Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
16619673
label
Bureau of the Budget- Progress reports on the National Defense Program, August 31, 1943
core
doc
dtoType
document
pageCount
1
Source metadata
Source extras
naId
16619673
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
a177c850583a401d
ocrText
Report 35 NATIONAL WAR PROGRAM MONTHLY PROGRESS REPORT August 31, 1943 Prepared by Bureau of the Budget Executive Office of the President DECLASSIFIED a E.O. 11652, Sec. 3(E) and 5(D) and (E) OMBletter, 11-27-172 By SLR NARS Date JAN. 2 2 1973 EXECUTIVE OFFICE OF THE PRESIDENT BUREAU OF THE BUDGET WASHINGTON, A O.C. file Sept. 17, 1943. FOR THE PERSONAL ATTENTION OF THE PRESIDENT. H.D.S. Report 35 NATIONAL WAR PROGRAM MONTHLY PROGRESS REPORT August 31, 1943 Prepared by Bureau of the Budget Executive Office of the President DECLASSIFIED E.O. 11652, Sec. 3(E) and 5(D) and (E) OMB letter, 11-27-72 By SLR NARS Date JAN % % 1973 CONTENTS Page I. Summary 1 II. Aeronautical Program 2 III. Army 7 IV. Navy 11 V. Merchant Shipping 17 VI. Review of Production in Selected War Industries 18 VII. War Industrial Facilities 21 VIII. Stockpile and Public Purchases of Basic War Commodities 23 IX. Agriculture and War Food Administration 24 X. Economic Stabilization Program 27 XI. War Finances 28 XII. Manpower 29 XIII. Administrative Developments 32 XIV. Charts 35 I. SUMMARY Aircraft Production: 67.7 million pounds of military airframes were accepted in August-an increase of 6 percent over July. The number of aircraft acceptances in August totaled 7,612--an increase of 239 planes over July. Four-engine bomber acceptances increased to 935. (Page 2; and charts 1, 2) Army Air Forces: First-line airplanes on hand totaled 49,947 on August 1; of these, 26,602 were tactical. Active duty personnel of the Army Air Forces totaled 2,239,000; 65,000 were pilots. (Pages 3, 4) Navy Aeronautical Program: The Navy had 19,466 airplanes on hand on August 23; of these 10,810 were combat. Navy and Marine Corps military aeronautical personnel totaled 218,000 on August 1; 28,000 were pilots. (Pages 5, 6) Active Military Strengths: Total All Classes Date Army 7,198,000 Sept. 1 Navy, Marine Corps, and Coast Guard 2,463,000 Aug. 15 The Army reported 1,816,000 overseas on September 1. (Pages 10, 16; and charts 3, 4) Selected Ordnance Production June July Jan.-July Torpedo, submarine 693 691 4,046 Medium tank 2,026 2,165 14,313 Gun, 90mm antiaircraft 415 362 3,210 Gun, 155mm (field) 43 55 316 (Pages 7, 15) Navy Ship Construction: 249 combatant vessels have been completed in 1943 through August 20: 2 battleships, 10 aircraft carriers, 21 aircraft car- rier escorts, 2 heavy cruisers, 3 light cruisers, 81 destroyers, 99 des- troyer escorts, and 31 submarines. (Pages 11, 12; and charts 5-9) Merchant Shipping: From August 1st through the 29th, 206,000 dwt. of United Nations' merchant vessels were reported lost, while gains from new construction increased 1,535,000 dwt. (Page 17, and chart 10) 2 II. AERONAUTICAL PROGRAM August Aircraft Production Preliminary reports indicate that 67.7 million pounds of airframes (spares included, gliders excluded) were accepted in August, bringing the total for the first eight months of the year to 428.6 million pounds. This is 12 percent below the 487.5 million pounds scheduled. The weight increased 6 percent over July. Military aircraft accepted in August totaled 7,612. This was 89 per- cent of the working schedule of the J.A.C. and represented an increase of 239 planes over the July total. 935 four-engine bombers were accepted. Aircraft Acceptances for 1943 Thru August July Jan.- Scheduled Aug. August Sept.-Dec. Bomber, 4-engine 830 935 5,236 4,861 Bomber, 2-engine 816 905 6,674 4,806 Bomber, 1-engine 806 842 5,448 5,439 Fighter 2,082 2,309 13,278 12,535 Reconnaissance 26 20 317 332 Total combat 4,560 5,011 30,953 27,973 Transport, 4-engine 17 17 117 114 Transport, 2- & 1-eng. 622 614 4,414 3,349 Total tactical 5,199 5,642 35,488 31,436 Trainers 1,726 1,562 13,892 6,533 Liaison 399 362 2,648 1,645 Rotary wing 2 4 6 18 Special purpose 47 42 324 517 Grand total 7,373 7,612 52,358 40,149 The "pool" of accepted but undelivered aircraft increased 16 percent during August to 1,852 (78 percent tactical) on August 31. 3 Army Air Forces A. Airplanes. On August 1, the Army Air Forces had on hand 49,947 first-line airplanes, an increase of 2,817 or 6 percent during the month. of the total, 26,602 were tactical types, including 4,833 four-engine bombers. Airplanes of the Army Air Forces on Hand July 1, August 1, and July Increase Type July 1 Aug. 1 Increase Tactical Combat: Bomber, heavy 4,327 4,833 506 Bomber, medium 3,450 3,633 183 Bomber, light 1,275 1,385 110 Fighter 7,425 8,188 763 Total combat 16,477 18,039 1,562 Service Combat: Transport: Heavy 304 350 46 Medium 1,977 2,065 88 Light - - -- Utility 1,956 2,202 246 Special purpose 3,567 3,946 379 Total tactical 24,281 26,602 2,321 Trainers 22,849 23,345 496 Grand total 47,130 49,947 2,817 A.A.F. Airplane Inventories, Jan. 1 and Aug. 1, 1943 Bomber Trans- Heavy Medium Light Fighter Other Total port Aug. 1, 1943 4,833 3,633 1,385 8,188 4,617 27,291 49,947 Jan. 1, 1943 1,996 1,628 641 4,453 1,297 20,321 30,336 Increase 2,837 2,005 744 3,735 3,320 6,970 19,611 4 B. Personnel of the Army Air Forces. The active duty strength of the Army Air Forces, including personnel assigned from other services, totaled 2,238,802 on August 1 - an increase of 41,688 during July and 91 percent of the requirements for the 273-group program by December 31, 1944. Active Duty Strength of the Army Air Forces August 1, 1943 Minimum Requirements Type of Personnel Officers Enlisted Total for 273 Groups by Dec. 1944 Pilots 63,713 1,163 64,876 118,736 Aviation cadets 107,164 - 107,164 84,382 Bombardiers 11,635 552 12,187 18,231 Navigators 8,450 - 8,450 23,380 Observers 403 - 403 887 Engineers 5,285 - 5,285 5,926 Mechanics -- 213,107 213,107 289,244 Armorers 2,253 57,022 59,275 85,473 Meteorologists 1,307 - 1,307 4,762 Communications 3,820 - 3,820 6,265 Photographic 1,336 - 1,336 1,016 Radar - 49,022 49,022 76,040 Other, Army Air Corps 67,640 1,070,453 1,138,093 1,046,462 Total, Army Air Corps 273,006 1,391,319 1,664,325 1,760,804 Assigned from other branches 51,319 523,158 574,477 706,157 Total, Army Air Forces 324,325 1,914,477 2,238,802 2,466,961 C. Flying Training. During July, 5,232 pilots completed advanced training, as compared with 5,628 in June. & total of 70,329 pilots have completed advanced training since the beginning of the war emergency. 