Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
174691248
label
Building 400 - Liggett Hall
core
doc
dtoType
map
pageCount
1
Source metadata
id
174691248
contentType
map
title
Building 400 - Liggett Hall
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691248
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
48027f6d91bf93ae
ocrText
United Reprographic Planroom Page 1 of 10 GOVENOR'S ISLAND: Set Order Full Set Order Individual Sheets Print Order File Name DrawingNumber Description Revision RevisionDate roll#110-bldg#400 F.A SYSTEM BLDG.400-SECT. G&H 4/8/88 office\FILE0001.TIF THIRD PLANS roll#110-bldg#400 400-6325-1 EXISTING CONDITIONS 2-18-63 office\FILE0002.TIF roll#110-bldg#400 PLUMBING AND ELECTRIC PLAN & 100-187 2-18-63 office\FILE0003.TIF DETAILS roll#110-bldg#400 100-185 HEATING PLAN 4/12/54 office\FILE0004.TIF roll#110-bldg#400 400-27 INDUCED DRAFT SYSTEMS 10/58 office\FILE0005.TIF roll#110-bldg#400 REMOVAL PLAN BUILDING 400 1966-400-R15 10/58 office\FILE0006.TIF SECTIONS L,M & N THIRD FLOOR roll#110-bldg#400 ARCHITECTURAL EXISTING FLOOR 03-5331 DWG 3 OF 3 10/58 office\FILE0007.TIF PLAN roll#110-bldg#400 REPLACEMENT OF LEADER AND CGR-6602-3 DWG 3 OF 3 10/58 office\FILE0008.TIF GUTTER VARIOUS BUILDINGS roll#110-bldg#400 6305-237 10/58 office\FILE0009.TIF roll#110-bldg#400 FIRST FLOOR PLANS UNITS 6 8/19/28 office\FILE0010.TIF 4,5,6,9,10,11 roll#110-bldg#400 SECOND AND THIRD FLOOR PLANS 7 8/19/28 office\FILE0011.TIF UNITS roll#110-bldg#400 9 FIRST FLOOR PLANS UNITS 7 AND 8 8/19/28 office\FILE0012.TIF roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A6 6/16/66 office\FILE0013.TIF SECTIONS D,E & F SECOND FLOOR roll#110-bldg#400 F.A SYSTEM BLDG.400-SECT. O FIRST 6/16/66 office\FILE0014.TIF FLOOR PLAN roll#110-bldg#400 F.A SYSTEM BLDG.400-SECT. O 6/16/66 office\FILE0015.TIF SECOND FLOOR PLAN roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A11 6/16/66 office\FILE0016.TIF SECTIONS G & H THIRD FLOOR roll#110-bldg#400 F.A SYSTEM BLDG 400-SECT.A,B,C 6/16/66 office\FILE0017.TIF FIRST FLOOR FURNITURE & EQUIPMENT PLAN roll#110-bldg#400 1966-400-FE13 BUILDING 400 SECTIONS L,M&N 6/16/66 office\FILE0018.TIF FIRST FLOOR FURNITURE & EQUIPMENT PLAN roll#110-bldg#400 1966-400-FE15 BUILDING 400 SECTIONS L,M&N 6/16/66 office\FILE0019.TIF THIRD FLOOR HEATING AND PLUMBING BUILDING roll#110-bldg#400 1966-400-HP13 400 SECTIONS L,M & N-FIRST FLOOR 6/16/66 office\FILE0020.TIF PLAN AND DETAILS HEATING AND PLUMBING BUILDING roll#110-bldg#400 1966-400-HP14 400 SECTIONS L.M & N-SECOND 6/16/66 office\FILE0021.TIF FLOOR PLAN AND DETAILS HEATING AND PLUMBING BUILDING roll#110-bldg#400 1966-400-HP15 400 SECTIONS L,M & N-THIRD FLOOR 6/16/66 office\FILE0022.TIF PLAN AND DETAILS FURNITURE & EQUIPMENT PLAN roll#110-bldg#400 1966-400-FE14 BUILDING 400 SECTIONS L,M & N 6/16/66 office\FILE0023.TIF SECOND FLOOR roll#110-bldg#400 F.A SYSTEM BLDG.400-SECT. I,J,K http://66.9.144.211/PNOnline/viewdetails.asp/a=editdiscipline8sid=9028paid=8998prid. 1/20/2006 United Reprographic Planroom Page 2 of 10 office\FILE0024.TIF SECOND FLOOR PLAN 6/16/66 roll#110-bldg#400 F.A SYSTEM BLDG.400-SECT. G & H 6/16/66 office\FILE0025.TIF FOUR FLOOR GYM roll#110-bldg#400 F.A SYSTEM BLDG.400-SECT. I,J,K 6/16/66 office\FILE0026.TIF FIRST FLOOR PLANS roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R1 6/16/66 office\FILE0027.TIF SECTIONS A,B & C FIRST FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R2 6/16/66 office\FILE0028.TIF SECTIONS A,B & C SECOND FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R3 6/16/66 office\FILE0029.TIF SECTIONS A,B & C THIRD FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R4 6/16/66 office\FILE0030.TIF SECTIONS D,E & F FIRST FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R5 6/16/66 office\FILE0031.TIF SECTIONS D,E & F SECOND FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R6 