on the first
shift as were on the second, the ratios being 59 percent for the former and 33 percent for
the latter. Only 9 percent were on the third shift. The engine and propeller branch re-
vealed a tendency toward more equal distribution between shifts as evidenced by 48 percent
assigned to the first shift, 30 percent to the second, and 22 percent to the third. A
tabulation of this data follows.
Shifts
Number
PRODUCTIVE EMPLOYEES
in
of
Total
lot Shift
2nd Shift
3rd Shift
Operation
Plants
Number
Percent
Number
Percent
Number
Percent
Number
Percent
Airframes
1-Shift
3 (a)
272
100.0
272
100.0
-
-
-
-
2-Shift
15
35,755
100.0
24,116
67.4
11,639
32.6
-
-
3-Shift
21
93,277
100.0
51,303
55.1
30,555
32.8
11,339
12.1
Total
39
129,304
100.0
75,771
58.6
42,194
32.6
11,339
8.8
Engines and
Propellers
1-Shift
-
-
-
-
-
-
-
-
-
2-Shift
10
2,468
100.0
1,741
70.5
727
29.5
-
-
3-Shift
15
34,705
100.0
16,161
46.6
10,260
29.5
8,284
23.9
Total
25
37,173
100.0
17,902
48.2
10,987
29.5
8,284
22.3
(a) No military contracts.
STATISTICS BRANCH
Air Corps
CUSW - WAR DEPARTMENT
18
6-28-41
PRODUCTIVE AIRCRAFT EMPLOYEES ACCORDING TO SHIFT WORKED - MAY 1941
Source of Information: Bureau of Labor Statistics, Labor Department
PERCENT OF
TOTAL PRODUCTIVE
EMPLOYEES
70
60
50
40
30
20
10
0
First shift
Second shift
Third shift
Airframes
Engines & Propellers
STATISTICS BRANCH
Air Corps
OUSLY - WR DEPARTMENT
19
6-28-41
NEW PRODUCTIVE WORKERS BY STATE - MILITARY AIRPLANE PLANTS - JUNE 1, 1941
Source of Information: Consolidated Statistical Report - Air Corps
No. of plants
Increase in productive
State
expanding
workers since July 1, 1940
California
10
33,828
New York
5
13,78:
Maryland
2
6,657
Kansas
4
4,743
Missouri
1
1,790
Texas
1
1,259
Connecticut
1
1,218
Ohio
2
839
Pennsylvania
1
812
Washington
1
670
Tennessee
1
518
Michigan
1
1390
Oklahoma
1
93
Delaware
1
13
TOTAL INCREASE 66,619
STATISTICS BRANCH
Air Corps
OUSW - WAR DEPARTMENT
20
6-28-41
NEW PRODUCTIVE WORKERS BY STATE - MILITARY AIRPLANE ENGINE PLANTS - JUNE 1, 1941
Source of Information: Consolidated Statistical Report - Air Corps
No. of plants
Increase in productive
State
expanding
workers since July 1, 1940
Connecticut
1
4,885
Indiana
1
4,660
New Jersey
1
3,450
Michigan
4
2,056
Pennsylvania
2
1,055
Ohio
1
784
New York
1
205
California
2
136
TOTAL INCREASE 17,231
STATISTICS BRANCH
Air Corps
OUSW - WAR DEPARTMENT
21
6-28-41
ADDITIONAL DEFENSE AIRCRAFT LABOR REQUIREMENTS BY APRIL 1942
Source of Information: Bureau of Labor Statistics, Labor Department
Semi-skilled
Skilled
Unskilled
Professional
92,240
Central
80,990
States
33,746
17,998
38,281
Eastern
33,612
States
14,005
7,469
36,941
Pacific
32,436
States
13,515
7,208
Mountain
States
None required
Total United States
Note:
Semi-skilled
167,462
Generally skilled and semi-skilled
Skilled
147,038
are productive employees whereas pro-
Unskilled
61,266
fessional and unskilled come in the non-
Professional
32,675
productive classification. Figures
Total
408,441
prepared May 20, 1941, and are subject
to revision.
Air Corps
STATISTICS BRANCH
22
OUSW - WAR DEPARTMENT
6-28-41
TEXT SUMMARY - PROCUREMENT OF CUARTERMSTER ITEMS - June 26, 1941
Source of Information: Statistics Branch, OUMG
GENERAL - As of June 8, 1941, contract awards have been made on 132 of 134
critical and essential quartermaster items. Of the total programs of the 132 items
an average of eighty-nine percent has been contracted and an average of sixty-nine
percent has been procured; the latter figure includes transfers from CCC stocks.
From a fiscal standpoint, 90% has been contracted and 5% transferred from CCC; of the
5% remaining, 42% is on directive. Contracts awarded during the week ended June 14,
1941 amounted to 21 million, of which million were for rail and water transporta-
tion, 6 million for new construction of military posts, and 11 million for clothing
and equipage.
CONTRACTS - Including transfers from CCC stocks, the programs of eighty-two
of the one hundred and thirty-four items have been completely contracted.
DELIVERIES -- During the quarter-monthly period ended June 8, 1941, deliveries
were effected on all but 39 of the 134 items; of these 20 items have been completely
procured; 3 are on schedule, 2 have no current schedule, and 14 are behind schedule.
SCHEDULES and DELINQUENCIES -- Of the 134 basic items, 77 are on or ahead of
schedule; 7 have no current schedule; 50 are behind schedule. Items currently more
than 20% delinquent and also behind May 31 schedules are:
Chest, supply, pack
(84%)
Helmet, fibre, c/cov.