5 Bureau of Aeronautics A. Airplanes. On August 23, the Navy reported a total of 19,466 airplanes on hand. Of these, 10,810 were tactical combat types - an increase of 993 tactical combat types since July 26. Navy Airplanes on Hand - July 26, Aug. 23, and Increase Type July 26 Aug. 23 Increase Tactical Combat Scout bomber 2,353 2,575 222 Tarpedo bomber 1,497 1,692 195 Patrol bomber, 2-engine: Boat 1,012 1,078 66 Landplane 623 736 113 Patrol bomber, 4-engine: Boat 82 98 16 Landplane 214 220 6 Observation scout 1,416 1,399 -17 Fighter 2,620 3,012 392 Subtotal 9,817 10,810 993 Tactical Non-Combat Utility 187 190 3 Utility (multi-engine) 171 174 3 Transport 259 267 8 Transport (multi-engine) 277 297 20 Subtotal 894 928 34 Training Trainer, primary 2,830 2,980 150 Trainer, advanced 4,592 4,725 133 Subtotal 7,422 7,705 283 Experimental 28 23 -5 Grand total 18,161 19,466 1,305 6 B. Personnel. The active duty strength of the Navy and Marine Corps military aeronautical personnel on August 1 was 218,175, as compared with a requirement through December 31, 1943 of 287,295. The number of aviation pilots on active duty on August 1 was 86 percent of required strength. Active Duty Strength on Aug. 1, 1943 and Requirements for Dec. 31, 1943 of Navy and Marine Corps Military Aeronautical Personnel Navy Marine Corps Total Require- Actual Require- Actual Require- Actual ments ments ments 12-31-43 Aug. 1 12-31-43 Aug. 1 12-31-43 Aug. 1 Pilots Officers 30,181 21,600 11,507* 5,667* 41,688 27,267 Enlisted 915 786 1,253 121 2,168 907 Subtotal 31,096 22,386 12,760 5,788 43,856 28,174 Other Officers 23,337* 22,210* 2,729 2,610 26,066 24,820 Enlisted 139,193 111,930 73,974 53,251 213,167 165,181 Subtotal 162,530 134,140 76,703 55,861 239,233 190,001 Grand total 193,626 156,526 89,463 61,649 283,089 218,175 * *Includes navigators 7 III. ARMY Production of Ordnance Equipment Production will have to be substantially increased over the July rates if the 1943 requirements for the 37mm antiaircraft gun and carbine are to be met. Deliveries of Selected Critical Ordnance Materiel for 1943 Thru July (Includes Defense Aid and Navy Items Procured by the Army) Jan. 1 Required Item June July Thru Production July 31 19431 Aircraft? Gun, 20mm 6,600 6,600 48,203 54,901 Gun, 37mm 498 260 4,125 7,062 Antiaircraft2/ Gun, 40mm 1,230 1,179 8,776 14,043 Gun, 90mm 415 362 3,210 4,149 Combat Vehicles Tank, light 758 826 5,312 7,921 Tank, medium 2,026 2,165 14,313 23,187 Artillery2/ Mortar, 60mm and 81mm 1,980 1,980 13,137 23,669 Howitzer, 75mm (S.P., field, and pack) 365 315 2,603 3,956 Howitzer, 105mm (S.P. & field) 450 582 3,264 5,515 Gun, 155mm (field) 43 55 316 596 Small Arms Rifle, U.S., cal. .30, VI 92,750 90,700 622,230 1,180,030 Rifle, all other, U.S., cal. .30 and .303 165,575 148,026 913,440 1,851,916 Carbine 185,549 228,536 892,543 3,000,507 Machine gun, cal. .30 15,615 10,056 144,270 205,298 Machine gun, cal. .50 53,303 56,630 353,013 676,102 August 1, 1943 Army Supply Program Proof firing may not be complete 8 Production of Ammunition In only two cases, for the selected ammunition items, will July pro- duction rates be high enough to meet the 1943 requirements if continued for the balance of the year. The monthly production rates for some items must be stepped up rather sharply to fulfill the year's requirements. Deliveries of Selected Items of Ammunition for 1943 Through July Jan. 1 Required Item June July Thru Production July 31 1943* Bombs 250-lb., G.P. & demolition 21,213 27,111 573,968 775,000 500-1b., G.P. & demolition 153,131 135,160 591,504 1,751,000 1,000-lb., G.P. & demolition 23,298 23,328 259,109 548,000 2,000-lb., G.P. & demolition 11,000 10,409 76,177 140,000 4,000-lb., G.P. & demolition 301 550 1,577 4,875 1,000-lb., armor piercing and semi-armor piercing 44,639 30,364 213,648 258,661 Cluster, fragmentation 51,758 74,344 432,787 1,399,395 Fragmentation, parachute 3,553 15,010 18,563 1,470,000 Small Arms Ammunition (Million rounds) All .30 cal. 1,028 1,103 6,519 12,165 All .50 cal. 422 453 2,533 5,010 For 20mm Guns, in, M2, Hispano (Thousand rounds) 13,672 17,902 68,388 170,335 Antiaircraft Ammunition (Thousand rounds) For 37m A.A. guns 67 455 2,320 5,246 For 40mm A.A. guns 908 1,650 11,635 35,285 For 90mm A.A. guns 183 186 1,360 7,012 Artillery Ammunition (Thousand rounds) For 75mm field guns 1,463 1,413 7,769 20,598 For 155m guns (shell) 57 90 896 1,422 For 75mm pack and field howit. 683 572 3,941 11,288 For 105mm howitsers 1,126 975 5,794 18,514 For 155mm howitsers 211 196 2,049 3,191 For 60mm and 81mm mortars 1,268 1,222 11,483 19,795 *August 1, 1943 Army Supply Program 9 War Construction Program by the Corps of Engineers The Office of the Chief of Engineers has authorized a total of $10.7 bil- lion for emergency projects under its War Construction Program, as follows: Construction in the U. S. $9.7 billion Construction outside the U. S. .6 billion Real estate program ols billion Total $10.7 billion Status of War Construction and Real Estate Program August 1, 1943 Estimated Cost In Place Type of Facilities Vil- $ of VHI- Percent of Estimated Cost lions Total lions x o 25 50 75 100 War Construction Air Force $2,854 26 $2,697 95 Ground Force 2,663 25 2,594 97 Storage & shipping 935 9 916 98 Industrial 2,848 26 2,778 98 Outside U. S. 636 6 361 57 Other 408 4 354 87 Real Estate 399 4 290 73 Total, Aug. 1 $10,743 100 $9,990 93 Total, July 1 10,666* 9,796* 92 Increase $ 77 $ 194 *Excluding repairs and utilities. The status of the program of construction in the U. s., covering major projects only (jobs of $500,000 and over), on August 1 was as follows: Status of Major Projects of the War Construction Program By Stages of Completion - August 1, 1943 Number of Estimated Status Percent of Projects Cost Total Cost Completed 1,722 $7,791,656,000 87.5% Under construction 325 1,110,491,000 12.4 Not started 8 6,474,000 .1 Total 2,055 $8,908,621,000 100.0% 10 Military Personnel The estimated increase in the active duty strength of the Army during August was 71,182, bringing the total to 7,198,000 on September 1. Distribution of the Active Duty Strength of the Army, by Grade Aug. 1 Sept. 1 August Actual Estimated Increase Commissioned officers 542,463 555,285 12,822 Warrant and flight officers 22,896 23,790 894 Enlisted men and selectees 6,467,436 6,534,000 66,564 W.A.C. 61,403 52,425 -8,978 Subtotal 7,094,198 7,165,500 71,302 Army Nurse Corps 32,620 32,500 -120 Total 7,126,818 7,198,000 71,182 Commissioned officers and enlisted men overseas at the beginning of September were estimated at 1,816,000, an increase of 94,000 over August 1. Disposition of Active Duty Commissioned Officers and Enlisted Men, by Assignment Aug. 1 Sept. 1 August Actual Estimated Increase Army Ground Forces in U.S. 2,066,884 2,016,945 -49,939 Army Air Forces in U.S. 1,540,296 1,499,955 -40,341 Army Service Forces in U.S. 1,333,448 1,311,755 -21,693 In Defense Commands in U.S. 367,725 372,235 4,510 In staging areas 38,777 55,420 16,643 In ships 50,925 125,955 75,030 Overseas 1,728,763 1,815,735 86,972 Total 7,126,818 7,198,000 71,182 On September 1, the total active duty military personnel in continental U.S., overseas, and in ships was distributed as follows: Ground Forces, 3,183,970 or 44 percent; Air Forces, 2,186,065 or 31 percent; and Service Forces, 1,827,965 or 25 percent. 