6/16/66 office\FILE0032.TIF SECTIONS D,E & F THIRD FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R10 6/16/66 office\FILE0033.TIF SECTIONS I.J & K FIRST FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R12 6/16/66 office\FILE0034.TIF SECTIONS I.J & K THIRD FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R11 6/16/66 office\FILE0035.TIF SECTIONS I.J & K SECOND FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R13 6/16/66 office\FILE0036.TIF SECTIONS L.M & N FIRST FLOOR roll#110-bldg#400 REMOVAL PLAN BUILING 400 1966-400-R14 6/16/66 office\FILE0037.TIF SECTIONS L,M & N SECOND FLOOR roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A1 6/16/66 office\FILE0038.TIF SECTIONS A,B & C FIRST FLOOR roll#110-bldg#400 MODIFICATION OF BOILER PLANT 6325-2 6/16/66 office\FILE0039.TIF BUILDING -400 MODIFICATION OF BOILER PLANT roll#110-bldg#400 400-6325-3 BUILDING -400 PIPING & CONTROL 6/16/66 office\FILE0040.TIF MODIFICATIONS roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A2 6/16/66 office\FILE0041.TIF SECTIONS A,B & C SECOND FLOOR roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A3 6/16/66 office\FILE0042.TIF SECTIONS A,B & C THIRD FLOOR roll#110-bldg#400 DOOR SCHEDULE BUILDING 400 1966-400-A4 6/16/66 office\FILE0043.TIF SECTIONS A,B & C roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A7 6/16/66 office\FILE0044.TIF SECTIONS D,E & F THIRD FLOOR roll#110-bldg#400 DOOR SCHEDULE BUILDING 400 1966-400-A8 6/16/66 office\FILE0045.TIF SECTIONS D,E & F roll#110-bldg#400 DOOR SCHEDULE BUILDING 400 1966-400-A12 6/16/66 office\FILE0046.TIF SECTIONS G & H roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A10 6/16/66 office\FILE0047.TIF SECTIONS G & H SECOND FLOOR roll#110-bldg#400 F.A SYSTEM BLDG. 400-SECT. I,J,K 6/16/66 office\FILE0048.TIF THIRD FLOOR PLANS roll#110-bldg#400 GUN DECK ADDITION ELEVATION & 1966-400-A18 6/16/66 office\FILE0049.TIF SECTIONS BUILDING 400 SECTION G roll#110-bldg#400 GUN DECK ADDITION ELEVATION & 1966-400-A19 6/16/66 office\FILE0050.TIF SECTIONS BUILDING 400 SECTION G GUN DECK ADDITION FIRST FLOOR roll#110-bldg#400 1966-400-A17 AND MEZZANINE PLAN BUILDING 400 6/16/66 office\FILE0051.TIF SECTION G roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A20 6/16/66 office\FILE0052.TIF SECTIONS I,J & K FIRST FLOOR roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A21 6/16/66 office\FILE0053.TIF SECTIONS I,J & K SECOND FLOOR roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A22 office\FILE0054.TIF 6/16/66 SECTIONS I,J & K THIRD FLOOR roll#110-bldg#400 DOOR SCHEDULE BUILDING 400 http://66 9 144211/PNOnline/viewdetails.asn?a=editdiscinline&sid=902qpaid=899&prid. 1/20/2006 United Reprographic Planroom Page 3 of 10 office\FILE0055.TIF 1966-400-A23 SECTIONS I,J&K 6/16/66 ALTERATION PLAN BUILDING 400 NEW roll#110-bldg#400 1966-400-A24 STORAGE LEANTO ADDITION FIRST 6/16/66 office\FILE0056.TIF FLOOR-SECTIONS I & J roll#110-bldg#400 DOOR SCHEDULE BUILDING 400 1966-400-A28 6/16/66 office\FILE0057.TIF SECTIONS L,M & N roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A29 6/16/66 office\FILE0058.TIF DETAILS OF TOILET ROOMS SHEET # 1 roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A30 6/16/66 office\FILE0059.TIF DETAILS OF TOILET ROOMS SHEET #2 roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A31 6/16/66 office\FILE0060.TIF DETAILS OF TOILET ROOMS SHEET # 3 roll#110-bldg#400 ALTERATION PLAN BUILDING 400 1966-400-A32 6/16/66 office\FILE0061.TIF DETAILS OF TOILET ROOMS SHEET # 4 ALTERATION WORK BUILDING 400 roll#110-bldg#400 1966-400-A33 COUNTERS AND MISCELLANEOUS 6/16/66 office\FILE0062.TIF DETAILS ALTERATION WORK BUILDING 400 roll#110-bldg#400 1966-400-A34 DETAILS OF WALL PANELING AND 6/16/66 office\FILE0063.TIF CUNTERS TOILET AND LAUNDRY ROOM DETAILS roll#110-bldg#400 1966-400-A36 BUILDING 400 SECTIONS A,C,L & N 6/16/66 