Ask the Scholar
Document scope · 1 page
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory.
For page-specific OCR and visual context, open one of the page chats.
Scholar Source Context
Document identity
localId
174691248
label
Building 400 - Liggett Hall
core
doc
dtoType
map
citationUrl
pageCount
1
Source metadata
id
174691248
contentType
map
title
Building 400 - Liggett Hall
citationUrl
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
thumbnailUrl
largeImageUrl
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691248
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
48027f6d91bf93ae
ocrText
United Reprographic Planroom
Page 1 of 10
GOVENOR'S ISLAND: Set
Order Full Set
Order Individual Sheets
Print
Order
File Name
DrawingNumber
Description
Revision
RevisionDate
roll#110-bldg#400
F.A SYSTEM BLDG.400-SECT. G&H
4/8/88
office\FILE0001.TIF
THIRD PLANS
roll#110-bldg#400
400-6325-1
EXISTING CONDITIONS
2-18-63
office\FILE0002.TIF
roll#110-bldg#400
PLUMBING AND ELECTRIC PLAN &
100-187
2-18-63
office\FILE0003.TIF
DETAILS
roll#110-bldg#400
100-185
HEATING PLAN
4/12/54
office\FILE0004.TIF
roll#110-bldg#400
400-27
INDUCED DRAFT SYSTEMS
10/58
office\FILE0005.TIF
roll#110-bldg#400
REMOVAL PLAN BUILDING 400
1966-400-R15
10/58
office\FILE0006.TIF
SECTIONS L,M & N THIRD FLOOR
roll#110-bldg#400
ARCHITECTURAL EXISTING FLOOR
03-5331 DWG 3 OF 3
10/58
office\FILE0007.TIF
PLAN
roll#110-bldg#400
REPLACEMENT OF LEADER AND
CGR-6602-3 DWG 3 OF 3
10/58
office\FILE0008.TIF
GUTTER VARIOUS BUILDINGS
roll#110-bldg#400
6305-237
10/58
office\FILE0009.TIF
roll#110-bldg#400
FIRST FLOOR PLANS UNITS
6
8/19/28
office\FILE0010.TIF
4,5,6,9,10,11
roll#110-bldg#400
SECOND AND THIRD FLOOR PLANS
7
8/19/28
office\FILE0011.TIF
UNITS
roll#110-bldg#400
9
FIRST FLOOR PLANS UNITS 7 AND 8
8/19/28
office\FILE0012.TIF
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A6
6/16/66
office\FILE0013.TIF
SECTIONS D,E & F SECOND FLOOR
roll#110-bldg#400
F.A SYSTEM BLDG.400-SECT. O FIRST
6/16/66
office\FILE0014.TIF
FLOOR PLAN
roll#110-bldg#400
F.A SYSTEM BLDG.400-SECT. O
6/16/66
office\FILE0015.TIF
SECOND FLOOR PLAN
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A11
6/16/66
office\FILE0016.TIF
SECTIONS G & H THIRD FLOOR
roll#110-bldg#400
F.A SYSTEM BLDG 400-SECT.A,B,C
6/16/66
office\FILE0017.TIF
FIRST FLOOR
FURNITURE & EQUIPMENT PLAN
roll#110-bldg#400
1966-400-FE13
BUILDING 400 SECTIONS L,M&N
6/16/66
office\FILE0018.TIF
FIRST FLOOR
FURNITURE & EQUIPMENT PLAN
roll#110-bldg#400
1966-400-FE15
BUILDING 400 SECTIONS L,M&N
6/16/66
office\FILE0019.TIF
THIRD FLOOR
HEATING AND PLUMBING BUILDING
roll#110-bldg#400
1966-400-HP13
400 SECTIONS L,M & N-FIRST FLOOR
6/16/66
office\FILE0020.TIF
PLAN AND DETAILS
HEATING AND PLUMBING BUILDING
roll#110-bldg#400
1966-400-HP14
400 SECTIONS L.M & N-SECOND
6/16/66
office\FILE0021.TIF
FLOOR PLAN AND DETAILS
HEATING AND PLUMBING BUILDING
roll#110-bldg#400
1966-400-HP15
400 SECTIONS L,M & N-THIRD FLOOR
6/16/66
office\FILE0022.TIF
PLAN AND DETAILS
FURNITURE & EQUIPMENT PLAN
roll#110-bldg#400
1966-400-FE14
BUILDING 400 SECTIONS L,M & N
6/16/66
office\FILE0023.TIF
SECOND FLOOR
roll#110-bldg#400
F.A SYSTEM BLDG.400-SECT. I,J,K
http://66.9.144.211/PNOnline/viewdetails.asp/a=editdiscipline8sid=9028paid=8998prid. 1/20/2006
United Reprographic Planroom
Page 2 of 10
office\FILE0024.TIF
SECOND FLOOR PLAN
6/16/66
roll#110-bldg#400
F.A SYSTEM BLDG.400-SECT. G & H
6/16/66
office\FILE0025.TIF
FOUR FLOOR GYM
roll#110-bldg#400
F.A SYSTEM BLDG.400-SECT. I,J,K
6/16/66
office\FILE0026.TIF
FIRST FLOOR PLANS
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R1
6/16/66
office\FILE0027.TIF
SECTIONS A,B & C FIRST FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R2
6/16/66
office\FILE0028.TIF
SECTIONS A,B & C SECOND FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R3
6/16/66
office\FILE0029.TIF
SECTIONS A,B & C THIRD FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R4
6/16/66
office\FILE0030.TIF
SECTIONS D,E & F FIRST FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R5
6/16/66
office\FILE0031.TIF
SECTIONS D,E & F SECOND FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R6