(25%)
Bag, cantle
(67%)
Belt, web, vaist
(24%)
Scabbard, subMG, cal. 45
(42%)
Breeches, wool
(23%)
Can, milk
(39%)
Belt, cart., dismtd.
(21%)
cotton,w & W res.
(27%)
LABOR DIFFICULTIES -- Strikes are currently affocting quartermaster procure-
ment as follows:
Man
Item affected
days
Contractor Name & Address
lost*
Undershirts & drawers
60,800
Standard Knitting Mills, Knoxville, Tenn.
Q.M. Laundry parts
44,400
Wilson Jones Co., Chicago, Illinois
Castings for motor vehicles
7,000
Sivyer Steel Castings Co., Chicago, Ill.
Undershirts & drawers
6,300
Fuld & Hatch Knitting Co., Cohoes, N.Y.
Shirts, cotton
2,100
Southeastern Shirt Co., Lafollette, Tenn.
Iron frames Q.M. construction
980
New Jersey Galvanizing Co., Newark, N.J.
Steel for sub-contractors
900
Ryerson, (Joseph P.), Detroit, Michigan
Cloth, serge
720
Premicr Warsted Co., Bridgeton, R.I.
Pillow, feather
315
Puro Feather & Down Co., Brooklyn, N.Y.
#Based on six working days per week
Quartermaster Corps
STATISTICS BRANCH
23
OUSW - WAR DEPARTMENT
6-28-41
QUARTERMASTER CORPS - STATUS OF Q.M. PROCUREMENT - FISCAL INDEX - JUNE 15, 1941
Source of Information: OCMG - - Statistics Branch, OUSW
This fiscal index of Quartermaster procurement is based on
procurement of twenty-five representative items. It has
been adjusted to cover estimated procurement of revised
programs, and amounts not currently contracted nor scheduled.
PERCENT
100
SCHEDULED
1940
1941
1942
75
DELIVERED
50
25
J A S o N D J F 1. A 1{ J J A S 0 N D J F M
Quartermaster Corps
STATISTICS BRANCH
24
- WAR DEPARTMENT
6-28-41
STATUS OF Q.M. PROCUREMENT - Six major procurement groups based on total programs
of basic types in each group. Combined programs for each group is 100%.
Source of Information: Statistics Branch, OQMG - June 8, 1941
$
Critical - 17 basic types
$
Clothing - 61 basic types
100
100
SCHEDULED
UNITS
SCHEDULED
UNITS
DELIVERED
DELI VERED
DEL IVERED
75
TO
75
TO
DELIVERED
DATE
DATE
30,286,828
238,699,450
50
50
1940
1941
1940
1941
25
25
$ o M D J F M A M J J A
$ 0 N D J F M A M J J A
%
Equipage - 45 basic types
30
General Supplies - 11 basic types
100
100
SCHEDULED
UNITS
SCHEDULED
UNITS
DEL IVERED
DEL IVERED
TO
75
TO
75
DATE
DATE
DEL LIVERED
DELIVERED
106,082,680
131,064
50
50
1940
1941
1940
1941
25
25
$ o N 0 J F M A M J J A
S o N 0 J F M A M J J A
$
Motor Vehicles - 172 basic types
$
Rail & Water Items - 76 basic types
100
100
UNITS
SCHEDULED
UNITS
DEL IVERED
DEL IVERED
75
TO
75
TO
DATE
DATE
SCHEDULED
98,743
552
DELIVERED
50
BELIVERED
50
1940
1941
1940
1941
25
25
$ o N o J F M A M J J A
$ 0 N D J F M A M J J A
Quartermaster Corps
25
STATISTICS BRANCH
CUSW - (WAR DEPARTMENT
6-28-41
TEXT SUMMARY - MOTOR VEHICLE PROCUREMENT - June 15, 1941
Source: Statistics Branch, OOIG
GENERAL -- As of June 15, 1941 contracts have been awarded for 208,593
vehicles of all types, obligating funds to the extent of 290 million
dollars. The combined programs are currently estimated to total 242,087
vehicles being procured by the Q.M.C. for the Supply Arms and Services,
funds for which have been made available by the branch for whom they are
obtained.
NEW CONTRACTS -- Contracts awarded during the past quarter-monthly
period provide for the procurement of 13,462 vehicles at a cost of
$18,396,943. These vehicles consist of:
1500
Ambulances, Field
1400 Trucks, à ton 4x4
22 Trucks, ton 4x4
1
Truck , 12 ton 4x2
50
Trucks,
ton 4x4
79 Trucks, 12 ton 4x2
1350
Trucks,
ton 4x4
2 Trucks, 22 ton 6x6
2000
Trucks,
ton 4x4
897 Trucks, 4-5 ton 4x4
350 Trucks, ton 4x4
160
Trucks, 5-6 ton 4x4
500 Trucks, ton 4x4
251
Trucks, 6-ton 6x6
4900 Trucks, ton 4x4
DELIVERIES -- During the period ended June 15, 1941 deliveries were
reported on 3,858 vehicles of all types. This brings the cumulative
delivery figure to 102,601 or 42 percent of the combined programs.
SCHEDULES and DELINQUENCIES -- Delivery schedules are based on
manufacturers' estimates and are not contractual obligations. On this
basis, 102,727 vehicles were scheduled for delivery by June 15, 1941.
This figure represents 42 percent of the current proposed procurement,
and is the same percentage as that for deliverios. There are, however,
certain delinquent contracts. In genoral, these delinquencies are not
confined to any specific types. Based on estimated schedules, 4,987
vehicles distributed among 14 manufacturers are behind schedule; 4,861
vehicles, however, have been delivered in advance of estimated schedules,
producing a not delinquency of 126 vehicles.
