Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
174691294
label
Building 680 - Post Commissary
core
doc
dtoType
map
pageCount
1
Source metadata
id
174691294
contentType
map
title
Building 680 - Post Commissary
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691294
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
48e0d164078503d9
ocrText
United Reprographic Planroom Page 1 of 13 GOVENOR'S ISLAND: Set # 680 6 Order Full Set Order Individual Sheets Print Order File Name DrawingNumber Description Revision RevisionDate roll#67 ALTERATIONS TO WAREHOUSE 2 & RECORD WORK AS bldg#680 680-91 1 OF 1 10/20/52 BINS BUILT \FILE0001.TIF roll#67 NEW COMMISSARY IN WAREHOUSE bldg#680 680-46 10/20/52 ELECTRICAL \FILE0002.TIF roll#67 - bldg#680 440-140-680 OF 4 EXISTG CONDITIONS & DEMO PLAN 6/13/84 \FILE0003.TIF roll#67 bldg#680 740-062-680 1 OF 3 NEW NAF ACTIVITIES AREA BLDG 680 3/17/77 \FILE0004.TIF roll#67 bldg#680 192-4 4 OF 5 EXIST REFRIGERATION ROOMS 2/12/59 \FILE0005.TIF roll#67 MODIFICATION OF EXISTING WET bldg#680 2032 10/15/64 SPRINKLER SYSTEM \FILE0006.TIF roll#67 NEW SERVICE NEW REFRIGERATION ROOMS bldg#680 680-21 5 OF 5 FROM NEW PANEL 4/10/59 \FILE0007.TIF ELECTRICAL, PLUMBING & HEATING BOARD roll#67 CONVERSION OF DRY SPRINKLER bldg#680 680-50 1 OF 1 5/30/58 SYSTEM TO WET SYSTEM BLDG 680 \FILE0008.TIF roll#67 CONSOLIDATION OF POST EXCHANGE bldg#680 680-64 1 OF 4 3/31/58 ARCHITECTURAL \FILE0009.TIF roll#67 MECHANICAL EQUIPMENT bldg#680 NY-0419 1 OF 4 1/21/93 \FILE0010.TIF SCHEDULES, SYMBOLS & NOTES roll#67 MECHANICAL BOILER ROOM PLAN, bldg#680 NY-0419 2 OF 4 1/21/93 ELEVATION & PIPING SCHEMATICS \FILE0011.TIF roll#67 MECHANICAL DETAILS, PIPING bldg#680 NY-0419 E OF 4 1/21/93 DIAGRAM \FILE0012.TIF roll#67 ELECTRICAL BOILER ROOM PLANS & bldg#680 NY-0419 4 OF 4 1/21/93 WIRING DIAGRAMS \FILE0013.TIF roll#67 bldg#680 03-6161 18 OF 39 WALL & PLAN DETAILS REVISED DETAILS 9/82 \FILE0014.TIF roll#67 bldg#680 NE-0262 1 OF 1 NAFA SIGNAGE 4/1/91 \FILE0015.TIF roll#67 REPLACEMENT OF DETERIORATED & bldg#680 090-246-680 1 OF 1 BROKEN CONCRETE FLOOR 5/24/90 \FILE0016.TIF COMMISSIARY WAREHOUSE roll#67 ROOF REPLACEMENT FOR BLDG 680 bldg#680 990-276-680 1 OF 7 4/7/89 COVER SHEET \FILE0017.TIF roll#67 ROOF REPLACEMENT FOR BLDG 680 REVISED AS bldg#680 990-276-680 2 OF 7 5/9/90 EXISTING ROOF PLAN & DEMOLITION NOTED \FILE0018.TIF roll#67 ROOF REPLACEMENT FOR BLDG 680 REVISED AS o 144 211 /PNOnline/viewdetails 