6/16/66
office\FILE0032.TIF
SECTIONS D,E & F THIRD FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R10
6/16/66
office\FILE0033.TIF
SECTIONS I.J & K FIRST FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R12
6/16/66
office\FILE0034.TIF
SECTIONS I.J & K THIRD FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R11
6/16/66
office\FILE0035.TIF
SECTIONS I.J & K SECOND FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R13
6/16/66
office\FILE0036.TIF
SECTIONS L.M & N FIRST FLOOR
roll#110-bldg#400
REMOVAL PLAN BUILING 400
1966-400-R14
6/16/66
office\FILE0037.TIF
SECTIONS L,M & N SECOND FLOOR
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A1
6/16/66
office\FILE0038.TIF
SECTIONS A,B & C FIRST FLOOR
roll#110-bldg#400
MODIFICATION OF BOILER PLANT
6325-2
6/16/66
office\FILE0039.TIF
BUILDING -400
MODIFICATION OF BOILER PLANT
roll#110-bldg#400
400-6325-3
BUILDING -400 PIPING & CONTROL
6/16/66
office\FILE0040.TIF
MODIFICATIONS
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A2
6/16/66
office\FILE0041.TIF
SECTIONS A,B & C SECOND FLOOR
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A3
6/16/66
office\FILE0042.TIF
SECTIONS A,B & C THIRD FLOOR
roll#110-bldg#400
DOOR SCHEDULE BUILDING 400
1966-400-A4
6/16/66
office\FILE0043.TIF
SECTIONS A,B & C
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A7
6/16/66
office\FILE0044.TIF
SECTIONS D,E & F THIRD FLOOR
roll#110-bldg#400
DOOR SCHEDULE BUILDING 400
1966-400-A8
6/16/66
office\FILE0045.TIF
SECTIONS D,E & F
roll#110-bldg#400
DOOR SCHEDULE BUILDING 400
1966-400-A12
6/16/66
office\FILE0046.TIF
SECTIONS G & H
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A10
6/16/66
office\FILE0047.TIF
SECTIONS G & H SECOND FLOOR
roll#110-bldg#400
F.A SYSTEM BLDG. 400-SECT. I,J,K
6/16/66
office\FILE0048.TIF
THIRD FLOOR PLANS
roll#110-bldg#400
GUN DECK ADDITION ELEVATION &
1966-400-A18
6/16/66
office\FILE0049.TIF
SECTIONS BUILDING 400 SECTION G
roll#110-bldg#400
GUN DECK ADDITION ELEVATION &
1966-400-A19
6/16/66
office\FILE0050.TIF
SECTIONS BUILDING 400 SECTION G
GUN DECK ADDITION FIRST FLOOR
roll#110-bldg#400
1966-400-A17
AND MEZZANINE PLAN BUILDING 400
6/16/66
office\FILE0051.TIF
SECTION G
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A20
6/16/66
office\FILE0052.TIF
SECTIONS I,J & K FIRST FLOOR
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A21
6/16/66
office\FILE0053.TIF
SECTIONS I,J & K SECOND FLOOR
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A22
office\FILE0054.TIF
6/16/66
SECTIONS I,J & K THIRD FLOOR
roll#110-bldg#400
DOOR SCHEDULE BUILDING 400
http://66 9 144211/PNOnline/viewdetails.asn?a=editdiscinline&sid=902qpaid=899&prid. 1/20/2006
United Reprographic Planroom
Page 3 of 10
office\FILE0055.TIF
1966-400-A23
SECTIONS I,J&K
6/16/66
ALTERATION PLAN BUILDING 400 NEW
roll#110-bldg#400
1966-400-A24
STORAGE LEANTO ADDITION FIRST
6/16/66
office\FILE0056.TIF
FLOOR-SECTIONS I & J
roll#110-bldg#400
DOOR SCHEDULE BUILDING 400
1966-400-A28
6/16/66
office\FILE0057.TIF
SECTIONS L,M & N
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A29
6/16/66
office\FILE0058.TIF
DETAILS OF TOILET ROOMS SHEET # 1
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A30
6/16/66
office\FILE0059.TIF
DETAILS OF TOILET ROOMS SHEET #2
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A31
6/16/66
office\FILE0060.TIF
DETAILS OF TOILET ROOMS SHEET # 3
roll#110-bldg#400
ALTERATION PLAN BUILDING 400
1966-400-A32
6/16/66
office\FILE0061.TIF
DETAILS OF TOILET ROOMS SHEET # 4
ALTERATION WORK BUILDING 400
roll#110-bldg#400
1966-400-A33
COUNTERS AND MISCELLANEOUS
6/16/66
office\FILE0062.TIF
DETAILS
ALTERATION WORK BUILDING 400
roll#110-bldg#400
1966-400-A34
DETAILS OF WALL PANELING AND
6/16/66
office\FILE0063.TIF
CUNTERS
TOILET AND LAUNDRY ROOM DETAILS
roll#110-bldg#400
1966-400-A36
BUILDING 400 SECTIONS A,C,L & N
6/16/66
office\FILE0064.TIF
FOURTH FLOOR
roll#110-bldg#400
ALTERATION WORK BUILDING 400
1966-400-A37
6/16/66
office\FILE0065.TIF
MISCELLANEOUS DETAILS
roll#110-bldg#400
BLDG.400 SECT.L & M 3 RD. FLOOR
SK-NY-028 DWG 1 OF 1
8/27/92
office\FILE0066.TIF
REHAB.