Quartermaster Corps
STATISTICS BRANCH
26
ousr - WAR DEPARTMENT
6-28-41
QUARTERMASTER CORPS - PROCUREMENT OF MOTOR VEHICLES - FISCAL DIAGRAM - JUNE 15, 1941
Source of Information: OQMG - Statistics Branch, OUSW
This diagram is based on average unit costs of nine general types of
motor vehicles. Schedules from July 1941 to March 1942 have been adjust-
ed to cover estimated procurement of vehicles not under current contract;
quantities, types and corresponding values, therefore, are subject to mod-
ification. All schedules used as a basis for computation are manufacturers'
estimates and are not contractual obligations.
(MILLIONS)
320
SCHEDULED
$289,946,762
CONTRACTED
240
1940
1941
1942
160
$123,234,214
DELIVERED
80
J A S 0 N D J F M A M J J A S 0 N D J F M
Quartermaster Corps
STATISTICS BRANCH
21
OUSW - WAP DEPARTMENT
6-28-41
QUARTERMASTER CORP3 - PROCUREMENT OF MOTOR VEHICLES BY TYPES - June 15, 1941
Source of Information: Statistics Branch, OOMG
Motorcycles. Program - 27,892
Passenger Cars. Program - 4,578
DEL.
4,500
SCHEDULED
4,500
3,915
DELIVERED
DEL.
3,897
SCHEDULED
DELIVERED
3,000
3,000
1,500
1,500
JFMAMJJASOND
JFMAMJJASOND
Ambulances. Program - 5,613
Trucks (±3 ton incl.) Program-160,011
SCHEDULED
SCHEDULED
3,000
120,000
DEL
DEL
2,340
71,800
2,000
IVERED
80,000
DEL IVERED
1,000
40,000
J F M A M J J A S o N D
JFMAMJJASOND
Trucks (4-ton & heavier) Program-7,804
Truilers,Semi-Trailers.Program-36,189
SCHEDULED
SCHEDULED
6,000
30,000
4,000
20,000
DELL'
18,150
DEL IVERED
DEL
2,000
2,499
10,000
DELIVERED
J F M A M J J A S 0 N D
J F M A M J J A S o N D
Quartermaster Corps
STATISTICS BRANCH
28
OUSIY - WAR DEPARTMENT
6-28-41
TEXT SUMMARY - STATUS OF QUARTERMASTER CONSTRUCTION - June 7, 1941
Source: Statistics Branch, OQMG - OUSW
Of 350 Q.M. construction projects, with a total estimated cost of $1,467,567,038:
Cost
333 projects are started
$1,437,401,048
(98% of total cost)
78 projects are completed
137,911,243
( 9% of total cost)
24 projects are ahead of schedule
155,644,657
(11% of total cost)
207 projects are on schedule*
1,022,234,857
(70% of total cost)
24 projects are behind schedule
121,610,291
( 8% of total cost)
17 projects are not started
30,165,990
( 2% of total cost)
Of the 24 projects ahead of schedule, with an estimated cost of $155,644,657:
12 are from 5-10% ahead
$50,102,182
(32% of $155,644,657)
5 are from 11-20% ahead
79,842,715
(51% of $155,644,657)
7 are over 20% ahead
25,699,760
(17% of $155,644,657)
Of the 24 projects behind schedule, with an estimated cost of $121,610,291:
15 are from 5-10% behind
$47,455,043
(39% of $121,610,291)
7 are from 11-20% behind
73,521,160
(60% of $121,610,291)
2 are over 20% behind
634,088
( 1% of $121,610,291)
Of the 350 Q.M. construction projects, 216 (62%) provide a troop housing capacity
of 1,325,679 at an estimated cost of $815,161,683 (56% of total estimated Q. M.
construction cost).
Of the 216 projects providing troop housing:
Capacity
215 projects are started
1,324,054
(99% of total)
69 projects are completed
358,854
(27% of total)
17 projects are ahead of schedule
144,786
(11% of total)
119 projects are on schedule*
809,870
(61% of total)
10 projects are behind schedule
10,544
( 1% of total)
Of the 10 projects behind schedule, with a troop capacity of 10,544:
8 are from 5-10% behind
9,542
(90% of 10,544)
1 is from 11-20% behind
962
( 9% of 10,544)
1 is over 20% behind
40
( 1% of 10,544)
*Projects 1 to 4% behind schedule and 1 to 4% ahead of schedule are included in
"on schedule" data, due to difficulty in estimating within these limits.
Quartermaster Corps
STATISTICS BRANCH
29
OUSW - WAR DEPARTMENT
6-28-41
QUARTERMASTER CORPS - STATUS OF CONSTRUCTION - June 7, 1941
Source: Statistics Branch, OQMG - OUSW
STATUS
COST IN
%
MILLIONS
COMPLETED
138
9
AHEAD OF SCHEDULE
156
11
(Includes projects
(from 1 to 4% be-
ON SCHEDULE
(hind schedule and
1022
70
(1 to 4% ahead of
(schedule
BEHIND SCHEDULE
122
8
NOT STARTED
30
2
TOTAL
1468
100
Quartermaster Corps
30
STATISTICS BRANCH
OUSW - WAR DEPARTMENT
6 -28-41
TEXT SUMMARY - PROCUREMENT OF SIGNAL CORPS ITEMS - JUNE 21, 1941
Source of Information: Office of the Chief Signal Officer, Supply Division
Labor Section, OUSW
RADIO COMMUNICATION - TANKS - Tests of commercial PM high frequency radio
equipment for communication between tanks have proved most encouraging. As a
result, a quantity of this equipment was ordered for installation in units of
the First and Second Armored Divisions, pending the development of PM receivers
and trensmitters to meet Signal Corps specifications.