1/26/2006 United Reprographic Planroom Page 2 of 13 bldg#680 BUILDING ELEVATIONS NOTED 990-276-680 3 OF 7 5/9/90 \FILE0019.TIF roll#67 ROOF REPLACEMENT FOR BLDG 680 bldg#680 990-276-680 4 OF 7 4/7/89 BUILDING ELEVATIONS \FILE0020.TIF roll#67 ADDED HATS ROOF REPLACEMENT FOR BLDG 680 bldg#680 990-276-680 5 OF 7 REINFORCED 5/9/90 NEW ROOF PLAN \FILE0021.TIF LADDER roll#67 - ROOF REPLACEMENT FOR BLDG 680 REVISED CANOPY bldg#680 990-276-680 6 OF 7 5/9/90 ROOFING DETAILS EXISTING & NEW DETAILS \FILE0022.TIF roll#67 ROOF REPLACEMENT FOR BLDG 680 AS BUILT bldg#680 990-276-680 7 OF 7 ROOFING DETAILS-NEW DRAWINGS \FILE0023.TIF roll#67 COMMISSARY EXPANSION FOR bldg#680 03-14-86 OF 24 APPROVED 2/12/90 BUILDING 680 EXISTING ROOF PLAN \FILE0024.TIF roll#67 bldg#680 A-2 2 OF 2 WINDOW & DOOR SCHEDULE, DETAILS 7/25/89 \FILE0025.TIF roll#67 bldg#680 A-1 ELEVATIONS-ALTERNATE #1 5/89 \FILE0026.TIF roll#67 ALTERNATE #1 GALLERY CURTAIN bldg#680 A-2 5/8/89 WALL DETAILS \FILE0027.TIF roll#67 ROOF REPLACEMENT FOR BUILDING bldg#680 990-276-680 8 OF 8 4/7/89 680 ROOFING DETAILS-NEW - \FILE0028.TIF roll#67 RENOVATING OFFICE & STORAGE bldg#680 G-1008 1 OF 1 9/2/88 FERRY BOAT MAINTENANCE \FILE0029.TIF roll#67 PARKING AREA 685 LAYOUT & bldg#680 890-122-685 OF 1 9/21/88 LUMINAIRES \FILE0030.TIF roll#67 INSTALLATION OF MODULAR ATM bldg#680 890-101-682 4 OF 4 8/4/88 BANK ELECTRICAL \FILE0031.TIF roll#67 WAREHOUSE ALTERATIONS BLDG bldg#680 680-52 REVISED 8/28/52 #680 \FILE0032. TIF roll#67 EXTERIOR LIGHTING FOR PERIMETER bldg#680 G-1007 1 OF 1 APPROVED 8/16/88 OF BLDG 680 \FILE0033.TIF roll#67 - EXTERIOR LIGHTING FOR PERIMETER bldg#680 G-1007 1 OF 1 APPROVED 8/16/88 OF BLDG 680 \FILE0034. TIF roll#67 ELECTRICAL/MECHANICAL FREEZER bldg#680 NE-0066 1 OF 4 APPROVED 6/30/88 REPLACEMENT-INSTALLATION PLAN \FILE0035.TIF roll#67 ELECTRICAL FREEZER bldg#680 FNE-0066 OF 4 REPLACEMENT-REMOVAL PLAN & APPROVED 6/30/88 \FILE0036.TIF PANEL SCHED roll#67 MECHANICAL FREEZER bldg#680 NE-0066 3 OF 4 REPLACEMENT-REMOVAL PARTIAL APPROVED 6/30/88 \FILE0037.TIF PLAN & ELEVATIONS roll#67 MECHANICAL FREEZER bldg#680 NE-0066 4 OF 4 REPLACEMENT-DETAILS, SECTIONS & APPROVED 6/30/88 \FILE0038.TIF ELEVATIONS roll#67 CAN REDEMPTION CENTER BLDG 680 bldg#680 740-188-680 2 OF 2 ELECTRICAL WIRING DEVICES & APPROVED 12/5/87 \FILE0039.TIF LIGHTING roll#67 PROPOSED CONC. BLOCK WALL & bldg#680 550-095-680 OF 1 COMPLETED 4/26/86 FENCE IN WAREHOUSE