Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
174691058
label
"On the Floor" Drawings, #2
core
doc
dtoType
map
pageCount
1
Source metadata
id
174691058
contentType
map
title
"On the Floor" Drawings, #2
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691058
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
e34e2bad376eb07a
ocrText
United Reprographic Planroom Page 1 of 7 GOVENOR'S ISLAND: Set Order Full Set Order Individual Sheets Print Order File Name DrawingNumber Description Revision RevisionDate on the floor 2 CHILLED WATER/HOT WATER PIPING RISER FILE0001.TIF NY-0331 21 OF 32 APPROVED 7/30/93 DIAGRAM on the floor 2 NY-0331 22 OF 32 AIR RISER DIAGRAM \FILE0002.TIF APPROVED 7/30/93 on the floor 2 NY-0331 23 OF 32 \FILE0003.TIF HVAC SYMBOLS, SCHEDULES & NOTES APPROVED 7/30/93 on the floor 2 NY-0331 24 OF 32 BASEMENT ELECTRICAL PLAN \FILE0004.TIF APPROVED 7/30/93 on the floor 2 NY-0331 25 OF 32 1ST FLOOR ELECTRICAL PLAN \FILE0005.TIF APPROVED 7/30/93 on the floor 2 NY-0331 26 OF 32 2ND FLOOR ELECTRICAL PLAN APPROVED 7/30/93 \FILE0006.TIF on the floor 2 NY-0331 27 OF 32 ELECTRICAL RISER DIAGRAM APPROVED 7/30/93 \FILE0007.TIF on the floor 2 NY-0331 28 OF 32 BASEMENT PLUMBING PLAN APPROVED 7/30/93 \FILE0008.TIF on the floor 2 NY-0331 29 OF 32 1ST FLOOR PLUMBING PLAN APPROVED 7/30/93 \FILE0009.TIF on the floor 2 NY-0331 30 OF 32 2ND FLOOR PLUMBING PLAN APPROVED 7/30/93 \FILE0010.TIF on the floor 2 NY-0331 31 OF 32 SANITARY RISER DIAGRAM APPROVED 7/30/93 \FILE0011.TIF on the floor 2 NY-0331 32 OF 32 DOMESTIC WATER PIPING RISER DIAGRAM APPROVED 7/30/93 \FILE0012.TIF on the floor 2 NY-0332 1 OF 6 TITLE SHEET ARCH APPROVED 7/30/93 \FILE0013.TIF on the floor 2 NY-0332 2 OF 6 SITE PLAN ARCH APPROVED 7/30/93 \FILE0014.TIF on the floor 2 NY-0332 3 OF 6 FLOOR PLANS ARCH APPROVED \FILE0015.TIF 7/30/93 on the floor 2 NY-0332 4 OF 6 ELEVATIONS ARCH APPROVED 7/30/93 \FILE0016.TIF on the floor 2 NY-0332 5 OF 6 WINDOW SCHEDULE & DETAILS ARCH APPROVED 7/30/93 \FILE0017.TIF on the floor 2 NY-0332 6 OF 6 DETAILS ARCH APPROVED 7/30/93 \FILE0018.TIF on the floor 2 NY-0331 1 OF 32 TITLE SHEET ARCH APPROVED 7/30/93 \FILE0019.TIF on the floor 2 NY-0331 2 OF 32 SITE PLAN ARCH APPROVED 7/30/93 \FILE0020.TIF on the floor 2 NY-0331 3 OF 32 DEMOLITION PLANS ARCH APPROVED 7/30/93 \FILE0021.TIF on the floor 2 NY-0331 4 OF 32 BASEMENT FLOOR PLAN ARCH APPROVED 7/30/93 \FILE0022.TIF on the floor 2 NY-0331 5 OF 32 1ST FLOOR PLAN ARCH APPROVED 7/30/93 \FILE0023.TIF on the floor 2 NY-0331 6 OF 32 2ND FLOOR PLAN ARCH APPROVED 