roll#110-bldg#400
PLAN. SECTIONS,ELAVTIONS &
740-277-402 DWG 1 OF 1
10/21/87
office\FILE0067.TIF
DETAILS
roll#110-bldg#400
ALTERATION PLAN BUILDING
1966-400-A5
10/21/87
office\FILE0068.TIF
SECTIONS D,E & F FIRST FLOOR
roll#110-bldg#400
ARCHITECTURAL PARTITION
SK-1502C DWG 1 OF 1
6/1/84
office\FILE0069.TIF
INSTALLATION
roll#110-bldg#400
INSTALLATION OF STORM WINDOWS
03-4338 DWG 1 OF 1
11/22/67
office\FILE0070.TIF
AND DOORS-BLDG# 400
roll#110-bldg#400
DWG 1 OF 1
NEW COTP/GROUP NEW YORK PLAN
9/16/77
office\FILE0071.TIF
roll#110-bidg#400
PLAN,SECTIONS,ELEVATIONS &
740-276-401 DWG 1 OF 1
8/9/87
office\FILE0072.TIF
DETAILS
roll#110-bldg#400
MECHANICAL INSTALLATION OF
03-4530 DWG 1 OF 1
1-29-69
office\FILE0073.TIF
WELDING EXHAUST SYSTEM
roll#110-bldg#400
03-5682 DWG 1 OF 2
RADAR TOWER PLOT PLAN
10/16/76
office\FILE0074.TIF
CONCRETE SPANDREL
roll#110-bldg#400
DWG 1 OF 1
BEAMS,COLUMNS,PILLASTERS AND
10-31-88
office\FILE0075.TIF
CORNICES
roll#110-bldg#400
440-099-400 DWG 1 OF 4
TITLE SHEET
10-31-88
office\FILE0076.TIF
roll#110-bldg#400
440-099-400 DWG 3 OF 4 GYM FLOOR PLAN & DETAILS
4-4-84
office\FILE0077.TIF
roll#110-bldg#400
440-099-400 DWG 4 OF 4 COURT LAYOUT & DETAILS
4-4-84
office\FILE0078.TIF
roll#110-bldg#400
DWG 1 OF 3
SECTIONS G & H FIRST FLOOR
10/7/86
office\FILE0079.TIF
roll#110-bldg#400
DWG 2 OF 3
SECTIONS G & H SECOND FLOOR
10/7/86
office\FILE0080.TIF
roll#110-bldg#400
DWG 3 OF 3
SECTIONS G & H THIRD FLOOR
10/7/86
office\FILE0081.TIF
roll#110-bldg#400
FIRST, SECOND & THIRD FLOORS
NY-0518 DWG 1 OF 1
10/14/94
office\FILE0082.TIF
PLANS
roll#110-bldg#400
NY-0518
10/14/94
office\FILE0083.TIF
roll#110-bldg#400
ELECTRICAL FIRST & SECOND FLOOR
NY-0356 DWG 16 OF 18
10/14/94
office\FILE0084.TIF
DEMOLITION PLANS
9 144 11/PNOnline/viewdetails asn?a=editdiscinline&sid=902&naid=899&nrid.
1/20/2006
United Reprographic Planroom
Page 4 of 10
roll#110-bldg#400
ELECTRICAL REFLECTED CEILING
NY-0356 DWG 17 OF 18
4-30-92
office\FILE0085.TIF
PLANS
roll#110-bldg#400
ELECTRICAL FIRST & SECOND FLOOR
NY-0356 DWG 18 OF 18
4-30-92
office\FILE0086.TIF
POWER AND SYSTEMS
roll#110-bldg#400
03-6573 DWG 13 OF 14
office\FILE0087.TIF
SCHEDULES,RISER DIAGRAMS
4/8/87
roll#110-bldg#400
03-6573 DWG 14 OF 14
FIXTURE SCHEDULE,LEGEND
4/8/87
office\FILE0088.TIF
roll#110-bldg#400
ELECTRICAL SECOND FL.REFLECTED
3/1/97
office\FILE0089.TIF
CEILING PLAN
roll#110-bldg#400
PROPOSED ELECTRIC POWER FOR
939-100-400 DWG 1 OF 1
8/24/79
office\FILE0090.TIF
TWO NEW WELDING BOOTHS
roll#110-bldg#400
03-6257 DWG E9 OF 9
ELECTRICAL REMOVAL PLANS
7-19-83
office\FILE0091.TIF
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 2 OF 10
7/21/81
office\FILE0092.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 3 OF 10
7/21/81
office\FILE0093.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 4 OF 10
7/21/81
office\FILE0094.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100- DWG 5 OF 10
7/21/81
office\FILE0095.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 6 OF 10
7/21/81
office\FILE0096.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 7 OF 10
7/21/81
office\FILE0097.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 8 OF 10
7/21/81
office\FILE0098.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 9 OF 10
7/21/81
office\FILE0099.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
SOLAR ENERGY SYSTEM FOR
03-6100 DWG 10 OF 10
7/21/81
office\FILE0100.TIF
DOMESTIC HOT WATER
roll#110-bldg#400
GYMNASIUM FLOOR REFINISHING
740-004-400 DWG 1 OF 1
4/19/77
office\FILE0101.TIF
BLDG.400-H
roll#110-bldg#400
CIVIL RADAR TOWER FOUNDATION
4/19/77
office\FILE0102.TIF
roll#110-bldg#400
VENTILATION FOR TRANSFORMER
540-348-400 DWG 1 OF 1
8/28/75
office\FILE0103.TIF
RM# 23 BLDG.400
roll#110-bldg#400
WELDING BOOTHS VENTILATION
539-043-400 DWG 1 OF 2