New equipment has been standardized and last week the first production
contract was awarded to Western Electric. This award covered the procurement
of receivers BC-603 ( ) and transmitters BC-604 (), the major components of
radio sets SC.- 508, 528 and 538. This type of equipment gives promise of
filling a long standing need - better radio communication between tanks in
combat.
RADIO PRODUCTION - The delivery of ground radio sets showed no improve-
ment during the past week. The principal obstacle to the delivery of these
sets is the shortage of several minor parts and accessories required to as-
semble complete units. These shortages were, to a great extent, due to the
inability of contractors to obtain sufficient aluminum and brass. It is an-
ticipated that the corrective action being taken will soon produce improve-
ment in this situation.
While the production of aircraft warning devices remains appreciably be-
hing scheduled deliveries, 15 sets of this type were delivered last week as
compared with only 9 sets in the preceding week.
The delivery of aircraft radio equipment continues to make a much better
showing than that of ground sets. A total of 205 command radios was delivered
last week. Five of these sets were the new high frequency command set SCR-274,
which is to replace command sets SCR-183 and SCR-240.
NEW CONTRACTS - New contract awards placed last week included the follow-
ing items:-
9447 Head and Chest HS-19
969 Radio Set SCR-50B
4545 Radio Compass SCR-269
3506 Radio Set SCR-528
4463 Radio Set, Command SCII-274
2431 Radio Set SCR-538
DELINQUENCIES - Deliveries made during the past week failed to eliminate
any critical Items from the delinquency list and thirty-three items of a total
of fifty-five items upon which deliveries are due renain behind schedule.
LABOR DIFFICULTIES - Strikes at the plant of Karp Metal Products Co.,
Brooklyn, N.Y., and liew Jersey Calvanizing Co., Howark, N.J. are still in
progress. No new strikes were reported last week although strikes are threat-
ened at American Srass Co. and Breeze Corporation. The latter concern holds
important contracts for the Air Corps and Signal Corps.
STATISTICS BRANCH
Signal Corps
OUSW - WAR DEPARTMENT
31
6-28-41
STATUS OF SIGNAL CORPS PROCUREMENT - selected-Critical ITEMS - JUNE 21, 1941
Source of Information: Office of the Chief Signal Officer, Supply Division
Not
Delivered Contracted Contracted
F.Y. 1941
program
Percent of Program
RADIO COMMUNICATION - GROUND
0
20
40
60
80
100
Head & chest set HS-19
31,845
Charging set SCR-169
1,395
Test Set
4,843
Frequency meter set SCR-211
3,874
Radio set
38,514
Loudspeaker LS-3
2,900
MISCELLANEOUS EQUIPMENT
Wire W-110-B (miles)
113,180 b/
Telephone EE-8
63,806
Telegraph set TG-5
4,427
Reel unit RL-26-A
5,055
Signal lamp equipment EE-84
501
Sound ranging set GR-3-C
35
Interphones (vehicular)
3,492
Includes 723 for Telegraph Set TG-5
Includes 8,000 miles for Marine Corps
Includes 5,068 for component parts of other critical items
All figures are cumulative
STATISTICS BRANCH
Signal Corps
OUSW - WAR DEPARTMENT
32
6-28-41
STATUS OF SIGNAL CORPS PROCUREMENT - SELECTED-CRITICAL ITEMS - JUNE 21, 1941
Source of Information: Office of the Chief Signal Officer, Supply Mivision
Not
F.Y. 1941
Delivered
Contracted
Contracted
program
AIRCRAFT COMMUNICATION
Percent of Program
0
20
40
60
80
100
Microphone amplifying equip-
ment RC-19
3,000
Headset 11S-23
40,000
Microphone T-20
4,500
Filter equipment RC-32
36,848
Interphone equipment
23,242
Microphone T-30
64,560
Radio sets
36,256*
Marker beacon receiving
equipment
9,346
Frequency meter set SCR-211
1,707
Radio compass
9,004
# Includes 526 SCR-183 for Navy
All figures are cumulative
STATISTICS BRANCH
Signal Corps
OUSW - WAR DEPARTMENT
33
6-28-41
SIGNAL CORPS PROCUREMENT - - SELECTED ITEMS, GROUND - STATUS AS OF JUNE 21, 1941
Source of Information: Supply Division, Office of the Chief Signal Officer
Radio Set
Field Wire
Program F.Y. 1940 & 1941 - 40,380
Program F.Y. 1940 & 1941 - 225,410(miles)
750
6000
21,000
500
180,000
4000
250
2000
A
M
J
A
M
J
14,000
120,000
DEL.
SCHEDULED
108,453
SCHEDULED
7,000
60,000
DEL.
4736
1940
1941
1942
1940
1941
1942
Telephone EE-8
Reel Unit
Program F.Y. 1940 & 1941 - 109,951
Program F.Y. 1940 & 1941 - 51,240
3750
900
150,000
2500
18,000
600
1250
300
SCHEDULED
A
M
J
A
M
J
100,000
12,000
DEL.
80,276
DEL
10,039
SCHEDULED
50,000
6,000
1940
1941
1942
1940
1941
1942
Signal Corps
STATISTICS BRANCH
34
OUSW - WAR DEPARTMENT
6-28-41
SIGNAL CORPS PROCUREMENT - SELECTED ITEMS, GROUND - STATUS AS OF JUNE 21, 1941
Source of Information: Supply Division, Office of the Chief Signal Officer
Interphones (Vehicular)
Test Set
Program F.Y. 1940 & 1941 -3,492
Program F.Y. 1940 & 1941 - 5,061
300
3,000
4,500
200
100
A
M
J
2,000
3,000
SCHEDULED
SCHEDULED
DEL.