11 IV. NAVY Completions of Naval Vessels Two hundred forty-nine combatant vessels had been completed in 1943 through August 20, as compared with a total of 145 completions in the cal- endar year 1942. Fifty-one of these completions occurred during July and 28 more during the first 20 days of August. Physical Completions of Selected Naval Vessels (Includes Land-Lease Vessels and Conversions) 1943 1942 Scheduled Actual Type for August Actual Thru Balance July Thru Aug. 20 20th of Year Combatant Vessels: Battleship 4 2 0 0 o Aircraft carrier 1 10 5 1 1 Aircraft carrier, escort* 17 21 25 3 3 Heavy cruiser 0 2 .2 0 o Light cruiser 8 3 5 1 0 Destroyer 81 81 48 14 5 Destroyer escort 0 99 177 26 17 Submarine 34 31 31 6 2 Total combatant 145 249 293 51 28 Patrol craft 919 537, 436 76 39 Mine vessels 272 229 183 45 28 Auxiliaries 208 200 183 25 11 Landing force vessels** 215 429 211 40 29 * Formerly "auxiliary aircraft carrier" ** IST, LSD, and LCI(L) 12 Status of Construction of Selected Naval Vessels of 1,581 combatant vessels on order on August 20, 14 percent had been launched and 70 percent had not been placed on the ways. Status of Construction of Selected Naval Vessels, Aug. 20, 1943 (Includes Lend-Lease Vessels) New Construction on Order Con- Add'l Type Not Yet On Launch- vert- Total Auth. on Ways Ways ed ing Combatant Vessels: Battleships 2 2 0 4 o 0 Aircraft carrier 13 11 3 27 0 0 Aircraft carrier, escort 15 5 12 32 48 0 Large cruiser 1 1 1 3 0 0 Heavy cruiser 17 8 2 27 0 0 Light cruiser 26 15 6 47 0 o Destroyer 177 46 46 269 0 0 Destroyer escort 664 108 134 906 o 0 Submarine 196 46 24 266 0 0 Total combatant 1,111 242 228 1,581 48 0 Patrol craft 374 225 210 809 104 35 Mine craft 92 57 193 342 0 68 Auxiliaries 97 84 99 280 275 97 Landing force vessels* 566 77 31 674 0 186 *IST, LSD, and LCI(L) 13 Change in Vessels on Hand Since June 30, 1940 The number of combatant vessels of the Navy has increased by 260 since June 30, 1940 to a total of 643. These figures reflect only publicly announced losses. Gains and Losses of Selected Naval Vessels June 30, 1940 Through August 20, 1943 (Includes Lend-Lease Vessels and Conversions) Additions and Reductions On Hand 6/30/40 to 8/20/43 On Hand Type June 30, Losses, Net Comple- Aug. 20, 1940 Transfers, Gain tions 1943 etc.* or Loss Combatant Vessels: Battleship 15 8 1 7 22 Aircraft carrier 6 12 4 8 14 Aircraft carrier, escort 0 40 17 23 23 Heavy cruiser 18 2 6 & 14 Light cruiser 19 12 3 9 28 Destroyer 225 189 121 68 293 Destroyer escort 0 99 9 90 90 Submarine 100 81 22 59 159 Total combatant 383 443 183 260 643 Patrol craft 98 1,565 237 1,328 1,426 Mine craft 36 613 175 438 474 Auxiliaries 138 532 101 431 569 Landing force vessels** 0 647 236 411 411 ** *Publicly announced losses, transfers, and reclassifications. LST, ISD, and LCI(L) 14 Analysis of Losses, Transfers, and Reclassifications Fifty-six combatant vessels have been announced as lost by the Navy, 96 vessels transferred, and 42 vessels reclassified through August 31, 1943. Publicly Announced Losses, Transfers, and Reclassifications June 30, 1940 to August 31, 1943* Trans- Reclassi- Type Lost ferred fied Total Combatant Vessels: Battleships 1** 0 0 1 Aircraft carriers 4 o o 4 Aircraft carrier escorts o 23 0 23 Heavy cruisers 6 0 0 6 Light cruisers 3 0 o 3 Destroyers 30 50 41 121 Destroyer escorts o 14 0 14 Submarines 12 9 1 22 Total combatants 56 96 42 194 Patrol craft 89 154 39 282 Mine craft 10 127 59 196 Auxiliaries 40 38 29 107 Landing craft*** 3 227 3 233 Total other 142 546 130 818 Grand total 198 642 172 1,012 * Figure for August is incomplete, and Canadian construction is excluded. ** The Arizona *** LSD, IST, and LCI(L) 15 Production of Naval Ordnance Materiel The following table shows the deliveries of selected ordnance materiel for 1943 through July: Deliveries of Selected Ordnance Materiel for 1943 Through July (Includes Defense Aid and Army Items Procured by the Navy) Scheduled Jan. 1 to Item June July Production Aug. 1 1943** Torpedoes Surface craft* 0 1 1 751 Submarine* 693 691 4,046 8,741 Aircraft* 655 620 2,715 8,422 Surface Fire Guns Heavy, 12 in. and 16 in. 0 0 3 6 Medium, 8 in. and 6 in. 4 5 26 56 Light, 4 in. 4 3 31 101 Antiaircraft Guns Heavy, 3 in. and 5 in., mounted barrel 757 771 4,403 9,160 Light, 40mm and 20mm, mounted barrel 4,694 4,889 31,532 57,467 Fire Control Equipment Gun directors 315 293 2,059 3,773 Radar fire control 40 92 343 1,642 Ammunition Heavy surface fire 2,440 1,632 16,889 36,519 Medium surface fire 19,674 16,826 144,345 305,545 Light surface fire 188M 363M 1,419M 4,686M Antiaircraft: Heavy 406M 496M 2,634M 5,984M Light: 20mm 37,738M 38,590M 271,146M 471,146M 40mm 774M 1,363M 15,104M N.A. 191 139M 116M 5,150M 9,900M M = 1,000 rounds N.A. = Not available * Turned into store ** Represents actual production through July 1943, and estimates for the balance of the year as of July 31. 16 Navy, Marine Corps, and Coast Guard Personnel The total active duty military personnel of the Navy, Marine Corps, and Coast Guard on August 15 was over 2,463,000 an increase of approxi- mately 195,000 during the last 30 days. Active Duty Military Strength of the Navy, Marine Corps, and Coast Guard - August 15, 1943 Officer Enlisted Officers Nurses Total Candidates Personnel Navy Regulars 30,507 2,990 353,899 1,897 389,293 Reserves: Men 150,324 112,718 1,267,057 4,094 1,534,193 Women 4,371 968 22,626 -- 27,965 Subtotal 185,202 116,676* 1,643,582** 5,991 1,951,451 Marine Corps Regulars 5,215 139 110,699 - 116,053 Reserves: Men 18,087 12,609 200,887 - 231,583 Women 319 144 4,932 - 5,395 Subtotal 23,621 12,892 316,518** - 353,031 Coast Guard Regulars 3,406 508 26,020 -- 29,934 Reserves: Men 5,180 644 119,299 - 125,123 Women 254 73 3,627 - 3,954 Subtotal 8,840 1,225 148,946** - 159,011 Grand total 217,663 130,793 2,109,046 5,991 2,463,493 * As of July 31, 1943 ** The enlisted strengths approved by the President are: Navy 2,092,960 by Dec. 31, 1943 Marine Corps 370,500 by Dec. 31, 1943 Coast Guard 150,000 by Feb. 28, 1943 17 V. MERCHANT SHIPPING Gains and Losses, United Nations. During the first 29 days of August no tankers were lost by the United Nations, and for merchant vessels other than tankers the tonnage reported lost was 206,000 dwt.-one-third of the July figure. During the same period, gains from new construction increased 1,535,000 dwt. to a total of 24,167,000 dwt. since December 1, 1941. The losses for the total period amounted to 16,801,000 dwt., leaving a net gain of 7,366,000 dwt. Gains and Losses of United Nations' Merchant Vessels December 1, 1941 Through August 29, 1943 (000 Dwt.) Dec. 1, 1941 Thru Aug. 1 June 30, 1943 July Thru 29 Total Gains 20,817 1,815 1,535 24,167 Losses 15,978 617 206 16,801 Net gains 4,839 1,198 1,329 7,366 Merchant Ship Deliveries by U.S. Shipbuilders During August, 142 merchant vessels totaling 1,604,000 dwt. were delivered by U.S. shipbuilders. The July deliveries were 143 vessels at 1,625,626 dwt. To September 1, 62 percent of the 18,889,000 dwt. pro- grammed for the year had been delivered. Merchant Ship Deliveries by U.S. Shipyards, Aug. 1943 Type Number Dwt. Dry cargo 125 1,326,971 Tanker 17 276,798 Total 142 1,603,769 18 VI. REVIEW OF PRODUCTION IN SELECTED WAR INDUSTRIES Studies by the War Projects Unit of the Bureau indicate that: (1) Peak production of synthetic rubber is not expected until the second quarter of 1944, current output is below available capacity and may amount to 254,000 tons for 1943. Total stocks available at the beginning of 1944 will be low. (2) Productive capacity of Government plants for anhydrous ammonia is 40 percent in excess of military needs for explosives, and output may be diverted to a fertilizer program. Synthetic Rubber Program (Buna S) The total program for synthetic rubber production in the United States and Canada provides an annual capacity of 850,000 long tons. Of this amount, 735,000 tons or 86 percent is Buna s, with the remainder divided between two other special types. The Buna S program includes 14 plants for direct production of synthetic rubber and 28 plants to supply, in the proper proportions, the two principal components, butadiene and styrene. About 95 percent of this plant capacity is Gov- ernment-financed, at an estimated cost of $470 million. The construction of the Government-financed part of the