AREA \FILE0040. TIF roll#67 PROPOSED ELECTRICAL LAYOUT FOR bldg#680 540-320-680 OF 1 11/20/85 DISPLAY CASES \FILE0041.TIF http://66 9 144 11/PNOnline/viewdetails asp7a=editdiscinline&sid=949&naid=943&prid. 1/26/2006 United Reprographic Planroom Page 3 of 13 roll#67 bldg#680 440-169-020-E1 1 OF 5 ELECTRICAL TITLE SHEET 10/1/85 \FILE0042.TIF roll#67 PROPOSED INSTALLATION OF GALV bldg#680 440-131-680 1 OF 1 POSTS FOR SHOPPING CART COMPLETED 10/14/84 \FILE0043.TIF ENCLOSURE roll#67 bldg#680 1 OF 1 OIL BURNER WIRING 8/25/64 \FILE0044.TIF roll#67 bldg#680 440-140-680 OF 4 LIGHTING PLAN 6/13/84 \FILE0045.TIF roll#67 - SPACE ALLOCATION TO PROVIDE A bldg#680 440-219-680 1 OF 1 TEMPORARY LOCATION FOR SMALL 6/8/84 \FILE0046.TIF STORES & THE UNIFORM SHOP roll#67 bldg#680 440-140-680 2 OF 4 REFLECTED CEILING PLAN 5/14/84 \FILE0047.TIF roll#67 bldg#680 440-140-680 2 OF 4 REFLECTED CEILING PLAN 6/13/84 \FILE0048.TIF roll#67 - INSTALL 2 3 TON ROOF MOUNTED bldg#680 240-133-680 1 OF 1 COMPLETED 4/30/83 \FILE0049. TIF REFRIG. UNITS (ELECTRICAL) roll#67 bldg#680 240-295-680 2 OF 3 COMMISSARY ALTERATIONS HVAC AS BUILT 5/13/83 \FILE0050.TIF roll#67 - COMMISSARY ALTERATIONS bldg#680 240-295-680 3 OF 3 AS BUILT 5/13/83 PLUMBING \FILE0051.TIF roll#67 . COMMISSARY ALTERATIONS bldg#680 240-295-680 1 OF 3 AS BUILT 5/13/83 ELECTRICAL \FILE0052.T roll#67 EXISTING ELECTRICAL PANELS bldg#680 640-297-680 1 OF 1 C 10/7/85 \FILE0053.TIF COMMISSARY STORES roll#67 EXISTING ELECTRICAL PANELS bldg#680 640-297-680 1 OF 1 C 10/7/85 COMMISSARY STORES \FILE0054.TIF roll#67 EMERGENCY LIGHTING BLDG 680 bldg#680 144-014-680 1 OF 1 COMPLETED 9/25/81 COMMISSARY \FILE0055.TIF roll#67 bldg#680 FLOOR PLAN VOID 1/7/81 \FILE0056.TIF roll#67 bldg#680 TRANSFORMER VAULT 12/22/80 \FILE0057.TIF roll#67 SANITARY DRAINAGE REPAIR bldg#680 040-154-680 1 OF 1 COMPLTED 8/2/80 WOMENS HEAD \FILE0058. TIF roll#67 FLOURESCENT LIGHTS IN bldg#680 744-020-680 1 OF 1 12/1/77 COMMISSARY WAREHOUSE BLDG 680 \FILE0059.TIF roll#67 NEW NAF ACTIVITIES AREA BLDG 680 bldg#680 740-062-680 2 OF 3 1 3/22/77 MECH & ELEC \FILE0060. TIF roll#67 bldg#680 740-032-680 1 OF 2 RRELOCATION OF EXCHANGE OFFICE APPROVED 12/19/76 \FILE0061. TIF roll#67 RRELOCATION OF EXCHANGE OFFICE bldg#680 740-032-680 2 OF 2 APPROVED 12/19/76 ELECTRICAL & MECHANICAL \FILE0062.TIF roll#67 RELOCATION OF COMMISSARY bldg#680 740-031-680 1 OF 2 APPROVED 11/24/76 OFFICE BLDG 680 \FILE0063.TIF roll#67 