2681
1,000
1,500
DEL.
0
1940
1941
1942
1940
1941
1942
Telegraph Set TG-5
Charging Set SCR-169
Program F.Y. 1940 & 1941 - 4,427
Program F.Y. 1940 & 1941 - 1,395
300
300
4,500
200
1,500
200
100
100
SCHEDULED
A
M
J
A
M
J
3,000
1,000
DEL.
DEL.
2288
898
/SCHEQULED
1,500
500
1940
1941
1942
1940
1941
1942
Signal Corps
STATISTICS BRANCH
OUSW . WAR DEPARTMENT
35
6-28-41
SIGNAL CORPS PROCUREMENT - AIRCRAFT SIGNAL EQUIPMENT - June 21, 1941
Source of Information: Supply Division, Office of the Chief Signal Officer
Radio Aircraft, Command
Radio Aircraft, Liaison
Program F. Y. 1940 & 1941 - 30,252
Program F.Y. 1940 & 1941 - 9,230
300
75
8,000
200
4,500
50
100
25
A
M
J
A
M
J
2,000
3,000
DEL.
SCHEDULED
SCHEDULED
0,578
JEL,
6,000
1,500
1,118
1940
1941
1942
1940
1941
1942
Radio Compass
Interphone Equipment - Aircraft
Program F.Y. 1940 & 1941 - 10,068
Program F.Y. 1940 & 1941 - 25,370
45
1,80
4,500
30
15,000
4,20
15
60
A
M
J
A
M
J
3,000
10,000
DEL.
8,161
SCHEDULED
SCHEDULED
DEL,
1,500
5,000
1,233
1940
1941
1942
1940
1941
1942
Signal Corps
STATISTICS BRANCH
36
OUSW - AR DEPARTMENT
6-28-41
SIGNAL CORPS PROCUREMENT - AIRCRAFT SIGNAL EQUIPMENT - JUNE 21-1941 (PAGE II)
Source of Information: Supply Division, Office of the Chief Signal Officer
Marker Beacon Receiving Equipment
Filter Equipment RC-32
Program F.Y. 1940 & 1941 - 11,196
Program F.Y. 1940 & 1941 - 42,348
240
6,000
NONE
DEL 1VERED
24,000
160
80
DEL.
SCHEDULED
16,800
A M J
A
M
J
16,000
4,000
DEL.
SCHEDULED
2,200
2,000
8,000
1940
1941
1942
1940
1941
1942
Frequency Meter Set SCR-211
Aircraft Microphones T-20 & T-30
Program F.Y. 1940 & 1941 - 7,459
Program F.Y. 1940 & 1941 - 71,370
4000
75
3000
6,000
50
30,000
2000
25
1000
SCHEDULED
SCHEDULED
A
M
J
A
M
J
4,000
20,000
DEL.
2,640
DEL.
15,031
2,000
10,000
1940
1941
1942
1940
1941
1942
Signal Corps
STATISTICS BRANCH
37
OUSW - WAR DEPARTMENT
6-28-41
TEXT SUMMARY - CORPS OF ENGINEERS - PROCUREMENT PROGRESS THROUGH JUNE 14, 1941
Source of Information: Supply Section, Office of the Chief of Engineers
GENERAL
The procurement program of the Corps of Engineers has not
been very active so far this month. For the week ended June 14
deliveries were due on only 12 items and were received on only
8. The reason for the number of active items being so low is
that the program is at a point of transition where old contracts
have been completed and new ones let from funds provided by the
Fifth Supplemental Appropriation Act are not scheduled to start
delivery until the latter part of June or until July. The items
for which deliveries were scheduled for the week did not do so
well in that only 2 equaled the scheduled rate.
BEHIND SCHEDULE
There are 11 items behind schedule. The items and the percentages
are:
Trailer for 60" searchlight
99
Stereoscope, mag., mirror
49
Searchlight, 18" beach
32
Hammer, gas operated
30
Trailer for triangulation tower
30
Ponton bridge, 10-ton
20
Searchlight, 60" antiaircraft
12
Compressor, air, motorized
12
Bridge, steel portable, H-20
10
Electric lighting equip., 3 kva
7
Shovel, gasoline, 1/2-yard
4
TRAILER FOR 60" SEARCHLIGHT
This important component of the 60" searchlight has recently been
added to our list of items requiring attention. The low steel
priority of the trailer made it impossible for the manufacturer
to produce the item. The first unit after the pilot model was
received during the past week and it is expected that deliveries
will continue. A higher steel priority has been secured for the
item.
STEREOSCOPE, MAGNIFYING, MIRROR
Deliveries exceed the 25 scheduled but the item is still almost
50 percent behind schedule.
STATISTICS BRANCH
Corps of Engineers
OUSW - WAR DEPARTMENT
38
6-28-41
TEXT SUMMARY - CORPS OF ENGINEERS (Continued)
SEARCHLIGHT, 18" BEACH DEFENSE
The manufacturer has been unable to produce the finished light
because of defective mirrors although his lights are ready for
the mirror. The item is well behind schedule (32 percent) even
though the Engineers have postponed schedules until the mirror
situation is straightened out.
SEARCHLIGHT, 60" ANTIAIRCRAFT
Deliveries slipped behind schedule for the first time since March.
General Electric exceeded its schedule but Sperry delivered only
5 against a schedule of 28. The situation is shown on the diagram
on a following page.
HAMMER, GAS OPERATED
No deliveries were recorded for the past week although 10 were
scheduled. The item is 30 percent behind schedule.