program is now 80 percent com- pleted and some plants are in actual production. Peak production is expected during the second quarter of 1944. Production of Buna s, besides being limited by its own plant capa- city, is also controlled by the availability of its main components. The following table shows estimated available capacity of Buna S and the Buna S equivalents of capacity available for its components, butadiene and styrene: Production Capacity of Buna S Rubber With Buna S Equivalents of Capacity for Components* Period Capacity (1,000 long tons) Buna S Butadiene Styrene 1943 - 1st half 21.1 actual 34.5 actual 18.0 actual - 2nd half 206.1 183.8 204.2 1944 - 1st half 358.6 346.2 362.7 - 2nd half 367.6 378.2 380.0 Short tons of styrene and butadiene are multiplied by 3.75 and 1.1, respectively, to convert them to Buna S long tons. 19 The output of butadiene may be curtailed below capacity, since this production depends on the amount of feed stock (butens-butylene) available. A considerable amount of this feed stock is secured from petroleum plants which are under the control of the Petroleum Adminis- trator for War and which are manufacturing high octans gasoline as the principal product. Actual production of Buna S and its components is failing to keep pace with available capacity to produce. Many technical difficulties in this new industry are still unsolved. In addition, manufacturing technique for using synthetic rubber is not yet fully developed. Current estimates of output for synthetic rubber for 1943, when compared with stockpile and requirements, show that a seriously low margin of rubber reserves will remain at the beginning of 1944. These relations are summarized in the following table: Stocks (crude) Jan. 1, 1943 443,000 tons New supplies, 1943-synthetic 254,000 -crude 54,000 308,000 tons Total supply 751,000 tons 1943 Requirements 609,000 tons Stocks, Jan. 1, 1944 142,000 tons Anhydrous Ammonia In modern warfare, the nitrogen component of explosives is derived chiefly from the synthetic production of anhydrous ammonia, using either natural gas or coke. This chemical also has a wide general use in industry and in fertilizer for agriculture. At the beginning of the present war program, domestic capacity of the United States and imports provided a total production of 860,000 tons of anhydrous ammonia per year. A Government expansion program was begun in the fall of 1940 to augment this production by ten Government plants with a designed capa- city of 1,147,000 tons, more than doubling the previous supply. This program also included facilities for converting ammonia to ammonium nitrate, with a capacity of 756,000 tons, at a combined program cost of $259 million. By the spring of 1943 it had become apparent that these proposed capacities were in excess of military needs. After canceling one plant and reducing capacities of others, a total new capacity remains in Government plants, amounting to about 793,000 tons for anhydrous ammonia. Present total capacity of private plants amounts to 528,000 tons, or a total of 1,321,000 tons. 20 Present estimates of military requirements for the fiscal year 1944 amount to 477,000 tons of anhydrous ammonia, or about 60 percent of the present reduced capacity of Government plants. A part of this capacity (including the TVA plant at Muscle Shoals) has already been diverted to manufacture for industrial purposes and for fertilizer. However, large surpluses for which there are no ready storage facilities at the point of manufacture will be accrued if the Government plants under Ordnance Department control continue to operate at the present scheduled rate. Studies are under way for utilizing this surplus capacity beyond military needs for production of anhydrous ammonia for fertiliser, under a program of the War Food Administration. Such a program will entail completion and operation of the ammonium nitrate plants which were begun as a part of the ammonia program but which are now largely kept in standby condition because of a change in military requirements. 21 VII. WAR INDUSTRIAL FACILITIES A total of 17,478 war industrial plant expansions, publicly and privately financed, costing $20 billion, had been approved by June 1, 1943. This was a net increase during May of 726 expansions, estimated to cost $279 million. War Industrial Facilities Financed with Public and Private Funds Number of Plant Expansions and Estimated Cost (Millions of Dollars) June 1, 1943 Total Public Funds Private Funds Type of Product Number Est. Number Est. Number Est. Cost Cost Cost Aircraft 1,380 $3,406 353 $3,150 1,027 $256 Ship construction & repair 768 2,246 227 2,145 541 101 Combat and motor vehicles 544 508 72 426 472 82 Guns 922 925 209 816 713 109 Ammunition, etc. 1,348 1,201 315 1,069 1,033 132 Explosives and assembling 160 2,885 81 2,872 79 13 Iron and steel 2,361 1,802 240 1,231 2,121 571 Non-ferrous metals 749 1,473 135 1,160 614 313 Machine tools 1,688 308 186 155 1,502 153 Machinery and equipment 2,508 802 331 475 2,177 327 Chemicals 884 1,411 177 1,118 707 293 Petroleum and coal products 282 609 40 201 242 408 Miscellaneous manufacturing 1,486 496 215 292 1,271 204 Non-manufacturing 2,653 1,916 100 444 2,553 1,472 Total 17,478 $19,988 2,426 $15,554 15,052 $4,434 Notes: Most projects costing less than $25,000 are excluded. Public commitments for the purchase of $2.4 billion of machine tools are excluded. Number of plants by product groups do not add to totals because of duplication of facilities between product groups. 22 Facilities financed with public funds were estimated to cost $15.6 bil- lion on June 1, an increase of $160 million during May. $12.3 billion or 79 percent were in place on June 1. (1) War Industrial Facilities Financed with Public Funds Value and Percentage in Place on June 1, 1943 (Millions of Dollars) Type of Product Number of Est. Construction in Place Expansions Cost Value $ 0 25 50 75 100 Aircraft 484 $3,151 $2,285 73 Ship construc- tion and repair 391 2,145 1,688 79 Combat and motor vehicles 89 425 379 89 Guns 295 816 709 87 Ammunition, etc. 453 1,069 994 93 Explosives and 92 2,872 2,731 95 assembling Iron and steel 309 1,231 884 72 Nonferrous metals 156 1,160 854 74 Machine tools 215 155 139 90 Machinery and 420 475 352 74 equipment Chemicals 204 1,118 764 68 Petroleum and 41 202 69 34 coal products Misc. manufactur- 247 292 200 69 ing Non-manufacturing 121 While 205 46 Total 3,517 $15,555 $12,253 79 Notes: Most projects costing less than $25,000 are excluded. Public commitments for purchase of $2.4 billion of machine tools are excluded. Number of plants by product groups do not add to totals because of duplication of facilities between product groups. 