office\FILE0064.TIF FOURTH FLOOR roll#110-bldg#400 ALTERATION WORK BUILDING 400 1966-400-A37 6/16/66 office\FILE0065.TIF MISCELLANEOUS DETAILS roll#110-bldg#400 BLDG.400 SECT.L & M 3 RD. FLOOR SK-NY-028 DWG 1 OF 1 8/27/92 office\FILE0066.TIF REHAB. roll#110-bldg#400 PLAN. SECTIONS,ELAVTIONS & 740-277-402 DWG 1 OF 1 10/21/87 office\FILE0067.TIF DETAILS roll#110-bldg#400 ALTERATION PLAN BUILDING 1966-400-A5 10/21/87 office\FILE0068.TIF SECTIONS D,E & F FIRST FLOOR roll#110-bldg#400 ARCHITECTURAL PARTITION SK-1502C DWG 1 OF 1 6/1/84 office\FILE0069.TIF INSTALLATION roll#110-bldg#400 INSTALLATION OF STORM WINDOWS 03-4338 DWG 1 OF 1 11/22/67 office\FILE0070.TIF AND DOORS-BLDG# 400 roll#110-bldg#400 DWG 1 OF 1 NEW COTP/GROUP NEW YORK PLAN 9/16/77 office\FILE0071.TIF roll#110-bidg#400 PLAN,SECTIONS,ELEVATIONS & 740-276-401 DWG 1 OF 1 8/9/87 office\FILE0072.TIF DETAILS roll#110-bldg#400 MECHANICAL INSTALLATION OF 03-4530 DWG 1 OF 1 1-29-69 office\FILE0073.TIF WELDING EXHAUST SYSTEM roll#110-bldg#400 03-5682 DWG 1 OF 2 RADAR TOWER PLOT PLAN 10/16/76 office\FILE0074.TIF CONCRETE SPANDREL roll#110-bldg#400 DWG 1 OF 1 BEAMS,COLUMNS,PILLASTERS AND 10-31-88 office\FILE0075.TIF CORNICES roll#110-bldg#400 440-099-400 DWG 1 OF 4 TITLE SHEET 10-31-88 office\FILE0076.TIF roll#110-bldg#400 440-099-400 DWG 3 OF 4 GYM FLOOR PLAN & DETAILS 4-4-84 office\FILE0077.TIF roll#110-bldg#400 440-099-400 DWG 4 OF 4 COURT LAYOUT & DETAILS 4-4-84 office\FILE0078.TIF roll#110-bldg#400 DWG 1 OF 3 SECTIONS G & H FIRST FLOOR 10/7/86 office\FILE0079.TIF roll#110-bldg#400 DWG 2 OF 3 SECTIONS G & H SECOND FLOOR 10/7/86 office\FILE0080.TIF roll#110-bldg#400 DWG 3 OF 3 SECTIONS G & H THIRD FLOOR 10/7/86 office\FILE0081.TIF roll#110-bldg#400 FIRST, SECOND & THIRD FLOORS NY-0518 DWG 1 OF 1 10/14/94 office\FILE0082.TIF PLANS roll#110-bldg#400 NY-0518 10/14/94 office\FILE0083.TIF roll#110-bldg#400 ELECTRICAL FIRST & SECOND FLOOR NY-0356 DWG 16 OF 18 10/14/94 office\FILE0084.TIF DEMOLITION PLANS 9 144 11/PNOnline/viewdetails asn?a=editdiscinline&sid=902&naid=899&nrid. 1/20/2006 United Reprographic Planroom Page 4 of 10 roll#110-bldg#400 ELECTRICAL REFLECTED CEILING NY-0356 DWG 17 OF 18 4-30-92 office\FILE0085.TIF PLANS roll#110-bldg#400 ELECTRICAL FIRST & SECOND FLOOR NY-0356 DWG 18 OF 18 4-30-92 office\FILE0086.TIF POWER AND SYSTEMS roll#110-bldg#400 03-6573 DWG 13 OF 14 office\FILE0087.TIF SCHEDULES,RISER DIAGRAMS 4/8/87 roll#110-bldg#400 03-6573 DWG 14 OF 14 FIXTURE SCHEDULE,LEGEND 4/8/87 office\FILE0088.TIF roll#110-bldg#400 ELECTRICAL SECOND FL.REFLECTED 3/1/97 office\FILE0089.TIF CEILING PLAN roll#110-bldg#400 PROPOSED ELECTRIC POWER FOR 939-100-400 DWG 1 OF 1 8/24/79 office\FILE0090.TIF TWO NEW WELDING BOOTHS roll#110-bldg#400 03-6257 DWG E9 OF 9 ELECTRICAL REMOVAL PLANS 7-19-83 office\FILE0091.TIF roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 2 OF 10 7/21/81 office\FILE0092.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 3 OF 10 7/21/81 office\FILE0093.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 4 OF 10 7/21/81 office\FILE0094.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100- DWG 5 OF 10 7/21/81 office\FILE0095.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 6 OF 10 7/21/81 office\FILE0096.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 7 OF 10 7/21/81 office\FILE0097.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 8 OF 10 7/21/81 office\FILE0098.