7/30/93 \FILE0024.TIF on the floor 2 BASEMENT REFLECTED CEILING PLAN NY-0331 7 OF 32 APPROVED 7/30/93 \FILE0025.TIF ARCH on the floor 2 1ST FLOOR REFLECTED CEILING PLAN NY-0331 8 OF 32 APPROVED 7/30/93 \FILE0026.TIF ARCH United Reprographic Planroom Page 2 of 7 on the floor 2 2ND FLOOR REFLECTED CEILING PLAN NY-0331 9 OF 32 \FILE0027.TIF APPROVED 7/30/93 ARCH on the floor 2 NY-0331 10 OF 32 SECTIONS ARCH \FILE0028.TIF APPROVED 7/30/93 on the floor 2 NY-0331 11 OF 32 KITCHEN ELEVATIONS & DETAILS ARCH APPROVED 7/30/93 \FILE0029.TIF on the floor 2 NY-0331 12 OF 32 BATHROOM ELEVATIONS & DETAILS ARCH APPROVED 7/30/93 \FILE0030.TIF on the floor 2 FINISH SCHEDULE & NOTES NY-0331 13 OF 32 APPROVED 7/30/93 \FILE0031.TIF ARCHITECTURAL on the floor 2 NY-0331 14 OF 32 WALL TYPES & DOOR DETAILS ARCH APPROVED 7/30/93 \FILE0032.TIF on the floor 2 NY-0331 14 OF 32 DETAILS ARCH APPROVED 7/30/93 \FILE0033.TIF on the floor 2 NY-0331 16 OF 32 DETAILS ARCH APPROVED 7/30/93 \FILE0034.TIF on the floor 2 NY-0331 17 OF 32 DETAILS ARCH APPROVED 7/30/93 \FILE0035.TIF on the floor 2 NY-0331 18 OF 32 BASEMENT HVAC PLAN APPROVED 7/30/93 \FILE0036.TIF on the floor 2 NY-0331 19 OF 32 1ST FLOOR HVAC PLAN APPROVED 7/30/93 \FILE0037.TIF on the floor 2 NY-0331 20 OF 32 2ND FLOOR HVAC PLAN APPROVED 7/30/93 \FILE0038.TIF on the floor 2 NY-0363 1 OF 1 ARCH 1ST FLOOR CARPET PLAN \FILE0039.TIF on the floor 2 BLDG 400L 4TH FLOOR VIEW SCHEME 1 \FILE0040.TIF on the floor 2 4TH FLOOR USCG SPACE DESIGN \FILE0041.TIF on the floor 2 AS IS PLAN BLDG 400 SECTIONS L, M & N 1966-400-A1 REVISION 1 12/16/86 \FILE0042.TIF 3RD FLOOR on the floor 2 AS IS PLAN BLDG 400 SECTIONS L, M & N 1966-400-A1 REVISION 1 12/16/86 \FILE0043.TIF 2ND FLOOR on the floor 2 AS IS PLAN BLDG 400 SECTIONS L, M & N 1966-400-A1 15 16 OF 25 \FILE0044.TIF 1ST FLOOR on the floor 2 SCHEME 1 REVISION 11/24/87 \FILE0045.TIF on the floor 2 BLDG 400 UPH SECTIONS A-F ELECTRICAL NY-0360 11 OF 13 APPROVED 7/31/92 \FILE0046.TIF POWER PLAN on the floor 2 BLDG 400 UPH SECTIONS A-F PLUMBING NY-0360 10 OF 13 APPROVED 7/31/92 \FILE0047.TIF RISERS & DETAILS on the floor 2 BLDG 400 UPH SECTIONS A-F PLUMBING NY-0360 9 OF 13 APPROVED 7/31/92 \FILE0048.TIF PLAN on the floor 2 NY-0360 7 OF 13 BLDG 400 UPH SECTIONS A-F HVAC PLAN APPROVED 7/31/92 \FILE0049.TIF on the floor 2 BLDG 400 UPH SECTIONS A-F HVAC NY-0360 8 OF 13 APPROVED 7/31/92 \FILE0050.TIF DETAILS on the floor 2 BLDG 400 UPH SECTIONS A-F NY-0360 6 OF 13 APPROVED 7/31/92 \FILE0051.TIF DETAILS/ROOF PLAN on the floor 2 BLDG 400 UPH SECTIONS A-F