23 VIII. STOCKPILE AND PUBLIC PURCHASES OF BASIC WAR COMMODITIES Strategic and critical materials are purchased by the Government: (1) for stockpiles to be used only in case of an emergency with respect to the specific items concerned; (2) for stockpiles to be released only by WPB; and (3) for resale to industry currently upon receipt. The following table shows the status of selected items as of August 15, 1943: Stockpile Status of Selected Commodities - August 15, 1943 Percent of Purchase Program Recom- Unit Stockpile Inventory mended Inventory Commodity of Inventory Increase Increase Purchase Measure Aug. 15, Since Since Pearl Program 1943 July 15 Harbor Alcohol 1,000 gal. 125,000 104% 3% 104% Antimony, metal Tons 24,922 49 0 18 Chrome ore 1,000 1.t. 1,950 36 -1 22 Diamond dies Dies 60,000 14 o 9 Manganese ore 1,000 1.t. 3,300 18 -3 3 Manila fiber 1,000 bales 2,037 4 0 -3 Mercury Flasks 87,200 52 -2 47 Mica Tons 14,415 72 o 54 Nickel, content of matte Tons 1/15,000 o o 0 Nitrate of soda 1,000 tons 2,100 0 -1 Opium 1,000 lbs. 640 101 0 101 Quartz crystals 1,000 lbs. 2,099 166 19 95 Quinine sulphate 1,000 av.oz. 12,450 22 0 -36 Rubber 1,000 l.t. 3/1,900 9 -1 -9 Silk 1,000 bales 50-100 11 o 3 Tin, refined 1,000 l.t. 1/307 19 1 3 Tungsten Tons 40,500 28 4 9 Zino concentrates 1,000 tons 1/1,700 13 -1 9 Zinc metal Tons 160,000 65 10 65 Part or all of this amount consists of recommended purchases per annum. 2 88,770 tons stored in Chile. Latest program recommends purchase of all available. 24 IX. AGRICULTURE AND WAR FOOD ADMINISTRATION On the food production front the prospects are about the same as reported last month. Arrangements have been made to increase shipments of grain into the United States from Canada and to import more molasses for production of alcohol 80 as to lighten the pressure on grain for this purpose. A new scientific development in handling ammonium nitrate promises to be of considerable significance in increasing agricultural production after the war and to some extent during the war. Prices and Income The index of prices received by farmers rose 5 points (188 to 193) from mid-July to mid-August, the highest level since September 1920, while prices paid by farmers remained unchanged during the same period. Cash farm income from marketings in the period from January to July 1943 totaled 34 percent more than in the first seven months of 1942. Returns from livestock were up 30 percent and returns from crops, 41 percent. Income in the last five months of this year is not expected to show as large a percentage increase because income rose very rapidly in the latter part of last year. Farm Labor Completing this year's harvest will require employment on farms by October 1 of at least 750,000 more persons than the number employed on August 1. In addition to family labor and hired workers, farmers will need the help of many thousands of U.S. Crop Corps paid volunteers. The War Food Administration, carrying on mobilization of these volunteers, expects that Crop Corps workers can be recruited and placed in sufficient numbers through local campaigns to meet the need. Up to August 31, 57,853 foreign farm workers had been brought into the United States. Of this total, 44,577 came from Mexico, 8,828 from Jamaica, and 4,448 from the Bahama Islands. Interstate movement of domestic seasonal workers during August included the transportation of 3,191 workers from Oklahoma, Arkansas, and Mississippi to the spring wheat harvest areas of North and South Dakota and Montana, and 325 workers from Oklahoma to Wyoming to assist in har- vesting hay. These workers were transported with the understanding that 25 they would be returned to their homes in September in time for cotton picking. The August interstate movement brought to 4,970 the number of workers transported since Public Law 45 went into effect on April 29, 1942. Previous to the enactment of this law, 8,165 domestic seasonal workers were transported with financing from the President's Emergency Fund. Transportation Arrangements have been made to import about million bushels more grain from Canada by way of the Great Lakes during September than was shipped in August. Arrangements have been made also for boats to ship grain from western Canada to California for feed and to bring much larger amounts of feed grains into western and central United States by rail from Canadian prairie provinces. The allocation of imports of molasses from the West Indies has been stepped up from 9 million to 29 million gallons a month for use in the production of alcohol, which will result in smaller amounts of grain being used for this purpose. Farm Machinery Manufacturers are well started on the 1944 machinery production pro- gram. Because of the increased volume of machinery production, it is apparent that the distribution and rationing program will be simpler and will apply to fewer items. Distribution To help maintain production of manufactured dairy products, including butter, cheese, and evaporated milk, at levels sufficient to supply essen- tial civilian requirements, a program has been prepared (for use in areas where needed) under which expanding consumption of fluid milk and cream can be arrested through a system of dealer quotas. Fluid milk consump- tion, increasing now at the rate of approximately 1 percent a month, is about 20 percent higher than in 1941. It is expected that practically all of October butter production will be available for civilian use and that no further "set-aside" will be required until the normal seasonal increase in butter production in the spring. Nearly half of the 10 million pounds of early-season turkeys, sought for shipment to our armed forces overseas, was obtained during the first month the order requiring sales to the Government for this purpose was in effect. 26 A total of 7,411 cars of early and intermediate crop Irish potatoes were purchased up to August 27 to prevent waste and to provide growers the fair returns assured them when the Government asked for increased production. of the purchases made, 3,833 cars went to canners, 278 to dehydrators, 1,017 to starch plants, 1,064 to state institutions and welfare associations, 407 were resold in commercial channels, and 70 cars were exported. More than 14 billion pounds of food and other agricultural commodi- ties were delivered during July for shipment to allied fighting fronts, the largest for any month since the beginning of Lend-Lease operations in March 1941. Scientific Achievements Fertilizer technologists, working with manufacturers, have developed a new method of handling ammonium nitrate now being manufactured in enor- mous quantities for use in making high explosives. Considerable amounts are available for fertilizer and still larger amounts will be available after the war. The affinity of ammonium nitrate for water, however, has made it difficult to handle. The new product, in the form of small par- ticles coated first with oil and then with clay, does not absorb moisture and become lumpy so as to clog fertilizer-distributing machinery. 27 X. ECONOMIC STABILIZATION PROGRAM Maintenance of high level of consumer expenditures and recent successes 4 in holding the price line do not justify too much optimism on stabilisation prospects, in view of existing pressures on prices and prospective depletion of inventories. Growing concern, furthermore, over the lack of measures with which to control excessive use of accumulated liquid funds in the reconversion period is justified. Prices-Cost-of-Living: With meat prices cut back by OPA and vegetables seasonally lower, the cost of living for city workers dropped 0.8 percent from mid-June to mid-July. Retail food prices, which declined by 2.0 percent dur- ing this period, are expected to show a further decline of 0.5 to 1.0 percent when August 15 figures become available. Prices-Farm: Upturns in prices received by farmers for chickens, eggs, cottonseed, dairy products and grains raised the general level of farm prices 5 points during the month ending August 15. This 2.6 percent rise more than offset the decline in the preceding month and lifted the index to 117 percent of parity, a new high point. Prices paid by farmers were unchanged. Wages: Since October 1942, when Congress directed the President to stabilize wages and salaries, wage-rate adjustments permitted by the War Labor Board have increased average weekly earnings in manufacturing by not more than 0.8 percent. However, as a result of factors over which the War Labor Board has no control-increases in the work week and in piecework earnings, increases in overtime worked, shifts in the distribution of the labor force, etc.