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 9 OF 10 7/21/81 office\FILE0099.TIF DOMESTIC HOT WATER roll#110-bldg#400 SOLAR ENERGY SYSTEM FOR 03-6100 DWG 10 OF 10 7/21/81 office\FILE0100.TIF DOMESTIC HOT WATER roll#110-bldg#400 GYMNASIUM FLOOR REFINISHING 740-004-400 DWG 1 OF 1 4/19/77 office\FILE0101.TIF BLDG.400-H roll#110-bldg#400 CIVIL RADAR TOWER FOUNDATION 4/19/77 office\FILE0102.TIF roll#110-bldg#400 VENTILATION FOR TRANSFORMER 540-348-400 DWG 1 OF 1 8/28/75 office\FILE0103.TIF RM# 23 BLDG.400 roll#110-bldg#400 WELDING BOOTHS VENTILATION 539-043-400 DWG 1 OF 2 4-75 office\FILE0104.TIF MECH roll#110-bldg#400 539-043-400 DWG 2 OF 2 ELECTRICAL POWER FOR WELDERS 4-75 office\FILE0105.TIF roll#110-bldg#400 MEZZANINE # 1 STRUC. ALTER. PLAN 03-4927 DWG 1 OF 1 5-26-71 office\FILE0106.TIF SECT. & DETAILS roll#110-bidg#400 03-5404 DWG A1 ARCHITECTURAL GENERAL SITE PLAN 9/18/75 office\FILE0107.TIF roll#110-bldg#400 03-5404 ARCHITECTURAL GENERAL SITE PLAN 9/18/75 office\FILE0108.TIF roll#110-bldg#400 03-5404 DWG A2 OF 12 ARCHITECTURAL SITE WORK DETAILS 9/13/74 office\FILE0109.TIF roll#110-bldg#400 ARCHITECTURAL CROSS SECTIONS & 03-5404 DWG A5 OF 12 9/13/74 office\FILE0110.TIF DETAILS roll#110-bldg#400 03-5404 DWG A4 OF 12 ARCHITECTURAL CROSS SECTIONS office\FILE0111.TIF 9/13/74 roll#110-bldg#400 ARCHITECTURAL TOILET PLAN- 03-5404 DWG A6 OF 12 office\FILE0112.TIF 9/13/74 ELEVATIONS & DETAILS roll#110-bidg#400 ARCHITECTURAL INTERIOR 03-5404 DWG A7 OF 12 office\FILE0113.TIF 9/13/74 ELEVATIONS & DETAILS roll#110-bldg#400 ARCHITECTURAL REFLECTED CEILING office\FILE0114.TIF 03-5404 DWG A8 OF 12 PLAN & DETAILS 9/13/74 roll#110-bldg#400 03-5404 DWG A9 OF 12 ARCHITECTURAL FINISH SCHEDULE, office\FILE0115.TIF DOOR & JAMB DETAILS 9/13/74 roll#110-bldg#400 03-5404 DWG A10 OF 12 ARCHITECTURAL WINDOW SECTIONS office\FILE0116.TIF & MISC.DETAILS 9/13/74 United Reprographic Planroom Page 5 of 10 roll#110-bldg#400 ARCHITECTURAL EXTERIOR DOOR 03-5404 DWG A11 OF 12 office\FILE0117.TIF 9/13/74 DETAILS roll#110-bldg#400 ARCHITECTURAL MISCELLANOUS 03-5404 DWG A12 OF 12 9/13/74 office\FILE0118.TIF DETAILS roll#110-bldg#400 ARCHITECTURAL RADIATOR 03-5404 DWG M1 OF 5 9/13/74 office\FILE0119.TIF LOCATION PLAN roll#110-bldg#400 MECHANICAL AIR CONDITIONING & 03-5404 DWG M4 OF 5 9/13/74 office\FILE0120.TIF VENTILATION CONTROLS roll#110-bldg#400 PLUMBING CO2 FIRE EXTINGUISHING 03-5404 DWG P3 OF 3 9/13/74 office\FILE0121.TIF SYSTEM roll#110-bldg#400 03-5404 DWG E1 OF 9 ELECTRICAL PLAN & DETAILS 9/13/74 office\FILE0122.TIF roll#110-bldg#400 ELECTRICAL LIGHTING PANEL & 03-5404 DWG E6 OF 9 9/13/74 office\FILE0123.TIF FIXTURE SCHEDULES roll#110-bldg#400 03-5404 DWG E7 OF 9 ELECTRICAL PANEL SCHEDULES 9/13/74 office\FILE0124.TIF roll#110-bldg#400 ELECTRICAL HIGH VOLTAGE-PLAN & 03-5404 DWG E8 OF 9 9/13/74 office\FILE0125.TIF DETAILS roll#110-bldg#400 ELECTRICAL HIGH VOLTAGE-PLAN & 03-5404 DWG E9 OF 9 9/13/74 office\FILE0126.TIF DETAILS roll#110-bldg#400 ELECTRICAL ELEVATIONS AND 03-5391 DWG 2 OF 2 9/13/74 office\FILE0127.TIF DETAILS-SECTION G & H roll#110-bldg#400 03-5906 9/13/74 office\FILE0128.TIF roll#110-bldg#400 MECHANICAL INSTALLATION OF 03-5705 DWG 2 OF 2 2-3-77 office\FILE0129.TIF WINDOW FANS roll#110-bldg#400 PLUMBING HOT & COLD WATER 03-5404 DWG PI OF 3 9/13/74 office\FILE0130.TIF PIPING PLAN-DIAGRAM roll#110-bldg#400 PLUMBING SEWAGE DRAINAGE,VENT 03-5404 DWG P2 OF 3 9/13/74 office\FILE0131.TIF PLAN & RISER DIAGRAM roll#110-bldg#400 MECHANICAL HEATING MODIFICATION 03-5404 DWG M2 OF 5 9/13/74 office\FILE0132.TIF PLAN & DETAILS roll#110-bldg#400 MECHANICAL AIR CONDITIONING & F.O 03-5404 DWG M5 OF 5 9/13/74 office\FILE0133.TIF PIPING DETAILS roll#110-bldg#400 03-5328 DWG 1 OF 1 BORING LOCATION PLAN 12-11-73 office\FILE0134.TIF roll#110-bldg#400 ARCHITECTURAL REPAIRS TO 03-5096 DWG 3 OF 3 5-12-72 office\FILE0135.TIF CONCRETE SURFACES roll#110-bldg#400 MECHANICAL /ELECTRICAL HEATING 03-4917 DWG 1 OF 2 5-13-71 office\FILE0136.TIF SYSTEM MODIFICATIONS roll#110-bldg#400 MECHANICAL /ELECTRICAL HEATING 03-4917 DWG 2 OF 2 5-13-71 office\FILE0137.TIF SYSTEM MODIFICATIONS MECHANICAL -ELECTRICAL roll#110-bldg#400 03-4924 DWG 2 OF 2 IMPROVEMENT TO DOMESTIC H.W 5/24/71 office\FILE0138.TIF DIST SYSTEM MECHANICAL -ELECTRICAL roll#110-bldg#400 03-4727 DWG 1 OF 3 INSTALLATION OF LIGHT