STATISTICS BRANCH
Corps of Engineers
OUSW - JWAR DEPARTMENT
39
6-28-41
CORPS OF ENGINEERS - PROCUREMENT PROGRESS - JUNE 23, 1941
Source of Information: Supply Section, Office of the Chief of Engineers
Scheduled Completion Dates
Program plus
Percentages
on hand
Item
Angledozer, tractor
100
656
Boat, assault
100
3,964
Mapping equip., Hqs.
100
9
Grader, road, mtzd.
97 100
102
Trailer, ned. tractor
45 77 100
609
Shovel, gas, 3/8 yd.
68
84
95
100
94
Searchlight, 13"
13
13
24
70
81 100
182
Hammer, gas operated
23
33
51
70
89
100
1,069
Ponton equip., 10-ton
27
45
67
82
98
100
93
Mixer, concrete
81
81
81
81
81
90
100
111
Welding set
74
74
74
74
74
87
100
195
Electric equip., 3 kva
o
0
18
40
67
82
100
571
Bridge, 11-10
43
57
71
81
88
%
100
96
Water puri. unit, mtzd.
41
48
76
83
89
96
100
46
Water puri. unit, port.
58
68
GB
68
80
80
91
100
378
Shovel, gas, 1/2 yd.
25
35
51
66
72
82
97
100
65
Duplicating Equip.
0
o
0
26
70
70
70
100
229
Compressor, air, mtzd.
167
57
65
73
31
BE
96
100
975
lens
o
12
12
13
27
Al
55
70
80
89
100
161
Sourchlight, 60" AA
27
32
30
dala
51
58
64
69
75
ni
87
88
2,815
J
F
1:
A
N
J
J
A
S
o
::
D
1941
STATISTICS BRANCH
Corps of Engineers
OUSIV - AR DEPARTMENT
40
6-28-41
DIAGRAM - CORPS OF ENGINEERS - PROCUREMENT PROGRESS THROUGH JUNE 14,1941
Source of Information: Supply Section, Office of the Chief of Engineers
60" ANTIAIRCRAFT SEARCHLIGHTS
40
Sperry Corporation
30
20
10
60
General Electric Co.
50
40
30
20
10
100
Total
90
80
70
60
50
40
30
20
10
APR
APR
APR
APR
MAY
MAY
MAY
MAY
JUN
JUN
JUN
JUN
8
15
23
30
8
15
23
31
8
14
23
30
Scheduled
Delivered
STATISTICS BRANCH
Corps of Engineers
CUSW - WAR DEPARTMENT
41
6-28-41
TEXT SUMMARY - MEDICAL DEPARTMENT - FOR WEEK ENDED JUNE 28, 1941
Source of Information: Finance & Supply Div. - Office of Surgeon General
Progress Report as of June 15, 1941, shows that Mm. Langbein
and Bros. completed delivery of 2,220 Towel Forceps on schedule. On another
order for six thousand two hundred Surgical Knives, in two sizes, deliveries
were completed two and two and one-half months ahead of schedule. The J. Sklar
Manufacturing Co., not yet entirely recovered from a six weeks strike, com-
pleted delivery on a contract for three thousand Hysterectomy Forceps and five
hundred Kidney Forceps on schedule. While surgical instruments as a group are
lagging, the outlook is slowly improving.
The only existing strike directly affecting the Medical Depart-
ment is that against the Shampaine Company, St. Louis, Missouri. This company
has a contract for Operating Tables. The strike at the American Potash and
Chemical Company, Trona, California, which has an indirect effect on Labora-
tory and Optical Glass, is still unsettled.
The Vim. Ball Corporation, Newark, New Jersey, completed deliv-
ery of three thousand Plain Medical Field Chests according to Progress Report
of June 15, 1941. The delivery was only fifteen days behind schedule.
Local boards for the Selective Service are still making inroads
into the skilled workers required by Medical Department facilities. The most
recent case reported is that of a surgical instrument worker in the employ of
the J. Sklar Manufacturing Co., who has been in training since December 1, 1939,
and is now considered a skilled mechanic.
According to a summary of Weekly Vital Statistical Report
No. 24, June 19, 1941, published in the Office of the Surgeon General, U. S.
Army, the percentage of sick for the Military Service in the United States
was 3.08. This percentage shows 2.73 remaining in hospitals and .35 in
quarters.
STATISTICS BRANCH
Medical Department
OUSW - WAR DEPARTMENT
6-28-41
42
MEDICAL DEPARTMENT - PROCUREMENT STATUS OF CRITICAL AND SELECTED ITEMS - JUNE 14, 1941
Source of Information: Medical Department Procurement Progress Reports
NUMBER OF CRITICAL ITEMS AND PERCENT CONTRACTED
Percent
contracted
Number of Items
100
13
18
75-99
21
50-74
25-49
8
1-24
0
0
1
NUMBER OF SELECTED ITEMS AND PERCENT CONTRACTED
Percent
contracted
Number of Items
100
21
75-99
5
50-74
24
25-49
19
1-24
2
o
o
STATISTICS BRANCH
Medical Department
OUSW - WAR DEPARTMENT
43
6-28-41
MEDICAL DEPARTMENT - DELIVERY STATUS OF CRITICAL AND SELECTED ITEMS - JUNE 14, 1941
Source of Information: Medical Department Procurement Progress Reports
NUMBER OF ITEMS BEHIND, ON, AND AHEAD OF SCHEDULE
CRITICAL ITEMS
SELECTED ITEMS
40
27
20
16
15
13
Behind
On
Ahead of
Behind
On
Ahead of
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
STATISTICS BRANCH
Medical Department
OUSIV - WAR DEPARTMENT
44
6-28-41
MEDICAL DEPARTMENT - CRITICAL ITEMS BEHIND SCHEDULE - JUNE 14, 1941
Source of Information: Medical Department Procurement Progress Reports
Delivered
Due
Contracted
Con-
Percent of contract
Item
tracted
0
20
40
60
80
100
Kit pouch, canvas
68,000
Sterilizer, hospital, dressing
58
Scissors, point sharp, 43"
7,600
Forceps, hemo., Kocher, str., 5½"
1,061
Sterilizer, hosp., instrument
122
Kit suspender
62,000
Scissors, one point sharp, 5½"
10,400
Forceps, intest., Doyen, curved
5,000
Scissors, double blunt, 52"
7,600
Retractor, tissue, nested
5,400
Forceps, intest., Doyen, str.