4-75
office\FILE0104.TIF
MECH
roll#110-bldg#400
539-043-400 DWG 2 OF 2
ELECTRICAL POWER FOR WELDERS
4-75
office\FILE0105.TIF
roll#110-bldg#400
MEZZANINE # 1 STRUC. ALTER. PLAN
03-4927 DWG 1 OF 1
5-26-71
office\FILE0106.TIF
SECT. & DETAILS
roll#110-bidg#400
03-5404 DWG A1
ARCHITECTURAL GENERAL SITE PLAN
9/18/75
office\FILE0107.TIF
roll#110-bldg#400
03-5404
ARCHITECTURAL GENERAL SITE PLAN
9/18/75
office\FILE0108.TIF
roll#110-bldg#400
03-5404 DWG A2 OF 12
ARCHITECTURAL SITE WORK DETAILS
9/13/74
office\FILE0109.TIF
roll#110-bldg#400
ARCHITECTURAL CROSS SECTIONS &
03-5404 DWG A5 OF 12
9/13/74
office\FILE0110.TIF
DETAILS
roll#110-bldg#400
03-5404 DWG A4 OF 12
ARCHITECTURAL CROSS SECTIONS
office\FILE0111.TIF
9/13/74
roll#110-bldg#400
ARCHITECTURAL TOILET PLAN-
03-5404 DWG A6 OF 12
office\FILE0112.TIF
9/13/74
ELEVATIONS & DETAILS
roll#110-bidg#400
ARCHITECTURAL INTERIOR
03-5404 DWG A7 OF 12
office\FILE0113.TIF
9/13/74
ELEVATIONS & DETAILS
roll#110-bldg#400
ARCHITECTURAL REFLECTED CEILING
office\FILE0114.TIF
03-5404 DWG A8 OF 12
PLAN & DETAILS
9/13/74
roll#110-bldg#400
03-5404 DWG A9 OF 12
ARCHITECTURAL FINISH SCHEDULE,
office\FILE0115.TIF
DOOR & JAMB DETAILS
9/13/74
roll#110-bldg#400
03-5404 DWG A10 OF 12
ARCHITECTURAL WINDOW SECTIONS
office\FILE0116.TIF
& MISC.DETAILS
9/13/74
United Reprographic Planroom
Page 5 of 10
roll#110-bldg#400
ARCHITECTURAL EXTERIOR DOOR
03-5404 DWG A11 OF 12
office\FILE0117.TIF
9/13/74
DETAILS
roll#110-bldg#400
ARCHITECTURAL MISCELLANOUS
03-5404 DWG A12 OF 12
9/13/74
office\FILE0118.TIF
DETAILS
roll#110-bldg#400
ARCHITECTURAL RADIATOR
03-5404 DWG M1 OF 5
9/13/74
office\FILE0119.TIF
LOCATION PLAN
roll#110-bldg#400
MECHANICAL AIR CONDITIONING &
03-5404 DWG M4 OF 5
9/13/74
office\FILE0120.TIF
VENTILATION CONTROLS
roll#110-bldg#400
PLUMBING CO2 FIRE EXTINGUISHING
03-5404 DWG P3 OF 3
9/13/74
office\FILE0121.TIF
SYSTEM
roll#110-bldg#400
03-5404 DWG E1 OF 9
ELECTRICAL PLAN & DETAILS
9/13/74
office\FILE0122.TIF
roll#110-bldg#400
ELECTRICAL LIGHTING PANEL &
03-5404 DWG E6 OF 9
9/13/74
office\FILE0123.TIF
FIXTURE SCHEDULES
roll#110-bldg#400
03-5404 DWG E7 OF 9
ELECTRICAL PANEL SCHEDULES
9/13/74
office\FILE0124.TIF
roll#110-bldg#400
ELECTRICAL HIGH VOLTAGE-PLAN &
03-5404 DWG E8 OF 9
9/13/74
office\FILE0125.TIF
DETAILS
roll#110-bldg#400
ELECTRICAL HIGH VOLTAGE-PLAN &
03-5404 DWG E9 OF 9
9/13/74
office\FILE0126.TIF
DETAILS
roll#110-bldg#400
ELECTRICAL ELEVATIONS AND
03-5391 DWG 2 OF 2
9/13/74
office\FILE0127.TIF
DETAILS-SECTION G & H
roll#110-bldg#400
03-5906
9/13/74
office\FILE0128.TIF
roll#110-bldg#400
MECHANICAL INSTALLATION OF
03-5705 DWG 2 OF 2
2-3-77
office\FILE0129.TIF
WINDOW FANS
roll#110-bldg#400
PLUMBING HOT & COLD WATER
03-5404 DWG PI OF 3
9/13/74
office\FILE0130.TIF
PIPING PLAN-DIAGRAM
roll#110-bldg#400
PLUMBING SEWAGE DRAINAGE,VENT
03-5404 DWG P2 OF 3
9/13/74
office\FILE0131.TIF
PLAN & RISER DIAGRAM
roll#110-bldg#400
MECHANICAL HEATING MODIFICATION
03-5404 DWG M2 OF 5
9/13/74
office\FILE0132.TIF
PLAN & DETAILS
roll#110-bldg#400
MECHANICAL AIR CONDITIONING & F.O
03-5404 DWG M5 OF 5
9/13/74
office\FILE0133.TIF
PIPING DETAILS
roll#110-bldg#400
03-5328 DWG 1 OF 1
BORING LOCATION PLAN
12-11-73
office\FILE0134.TIF
roll#110-bldg#400
ARCHITECTURAL REPAIRS TO
03-5096 DWG 3 OF 3
5-12-72
office\FILE0135.TIF
CONCRETE SURFACES
roll#110-bldg#400
MECHANICAL /ELECTRICAL HEATING
03-4917 DWG 1 OF 2
5-13-71
office\FILE0136.TIF
SYSTEM MODIFICATIONS
roll#110-bldg#400
MECHANICAL /ELECTRICAL HEATING
03-4917 DWG 2 OF 2
5-13-71
office\FILE0137.TIF
SYSTEM MODIFICATIONS
MECHANICAL -ELECTRICAL
roll#110-bldg#400
03-4924 DWG 2 OF 2
IMPROVEMENT TO DOMESTIC H.W
5/24/71
office\FILE0138.TIF
DIST SYSTEM
MECHANICAL -ELECTRICAL
roll#110-bldg#400
03-4727 DWG 1 OF 3
INSTALLATION OF LIGHT OIL BURNER
2-11-70