OIL BURNER 2-11-70 office\FILE0139.TIF & CONTROLS MECHANICAL -ELECTRICAL roll#110-bldg#400 03-4727 DWG 2 OF 3 office\FILE0140.TIF INSTALLATION OF LIGHT OIL BURNER 2-11-70 & CONTROLS roll#110-bldg#400 ARCHITECTURAL ACOUSTICAL 03-4721 DWG 1 OF 2 1-12--70 office\FILE0141.TIF CEILING INSTALLATION roll#110-bldg#400 ARCHITECTURAL ACOUSTICAL office\FILE0142.TIF 03-4721 DWG 2 OF 2 1-12--70 CEILING INSTALLATION roll#110-bldg#400 ARCHITECTURAL ACOUSTICAL 03-4753 DWG 1 OF 2 office\FILE0143.TIF CEILING INSTALLATION 3-17-70 roll#110-bldg#400 MECHANICAL-ELECTRICAL office\FILE0144.TIF 03-4727 DWG 1 OF 3 INSTALLATION OF LIGHT OIL BURNERS 2-11-70 & CONTROLS roll#110-bldg#400 MECHANICAL-ELECTRICAL 03-4727 DWG 3 OF 3 office\FILE0145.TIF INSTALLATION OF LIGHT OIL BURNERS 2-11-70 & CONTROLS roll#110-bldg#400 03-4338 DWG 1 OF 1 INSTALLATION OF STORM WINDOWS office\FILE0146.TIF AND DOORS-BLDG# 400 11-22-67 9 144 11/PNOnline/viewdetails asna=editdiscinline&sid=902&naid=8998nri 1/20/2006 United Reprographic Planroom Page 6 of 10 ALTERNATE DETAIL FOR LAVATORIES roll#110-bldg#400 3826-5 DWG 1 OF 1 IN BATTERRIES FOR BERTHING 11-22-67 office\FILE0147.TIF AREAS. BUILDING 400 roll#110-bldg#400 REPLACEMENT OF GUTTERS & 400-67-42 DWG 2 OF 3 11/18/66 office\FILE0148.TIF DOWNSPOUTS VARIOUS BUILDINGS roll#110-bldg#400 REPAIRS & REROOFING OF BUILDING 400-67-42 DWG 3 OF 3 11/18/66 office\FILE0149.TIF 333,400 AND 550 roll#110-bldg#400 1966-400-AI3 DWG 6 OF AS IS PLAN BUILDING 400 SECTIONS 11/18/66 office\FILE0150.TIF 25 A,B & C THIRD FLOOR roll#110-bldg#400 1966-400-AI10 DWG 13 AS IS PLAN BUILDING 400 SECTIONS 11/18/66 office\FILE0151.TIF OF 25 I,J & K FIRST FLOOR roll#110-bldg#400 03-5391 DWG 1 OF 2 ELECTRICAL PLAN-SECTION G & H 11/18/66 office\FILE0152.TIF roll#110-bidg#400 1966-400-AI15 DWG 8 OF AS IS PLAN BUILDING 400 SECTIONS 11/18/66 office\FILE0153.TIF 25 D,E & F SECOND FLOOR roll#110-bldg#400 1966-400-AI 6 DWG 9 OF AS IS PLAN BUILDING 400 SECTIONS 11/18/66 office\FILE0154.TIF 25 D,E & F THIRD FLOOR roll#110-bldg#400 BLDG.400-FIRST FLOOR AIR 03-4433 DWG 1 OF 3 6-18-68 office\FILE0155.TIF CONDITIONING PLAN & SCHEDULES roll#110-bldg#400 BLDG.400-FIRST FLOOR AIR 03-4433 DWG 2 OF 3 6-18-68 office\FILE0156.TIF CONDITIONING PLAN & DETAILS roll#110-bldg#400 BLDG.400-FIRST FLOOR AIR 03-4433 DWG 3 OF 3 6-18-68 office\FILE0157.TIF CONDITIONING PLAN & DETAILS roll#110-bidg#400 1966-400-AI 15 DWG 18 AS IS PLAN BUILDING 400 SECTIONS 6-18-68 office\FILE0158.TIF OF 25 L,M & N THIRD FLOOR roll#110-bldg#400 1966-400-AI 16 DWG 19 AS IS PLAN BUILDING 400 SECTIONS A 6-18-68 office\FILE0159.TIF OF 25 & C, L & N FOURTH FLOOR FURNITURE & EQUIPMENT PLAN roll#110-bidg#400 1966-400-FE 16 BUILDING 400 SECTIONS A,C L & N 6-18-68 office\FILE0160.TIF FOURTH FLOOR roll#110-bldg#400 400-31 ENCLOSING OF PORCHES ETC 7/23/52 office\FILE0161.TIF roll#110-bldg#400 REPAIR OF CUPOLA & SLYLIGHTS 400-69 7/23/52 office\FILE0162.TIF GYMNASIUM roll#110-bidg#400 BUILDING-400 BASEMENT & FIRST 9/30/63 office\FILE0163.TIF FLOOR PLAN SECTION G & H roll#110-bldg#400 03-4260-G1 INDEX,ABBREVIATIONS AND SYNBOLS 7/20/67 office\FILE0164.TIF roll#110-bldg#400 7/20/67 office\FILE0165.TIF roll#110-bldg#400 STRUCTURAL GENERAL NOTES & 03-4260-G3 DWG 3 OF 42 7/20/67 office\FILE0166.TIF TEST BORINGS roll#110-bldg#400 STRUCTURAL FOUNDATION & CELLAR 03-4260-S1 DWG 4 OF 42 7/20/67 office\FILE0167.TIF PLAN, & DETAILS roll#110-bldg#400 STRUCTURAL FOUNDATION & FIRST 03-4260-S2 DWG 5 OF 42 7/20/67 office\FILE0168.TIF FLOOR DETAILS roll#110-bldg#400 STRUCTURAL FIRST FLOOR 03-4260-S3 DWG 6 OF 42 7/20/67 office\FILE0169.TIF PLAM,SECTIONS & DETAILS roll#110-bldg#400 STRUCTURAL SECOND & THIRD 03-4260-S4 DWG 7 OF 42 7/20/67 office\FILE0170.TIF FLOOR PLANS roll#110-bldg#400 STRUCTURAL SECOND & THIRD 03-4260-S5 DWG 8 OF 42 7/20/67 office\FILE0171.TIF FLOOR SECTIONS roll#110-bldg#400 STRUCTURAL ATTIC