RELOCATION OF COMMISSARY bldg#680 740-031-680 2 OF 2 OFFICE BLDG 680 ELECTRICAL & APPROVED 11/24/76 \FILE0064.TIF MECHANICAL http://66 9 144 11/PNOnline/viewdetails asp?a=editdiscinline%sid=949xnaid=943&prid. 1/26/2006 United Reprographic Planroom Page 4 of 13 roll#67 bldg#680 P495839 D4 WOUND ROTOR MOTOR CONTROLLER 2/18/76 \FILE0065. TIF roll#67 bldg#680 644-003-680 1 OF 1 VENTILATION FOR WAREHOUSE AREA APPROVED 9/11/75 \FILE0066.TIF roll#67 - ARCH REMOVE WALL & RELOCATE bldg#680 03-5398 1 OF 8 AS BUILT 3/25/75 MEAT RACK \FILE0067.TIF roll#67 bldg#680 03-5398 2 OF 8 ARCH SECTIONS & DETAILS AS BUILT 3/25/75 \FILE0068.TIF roll#67 bldg#680 03-5398 3 OF 8 ARCH MEAT RACK SUPPORT-DETAILS AS BUILT 3/25/75 \FILE0069. TIF roll#67 ARCH EXISTING & NEW LAYOUT OF bldg#680 03-5398 4 OF 8 AS BUILT 3/25/75 FACILITIES \FILE0070.TIF roll#67 ARCH & MECH NEW FLOORS, bldg#680 03-5398 5 OF 8 AS BUILT 3/25/75 DRAINAGE, WATER SUPPLY & SINKS \FILE0071.TIF roll#67 bldg#680 03-5398 6 OF 8 ELEC LIGHTING PLAN AS BUILT 3/25/75 \FILE0072.TIF roll#67 bldg#680 03-5398 7 OF 8 ELEC WIRING LAYOUT AS BUILT 3/25/75 \FILE0073. TIF roll#67 bldg#680 03-5398 8 OF 8 ELEC NOTES AS BUILT 3/25/75 \FILE0074.TIF roll#67 CONSTRUCTION OF NEW SMALL bldg#680 450-014-680 1 OF 2 AS BUILT 4/26/74 STORES AREA \FILE0075.TIF roll#67 - CONSTRUCTION OF NEW SMALL bldg#680 450-015-680 2 OF 2 4/26/74 STORES AREA \FILE0076. TIF roll#67 PROPOSED EXPANSION OF MEAT bldg#680 SKETCH 8/73 1 OF 1 APPROVED 8/22/73 PREP. COOLER BLDG 680 \FILE0077.TIF roll#67 ARCH ROOF REPAIRS SECTIONS & bldg#680 03-5266 2 OF 2 APPROVED 6/21/73 DETAILS \FILE0078.TIF roll#67 bldg#680 03-5266 OF 2 ARCH ROOF REPAIRS APPROVED 6/21/73 \FILE0079.TIF roll#67 NEW ADDITION TO MEAT PACKING bldg#680 340-182-680 1 OF 1 APPROVED 5/23/73 COOLER IN COMMISSARY \FILE0080.TIF roll#67 MODIFIED DRAINAGE SYSTEM FOR bldg#680 140-247-680/A NEW DAIRY CASES IN BASE APPROVED 11/71 \FILE0081. TIF COMMISARY roll#67 REPLACEMENT OF REFRIGERATED bldg#680 140-247-680 1 OF 1 APPROVED 4/30/71 DAIRY CASES IN BASE COMMISSARY \FILE0082. TIF roll#67 REPLACEMENT OF REFRIGERATED bldg#680 040-098-680 1 OF 1 APPROVED 11/26/69 DAIRY CASES IN BASE COMMISSARY \FILE0083.TIF roll#67 MODIFICATION OF EXHAUST SYSTEM bldg#680 680-67-51 1 OF 1 TYPEWRITER REPAIR SHOP BLDG APPROVED 12/19/66 \FILE0084. TIF #680 roll#67 STRUCTURAL & ELECTRICAL PLANS & bldg#680 66-680-1 1 OF 1 APPROVED 8/22/66 DETAILS \FILE0085. TIF roll#67 bldg#680 