office\FILE0139.TIF
& CONTROLS
MECHANICAL -ELECTRICAL
roll#110-bldg#400
03-4727 DWG 2 OF 3
office\FILE0140.TIF
INSTALLATION OF LIGHT OIL BURNER
2-11-70
& CONTROLS
roll#110-bldg#400
ARCHITECTURAL ACOUSTICAL
03-4721 DWG 1 OF 2
1-12--70
office\FILE0141.TIF
CEILING INSTALLATION
roll#110-bldg#400
ARCHITECTURAL ACOUSTICAL
office\FILE0142.TIF
03-4721 DWG 2 OF 2
1-12--70
CEILING INSTALLATION
roll#110-bldg#400
ARCHITECTURAL ACOUSTICAL
03-4753 DWG 1 OF 2
office\FILE0143.TIF
CEILING INSTALLATION
3-17-70
roll#110-bldg#400
MECHANICAL-ELECTRICAL
office\FILE0144.TIF
03-4727 DWG 1 OF 3
INSTALLATION OF LIGHT OIL BURNERS
2-11-70
& CONTROLS
roll#110-bldg#400
MECHANICAL-ELECTRICAL
03-4727 DWG 3 OF 3
office\FILE0145.TIF
INSTALLATION OF LIGHT OIL BURNERS
2-11-70
& CONTROLS
roll#110-bldg#400
03-4338 DWG 1 OF 1
INSTALLATION OF STORM WINDOWS
office\FILE0146.TIF
AND DOORS-BLDG# 400
11-22-67
9 144 11/PNOnline/viewdetails asna=editdiscinline&sid=902&naid=8998nri
1/20/2006
United Reprographic Planroom
Page 6 of 10
ALTERNATE DETAIL FOR LAVATORIES
roll#110-bldg#400
3826-5 DWG 1 OF 1
IN BATTERRIES FOR BERTHING
11-22-67
office\FILE0147.TIF
AREAS. BUILDING 400
roll#110-bldg#400
REPLACEMENT OF GUTTERS &
400-67-42 DWG 2 OF 3
11/18/66
office\FILE0148.TIF
DOWNSPOUTS VARIOUS BUILDINGS
roll#110-bldg#400
REPAIRS & REROOFING OF BUILDING
400-67-42 DWG 3 OF 3
11/18/66
office\FILE0149.TIF
333,400 AND 550
roll#110-bldg#400
1966-400-AI3 DWG 6 OF
AS IS PLAN BUILDING 400 SECTIONS
11/18/66
office\FILE0150.TIF
25
A,B & C THIRD FLOOR
roll#110-bldg#400
1966-400-AI10 DWG 13
AS IS PLAN BUILDING 400 SECTIONS
11/18/66
office\FILE0151.TIF
OF 25
I,J & K FIRST FLOOR
roll#110-bldg#400
03-5391 DWG 1 OF 2
ELECTRICAL PLAN-SECTION G & H
11/18/66
office\FILE0152.TIF
roll#110-bidg#400
1966-400-AI15 DWG 8 OF
AS IS PLAN BUILDING 400 SECTIONS
11/18/66
office\FILE0153.TIF
25
D,E & F SECOND FLOOR
roll#110-bldg#400
1966-400-AI 6 DWG 9 OF
AS IS PLAN BUILDING 400 SECTIONS
11/18/66
office\FILE0154.TIF
25
D,E & F THIRD FLOOR
roll#110-bldg#400
BLDG.400-FIRST FLOOR AIR
03-4433 DWG 1 OF 3
6-18-68
office\FILE0155.TIF
CONDITIONING PLAN & SCHEDULES
roll#110-bldg#400
BLDG.400-FIRST FLOOR AIR
03-4433 DWG 2 OF 3
6-18-68
office\FILE0156.TIF
CONDITIONING PLAN & DETAILS
roll#110-bldg#400
BLDG.400-FIRST FLOOR AIR
03-4433 DWG 3 OF 3
6-18-68
office\FILE0157.TIF
CONDITIONING PLAN & DETAILS
roll#110-bidg#400
1966-400-AI 15 DWG 18
AS IS PLAN BUILDING 400 SECTIONS
6-18-68
office\FILE0158.TIF
OF 25
L,M & N THIRD FLOOR
roll#110-bldg#400
1966-400-AI 16 DWG 19
AS IS PLAN BUILDING 400 SECTIONS A
6-18-68
office\FILE0159.TIF
OF 25
& C, L & N FOURTH FLOOR
FURNITURE & EQUIPMENT PLAN
roll#110-bidg#400
1966-400-FE 16
BUILDING 400 SECTIONS A,C L & N
6-18-68
office\FILE0160.TIF
FOURTH FLOOR
roll#110-bldg#400
400-31
ENCLOSING OF PORCHES ETC
7/23/52
office\FILE0161.TIF
roll#110-bldg#400
REPAIR OF CUPOLA & SLYLIGHTS
400-69
7/23/52
office\FILE0162.TIF
GYMNASIUM
roll#110-bidg#400
BUILDING-400 BASEMENT & FIRST
9/30/63
office\FILE0163.TIF
FLOOR PLAN SECTION G & H
roll#110-bldg#400
03-4260-G1
INDEX,ABBREVIATIONS AND SYNBOLS
7/20/67
office\FILE0164.TIF
roll#110-bldg#400
7/20/67
office\FILE0165.TIF
roll#110-bldg#400
STRUCTURAL GENERAL NOTES &
03-4260-G3 DWG 3 OF 42
7/20/67
office\FILE0166.TIF
TEST BORINGS
roll#110-bldg#400
STRUCTURAL FOUNDATION & CELLAR
03-4260-S1 DWG 4 OF 42
7/20/67
office\FILE0167.TIF
PLAN, & DETAILS
roll#110-bldg#400
STRUCTURAL FOUNDATION & FIRST
03-4260-S2 DWG 5 OF 42
7/20/67
office\FILE0168.TIF
FLOOR DETAILS
roll#110-bldg#400
STRUCTURAL FIRST FLOOR
03-4260-S3 DWG 6 OF 42
7/20/67
office\FILE0169.TIF
PLAM,SECTIONS & DETAILS
roll#110-bldg#400
STRUCTURAL SECOND & THIRD
03-4260-S4 DWG 7 OF 42
7/20/67
office\FILE0170.TIF
FLOOR PLANS
roll#110-bldg#400
STRUCTURAL SECOND & THIRD
03-4260-S5 DWG 8 OF 42
7/20/67