FLOOR 03-4269-S6 DWG 9 OF42 7/20/67 office\FILE0172.TIF PLAN,SECTIONS & DETAILS roll#110-bldg#400 03-4260-S7 DWG 10 OF STRUCTURAL SLAB SCHEDULE & 7/20/67 office\FILE0173.TIF 42 TYPICAL SECTIONS roll#110-bldg#400 03-4260-S8 DWG 11 OF STRUCTURAL COLUMN SCHEDULE & 7/20/67 office\FILE0174.TIF 42 DETAILS roll#110-bldg#400 03-4260-S9 DWG 12 OF STRUCTURAL BEAM SCHEDULE & 7/20/67 office\FILE0175.TIF 42 DETAILS roll#110-bldg#400 03-4269-S10 DWG 13 OF STRUCTURAL STAIR SECTIONS & 7/20/67 office\FILE0176.TIF 42 DETAILS roll#110-bldg#400 03-4260-A1 DWG 14 OF BASEMENT & TRENCH PLANS & 7/20/67 office\FILE0177.TIF 42 DETAILS roll#110-bldg#400 03-4260-A2 DWG 15 OF 0 United Reprographic Planroom Page 7 of 10 office\FILE0178.TIF 42 ARCHITECTURAL FIRST FLOOR PLAN 7/20/67 roll#110-bldg#400 03-4260-A3 DWG 16 OF ARCHITECTURAL SECOND FLOOR 7/20/67 office\FILE0179.TIF 42 PLAN roll#110-bldg#400 03-4260-A4 DWG 17 OF ARCHITECTURAL THIRD FLOOR PLAN 7/20/67 office\FILE0180.TIF 42 roll#110-bldg#400 03-4260-A5 DWG 18 OF ARCHITECTURAL ATTIC FLOOR & 7/20/67 office\FILE0181.TIF 42 ROOF DECK roll#110-bldg#400 03-4260-A6 DWG 19 OF EXTERIOR ELEVATIONS 7/20/67 office\FILE0182.TIF 42 roll#110-bldg#400 03-4260-A7 DWG 20 OF EXTERIOR DETAILS 7/20/67 office\FILE0183.TIF 42 roll#110-bldg#400 03-4260-FE1 DWG 41 OF FURNITURE & EQUIPMENT PLAN FIRST 7/20/67 office\FILE0184.TIF 42 & SECOND FLOORS roll#110-bidg#400 03-4260-FE2 DWG 42 OF FURNITURE & EQUIPMENT PLAN 7/20/67 office\FILE0185.TIF 42 THIRD FLOOR & ATTIC roll#110-bldg#400 03-4260-A8 DWG 21 OF CROSS SECTION THRU BUILDING 7/20/67 office\FILE0186.TIF 42 roll#110-bldg#400 7/20/67 office\FILE0187.TIF roll#110-bldg#400 03-4260-A10 DWG 23 OF PLANS & DETAILS OF STAIRWAYS 7/20/67 office\FILE0188.TIF 42 roll#110-bldg#400 03-4260-A11 DWG 24 OF SECOND FLOOR ROOF DECK & 7/20/67 office\FILE0189.TIF 42 MISCELLANEOUS DETAILS roll#110-bidg#400 03-4260-A12 DWG 25 OF DOOR SCHEDULE AND DOOR DETAILS 7/20/67 office\FILE0190.TIF 42 roll#110-bidg#400 03-4260-A14 DWG 27 OF PLANS,ELEVATIONS & DETAILS TOILET 7/20/67 office\FILE0191.TIF 42 & LAUNDRY ROOMS roll#110-bldg#400 03-4260-A15 DWG 28 OF CONTRACTOR FURNISHED 7/20/67 office\FILE0192.TIF 42 EQUIPMENT roll#110-bldg#400 03-4260-A13 DWG 26 OF WINDOW SCHEDULE AND WINDOW 7/20/67 office\FILE0193.TIF 42 DETAILS roll#110-bldg#400 BUILDING-400 FIRST-SECOND-THIRD 6/17/62 office\FILE0194.TIF FLOORS UNITS A-B-C roll#110-bidg#400 BUILDING-400 FIRST-SECOND-THIRD 7/23/62 office\FILE0195.TIF FLOORS UNITS-L-M-N roll#110-bldg#400 1270-8 SECOND FLOOR PLANS UNITS 7 AND 8 7/23/62 office\FILE0196.TIF roll#110-bldg#400 THIRD FLOOR PLANS UNITS 7 AND 8 7/23/62 office\FILE0197.TIF roll#110-bldg#400 ELECTRICAL SECOND & THIRD 400-4 11/17/60 office\FILE0198.TIF FLOORS-BLDG.400 roll#110-bldg#400 PLOT PLAN & INDEX 11/17/60 office\FILE0199.TIF roll#110-bldg#400 11/17/60 office\FILE0200.TIF roll#110-bldg#400 ARCHITECTURAL & PLUMBING 11/17/60 office\FILE0201.TIF REHABILITION OF LATRINES roll#110-bldg#400 ELECTRICAL-REHABILITION OF 11/17/60 office\FILE0202.TIF LATRINES ELECTRICAL ALTERATIONS roll#110-bldg#400 400-32 office\FILE0203.TIF TRANSFORMER AND UNDERGROUND 2/19/59 WIRING BLDG 400 GYMNASIUM NEW ROOFING roll#110-bldg#400 100-197 TO REPLACE SKYLIGHTS REBUILD office\FILE0204.TIF 11/15/55 GUTTERS BLDG 400 GYMNASIUM NEW ROOFING roll#110-bldg#400 100 office\FILE0205.TIF TO REPLACE SKYLIGHTS REBUILD 11/15/55 GUTTERS roll#110-bldg#400 100-189 REVISION OF ELECTRICAL SYSTEM, office\FILE0206.TIF 10/1/54 BLDG 400-H roll#110-bldg#400 400-62-1 ACOUSTICAL TREATMENT BLDG 400- office\FILE0207.TIF SEC B-RM 6 8/16/61 roll#110-bldg#400 office\FILE0208.TIF 8/16/61 9 144 211/PNOnline/viewdetails asn?a=editdiscinline&sid=902&naid=899&nrid. 1/20/2006 United Reprographic Planroom Page 8 of 10 roll#110-bldg#400 STRUCTURAL BRACES 8-28-90 office\FILE0209.TIF roll#110-bldg#400 REPLACEMENT OF EXIST COLD 21-01-01 DWG 3 