ELECTRICAL NY-0360 13 OF 13 APPROVED 7/31/92 \FILE0052.TIF DETAILS on the floor 2 BLDG 400 UPH SECTIONS A-F LIGHTING NY-0360 12 OF 13 APPROVED 7/31/92 \FILE0053.TIF PLAN on the floor 2 BLDG 400 UPH SECTIONS A-F ELECTRICAL NY-0360 13 OF 13 APPROVED 7/31/92 \FILE0054.TIF DETAILS on the floor 2 BLDG 400 UPH SECTIONS A-F LIGHTING NY-0360 12 OF 13 APPROVED 7/31/92 \FILE0055.TIF PLAN on the floor 2 BLDG 400 UPH SECTIONS A-F ELECTRICAL NY-0360 11 OF 13 APPROVED 7/31/92 \FILE0056.TIF POWER PLAN on the floor 2 BLDG 400 UPH SECTIONS A-F PLUMBING NY-0360 10 OF 13 APPROVED 7/31/92 \FILE0057.TIF RISERS & DETAILS on the floor 2 BLDG 400 UPH SECTIONS A-F PLUMBING NY-0360 9 OF 13 APPROVED 7/31/92 \FILE0058.TIF PLAN United Reprographic Planroom Page 3 of 7 on the floor 2 BLDG 400 UPH SECTIONS A-F NY-0360 5 OF 13 \FILE0059.TIF APPROVED 7/31/92 SCHEDULES/DETAILS/ELEVATIONS on the floor 2 BLDG 400 UPH SECTIONS A-F RELFECTED NY-0360 4 OF 13 APPROVED 7/31/92 \FILE0060.TIF CEILING PLANS on the floor 2 NY-0360 3 OF 13 BLDG 400 UPH SECTIONS A-F FLOOR PLANS APPROVED 7/31/92 \FILE0061.TIF on the floor 2 BLDG 400 UPH SECTIONS A-F DEMOLITION NY-0360 2 OF 13 APPROVED 7/31/92 \FILE0062.TIF PLANS on the floor 2 NY-0360 1 OF 13 BLDG 400 UPH SECTIONS A-F COVER SHEET APPROVED \FILE0063.TIF 7/31/92 on the floor 2 BLDG 400 UPH SECTIONS A-F DEMOLITION NY-0360 2 OF 13 APPROVED 7/31/92 \FILE0064.TIF PLANS on the floor 2 NY-0360 3 OF 13 BLDG 400 UPH SECTIONS A-F FLOOR PLANS APPROVED 7/31/92 \FILE0065.TIF on the floor 2 NY-0360 4 OF 13 REFLECTED CEILING PLANS APPROVED 7/31/92 \FILE0066.TIF on the floor 2 NY-0360 5 OF 13 SCHEDULES/DETAILS/ELEVATIONS APPROVED 7/31/92 \FILE0067.TIF on the floor 2 NY-0509 1 OF 5 BLDG 106 TITLE SHEET APPROVED 1/27/95 \FILE0068.TIF on the floor 2 NY-0509 2 OF 5 BLDG 106 SITE PLAN APPROVED 1/27/95 \FILE0069.TIF on the floor 2 NY-0509 3 OF 5 BLDG 106 NEW VALVE PIT ROOF APPROVED 1/27/95 \FILE0070.TIF on the floor 2 NY-0509 4 OF 5 BLDG 106 VAVLE PIT PLAN & SECTION APPROVED 1/27/95 \FILE0071.TIF on the floor 2 BLDG 106 ELECTRICAL SITE PLAN & NY-0509 OF 5 APPROVED 1/27/95 \FILE0072.TIF DETAILS on the floor 2 BLDG 400 UPH SECTIONS A-F NY-0360 OF 13 APPROVED 7/31/92 \FILE0073.TIF DETAILS/ROOF PLAN on the floor 2 NY-0360 7 OF 13 BLDG 400 UPH SECTIONS A-F HVAC PLAN APPROVED 7/31/92 \FILE0074.TIF on the floor 2 BLDG 400 UPH SECTIONS A-F HVAC NY-0360 8 OF 13 APPROVED 7/31/92 \FILE0075.TIF DETAILS on the floor 2 NY-0360 1 OF 13 BLDG 400 UPH SECTIONS A-F COVER SHEET APPROVED 7/31/92 \FILE0076.TIF on the floor 2 2-5 ALTERATIONS & ADDITION