- average weekly earnings in manufacturing had advanced 10.7 percent by May 1943. Taxes: Observers think that Congress won't enact more than $4 to $5 billion of taxes in a new revenue measure (assuming no sales tax) although it might in addition enact a compulsory savings program if pressed by the administra- tion. Tax committees are reported to be planning a tax simplification bill to be taken up after regular revenue act, the principal object being the elimination of 20 to 30 million individual income tax returns. War Bonds: War savings bond sales in August totaled $802 million, the lowest volume since November 1942. Redemptions reached an all-time high of $152 mil- lion, 19 percent of sales as compared with 15 percent the previous month. In its Third War Loan drive, which began September 9, the Treasury hopes to sell $3 billion Series E savings bonds-double the amount sold in the Second War Loan. Rationing: Failure to divert milk supplies into fluid uses and failure to stimulate increased production may require rationing of milk. 28 II. WAR FINANCES Disbursements Disbursements for war purposes for the first two months (16.7 per- cent) of the year amounted to 14.2 percent of the $100 billion estimated for fiscal year 1944. May June July August Monthly rate $7.373 $7.687 $6.746 $7.529 Adjusted annual rate 87.900 91.700 78.200 90.600 Appropriations Appropriations, other Congressional authorizations, and commitments of Government corporations for war purposes increased $180 million in August to a total of $344 billion since June 30, 1940. Net disburse- ments against this amounted to $124 billion. Appropriations and Disbursements, F.Y. 1941 Thru August of F.Y. 1944 (Billions) Appropriations & Authorizations Disbursements F.Y. 1941 Thru F.Y. 1944 Total F.Y. 1941 Thru F.Y. 1943 August 1943 War $126.649 $59.036 $185.685 $68.008 Navy 47.480 28.321 75.801 35.669 Maritime Commission 11.243 .013 11.256 4.393 Govt. corpns. (commit.) 19.910 .288 20.198 6.206 Other 26.411 9.799 36.210 10.014 Est. approp. required beyond F.Y. 1944 for completion of Navy -- -- 14.617 - Total $231.693 $97.457 $343.767 $124.290 29 XII. MANPOWER Employment and Labor Supply There was an increase of 900,000 in both the number of persons employed and in the number in the labor force during July as a result of the continued shift of students into the labor market with the close of the school year. Employed persons totaled 54.3 million and the labor force 55.5 million in July. No change is reported between June and July in the 1.2 million unemployed. Since July 1942, employed persons increased by 300,000 but the total labor force declined by 1.3 million. Agricultural employment has been well maintained, or perhaps even increased, between July 1942 and July 1943. Non-agricultural employment is showing definite indications of having reached its peak, or even of declining, when comparisons are made between corresponding months of 1942 and 1943. During the past year, the male labor force has declined by 3.8 mil- lion, but much of this slack has been absorbed by an increase in the female labor force of 2.5 million. Employed, Unemployed, and Total Labor Force (In Millions) July 1943 June 1943 July 1942 Employed 54.3 53.4 54.0 Unemployed 1.2 1.2 2.8 Total labor force 55.5 54.6 56.8 30 Labor Turnover and Absenteeiam Labor turnover in manufacturing was somewhat higher in June 1943 than in the previous month. All separations in June were at the rate of 7.04 per 100 employees, while the May rate was 6.57. Total accessions to manu- facturing payrolls continued to outstrip separations with a June rate of 8.30. Information is not yet available to appraise the effect of WMC stabilization programs upon labor turnover rates. The rate of absenteeism as reported by important war industry plants continued in June at approximately the same level as in recent months in spite of increases in the numbers of women employed. The June rates for manufacturing ranged from 2.7 percent for petroleum refining to 8.1 percent for shipbuilding. Other manufacturing industries with rates in excess of 6.0 percent included tanks 6.1, firearms 6.4, ferrous foundries 6.4, air- frames 7.2, aero-engines 6.1, and propellers 6.4. In bituminous coal mining, the June rate was 8.1 in comparison with a May rate of 8.4 percent. Hours and Earnings Average weekly hours of employment in all manufacturing industries were 45.2 in June 1943 and 45.3 in May. This slight decline was caused partly by vacations in the durable goods industries which reported average weekly hours of 46.8 in June and 47.0 in May. In the non-durable goods industries, the general coal strike resulted in a drop in average weekly hours to 28.1 in anthracite mines and to 28.3 in bituminous mines for June. Other non-manufacturing industries reporting average weekly hours below 42 included telephone and telegraph 41.8, electric light and power 41.7, general merchandising 37.5, and apparel 37.6. 31 Average hourly earnings in all manufacturing industries were up to 95.9 cents in June from 95.4 cents in May. Both durable and non-durable goods contributed to this increase, with average earnings in durable goods increasing from 105.0 cents per hour to 105.5 cents and in non-durable goods from 79.7 to 80.4 cents. The aircraft engine and shipbuilding indus- tries continued to show the highest average earnings at 126.5 and 125.3 cents per hour, respectively. Strikes Strike statistics are not now available for July through temporary discontinuance of OWI-BLS arrangements for collection. It is expected that the series will again be available for August, and it may be possible to secure estimates for July. 32 XIII. ADMINISTRATIVE DEVELOPMENTS Highlights in the administrative developments of the month were: 1. Continued turmoil in the activities of civilian agencies involved in foreign programs. 2. Continuing concentration of management upon the operating problems within the War Production Board, the War Manpower Commission, and the OPA. 3. Inaction within the War Food Administration in regard to its increasingly acute problem of organization and manage- ment. Economic Operations in Liberated Areas Meager progress has been shown by the Office of Foreign Economic Operations in the State Department in its first three months. Two of the total of eleven prospective area committees are operating and two more have recently been formed. Recruitment of necessary coordinating staff by the State Department has scarcely begun. August witnessed new flareups of interagency rivalry and contro- versy to the extent that no agreement has yet been reached on the type of civilian agency set-up to replace AMGOT in Sicily, the first sub- area. Lend-Lease and OFRRO still dispute what territories should be allocated to each for distribution; OFRRO and the State Department are in disagreement as to the control of the former's staff in the field; OEW and OFRRO have not yet agreed on which is to carry on industrial rehabilitation. Meanwhile, a larger and far-reaching issue is rising among a number of agencies, namely: Is the State Department to absorb all foreign economic operations or will it restrict its operations to secur- ing observance by other agencies of our foreign policies? The issue is a burning one on the interagency front. Office of Economic Warfare The transfer of the foreign economic operations of RFC corporations to the Office of Economic Warfare is proceeding slowly and painstakingly. Much of the transfer of contracts and other detailed arrangements should be completed by October 1. Foreign Food Procurement Foreign food development and procurement is daily becoming more urgent. Not one major food directive has been given OEW by the War Food Administration since the OEW establishment on July 15. 