OF 5 8-28-90 office\FILE0210.TIF WATER SUPPLY FIRST FLOOR PLAN roll#110-bldg#400 REPLACEMENT OF EXIST COLD 21-01-01 DWG 5 OF 5 8-28-90 office\FILE0211.TIF WATER SUPPLY THIRD FLOOR PLAN roll#110-bidg#400 REPLACEMENT OF EXIST .COLD 21-01-01 DWG 4 OF 5 8-28-90 office\FILE0212.TIF WATER SUPPLY SECOND FLOOR PLAN roll#110-bldg#400 6/1/45 MISCELLANEOUS DETAILS 8-28-90 office\FILE0213.TIF roll#110-bldg#400 SECOND FLOOR PLAN-UNITS 4,5,6 & 7 6/1/45 office\FILE0214.TIF roll#110-bldg#400 FIRST FLOOR PLAN-UNITS 4,5,6 & 7 6/1/45 office\FILE0215.TIF roll#110-bldg#400 THIRD FLOOR PLAN-UNITS 3,4,5,6 & 7 6/1/45 office\FILE0216.TIF roll#110-bldg#400 6305-25 8/15/28 office\FILE0217.TIF roll#110-bldg#400 F.A SYSTEM BLDG 400-SECT.A,B,C 8/15/28 office\FILE0218.TIF SECOND FLOOR roll#110-bidg#400 F.A SYSTEM BLDG 400-SECT.A,B,C 8/15/28 office\FILE0219.TIF THIRD FLOOR roll#110-bldg#400 F.A SYSTEM BLDG 400-SECT.D,E & F 8/15/28 office\FILE0220.TIF SECOND FLOOR roll#110-bldg#400 F.A SYSTEM BLDG 400-SECT.D,E & F 8/15/28 office\FILE0221.TIF THIRD FLOOR ELECTRICAL COMBUSTION CONTROL roll#110-bldg#400 03-4603 DWG 1 OF 1 CENTER FOR BOILER WITH FULLY 5/15/65 office\FILE0222.TIF MODULATING BURNERS roll#110-bldg#400 12/10/86 office\FILE0223.TIF roll#110-bldg#400 BLDG.400-SECT. M THIRD FLOOR AS IS DWG 2 OF 2 12/10/86 office\FILE0224.TIF PLAN roll#110-bldg#400 BLDG.400-SECT. J& K FIRST FLOOR 3-13-87 office\FILE0225.TIF AS IS PLAN roll#110-bldg#400 ARCHITECTURAL GUTTER & LEADER 03-5367 DWG 1 OF 1 3-13-87 office\FILE0226.TIF SYSTEM ALTERATION roll#110-bldg#400 BUILDING 400-NEW ADMIN SPACES DWG 1 OF 1 10/12/77 office\FILE0227.TIF SECTION 400-F-1 & 400-G-1 NEW YORK BASE GOVERNORS ISLAND roll#110-bldg#400 DWG 1 OF 2 BUILDING # 400 SOUTH PORTITON OF 10/12/77 office\FILE0228.TIF EAST ELEVATION NEW YORK BASE GOVERNORS ISLAND roll#110-bldg#400 DWG 2 OF 2 BUILDING # 400 SOUTH PORTITON OF 10/12/77 office\FILE0229.TIF EAST ELEVATION roll#110-bldg#400 ARCHITECTURAL RELOCATION OF SK-1343D DWG 3 OF 3 10/12/77 office\FILE0230.TIF MARINE SCIENCE TRAINING roll#110-bldg#400 ARCHITECTURAL SECOND & THIRD 03 DWG 4 OF 4 10/12/77 office\FILE0231.TIF FLOOR PLAN -SECTION D,E & F roll#110-bldg#400 ARCHITECTURAL FIRST FLOOR PLAN 03 DWG 3 OF 4 10/12/77 office\FILE0232.TIF SECTION D,E & F roll#110-bldg#400 ARCHITECTURAL FIRST FLOOR PLAN 03 DWG 1 OF 4 10/12/77 office\FILE0233.TIF SECTION D,E & F roll#110-bldg#400 BUILDING -400 FIRST-SECOND-THIRD 10/12/77 office\FILE0234.TIF FLOORS UNITS D-E-F roll#110-bldg#400 NY TRACEN BLDG.400 FOURTH FLOOR SK-1002 DWG 1 OF 1 12-27-67 office\FILE0235.TIF REC. RM roll#110-bldg#400 1966-400-AI1 DWG 4 OF AS IS PLAN BUILDING 400 SECTIONS 12-27-67 office\FILE0236.TIF 25 A,B & C FIRST FLOOR roll#110-bldg#400 1966-400-AI2 DWG 5 OF AS IS PLAN BUILDING 400 SECTIONS 12-27-67 office\FILE0237.TIF 25 A,B & C SECOND FLOOR roll#110-bldg#400 1966-400-AI4 DWG 7 OF AS IS PLAN BUILDING 400 SECTIONS 12-27-67 office\FILE0238.TIF 25 D,E & F FIRST FLOOR roll#110-bldg#400 1966-400-Al11 DWG 14 AS IS PLAN BUILDING 400 SECTIONS 12-27-67 office\FILE0239.TIF OF 25 I,J & K SECOND FLOOR o 11/PNOnline/viewdetails United Reprographic Planroom Page 9 of 10 roll#110-bldg#400 1966-400-AI12 DWG 15 AS IS PLAN BUILDING 400 SECTIONS 12-27-67 office\FILE0240.TIF OF 25 I,J & K THIRD FLOOR roll#110-bldg#400 1966-400-AI13 DWG 16 AS IS PLAN BUILDING 400 SECTIONS 12-27-67 office\FILE0241.TIF OF 25 L,M & N FIRST FLOOR roll#110-bldg#400 740-127-400 DWG 1 OF 1 EXHAUST FAN GYM BLDG.400 12-27-67 office\FILE0242.TIF roll#110-bldg#400 TEMPORARY HOUSING GROUPS A & B 6303-644 12-27-67 office\FILE0243.TIF PLOT PLAN & ELECTRICAL LAYOUT ELEVATIONS OF BUILDING# 400 roll#110-bldg#400 DAMAGE CONCRETE SPANDREL 890-131-LST 11/2/88 office\FILE0244.TIF BEAMS COLUMN,PILASTERS, AND CORNICES roll#110-bldg#400 PROPOSED EXTENSION TO FIRE SK-1332 DWG 1 OF 1 7/3/73 office\FILE0245.TIF DETECTION SYSTEM