BLDG #2 4/12/39 \FILE0077.TIF on the floor 2 2-6 ALTERATIONS & ADDITION BLDG #2 4/12/39 \FILE0078.TIF on the floor 2 2-4 ALTERATIONS & ADDITION BLDG #2 4/12/39 \FILE0079.TIF on the floor 2 511-11 TYPICAL FLOOR PLANS & PLOT PLAN REVISION 2 7/56 \FILE0080.TIF on the floor 2 HALF FLOOR PLAN 2ND FLOOR FOR \FILE0081.TIF INSTALLATION OF FLOOR COVERING on the floor 2 251-9 \FILE0082.TIF on the floor 2 NE- MAIN FLOOR PLAN FINAL DESIGN STUDY APP'D 7/28/89 \FILE0083.TIF on the floor 2 NE-0324 3 OF 14 ARCH BASEMENT FLOOR PLAN APP'D 7/28/89 \FILE0084.TIF on the floor 2 \FILE0085.TIF on the floor 2 AS IS PLAN BLDG 400 SECTIONS.. 4TH 1966-400-A1 28 19 OF 25 \FILE0086.TIF FLOOR on the floor 2 NE- \FILE0087.TIF on the floor 2 BLDG 400-NEW HUMAN RESOURCES 9/27/77 \FILE0088.TIF SCHOOL LAYOUT (400-H-2) on the floor 2 BLDG 400-NEW HUMAN RESOURCES 9/27/77 \FILE0089.TIF SCHOOL LAYOUT (400-H-2) on the floor 2 BLDG 400-NEW HUMAN RESOURCES 9/27/77 \FILE0090.TIF SCHOOL LAYOUT (400-H-2) United Reprographic Planroom Page 4 of 7 on the floor 2 \FILE0091.TIF on the floor 2 7030 C5 19 OF 108 SITE PLAN REVISION D 6/8/85 \FILE0092.TIF on the floor 2 SUBMITTAL #4 5/26/93 \FILE0093.TIF on the floor 2 CONTRACTORS PROPOSED SCHEDULE OF 1 OF 8 \FILE0094.TIF PROGRESS on the floor 2 NY-0368 T-1 OF 26 TITLE SHEET APPROVED 6/22/92 \FILE0095.TIF on the floor 2 ASBESTOS REMOVAL PLAN ROOF PLAN NY-0368 ARP-1 2 OF 26 APPROVED 6/22/92 \FILE0096.TIF (SECT. C-E) on the floor 2 ASBESTOS REMOVAL PLAN ROOF PLANS NY-0368 ARP-2 3 OF 26 APPROVED 6/22/92 \FILE0097.TIF (SECT. F-H) on the floor 2 ASBESTOS REMOVAL PLAN ROOF PLAN NY-0368 ARP-3 4 OF 26 APPROVED 6/22/92 \FILE0098.TIF (SECT. K-M) on the floor 2 ASBESTOS REMOVAL PLAN ROOF PLAN NY-0368 ARP-4 5 OF 26 APPROVED 6/22/92 \FILE0099.TIF (SECT. N-R) on the floor 2 NY-0368 ARP-5 6 OF 26 ASBESTOS REMOVAL PLAN APPROVED 6/22/92 \FILE0100.TIF on the floor 2 NY-0368 ARP-6 7 OF 26 ASBESTOS REMOVAL PLAN APPROVED 6/22/92 \FILE0101.TIF on the floor 2 NY-0368 ARP-7 8 OF 26 ASBESTOS REMOVAL PLAN APPROVED 6/22/92 \FILE0102.TIF on the floor 2 NY-0368 ARP-8 9 OF 26 ASBESTOS REMOVAL PLAN APPROVED 6/22/92 \FILE0103.TIF on the floor 2 NY-0368 A-1 OF 26 BLDG 134 ELEVS/SECTION APPROVED 6/22/92 \FILE0104.TIF on the floor 2 NY-0368 A-2 OF 26 BLDG 111 ROOF PLAN APPROVED 6/22/92 \FILE0105.TIF on the floor 2 NY-0368 A-3 OF 26 BLDG 112 ROOF PLAN APPROVED 6/22/92 \FILE0106.TIF on the floor 2 NY-0368 A-4 13 OF 26 BLDG 515 ROOF PLAN APPROVED 6/22/92 \FILE0107.TIF on the floor 2 NY-0368 A-5 14 OF 26 BLDG 515 SECTIONS APPROVED 6/22/92 \FILE0108.TIF on the floor 2 NY-0368 A-6 14 OF 26 BLDG 12 ROOF PLAN (SECT. C-E) APPROVED 6/22/92 \FILE0109.TIF on the floor 2 NY-0368 A-7 16 OF 26 BLDG 12 ROOF PLAN (SECT. F-H) APPROVED 6/22/92 \FILE0110.TIF on the floor 2 NY-0368 A-8 17 OF 26 BLDG 12 ROOF PLAN (SECT. K-M) APPROVED 6/22/92 \FILE0111.TIF on the floor 2 NY-0368 A-9 18 OF 26 BLDG 12 ROOF PLAN (SECT. N-R) APPROVED 6/22/92 \FILE0112.TIF on the floor 2 11031 OF 1 \FILE0113.TIF on the floor 2 NY-0368 A-10 19 OF 26 BLDG 12, 134, 515 DETAILS APPROVED 6/22/92 \FILE0114.TIF on the floor 2 NY-0368 A-11 OF 26 BLDG 12, 134, 515 DETAILS APPROVED 6/22/92 \FILE0115.TIF on the floor 2 NY-0368 A-12 21 OF 26 BLDG 12, 134, 515 DETAILS APPROVED 6/22/92 \FILE0116.TIF on the floor 2 NY-0368 A-13 22 OF 26 BLDG 12, 134, 515 DETAILS APPROVED 6/22/92 \FILE0117.TIF on the floor 2 NY-0368 A-14 23 OF 26 BLDG 134 ROOF PHOTO DETAILS APPROVED 6/22/92 \FILE0118.TIF on the floor 2 NY-0368 A-15 OF 26 BLDG 111, 112 ROOF PHOTO DETAILS APPROVED 6/92 \FILE0119.TIF on the floor 2 NY-0368 A-16 25 OF 26 BLDG 515 ROOF PHOTO DETAILS APPROVED 6/92 \FILE0120.TIF on the floor 2 NY-0368 A-17 26 OF 26 BLDG 515 ROOF PHOTO DETAILS APPROVED 6/92 \FILE0121.TIF on the floor 2 RENOVATION OF BLDG #107 1ST FLOOR NY-0363 OF 30 REVISION 2 3/29/94 \FILE0122.TIF POWER PLAN United Reprographic Planroom Page 5 of 7 on the floor 2 FUTURE VESTIBULE REVISION \FILE0123.TIF 5/24/94 on the floor 2 A-01 1ST FLOOR REVISION 3 4/15/94 \FILE0124.TIF on the floor 2 EXISTING EXTERIOR ELEVATIONS 03-6442 OF 33 4/18/86 \FILE0125.TIF REMOVALS on the floor 2 FOUR FAMILY RESIDENCE ELEVATION & 404-5 5 OF 5 APPROVED 12/19/56 \FILE0126.TIF SECTION on the floor 2 405-3 3 OF 3 ELEVATION & SECTION 12/19/56 \FILE0127.TIF on the floor 2 3 OF 3 DUPLEX RESIDENCE ELEVATION & SECTION 12/19/56 \FILE0128.TIF on the floor 2 406-3 3 OF 3 DUPLEX RESIDENCE ELEVATIN & SECTION 12/19/56 \FILE0129.TIF on the floor 2 408-3 3 OF 3 DUPLEX RESIDENCE ELEVATIN & SECTION 12/19/56 \FILE0130.TIF on the floor 2 NY-0436 1 OF 6 ARCH TITLE SHEET APPROVED 7/30/93 \FILE0131.TIF on the floor 2 NY-0436 2 OF 6 ARCH ROOF PLANS APPROVED 7/30/93 \FILE0132.TIF on the floor 2 NY-0436 3 OF 6 ARCH ROOF PLANS APPROVED 7/30/93 \FILE0133.TIF on the floor 2 NY-0436 4 OF 6 ARCH DETAILS APPROVED 7/30/93 \FILE0134.TIF on the floor 2 NY-0436 5 OF 6 ARCH TRIM DETAILS APPROVED 7/30/93 \FILE0135.TIF on the floor 2 NY-0436 OF 6 ARCH GUTTER DETAILS APPROVED 7/30/93 \FILE0136.TIF on the floor 2 ELECTRICAL FIRE DETECTION PLAN & 03-5404 REVISION A \FILE0137.TIF DETAILS on the floor 2 \FILE0138.TIF on the floor 2 190-119-MH9 1 OF 1 REPLACE OIL SWITCH AT BLDG #400 6/18/91 \FILE0139.TIF on the floor 2 110-34 BLDG 11- AS BUILT APPROVED \FILE0140.TIF on the floor 2 DUPLEX RESIDENCE BASEMENT, 1ST & 2ND 410-1 1 OF 2 APPROVED 12/19/56 \FILE0141.TIF FLOOR PLAN on the floor 2 REPLACEMENT OF FUSE PANELS IN BLDG 190-064-324 1 OF 1 6/6/91 \FILE0142.TIF #324 on the floor 2 REPLACEMENT OF FUSE PANELS IN BLDG 190-064-324 1 OF 1 6/6/91 \FILE0143.TIF #324 on the floor 2 OIL COOLED DEAD FRONT 150 KVA 890-129-012 1 OF 1 APPROVED 7/7/88 \FILE0144.TIF DISTRIBUTION TRANSFORMER on the floor 2 BLDG 301 1 OF 1 FACILITIES ENGINEERING \FILE0145.TIF on the floor 2 MODIFICATION TO RETURN AIR BASEMENT 1 OF 1 10/92 \FILE0146.TIF BLDG #110 on the floor 2 IMPROVE HEATING SYSTEM JEWISH \FILE0147.TIF 090-314-040 1 OF 1 CHAPEL on the floor 2 91.-117-550 1 OF 1 BOILER ROM LIGHTING PLAN \FILE0148.TIF on the floor 2 REPLACEMENT OF FUSE PANELS IN BLDG 190-064-324 1 OF 1 7/3/91 \FILE0149.TIF #324 on the floor 2 SECTIONS K THRU M ENERGY EFFICIENT 090-284-012 1 OF 1 \FILE0150.TIF LIGHTING OF COMMON AREAS BLDG 12 BASEMENT-SECTINS N THRU R on the floor 2 090-285-012 1 OF 1 INSTALLATION OF NEW ENERGY EFFICIENT \FILE0151.TIF LIGHTING IN COMMON AREAS on the floor 2 640-313-409 5 OF ELECTRICAL RISER DIAGRAM 2/13/89 \FILE0152.TIF on the floor 2 640-313-409 4 OF 5 ELECTRICAL ATTIC FLOOR PLAN & DETAILS 2/13/89 \FILE0153.TIF on the floor 2 640-313-409 3 OF 5 ELECTRICAL 2ND FLOOR PLAN 2/13/89 \FILE0154.TIF United Reprographic Planroom Page 6 of 7 on the floor 2 640-313-409 2 OF 5 ELECTRICAL 1ST FLOOR PLAN & LEGEND \FILE0155.TIF 2/13/89 on the floor 2 ELECTRICAL BASEMENT FLOOR PLAN & 640-313-409 1 OF 5 2/13/89 \FILE0156.TIF NOTES on the floor 2 INSTALLATION OF FIRE ALARM SYSTEM & 640-313-409 1 OF 1 11/19/88 \FILE0157.TIF DEVICES AT BLDG 409-BOQ on the floor 2 03-6093 1 OF 3 MECHANICAL PLAN, SECTIONS & DETAILS APPROVED \FILE0158.TIF on the floor 2 MECHANICAL EQUIPMENT SCHEDULES & NE-0193 32 OF 159 APPROVED 6/13/90 \FILE0159.TIF DETAILS on the floor 2 NE-0193 MECHANICAL EQUIPMENT SCHEDULES APPROVED \FILE0160.TIF on the floor 2 MECHANICAL BASEMENT FLOOR PLAN & NE-0193 27 OF 50 APPROVED 6/13/90 \FILE0161.TIF LEGEND on the floor 2 NE-0193 28 OF 50 MECHANICAL DETAILS 1 APPROVED 6/13/90 \FILE0162.TIF on the floor 2 NE-0193 29 OF 50 MECHANICAL DETAILS 2 APPROVED 6/13/90 \FILE0163.TIF on the floor 2 MECHANICAL RISER DIAGRAM FAN COIL NE-0193 APPROVED 6/13/90 \FILE0164.TIF UNIT SCHEDULE & DETAILS on the floor 2 MECHANICAL FLOW DIAGRAM & BOILER NE-0193 