6,050
Sterilizer, hospital, utensil
2,567
Scissors, suture
1,000
Packet, first aid
3,200,000
Scissors, nasal, angular
2,850
Forceps, tissue, Allis
40,000
XXX
Forceps, kidney, curved
7,600
ser
X-Ray machine, radiographic
292
XXI
Sterilizer, hospital, complete
807
Forceps, bone-cut., heavy, str.
1,850
ou
Retractor, abdom., self-retaining
5,200
<
Scissors, iris, angular
2,900
X-Ray, field, mobile unit
282
SI
Forceps, sponge
84,000
Forceps, bone, rongeur, 7"
2,000
Chest, field, plain
11,500
el
Splint, Army, leg, half-ring
17,000
:
STATISTICS BRANCH
Medical Department
CUSW - WAR DEPARTMENT
6-28-41
45
MEDICAL DEPARTMENT - SELECTED ITEMS DEHIND SCHEDULE - JUNE 14, 1941
Source of Information: Medical Department Procurement Progress Reports
Delivered
Due
Contracted
X
Con-
Percent of contract
Item
tracted
o
20
40
60
80
100
Iodine swab, 1 1/2 CC.
250,000
Bed, adjustable
21,927
Litter, aluminum pole
23,000
Basic instrument set case, empty
3,200
Bandage, gauze, compressed, 3"
80,150
Pajama coat, summer
929,953
Pajama trousers, summer
929,953
Quinine sulfate, 5 gr. tab.
80,000
Ether (for anesthesia)
651,496
OR
Cotton, absorbent, roll
742,000
2
Bed, folding
25,000
or
Mattress, inner spring
24,980
Bandage, gauze, roller, 2"
550,000
(
Sheet
1,765,460
X
Gauze, plain, 100 yards
235,000
Robe, bath
330,816
STATISTICS BRANCH
Medical Department
OUSW - WAR DEPARTMENT
46
6-28-41
TEXT SUMMARY - CHEMICAL WARFARE SERVICE - STATUS JUNE 20, 1941
Source of Information: Chemical Warfare Service Weekly Reports
The diagrams included in this report represent the total program for the fiscal
years 1940 and 1941 including the figures on the Fifth Supplemental National Defense
Appropriation.
An analysis of the weekly Chemical Warfare reports reveals a downward trend in
production and deliveries of critical Chemical Warfare materiel, partly due to the
completion of certain contracts.
The 1941 contracts covering 1,210,797 Service Gas Masks were completed this week.
Firestone Tire and Rubber Co., 403,599; Johnson & Johnson Co., 403,599; and The
Goodyear Tire and Rubber Company, 403,599.
GAS MASK DELIVERIES
Percentage Increase
Type
This Week
Last Week
or Decrease
Service Masks
28,794
34,236
- 16
Diaphragm Masks
25,592
66,320
- 61
Optical Masks
11,780
None
Training Masks
39,060
53,121
- 26
The gas mask canister situation is rather grave due to a definite shortage of
whetlerite. This compound is an impregnated charcoal utilized in the canister for the
absorption of toxic gases. Most of the charcoal is obtained from imported coconut
shells and because of the lack of ship bottoms it is difficult to obtain the necessary
supply of this basic raw material. However, there are 4 plants under construction for
the manufacture of charcoal from substances other than coconut shell and these facili-
ties are expected to be in operation some time in the latter part of August 1941 pro-
vided the Chemical Warfare Service can get a priority rating of "A-1-b" on the neces-
sary equipment for those plants.
The aluminum situation has now cleared and the Chemical Warfare Service is receiv-
ing its allotted share, thus the production of gas mask parts from this element is
progressing satisfactorily.
There is still a definite shortage of white phosphorus but the first shipments are
expected to arrive at Edgewood Arsenal during the coming week. It is reported that
additional contracts have been let for phosphorus amounting to approximately 5,000
tons.
Extra Gas Mask Canisters:--There were no deliveries of Extra Gas Mask Canisters
reported during the week because of the shortage of whetlerite. All canisters pro-
duced are being used in the assembly of the Diaphragm and Service Gas Masks.
Mustard Gas:-The production of Mustard Gas reported this week amounted to 90 tons
while the previous week's production was 81 tons.
Imprognite "I":--The production of Impregnite "I" amounted to 11.3 tons of which
8.2 tons were delivered and 3.1 tons are in the process of being inspected.
STATISTICS BRANCH
Chemical Warfare Service
OUSIV - WAR DEPARTMENT
47
6-28-41
PERCENTAGE PROGRESS OF DELIVERIES OF MAJOR
CHEMICAL WARFARE ITEMS FOR FISCAL YEARS 1940-41
Source of Information: Chemical Warfare Service
June 20, 1941
TOTAL PROGRAM
0%
10
20
30
40
50
60
70
80
90
100
72%
MABKS, GAS, SERVICE
775
MASKS, GAS, DIAPHRAGM
45%
MASKS, GAS, OPTICAL
91%
MASKS, GAS, TRAINING
MASKS, GAB, HORSE
24%
CANISTERS, SERVICE
18%
CANISTERS, DIAPHRAGM
40%
CANISTERS, OPTICAL
1002
IRRITANT GAS (TONS)
100%
SCREENING SMOKE, FS (TONS)
876
MUSTARD GAS (TONS)
19%
IRRITANT CANDLES, D.M.