ELEVATIONS OF BUILDING# 400 roll#110-bldg#400 DAMAGE CONCRETE SPANDREL 890-131-LST 7/3/73 office\FILE0246.TIF BEAMS COLUMN,PILASTERS, AND CORNICES roll#110-bldg#400 6305-256 INFANTRY REGIMENTAL BARRACKS 7/3/73 office\FILE0247.TIF roll#110-bldg#400 6305-254 INFANTRY REGIMENTAL BARRACKS 7/3/73 office\FILE0248.TIF roll#110-bldg#400 6305-255 INFANTRY REGIMENTAL BARRACKS 7/3/73 office\FILE0249.TIF roll#110-bldg#400 INFANTRY REGIMENTAL BARRACKS 8/15/28 office\FILE0250.TIF roll#110-bldg#400 6305-252 INFANTRY REGIMENTAL BARRACKS 8/15/28 office\FILE0251.TIF roll#110-bldg#400 6305-253 INFANTRY REGIMENTAL BARRACKS 8/15/28 office\FILE0252.TIF roll#110-bldg#400 6305-250 INFANTRY REGIMENTAL BARRACKS 8/15/28 office\FILE0253.TIF roll#110-bldg#400 GENERAL PANS THIRD DRILL HALL 2 8/15/28 office\FILE0254.TIF AND ROOF PLANS roll#110-bldg#400 400-69 DWG 2 OF 2 PLAN & DETAILS OF CUPOLA 12/28/84 office\FILE0255.TIF roll#110-bldg#400 CUPOLA & SKYLIGHTS OVER 400-69 DWG 1 OF 2 12/28/84 office\FILE0256.TIF GYMNASIUM roll#110-bldg#400 ARCHITECTURAL NEW WINDOW AND 03-5454 DWG 3 OF 3 12/28/84 office\FILE0257.TIF MASSONRY RESTORATION roll#110-bldg#400 10 SECOND FLOOR PLANS UNITS 7 AND 8 12/28/84 office\FILE0258.TIF ELECTRICAL ALTERATIONS roll#110-bidg#400 400-8 DWG 2 OF 4 TRANSFORMER & UNDERGORUND 12/28/84 office\FILE0259.TIF WIRING roll#110-bldg#400 6305-251 INFANTRY REGIMENTAL BARRACKS 8/15/28 office\FILE0260.TIF roll#110-bldg#400 INFANTRY REGIMENTAL BARRACKS 8/15/28 office\FILE0261.TIF roll#110-bldg#400 11 THIRD FLOOR PLANS UNITS 7 AND 8 8/15/28 office\FILE0262.TIF roll#110-bldg#400 DETAILS FOR STANDARD MANHOLE 672-173 8/15/28 office\FILE0263.TIF C.I FRAME AND COVER roll#110-bldg#400 L1 SITE PLANTING PLAN 8/18/88 office\FILE0264.TIF roll#110-bldg#400 PROPOSED HOT WATER LINE # 940-076-LST DWG 1 OF 1 9/18/68 office\FILE0265.TIF 400,517 & 550 roll#110-bldg#400 ACOUSTICAL CEILING INST. PLAN & 03-4434 DWG 1 OF 1 2-18-69 office\FILE0266.TIF DETAILS roll#110-bldg#400 ARCHITECTURAL NEW WINDOW AND 03-5454 DWG 2 OF 3 12/12/74 office\FILE0267.TIF MASSONRY RESTORATION roll#110-bldg#400 ARCHITECTURAL BRICK-UP WINDOW & 03-5705 DWG 1 OF 2 2-3-77 office\FILE0268.TIF INSTALL EXHAUST FANS roll#110-bldg#400 740-163-400H DWG 2 OF BASKET REALIGNMENT AT BUILDING 6/14/77 office\FILE0269.TIF 2 400 H a 144 /PNOnline/viewdetails 1/20/2006 United Reprographic Planroom Page 10 of 10 roll#110-bldg#400 MECHANICAL DUCTWORK & PLUMB.- 03-5872 DWG 2 OF 4 12/4/78 office\FILE0270.TIF PLAN-ELEV. roll#110-bldg#400 MECH/ELEC CONTROL WIRING 03-5872 DWG 3 OF 4 12/4/78 office\FILE0271.TIF DIAGRAMS roll#110-bldg#400 03-5872 DWG 4 OF 4 ELECTRICAL INSTALLATIONS 12/4/78 office\FILE0272.TIF roll#110-bldg#400 740-163-400 H DWG 1 OF BASKET REALIGNMENT AT BUILDING 12/4/78 office\FILE0273.TIF 2 400 H roll#110-bldg#400 ALTERATION TO BOILER ROOM 400-1 4/12/54 office\FILE0274.TIF BUILDING 400-SECTION H roll#110-bldg#400 6305-841 FIRST FLOOR PLAN-UNITS 4,5,6 & 7 4/12/54 office\FILE0275.TIF INSTALLATION OF OBSTRUCTION & roll#110-bldg#400 100-177 FLOOD LIGHTS ON BLDG 400 6-17-52 office\FILE0276.TIF RELOCATE TRAFFIC SIGNALS roll#110-bldg#400 REPLACEMENT OF EXIST.COLD 21-01-01 DWG 2 OF 5 11/30/48 office\FILE0277.TIF WATER SUPPLY BASEMENT PLAN ELEVATIONS OF BUILDING# 400 roll#110-bldg#400 DAMAGE CONCRETE SPANDREL 890-131-LST 11/2/88 office\FILE0278.TIF BEAMS COLUMN,PILASTERS, AND CORNICES roll#110-bldg#400 03-5404 FIRST FLOOR ALTERATIONS 11/2/88 office\FILE0279.TIF roll#110-bldg#400 SECOND AND THIRD PLANS FLOOR 11/2/88 office\FILE0280.TIF PLANS UNITS 4,5,6,9,10,11 roll#110-bldg#400 11/2/88 office\FILE0281.TIF roll#110-bldg#400 6305-245 INFANTRY REGIMENTAL BARRACKS 11/2/88 office\FILE0282.TIF roll#110-bldg#400 6305-246 INFANTRY REGIMENTAL BARRACKS 11/2/88 office\FILE0283.TIF 283 Items 4.234 http://66.9.144.211/PNOnline/viewdetails.asp?a=editdiscipline&sid=902&paid=899&prid. 1/20/2006