APPROVED 6/13/90 \FILE0165.TIF DETAILS on the floor 2 MECHANICAL PART BASEMENT PLAN & NE-0193 APPROVED 6/13/90 \FILE0166.TIF DETAILS on the floor 2 MECHANICAL 2ND FLOOR PLAN ATTIC PLAN NE-0193 APPROVED 6/13/90 \FILE0167.TIF & SECTIONS on the floor 2 MECHANICAL 1ST FLOOR PLAN PART PLAN NE-0193 23 OF 50 APPROVED 6/13/90 \FILE0168.TIF & DETAILS on the floor 2 NE-0193 30 OF 50 MECHANICAL AIR HANDLING UNIT, APPROVED 6/13/90 \FILE0169.TIF EXHAUST FAN SCHEDULES & DETAILS on the floor 2 MECHANICAL FUEL OIL FLOW DIAGRAM & NE-0193 33 OF 50 APPROVED 6/13/90 \FILE0170.TIF DETAILS MECHANICAL & ELECTRICAL 1ST FLOOR on the floor 2 NE-0193 34 OF 50 DEMOLITION PLAN PART BASEMENT APPROVED 6/13/90 \FILE0171.TIF DEMOLITION PLAN & NOTES on the floor 2 MECHANICAL & ELECTRICAL 2ND FLOOR NE-0193 35 OF 50 APPROVED 6/13/90 \FILE0172.TIF DEMOLITION PLAN & NOTES on the floor 2 OIL COOLED DEAD FRONT 150 KVA 890-129-012 1 OF 1 7/7/88 \FILE0173.TIF DISTRIBUTION TRANSFORMER on the floor 2 39-1 FLOOR PLANS 4/23/36 \FILE0174.TIF on the floor 2 1ST FLOOR PLANS \FILE0175.TIF on the floor 2 2ND FLOOR PLAN \FILE0176.TIF on the floor 2 ELECTRICAL FIRE ALARM & EMERGENCY LT 03-5559 2 OF 2 REVISION B 7/23/84 \FILE0177.TIF SYS ALTERATIONS on the floor 2 614-0259-2 ELECVATIONS & ROOF PLAN APPROVED 4/15/36 \FILE0178.TIF on the floor 2 ELECTRICAL FIRE ALARM & EMERGENCY LT 03-5559 1 OF 2 REVISION A 5/25/76 \FILE0179.TIF SYS ALTERATIONS on the floor 2 1 OF 1 TOPOGRAPHIC SURVEY REVISION 1 3/91 \FILE0180.TIF on the floor 2 1 OF 2 TOPOGRAPHIC SURVEY 8/21/91 \FILE0181.TIF on the floor 2 2 OF 2 TOPOGRAPHIC SURVEY 8/21/91 \FILE0182.TIF on the floor 2 FIRE STATION SITE PLAN-EXISTING REVISION 2 1/14/85 \FILE0183.TIF on the floor 2 FIRE STATION SITE PLAN-EXISTING REVISION 2 1/14/85 \FILE0184.TIF on the floor 2 03-4399 29 OF 44 PLUMBING PLAN APPROVED 5/15/68 \FILE0185.TIF on the floor 2 03-4399 40 OF 44 ELECTRICAL PLAN APPROVED 5/15/68 \FILE0186.TIF United Reprographic Planroom Page 7 of 7 on the floor 2 03-4354 1 OF 1 TOPOGRAPHIC SURVEY APPROVED 1/25/67 \FILE0187.TIF on the floor 2 SURVEY & PLAN \FILE0188.TIF on the floor 2 CIVIL ENGINEERING REVISION B 4/18/69 \FILE0189.TIF on the floor 2 SITE UTILITY PLAN \FILE0190.TIF on the floor 2 03-15-80 3 OF 28 FIRE STATION SITE PLAN REVISION 1 4/9/85 \FILE0191.TIF on the floor 2 32-301-89 3 OF 10 SITE PLAN & DETAILS REVISION A 7/92 \FILE0192.TIF on the floor 2 03-05-83 SD-1 CIVIL SITE DEVELOPMENT PLAN AS BUILT 4/94 \FILE0193.TIF on the floor 2 BERVMART 5/82 \FILE0194.TIF on the floor 2 \FILE0195.TIF 195 Items 3.468