33 Underlying the present stymied conditions is & controversy between CCC (War Food Administration) and OEW. In addition, the State Depart- ment is delaying moves already begun, pending settlement of the juris- dictional dispute. Food Allocations A proposal is current to increase the membership of the Combined Food Board to include Canada and later, perhaps, several other food- producing nations. Meanwhile, the present two-way (British-American) organization is working far from smoothly. On the one hand, the Secretary of Agricul- ture and his OFAR staff are in the Combined Food Board. On the other hand, the War Food Administrator and his WFA staff have national food responsibility. The result is the lack of a continuous and consistent American policy on national and international levels. War Food Administration The War Food Administration still lacks a general manager and has postponed action upon its problem of organization and administration. Rather widespread evidence points to (1) inadequate field organization, (2) serious and probably growing non-compliance with food orders, (3) uncertainty as to ability to handle peak production of various foods as they are harvested, and (4) need for better arrangements for consistent action by both WFA and OPA in food problems. Arrangements for foreign food procurement continued to be unsatisfactory to both WFA and OEW; and no stiffening of WFA policy in the direction of & more realistic review of food requirements is visible. War Production The War Production Board continued to concentrate upon its operating problems, and there were no dramatic developments. Increasing, although still inadequate, attention was given to the matter of preparing the Board to deal with the changing production problems growing out of the progress of the war and the generally encouraging production of war materials. WPB policies and operations promise to have even greater influence upon the American economy and to be of more vital concern to public welfare in the coming year than they have been in the past. The Board is suffering an attrition in the number of its experienced and responsible officials which, if unchecked, may impair its effectiveness. The Office of War Mobilization gave continuing attention to stimu- lating revision of requirements of claimant agencies along realistic lines. 34 Manpower It became clear during the month that manpower is the "short" element in the economy. The War Manpower Commission carried forward its decentralisation of operations into regional and field offices. The harmonious correlation of manpower supply with production programs loomed as a coming critical problem on the domestic front. Price Control Food prices eased, and the top management of OPA centered attention upon internal policies and operating problems. Since the position of general manager in the organization was filled, there has been a notable improvement in operations. The problem of close and consistent coopera- tion between OPA and WFA remains to be solved. Transportation Relationships between the ODT and the Division of Stockpiling and Transportation of the War Production Board continued to be strained. The issue involved is one of division of labor in the determination and administration of transportation priorities. Information Steps were taken to make better use of the Deputy Directors of OWI. They had been set up in OFF days to maintain contact with other agencies. Under the new organization in the Domestic Branch, they will participate more actively in supervising both the planning and execution of cam- paigns. The OWI also arranged to reestablish the Central Press Intelligence Unit to furnish clippings for all Government agencies on approximately the same scale as at the end of the 1943 fiscal year when the centralized activity was abolished. The reorganized unit is scheduled to be in operation shortly after September 1. The regional planning units in Washington were pulled together into three divisions to be responsible for (1) the United Kingdom and the Middle East, where the problem is essentially one of information; (2) enemy and occupied Europe, which is concerned principally with propaganda warfare; and (3) the Pacific area, which is concerned with both information and propaganda warfare. 35 XIV. CHARTS 1. Monthly Acceptances of Military Airplanes by Type 2. Monthly Aircraft Acceptances by Weight 3. Total Army Strength 4. Total Active Duty Strength of Navy, Marine Corps, and Coast Guard 5. Construction Progress on Battleships and Aircraft Carriers 6. Construction Progress on Aircraft Carriers, Escort 7. Construction Progress on Large and Heavy Cruisers 8. Construction Progress on Light Cruisers 9. Destroyers, Escort Vessels, and Submarines -- Construction Program 10. Gains and Losses of Merchant Ocean Vessels Available to the United Nations 11. Deliveries of Merchant Ships by U. S. Shipbuilders 12. Status of Basic War Commodities Program 13. Monthly War Disbursements on an Annual Basis CHART I MONTHLY ACCEPTANCES OF MILITARY AIRPLANES BY TYPE NUMBER 15,000 LEGEND TRAINER OBSERVATION AND TRANSPORTS FIGHTER I a 2 ENGINE BOMBER 4 ENGINE BOMBER TOTAL ALL TYPES 10,000 WPB SCHEDULE B-L- NOV.1942 TOTAL ALL TYPES JOINT AIRCRAFT COMMITTEE WORKING SCHEDULE, W- 5 JULY 15,1943 5,000 o # F . A . / a A 5 o N o / F M A M - , A 5 o . D 1942 1943 SOURCE:WAR PRODUCTION BOARD CHART 2 MONTHLY AIRCRAFT ACCEPTANCES BY WEIGHT ( INCLUDES SPARE AIRFRAME PARTS BUT EXCLUDES GOVERNMENT-FURNISHED EQUIPMENT SUCH AS ENGINES, PROPELLERS, TURRETS, ETC.) MILLIONS OF POUNDS 120 KEY ESTIMATED ACTUAL 100 80 60 40 20 o . F M A M , a A $ o N o é F M A M . di A 5 o N o 1942 1943 TOTAL 292,000,000 POUNDS TOTAL 911,000,000 POUNDS CHART 3 TOTAL ARMY STRENGTH MILLIONS OF MEN 10 8 7.2 6 4 2 ENLISTED MEN AND WARRANT OFFICERS 56 o OFFICERS J A 5 o " o / F M & M , a A 5 o N o a F M A M a J A 5 o N D , , - A M a J & 5 o N D 1940 1941 1942 1943 CHART 4 TOTAL ACTIVE DUTY STRENGTH OF NAVY, MARINE CORPS AND COAST GUARD OFFICERS, OFFICER CANDIDATES, ENLISTED PERSONNEL, a NURSES THOUSANDS OF MEN 2,500 2,463 2,304 2,000 1,951 1,500 COAST GUARD MARINE CORPS 1,000 500 NAVY o J A $ o N 0 J F M A M J J A 5 o N D J F M A M J J A SONOJFMAMJJASOND 1940 1941 1942 1943 CHART 5 CONSTRUCTION PROGRESS ON BATTLESHIPS AND AIRCRAFT CARRIERS JULY 1,1940 TO AUGUST 1, 1943 Estimated TYPE AND NAME Keel PERCENT OF COMPLETION Completion Laid Date o 20 40 60 80 100 BATTLESHIPS NORTH CAROLINA 10-27-17 7-31-41 WASHINGTON 