WHITE PHOSPHORUS (TONS)
376
SMOKE POTS
21%
GAS IDENTIFICATION SETS
(DETONATION)
1006
CAPSULES, C.N.
o
0
DELIVERED
//////
UNDER CONTRACT
NOT UNDER CONTRACT
STATISTICS BRANCH
Chemical Warfare Service
OUSW - WAR DEPARTMENT
6-28-41
48
PERCENTAGE PROGRESS OF DELIVERIES OF MAJOR
CHEMICAL WARFARE ITEMS FOR FISCAL YEARS 1940-41
Source of Information: Chemical Warfare Service
June 20, 1941
TOTAL PROGRAM
0%
10
20
30
40
50
60
7.0
80
90
100
16%
PORTABLE CYLINDERS
100%
LAND MINES, CHEMICAL
93%
///
CONTAINERS, STEEL, I TON
6%
31%
SHELLS, C.M.
SHELLS, L.P.
18%
IMPREGNITE I (TONS)
1%
IMPREGNITE 8 (TONS)
100%
ALARMS, GAS
34%
OINTMENT, PROTECTIVE
99%
/
ANTI-DIM, SETS
34%
REGIMENTAL GAS MASK
REPAIR KITS, SERVICE
100%
DECONTAMINATING EQUIP.
(3 GAL)
100%
DECONTAMINATING EQUIP.
(12 QT)
20%
AIRPLANE CHEMICAL
SPRAY TANKS
50%
DUST RESPIRATORS
FIELD LABORATORIES
DELIVERED
/////
UNDER CONTRACT
NOT UNDER CONTRACT
STATISTICS BRANCH
Chemical Warfare Service
OUSW - WAR DEPARTMENT
6-28-41
49
GAS MASKS
Status of 2,800,000 Man Program as of May 31, 1941
GAS MASKS,
GAS MASKS,
GAS MASKS,
SERVICE
DIAPHRAGM
OPTICAL
(Complete)
(Complete)
(Complete)
Program
1. Total requirements for 2,800,000 man army
3,201,175
1,241,972
66,451
2.
Deferments
304,528
131,873
0
3. Total financed requirements (1-2)
2,896,647
1,110,099
116,623
4. On hand, June 30, 1940
494,074
0
0
5. On order or to be ordered under financed
program, June 30, 1940 (3-4)
2,402,573
1,110,099
116,623
Contracts
6. On order, June 30, 1940
478,671
389,425
38,943
7. Contracts awarded since June 30, 1940
1,923,902
720,744
77,680
8. To be contracted for from available
funds (5 minus sum of 6 and 7)
0
0
o
9. Contracts awarded during this month
0
0
0
10. On order, end of this month
805,511
397,200
75,840
11. Average unit cost, current procurement
program (approximate)
7.70
11.00
11.00
Inventory
12. On hand, end of preceding month
1,643,403
437,504
38,943
13. Receipts during this month
247,733
275,395
1,840
14. Losses during this month
0
0
0
15. On hand, end of this month
1,891,136
712,899
40,783
16. On hand, suitable for purpose
indicated, end of this month
1,891,136
712,899
40,783
Chemical Warfare Service
STATISTICS BRANCH
50
OUSN - WAR DEPARTMENT
6-28-41
TEXT SUMMARY - COAST ARTILLERY CORPS - PROCUREMENT PROGRESS THROUGH JUNE 23, 1941
Source of Information: Office, Chief of Coast Artillery
CONTROL PANELS, M-3
The procurement of the control panels for the mine field groups
is progressing ahead of schedule. On June 23 there were 73
scheduled and 100 delivered. Deliveries now are 28 more than
the schedule and 72 percent of the total program of 138.
The diagram on the following page shows the distribution by
locations and the scheduled dates of completion.
SUBMARINE MINE CABLE - BEHIND SCHEDULE
This item is being procured for the Coast Artillery by the Signal
Corps. During the past week 160,000 feet were delivered. Deliv-
eries to date are 3,015,300 feet, or 83 percent of the program.
TABULAR SUMMARY - COAST ARTILLERY CORPS - PROCUREMENT PROGRESS THROUGH JUNE 23, 1941
Source of Information: Office, Chief of Coast Artillery
Current program
Deliveries
Percent of program
Item
Appro-
Con-
Sched-
Actual
Con-
De-
priated
tracted
uled
June 23
tracted
livered
Group control panels, M-3
138
138
73
100
100
72
STATISTICS BRANCH
Coast Artillery Corps
OUSIV - WAR DEPARTMENT
51
6-28-41
SUMMARY - COAST ARTILLERY CORPS - PROCUREMENT THROUGH JUNE 23, 1941
Source of Information: Office of the Chief of Coast Artillery
Group control panels, M-3
Program: 138
1940
1941
100
DEL
VERED
50
SCHEDULED
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Delivery schedule
1940
1941
Harbor defense of:
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Boston
5#
4#
Sandy Hook
23#
Columbia River
7#
Southern New York
4
Portsmouth
6#
Chesspeake Bay
28#
Narragansett Bay
12#
Portland
10#
Delaware Bay
25
San Francisco Bay
14
Total scheduled
5
11
11
11
34
34
34
62
73
73
85
99
99
99
124
138
Actual deliveries
5
11
11
11
34
47
47
69
85
# delivered
* 5 of 25 delivered
STATISTICS BRANCH
Coast Artillery Corps
OUSW - WAR DEPARTMENT
52