2042 ELECTRICAL POWER PLAN APPROVED 10/20/64 \FILE0086.TIF roll#67 REFLECTED CEILING & LIGHTING bldg#680 2041 APPROVED 10/20/64 PLAN, SOUND SYSTEM \FILE0087.TIF http://66 9 144 11/PNOnline/viewdetails asp?a=editdiscinline&sid=949&paid=943&prid. 1/26/2006 United Reprographic Planroom Page 5 of 13 roll#67 AIR CONDITIONING & HEATING bldg#680 2031 10/20/64 ADDITIONS & CHANGES \FILE0088. TIF roll#67 EXTERIOR STAIRS BULLETIN BOARD bldg#680 2005 10/20/64 CORRIDOR WALL \FILE0089. TIF roll#67 MAIN ENTRANCE, CASHIERS WINDOW bldg#680 2004 10/20/64 & FINISH SCHEDULE \FILE0090. TIF roll#67 bldg#680 2000-01 TITLE SHEET & SITE PLAN 10/20/64 \FILE0091. TIF roll#67 bldg#680 2001 MODIFICATION PLAN 10/20/64 \FILE0092. TIF roll#67 bldg#680 2002 DOOR DETAILS APPROVED 10/20/64 \FILE0093. TIF roll#67 WALL, CURTAIN WALL & SUSPENDED bldg#680 2003 APPROVED 10/20/64 ACOUSTICAL CEILING DETAILS \FILE0094. TIF roll#67 bldg#680 FILE0095 11/63 \FILE0095. TIF roll#67 - bldg#680 680-6263-1 2 OF 2 DETAILS APPROVED 1/9/63 \FILE0096.TIF roll#67 INSTALLATION OF AUTOMATIC DOO... bldg#680 680-632-... 1 OF APPROVED 1/9/62 POST COMMISSARY BUILDING.. \FILE0097. TIF roll#67 bldg#680 MEAT CUTTING WRAPPING ROOM 12/30/60 \FILE0098.TIF roll#67 bldg#680 C-520-L BALLY CASE & COOLER A 1/27/61 \FILE0099.TIF roll#67 bldg#680 680-4 COLD STORAGE PLANT 10/60 \FILE0100. TIF roll#67 REFRIGERANT PIPING FREEZER, bldg#680 P-2 CHILLED MEAT BOX, VEGETABLE BOX, 8/1/60 \FILE0101.TIF DAIRY PRODUCT BOX roll#67 - CHANGES DUE TO RELOCATION OF bldg#680 680-8 6/30/60 COLD STORAGE PLANT \FILE0102.TIF roll#67 bldg#680 680-7 SHEET 3 OF 6 DETAIL SHEET NEW REFRIG ROOMS 2/12/59 \FILE0103.TIF roll#67 bldg#680 680-5 1 OF 6 NEW REFRIGERATION ROOMS 2/12/59 \FILE0104.TIF roll#67 bldg#680 680-24 ENTRANCE TO P_X 12/53 \FILE0105.TIF roll#67 HEATING DUCT WORK & TOILET bidg#680 680-20 10/28/58 VENTILATION \FILE0106.TIF roll#67 BOILER ROOM WITHING CLEANERS bldg#680 680-25 9/12/58 ROOM \FILE0107.TIF roll#67 - BOILER ROOM WITHING CLEANERS bldg#680 680-25 9/12/58 ROOM \FILE0108. TIF roll#67 INTERCOM SYSTEM IN bldg#680 30-094TL-203 QUATERMASTER WAREHOUSE BLDG 9/12/58 \FILE0109.TIF 192 roll#67 bldg#680 EXCHANGE FLOOR PLAN 2/9/89 \FILE0110.TIF 9 144 211/PNOnline/viewdetails asp?a=editdiscinline&sid=949&naid=943&nrid 1/26/2006 United Reprographic Planroom Page 6 of 13 roll#67 RELOCATION OF POST EXCHANGE bldg#680 680-11 2 OF 11 5/16/58 PLAN & SECTIONS \FILE0111.TIF roll#67 