office\FILE0171.TIF
FLOOR SECTIONS
roll#110-bldg#400
STRUCTURAL ATTIC FLOOR
03-4269-S6 DWG 9 OF42
7/20/67
office\FILE0172.TIF
PLAN,SECTIONS & DETAILS
roll#110-bldg#400
03-4260-S7 DWG 10 OF
STRUCTURAL SLAB SCHEDULE &
7/20/67
office\FILE0173.TIF
42
TYPICAL SECTIONS
roll#110-bldg#400
03-4260-S8 DWG 11 OF
STRUCTURAL COLUMN SCHEDULE &
7/20/67
office\FILE0174.TIF
42
DETAILS
roll#110-bldg#400
03-4260-S9 DWG 12 OF
STRUCTURAL BEAM SCHEDULE &
7/20/67
office\FILE0175.TIF
42
DETAILS
roll#110-bldg#400
03-4269-S10 DWG 13 OF
STRUCTURAL STAIR SECTIONS &
7/20/67
office\FILE0176.TIF
42
DETAILS
roll#110-bldg#400
03-4260-A1 DWG 14 OF
BASEMENT & TRENCH PLANS &
7/20/67
office\FILE0177.TIF
42
DETAILS
roll#110-bldg#400
03-4260-A2 DWG 15 OF
0
United Reprographic Planroom
Page 7 of 10
office\FILE0178.TIF
42
ARCHITECTURAL FIRST FLOOR PLAN
7/20/67
roll#110-bldg#400
03-4260-A3 DWG 16 OF
ARCHITECTURAL SECOND FLOOR
7/20/67
office\FILE0179.TIF
42
PLAN
roll#110-bldg#400
03-4260-A4 DWG 17 OF
ARCHITECTURAL THIRD FLOOR PLAN
7/20/67
office\FILE0180.TIF
42
roll#110-bldg#400
03-4260-A5 DWG 18 OF
ARCHITECTURAL ATTIC FLOOR &
7/20/67
office\FILE0181.TIF
42
ROOF DECK
roll#110-bldg#400
03-4260-A6 DWG 19 OF
EXTERIOR ELEVATIONS
7/20/67
office\FILE0182.TIF
42
roll#110-bldg#400
03-4260-A7 DWG 20 OF
EXTERIOR DETAILS
7/20/67
office\FILE0183.TIF
42
roll#110-bldg#400
03-4260-FE1 DWG 41 OF
FURNITURE & EQUIPMENT PLAN FIRST
7/20/67
office\FILE0184.TIF
42
& SECOND FLOORS
roll#110-bidg#400
03-4260-FE2 DWG 42 OF
FURNITURE & EQUIPMENT PLAN
7/20/67
office\FILE0185.TIF
42
THIRD FLOOR & ATTIC
roll#110-bldg#400
03-4260-A8 DWG 21 OF
CROSS SECTION THRU BUILDING
7/20/67
office\FILE0186.TIF
42
roll#110-bldg#400
7/20/67
office\FILE0187.TIF
roll#110-bldg#400
03-4260-A10 DWG 23 OF
PLANS & DETAILS OF STAIRWAYS
7/20/67
office\FILE0188.TIF
42
roll#110-bldg#400
03-4260-A11 DWG 24 OF
SECOND FLOOR ROOF DECK &
7/20/67
office\FILE0189.TIF
42
MISCELLANEOUS DETAILS
roll#110-bidg#400
03-4260-A12 DWG 25 OF
DOOR SCHEDULE AND DOOR DETAILS
7/20/67
office\FILE0190.TIF
42
roll#110-bidg#400
03-4260-A14 DWG 27 OF
PLANS,ELEVATIONS & DETAILS TOILET
7/20/67
office\FILE0191.TIF
42
& LAUNDRY ROOMS
roll#110-bldg#400
03-4260-A15 DWG 28 OF
CONTRACTOR FURNISHED
7/20/67
office\FILE0192.TIF
42
EQUIPMENT
roll#110-bldg#400
03-4260-A13 DWG 26 OF
WINDOW SCHEDULE AND WINDOW
7/20/67
office\FILE0193.TIF
42
DETAILS
roll#110-bldg#400
BUILDING-400 FIRST-SECOND-THIRD
6/17/62
office\FILE0194.TIF
FLOORS UNITS A-B-C
roll#110-bidg#400
BUILDING-400 FIRST-SECOND-THIRD
7/23/62
office\FILE0195.TIF
FLOORS UNITS-L-M-N
roll#110-bldg#400
1270-8
SECOND FLOOR PLANS UNITS 7 AND 8
7/23/62
office\FILE0196.TIF
roll#110-bldg#400
THIRD FLOOR PLANS UNITS 7 AND 8
7/23/62
office\FILE0197.TIF
roll#110-bldg#400
ELECTRICAL SECOND & THIRD
400-4
11/17/60
office\FILE0198.TIF
FLOORS-BLDG.400
roll#110-bldg#400
PLOT PLAN & INDEX
11/17/60
office\FILE0199.TIF
roll#110-bldg#400
11/17/60
office\FILE0200.TIF
roll#110-bldg#400
ARCHITECTURAL & PLUMBING
11/17/60
office\FILE0201.TIF
REHABILITION OF LATRINES
roll#110-bldg#400
ELECTRICAL-REHABILITION OF
11/17/60
office\FILE0202.TIF
LATRINES
ELECTRICAL ALTERATIONS
roll#110-bldg#400
400-32
office\FILE0203.TIF
TRANSFORMER AND UNDERGROUND
2/19/59
WIRING
BLDG 400 GYMNASIUM NEW ROOFING
roll#110-bldg#400
100-197
TO REPLACE SKYLIGHTS REBUILD
office\FILE0204.TIF
11/15/55
GUTTERS
BLDG 400 GYMNASIUM NEW ROOFING
roll#110-bldg#400
100
office\FILE0205.TIF
TO REPLACE SKYLIGHTS REBUILD
11/15/55
GUTTERS
roll#110-bldg#400
100-189
REVISION OF ELECTRICAL SYSTEM,
office\FILE0206.TIF
10/1/54
BLDG 400-H
roll#110-bldg#400
400-62-1
ACOUSTICAL TREATMENT BLDG 400-
office\FILE0207.TIF
SEC B-RM 6
8/16/61
roll#110-bldg#400
office\FILE0208.TIF
8/16/61
9 144 211/PNOnline/viewdetails asn?a=editdiscinline&sid=902&naid=899&nrid.