0-14-28 7-31-41 SOUTH CAROLINA 7-15-39 3-20-42 INDIANA 11-20-29 4-30-42 MASSACHUSETTS 7-20-19 5-15-42 ALABAMA 2-1-40 8-16-42 IOWA 6-27-40 3-28-43 NEW JERSEY 9-16-40 6-30-43 MISSOURI 1-6-41 7-24-44 WISCONSIN 1-25-41 8-31-44 ILLINOIS 2-1-44 7-31-45 KENTUCKY 6-1-44 9-10-45 MONTANA WORK SUSPENDED OHIO WORK SUSPENDED MAINE WORK SUSPENDED NEW HAMPSHIRE WORK SUSPENDED LOUISIANA WORK SUSPENDED AIRCRAFT CARRIERS HORNET 9-25-39 10-20-41 ESSEX 4-28-41 12-30-42 YORKTOWN 12-1-41 4-15-43 INTREPIO 12-1-41 8-16-43 HORNET 1-1-12 12-1-43 FRANKLIN 12-7-42 1-1-44 TICONDEROGA 2-1-13 1-1-44 RANDOLPH 5-10-43 11-15-44 LEXINGTON 7-15-41 2-17-43 BUNKER HILL 9-15-41 5-24-43 WASP 3-18-42 12-14-43 HANCOCK 1-26-43 5.15.44 BENNINGTON 12-15-42 9-15-11 BOXER 9-15-13 1.1.15 INDEPENDENCE 1-14-43 7-75-13 PRINCETON 6-2-41 2-25-43 BELLEAU WOOD 9-11-41 3-31-43 COMPENS 11-17-41 5-28-43 MONTERCY 12-29-41 6-17-43 LANGLEY 4-11-42 4.74.13 CABOT 3-16-42 7.24.1) BATAAN 8-31-42 11-10-43 SAN JACINTO 10-26-42 12-22-43 BON HOMME RICHARD 2-1-43 12-1-14 CROWN POINT 2-21-44 7.14.47 KEARSARGE 3-1-44 3-1-46 ORISKANY 5-1-11 4-1-48 REPRISAL 7.1.11 6-1-45 ANTIETAM 1.15.13 2-1-45 CV37 9-11-13 12-31-45 SHANGRI-LA 1-15-43 11-1-44 CV39 3-15-43 12-31-44 CV40 1.1.41 1.1.46 CV41 11-1-43 9-15-45 CV42 10-1-43 10-1-45 GV43 7-20-48 LEGEND CV45 7-28-46 CV46 2- 1-46 PROGRESS LAST MONTH CV47 7-1-46 PROGRESS PRIOR TO LAST MONTH CHART 6 CONSTRUCTION PROGRESS ON AIRCRAFT CARRIERS, ESCORT JULY 1,1940 TO AUGUST 1,1943 NUMBER PERCENT OF COMPLETION o 20 40 60 80 100 10 20 30 40 50 60 CONTRACTS FOR " VESSELS AWARDED BY NAVY WITH NO PROCEFES REPORTED. 70 80 90 " ADDITIONAL VERSILS REING CONSTRUCTED or CON- VERTED BY THE MARITINE COMMISSION. PROGRESS ON THESE " NOT REPORTED ON SAME BASES AS NAVY USES. 100 110 120 CHART 7 CONSTRUCTION PROGRESS ON LARGE AND HEAVY CRUISERS JULY 1,1940 TO AUGUST 1,1943 Estimated Keel PERCENT OF COMPLETION TYPE AND NAME Loid Completion Date o 20 40 60 80 100 LARGE CRUISERS ALASKA (2-17-4) " 1-44 GUAM 1-2-42 7-15-44 HAWAII WORK SUSPENDED PHILIPPINES WORK SUSPENDED PUERTO RICO WORK SUSPENDED SAMOA WORK SUSPENDED HEAVY CRUISERS BALTIMORE 5-26-41 4-15-43 BOSTON 6-30-41 6-30-43 CANBERRA 9-3-41 0.10.17 QUINCY 10-9-41 11-10-13 PITTSBURGH 2-3-43 7.16.18 ST. PAUL 2-3-43 8-15-44 COLUMBUS 6-25-43 12-15-44 DES MOINES 5-27-43 2-1-45 OREGON CITY 2-1-49 6-1-45 ALBANY 2-15-44 6-15-45 ROCHESTER 7-70-44 7-15-45 NORTHAMPTON 7-10-14 1-1-45 CAMBRIDGE 1-15-11 8-15-45 CA127 9-1-45 KANSAS CITY 10-1-45 CA129 11-15-45 CAI30 2-1-43 12-15-44 CA131 4-12-43 12-28-44 CA132 4-14-43 2-15-45 CA133 9-1-13 6-1-45 CA134 6-1-44 3-1-46 LOS ANGELES 7-26-43 12-31-44 CHICAGO 7-26-43 2-1-45 CA137 3-15-44 10-31-45 CAISE 3-15-44 3-31-45 CA139 12-1-44 ...... CA140 3-1-45 4-10-40 CA141 1-15-45 7-14-45 CA142 2-15-45 - 1-15 LEGEND PROGRESS LAST MONTH PROGRESS PRIOR TO LAST MONTH CHART 8 CONSTRUCTION PROGRESS ON LIGHT CRUISERS JULY 1,1940 TO AUGUST 1, 1943 Estimated Keel PERCENT OF COMPLETION TYPE AND NAME Completion Laid Date o 20 40 60 80 100 LIGHT CRUISERS 6000 TONS ATLANTA 4-22-40 12-23-41 JUNEAU 5-27-40 7-11-42 SAN DIEGO 3-27-40 1-10-42 SAN JUAN 5-15-40 2-24-42 OAKLAND 7-14-41 7.17.11 RENO to 11-1-42 FLINT 10-23-42 1.1.11 TUCSON 12-23-42 10-1-44 JUNEAU 12-1-43 6-1-45 SPOKANE 12-1-4) 7-1-45 FRESNO 2-1-48 -1-45 LIGHT CRUISERS 10,000 TONS CLEVELAND 8-15-42 COLUMBIA 9-19-10 7-15-42 MONTPELIER 12-2-40 9-1-42 DENVER 12-26-40 10-13-42 SANTA FE 11-24-42 BIRMINCHAM 2-17-41 1-75-43 MOBILE 4-18-41 3-24-13 VINGENNES 1-7-42 12-71-43 PASADENA 2-6-43 4.1.14 SPRINGFIELD 2-13-43 --- TOPEKA 1.21.11 10-1-11 BILOXI * 11.13 HOUSTON ... 12-11-43 PROVIDENCE 7.77.17 MANCHESTER 1.1.11 4.1.15 VICKSBURG 16+19+1, 5-1-44 DULUTH 11-3-42 8-1-44 MIAMI 11-1-43 ASTORIA 2-6-41 1-31-44 OKLAHOMA CITY 12. 10-15-44 LITTLE ROCK 12-31-44 GALVESTON 12-21-43 8-7-45 YOUNGSTOWN 11-1-45 AMSTERDAM 1.1.41 10-14-44 PORTSMOUTH 12-30-44 WILKES-BARRE 12-14-42 ATLANTA 1-25-43 8-15-44 DAYTON 1.1.13 9-15-44 FARGO 1-9-13 3-15-45 HUNTINGTON 9-18-43 4-15-45 NEWARK 1.1.41 7-1-41 NEW HAVEN 2-1-44 9-1-45 BUFFALO 3-1-11 10-1-45 WILMINGTON 7-1-44 1-1-46 CLIIZ 1-1-11 1- 2-1-46 CLIIS 9-15-44 4-1-46 CLII4 11-1-44 5-1-46 CLIIS 11.1.44 4-1-46 TALLAHASSEE 11-15-43 LEGEND 5-15-45 CHEYENNE 2-15-44 8-15-45 PROGRESS LAST MONTH NORFOLK 4-15-14 10-15-45 PROGRESS PRIOR TO LAST MONTH CL43 1-1-11 7-8-46 CL44 7.4.11 8-15-40 CL45 10-16-16 9-15-46 CL46 1.1.15 12-1-98 CL147 7-8-45 12-30-46 CLI48 11-14-19 7-1-48 CL149 2-8-45 10-1-46 CHART 9 DESTROYERS, ESCORT VESSELS AND SUBMARINES CONSTRUCTION PROGRAM AUGUST I, 1943 DESTROYERS NUMBER o 100, 200 300 400 500 TOTAL IN PROGRAM 458 COMPLETED SINCE JULY 1,1940 184 UNDER CONSTRUCTION, TOTAL 142 BY STAGES OF COMPLETION 80% 99% 22 60% 79% 19 40% 59% 20 20%- 39% 18 0%- 19% 63 CONTRACTS AWARDED, NO PROGRESS 132 AUTHORIZED, NO CONTRACT o ESCORT VESSELS NUMBER o 200 400 600 800 1000 TOTAL IN PROGRAM 1005 COMPLETED SINCE JULY ,1940 82 UNDER CONSTRUCTION, TOTAL 410 BY STAGES OF COMPLETION 80% - 99% 27 / 60% 79% 45 40% 59% 58 20% 39% 72 0%- 19% 208 CONTRACTS AWARDED,NO PROGRESS 513 AUTHORIZED, NO CONTRACT o SUBMARINES NUMBER o 100 200 300 400 TOTAL IN PROGRAM 346 COMPLETED SINCE JULY I, 1940 78 UNDER CONSTRUCTION, TOTAL 107 BY STAGES OF COMPLETION 80% 99% 16 60% 79% 12 40% 59% 14 20% 39% 16 0%- 19% 47 CONTRACTS AWARDED, NO PROGRESS 161 AUTHORIZED, NO CONTRACT 0 CHART 10 GAINS AND LOSSES OF MERCHANT OCEAN VESSELS * AVAILABLE TO THE UNITED NATIONS MILLIONS CUMULATIVE GAINS AND LOSSES SINCE DECEMBER 1, 1941 DEADWEIGHT TONS 50 40 30 24.2 20 16.8 10 LOSSES GAINS o o JFMAMJJASONDJ F M A M J a A $ o N 0 A , M A M J J A 5 o N o 1942 1943 1944 THOUSANDS MONTHLY TOTALS-GAINS AND LOSSES DEADWEIGHT TONS 2500 KEY GAINS 2000 LOSSES 1500 1000 500 o D J , M A M - , à 5 0 # o . F M à M J J A 5 0 # DJFMANJJASOND 1942 1943 1944 * LOSSES ON NOTIFICATION BASIS SOURCE WEEKLY REPORT OF THE COMBINED SHIPPING ADJUSTMENT BOARD CHART = DELIVERIES OF MERCHANT SHIPS BY U.S. SHIPBUILDERS U.S. MARITIME COMMISSION - PRIVATE AND BRITISH ACCOUNTS 1. DRY CARGO VESSELS NUMBER ( MAJOR TYPES) ACTUAL TOTAL 655 TOTAL 1440 150 140 LEGEND 130 ACTUAL SCHEDULED 120 110 100 90 80 70 60 50 40 30 20 10 o J F M A = J J A 5 o N o , F M A = J 4 A 5 o N D 1942 1943 2. TANKERS (MAJOR TYPES) NUMBER ACTUAL TOTAL 62 TOTAL 197 30 20 10 o / F M & E J é A 5 o N D di F M A M , J a 5 0 M o 1942 1943 SOURCE: MARITIME COMMISSION- SCHEDULE REVISED 3-31-43 CHART 12 STATUS OF BASIC WAR COMMODITIES PROGRAM SELECTED CRITICAL AND STRATEGIC MATERIALS (PERCENTAGES BASED ON QUANTITIES IN RECOMMENDED PURCHASE PROGRAM) AS OF AUGUST 15,1943 STATUS OF PROGRAM RECOMMENDED %UNDELIVERED %ON HAND COMMODITY PURCHASING PURCHASES PROGRAM % RELEASED %NOT PURCHASED o 20 40 60 so 100 104 ALCOHOL 125,000,000 GAL. ANTIMONY 24,992ST. CHROME ORE 1,950,000 L.T. DIAMOND DIES 60,000 DIES MANGANESE ORE 3,300,000 L.T. MANILA FIBER 2,037,268 BALES MERCURY 87,200 FLASKS MICA 14,415 S.T. NICKEL, Motte Content 15,000 S.T. NITRATE OF SODA 2,100,000 S.T. OPIUM 640,000 LBS. QUARTZ CRYSTALS 2,099,270 LBS. QUININE SULPHATE 12,450,000 AV.OZ. * RUBBER 1,900,000 L.T. SILK 100,000 BALES TIN, Refined 307,433 LT. TUNGSTEN ORE 40,500 S.T. ZINC CONCENTRATE 1,600,000 S.T. ZINC METAL 160,000 S.T. * LATEST PROGRAM RECOMMENDS PURCHASE OF ALL AVAILABLE CHART 13 MONTHLY WAR DISBURSEMENTS ON AN ANNUAL BASIS BILLION DOLLARS PER YEAR 100 KEY NET RFC AND OTHER NAVY ARMY 80 60 40 20 o , A $ o . D , , E A M , J a 5 o N o di F M A E 4 1943 1944 FISCAL YEARS