RELOCATION OF POST EXCHANGE bldg#680 680-12 3 OF 11 5/16/58 ELEVATIONS \FILE0112.TIF roll#67 bldg#680 680-13 4 OF 11 RELOCATION OF POST ARCH DETAILS 5/16/58 \FILE0113.TIF roll#67 - bldg#680 680-14 RELOCATION OF POST ARCH DETAILS 5/16/58 \FILE0114.TIF roll#67 RELOCATION OF POST ARCH DETAILS bldg#680 680-15 OF 11 5/16/58 & SCHEDS \FILE0115.TIF roll#67 RELOCATION OF POST EXCHANGE bldg#680 680-16 7 OF 11 5/16/58 PLUMBING \FILE0116.TIF roll#67 - RELOCATION OF POST EXCHANGE bldg#680 680-17 8 OF 11 5/16/58 HEATING & VENTILATING \FILE0117.TIF roll#67 RELOCATION OF POST HEATING & bldg#680 680-18 9 OF 11 5/16/58 VENTILATING \FILE0118.TIF roll#67 bldg#680 680-18 10 OF 11 RELOCATION OF POST ELECTRICAL 5/16/58 \FILE0119.TIF roll#67 - RELOCATION OF POST EXCHANGE bldg#680 680-19 11 OF 11 5/16/58 ELECTRICAL \FILE0120.TIF roll#67 CONVERSION DRY SPRINKLER bldg#680 680-60 5/58 SYSTEM TO... \FILE0121.TIF roll#67 CONSOLIDATION OF POST EXCHANGE bldg#680 640-66 3 OF 4 3/31/58 \FILE0122.TIF PLUMBING & FIRE ALARM SYSTEM roll#67 CONSOLIDATION OF POST EXCHANGE bldg#680 680-67 4 OF 4 3/31/58 ELECTRICAL \FILE0123.TIF roll#67 bldg#680 680-62 SITE PLAN & TITLE SHEET 3/31/58 \FILE0124.TIF roll#67 CONSOLIDATION OF POST EXCHANGE bldg#680 680-65 2 OF 4 3/31/58 HEATING & VENTILATING \FILE0125.TIF roll#67 CONSOLIDATION OF POST EXCHANGE bldg#680 680-63 2 OF 4 3/31/58 HEATING & VENTILATING \FILE0126.TIF roll#67 POST ENG OFFICE HOT AIR bldg#680 680-59 3/31/58 CIRCULATION \FILE0127.TIF roll#67 REVISION TO COMMISSARY MEAT & bldg#680 680-37 6/17/55 FROZEN FOOD DEPT \FILE0128.TIF roll#67 bldg#680 680-... ALT TO REFRIGERATION PLANT REVISED 12/31/53 \FILE0129.TIF roll#67 bldg#680 680-80 RECORD DRAWING 6/6/53 \FILE0130.TIF roll#67 - bldg#680 RECORD WORK AS 680-69 RECORD WORK AS BUILT 6/6/53 \FILE0131.TIF BUILT roll#67 PLANS & DETAILS OF FINISHED bldg#680 1300-20 GRADES & CATCH BASINS FOR 3/6/52 \FILE0132.TIF COMMISSARY ROAD & PARKING AREA roll#67 TOPOGRAPHIC SURVEY FOR bldg#680 1300-15 3/6/53 \FILE0133.TIF COMMISSARY ROAD & PARKING AREA o 1/26/2006 United Reprographic Planroom Page 7 of 13 roll#67 REFRIGERATOR ROOM DETAILS FOR bldg#680 1 12/19/52 NEW COMMISARRY IN WAREHOUSE \FILE0134.TIF roll#67 RECORD DRAWING bldg#680 6600 OIL BURNER WIRING 12/16/52 OF WORK AS BUILT \FILE0135.TIF roll#67 MISC. DETAIL PLANS & DETAILS OF bldg#680 680-51 HEATING & REFRIGERATION STORAGE 10/29/52 \FILE0136.TIF FOR COMMISARRY roll#67 - RECORD DRAWING bldg#680 