1/20/2006
United Reprographic Planroom
Page 8 of 10
roll#110-bldg#400
STRUCTURAL BRACES
8-28-90
office\FILE0209.TIF
roll#110-bldg#400
REPLACEMENT OF EXIST COLD
21-01-01 DWG 3 OF 5
8-28-90
office\FILE0210.TIF
WATER SUPPLY FIRST FLOOR PLAN
roll#110-bldg#400
REPLACEMENT OF EXIST COLD
21-01-01 DWG 5 OF 5
8-28-90
office\FILE0211.TIF
WATER SUPPLY THIRD FLOOR PLAN
roll#110-bidg#400
REPLACEMENT OF EXIST .COLD
21-01-01 DWG 4 OF 5
8-28-90
office\FILE0212.TIF
WATER SUPPLY SECOND FLOOR PLAN
roll#110-bldg#400
6/1/45
MISCELLANEOUS DETAILS
8-28-90
office\FILE0213.TIF
roll#110-bldg#400
SECOND FLOOR PLAN-UNITS 4,5,6 & 7
6/1/45
office\FILE0214.TIF
roll#110-bldg#400
FIRST FLOOR PLAN-UNITS 4,5,6 & 7
6/1/45
office\FILE0215.TIF
roll#110-bldg#400
THIRD FLOOR PLAN-UNITS 3,4,5,6 & 7
6/1/45
office\FILE0216.TIF
roll#110-bldg#400
6305-25
8/15/28
office\FILE0217.TIF
roll#110-bldg#400
F.A SYSTEM BLDG 400-SECT.A,B,C
8/15/28
office\FILE0218.TIF
SECOND FLOOR
roll#110-bidg#400
F.A SYSTEM BLDG 400-SECT.A,B,C
8/15/28
office\FILE0219.TIF
THIRD FLOOR
roll#110-bldg#400
F.A SYSTEM BLDG 400-SECT.D,E & F
8/15/28
office\FILE0220.TIF
SECOND FLOOR
roll#110-bldg#400
F.A SYSTEM BLDG 400-SECT.D,E & F
8/15/28
office\FILE0221.TIF
THIRD FLOOR
ELECTRICAL COMBUSTION CONTROL
roll#110-bldg#400
03-4603 DWG 1 OF 1
CENTER FOR BOILER WITH FULLY
5/15/65
office\FILE0222.TIF
MODULATING BURNERS
roll#110-bldg#400
12/10/86
office\FILE0223.TIF
roll#110-bldg#400
BLDG.400-SECT. M THIRD FLOOR AS IS
DWG 2 OF 2
12/10/86
office\FILE0224.TIF
PLAN
roll#110-bldg#400
BLDG.400-SECT. J& K FIRST FLOOR
3-13-87
office\FILE0225.TIF
AS IS PLAN
roll#110-bldg#400
ARCHITECTURAL GUTTER & LEADER
03-5367 DWG 1 OF 1
3-13-87
office\FILE0226.TIF
SYSTEM ALTERATION
roll#110-bldg#400
BUILDING 400-NEW ADMIN SPACES
DWG 1 OF 1
10/12/77
office\FILE0227.TIF
SECTION 400-F-1 & 400-G-1
NEW YORK BASE GOVERNORS ISLAND
roll#110-bldg#400
DWG 1 OF 2
BUILDING # 400 SOUTH PORTITON OF
10/12/77
office\FILE0228.TIF
EAST ELEVATION
NEW YORK BASE GOVERNORS ISLAND
roll#110-bldg#400
DWG 2 OF 2
BUILDING # 400 SOUTH PORTITON OF
10/12/77
office\FILE0229.TIF
EAST ELEVATION
roll#110-bldg#400
ARCHITECTURAL RELOCATION OF
SK-1343D DWG 3 OF 3
10/12/77
office\FILE0230.TIF
MARINE SCIENCE TRAINING
roll#110-bldg#400
ARCHITECTURAL SECOND & THIRD
03 DWG 4 OF 4
10/12/77
office\FILE0231.TIF
FLOOR PLAN -SECTION D,E & F
roll#110-bldg#400
ARCHITECTURAL FIRST FLOOR PLAN
03 DWG 3 OF 4
10/12/77
office\FILE0232.TIF
SECTION D,E & F
roll#110-bldg#400
ARCHITECTURAL FIRST FLOOR PLAN
03 DWG 1 OF 4
10/12/77
office\FILE0233.TIF
SECTION D,E & F
roll#110-bldg#400
BUILDING -400 FIRST-SECOND-THIRD
10/12/77
office\FILE0234.TIF
FLOORS UNITS D-E-F
roll#110-bldg#400
NY TRACEN BLDG.400 FOURTH FLOOR
SK-1002 DWG 1 OF 1
12-27-67
office\FILE0235.TIF
REC. RM
roll#110-bldg#400
1966-400-AI1 DWG 4 OF
AS IS PLAN BUILDING 400 SECTIONS
12-27-67
office\FILE0236.TIF
25
A,B & C FIRST FLOOR
roll#110-bldg#400
1966-400-AI2 DWG 5 OF
AS IS PLAN BUILDING 400 SECTIONS
12-27-67
office\FILE0237.TIF
25
A,B & C SECOND FLOOR
roll#110-bldg#400
1966-400-AI4 DWG 7 OF
AS IS PLAN BUILDING 400 SECTIONS
12-27-67
office\FILE0238.TIF
25
D,E & F FIRST FLOOR
roll#110-bldg#400
1966-400-Al11 DWG 14
AS IS PLAN BUILDING 400 SECTIONS
12-27-67
office\FILE0239.TIF
OF 25
I,J & K SECOND FLOOR
o 11/PNOnline/viewdetails
United Reprographic Planroom
Page 9 of 10
roll#110-bldg#400
1966-400-AI12 DWG 15
AS IS PLAN BUILDING 400 SECTIONS
12-27-67
office\FILE0240.TIF
OF 25
I,J & K THIRD FLOOR
roll#110-bldg#400
1966-400-AI13 DWG 16
AS IS PLAN BUILDING 400 SECTIONS
12-27-67
office\FILE0241.TIF
OF 25
L,M & N FIRST FLOOR
roll#110-bldg#400
740-127-400 DWG 1 OF 1
EXHAUST FAN GYM BLDG.400
12-27-67
office\FILE0242.TIF
roll#110-bldg#400
TEMPORARY HOUSING GROUPS A & B
6303-644
12-27-67
office\FILE0243.TIF
PLOT PLAN & ELECTRICAL LAYOUT
ELEVATIONS OF BUILDING# 400
roll#110-bldg#400
DAMAGE CONCRETE SPANDREL
890-131-LST
11/2/88
office\FILE0244.TIF
BEAMS COLUMN,PILASTERS, AND
CORNICES
roll#110-bldg#400
PROPOSED EXTENSION TO FIRE
SK-1332 DWG 1 OF 1
7/3/73
office\FILE0245.TIF
DETECTION SYSTEM
ELEVATIONS OF BUILDING# 400
roll#110-bldg#400
DAMAGE CONCRETE SPANDREL
890-131-LST
7/3/73
office\FILE0246.TIF
BEAMS COLUMN,PILASTERS, AND
CORNICES
roll#110-bldg#400
6305-256
INFANTRY REGIMENTAL BARRACKS
7/3/73
office\FILE0247.TIF
roll#110-bldg#400
6305-254
INFANTRY REGIMENTAL BARRACKS
7/3/73
office\FILE0248.TIF
roll#110-bldg#400
6305-255
INFANTRY REGIMENTAL BARRACKS
7/3/73
office\FILE0249.TIF
roll#110-bldg#400
INFANTRY REGIMENTAL BARRACKS
8/15/28
office\FILE0250.TIF
roll#110-bldg#400
6305-252
INFANTRY REGIMENTAL BARRACKS
8/15/28
office\FILE0251.TIF
roll#110-bldg#400
6305-253
INFANTRY REGIMENTAL BARRACKS
8/15/28
office\FILE0252.TIF
roll#110-bldg#400
6305-250
INFANTRY REGIMENTAL BARRACKS
8/15/28
office\FILE0253.TIF
roll#110-bldg#400
GENERAL PANS THIRD DRILL HALL
2
8/15/28
office\FILE0254.TIF
AND ROOF PLANS
roll#110-bldg#400
400-69 DWG 2 OF 2
PLAN & DETAILS OF CUPOLA
12/28/84
office\FILE0255.TIF
roll#110-bldg#400
CUPOLA & SKYLIGHTS OVER
400-69 DWG 1 OF 2
12/28/84
office\FILE0256.TIF
GYMNASIUM
roll#110-bldg#400
ARCHITECTURAL NEW WINDOW AND
03-5454 DWG 3 OF 3
12/28/84
office\FILE0257.TIF
MASSONRY RESTORATION
roll#110-bldg#400
10
SECOND FLOOR PLANS UNITS 7 AND 8
12/28/84
office\FILE0258.TIF
ELECTRICAL ALTERATIONS
roll#110-bidg#400
400-8 DWG 2 OF 4
TRANSFORMER & UNDERGORUND
12/28/84
office\FILE0259.TIF
WIRING
roll#110-bldg#400
6305-251
INFANTRY REGIMENTAL BARRACKS
8/15/28
office\FILE0260.TIF
roll#110-bldg#400
INFANTRY REGIMENTAL BARRACKS
8/15/28
office\FILE0261.TIF
roll#110-bldg#400
11
THIRD FLOOR PLANS UNITS 7 AND 8
8/15/28
office\FILE0262.TIF
roll#110-bldg#400
DETAILS FOR STANDARD MANHOLE
672-173
8/15/28
office\FILE0263.TIF
C.I FRAME AND COVER
roll#110-bldg#400
L1
SITE PLANTING PLAN
8/18/88
office\FILE0264.TIF
roll#110-bldg#400
PROPOSED HOT WATER LINE #
940-076-LST DWG 1 OF 1
9/18/68
office\FILE0265.TIF
400,517 & 550
roll#110-bldg#400
ACOUSTICAL CEILING INST. PLAN &
03-4434 DWG 1 OF 1
2-18-69
office\FILE0266.TIF
DETAILS
roll#110-bldg#400
ARCHITECTURAL NEW WINDOW AND
03-5454 DWG 2 OF 3
12/12/74
office\FILE0267.TIF
MASSONRY RESTORATION
roll#110-bldg#400
ARCHITECTURAL BRICK-UP WINDOW &
03-5705 DWG 1 OF 2
2-3-77
office\FILE0268.TIF
INSTALL EXHAUST FANS
roll#110-bldg#400
740-163-400H DWG 2 OF
BASKET REALIGNMENT AT BUILDING
6/14/77
office\FILE0269.TIF
2
400 H
a 144 /PNOnline/viewdetails
1/20/2006
United Reprographic Planroom
Page 10 of 10
roll#110-bldg#400
MECHANICAL DUCTWORK & PLUMB.-
03-5872 DWG 2 OF 4
12/4/78
office\FILE0270.TIF
PLAN-ELEV.
roll#110-bldg#400
MECH/ELEC CONTROL WIRING
03-5872 DWG 3 OF 4
12/4/78
office\FILE0271.TIF
DIAGRAMS
roll#110-bldg#400
03-5872 DWG 4 OF 4
ELECTRICAL INSTALLATIONS
12/4/78
office\FILE0272.TIF
roll#110-bldg#400
740-163-400 H DWG 1 OF
BASKET REALIGNMENT AT BUILDING
12/4/78
office\FILE0273.TIF
2
400 H
roll#110-bldg#400
ALTERATION TO BOILER ROOM
400-1
4/12/54
office\FILE0274.TIF
BUILDING 400-SECTION H
roll#110-bldg#400
6305-841
FIRST FLOOR PLAN-UNITS 4,5,6 & 7
4/12/54
office\FILE0275.TIF
INSTALLATION OF OBSTRUCTION &
roll#110-bldg#400
100-177
FLOOD LIGHTS ON BLDG 400
6-17-52
office\FILE0276.TIF
RELOCATE TRAFFIC SIGNALS
roll#110-bldg#400
REPLACEMENT OF EXIST.COLD
21-01-01 DWG 2 OF 5
11/30/48
office\FILE0277.TIF
WATER SUPPLY BASEMENT PLAN
ELEVATIONS OF BUILDING# 400
roll#110-bldg#400
DAMAGE CONCRETE SPANDREL
890-131-LST
11/2/88
office\FILE0278.TIF
BEAMS COLUMN,PILASTERS, AND
CORNICES
roll#110-bldg#400
03-5404
FIRST FLOOR ALTERATIONS
11/2/88
office\FILE0279.TIF
roll#110-bldg#400
SECOND AND THIRD PLANS FLOOR
11/2/88
office\FILE0280.TIF
PLANS UNITS 4,5,6,9,10,11
roll#110-bldg#400
11/2/88
office\FILE0281.TIF
roll#110-bldg#400
6305-245
INFANTRY REGIMENTAL BARRACKS
11/2/88
office\FILE0282.TIF
roll#110-bldg#400
6305-246
INFANTRY REGIMENTAL BARRACKS
11/2/88
office\FILE0283.TIF
283 Items
4.234
http://66.9.144.211/PNOnline/viewdetails.asp?a=editdiscipline&sid=902&paid=899&prid.
1/20/2006