6/5/53 OF WORK AS BUILT \FILE0137.TIF roll#67 PLOT PLAN OF NEW WAREHOUSE bldg#680 680-47 7/3/52 EXISTING UTILITIES ETC \FILE0138.TIF roll#67 bldg#680 6600 ELECTRICAL FEEDER PLAN RECORD DRAWING 7/15/52 \FILE0139.TIF roll#67 TWO WAREHOUSES REVISED PILE bldg#680 680-74 RECORD DRAWING 6/5/53 CAPS FOR PILES AS DRIVEN \FILE0140.TIF roll#67 bldg#680 680-90 ANCORAGE DETAILS-STORAGE TANK RECORD DRAWING 6/5/53 \FILE0141.TIF roll#67 - TWO WAREHOUSE HEATING FLOOR RECORD DRAWING bldg#680 680-24 1/8/52 PLAN-DETAILS AS BUILT \FILE0142.TIF roll#67 RECORD DRAWING bldg#680 680 6/53 OF WORK AS BUILT \FILE0143.TIF roll#67 RECORD DRAWING bldg#680 6305- TITLE SHEET 6/53 OF WORK AS BUILT \FILE0144.TIF roll#67 RECORD DRAWING bldg#680 680-71 FLOOR PLAN-ELEVATIONS SECTION 6/2/53 OF WORK AS BUILT \FILE0145.TIF roll#67 WALL SECTIONS DETAILS WINDOW RECORD DRAWING bldg#680 680-72 6/2/53 SCHEDULE OF WORK AS BUILT \FILE0146.TIF roll#67 RECORD DRAWING bldg#680 680 DETAILS 6/53 OF WORK AS BUILT \FILE0147.TIF roll#67 - RECORD DRAWING bldg#680 680-73 FOUNDATION & FLOOR PLAN 6/53 OF WORK AS BUILT \FILE0148.TIF roll#67 RECORD DRAWING bldg#680 680-77 ROOF FRAMING PLAN 2/11/52 OF WORK AS BUILT \FILE0149.TIF roll#67 RECORD DRAWING bldg#680 680-7.. ROOF FRAMING DETAILS-LINTELS 1/8/52 OF WORK AS BUILT \FILE0150.TIF roll#67 RECORD WORK AS bldg#680 680-83 PLUMBING FLOOR PLAN DETAILS 10/20/52 BUILT \FILE0151.TIF roll#67 PLUMBING PLOT PLAN DRAINAGE & RECORD WORK AS bldg#680 680-82 8/15/52 WATER SUPPLY BUILT \FILE0152.TIF roll#67 RECORD WORK AS bldg#680 680-85 ELECTRICAL PLOT PLAN 6/5/53 BUILT \FILE0153.TIF roll#67 - RECORD WORK AS bldg#680 680-87 ELETRIC FLOOR PLAN DETAILS 6/5/53 BUILT \FILE0154.TIF roll#67 RECORD WORK AS bldg#680 680-89 SPRINKLER FLOOR PLAN DETAILS 6/5/53 BUILT \FILE0155.TIF roll#67 RECORD WORK AS bldg#680 680... PLUMBING FLOOR PLAN DETAILS BUILT \FILE0156.TIF o 144 11/PNOnline/viewdetails 1/26/2006 United Reprographic Planroom Page 8 of 13 roll#67 AS BUILT bldg#680 03-14-86 1 OF 25 COVER SHEET DRAWINGS \FILE0157.TIF roll#67 AS BUILT bldg#680 03-14-86 2 OF 23 DEMOLITION PLAN DRAWINGS \FILE0158.TIF roll#67 AS BUILT bldg#680 03-14-86 A-2 3 OF 23 FLOOR PLAN DRAWINGS \FILE0159.TIF roll#67 AS BUILT bldg#680 03-14-86 4 OF 23 SCHEDULE & DETAILS DRAWINGS \FILE0160.TIF roll#67 AS BUILT bldg#680 03-14-86 A-4 5 OF 23 PARTIAL FLOOR PLAN DRAWINGS \FILE0161.TIF roll#67 AS BUILT bldg#680 03-14-86 6 OF 23 SECTION & DETAILS DRAWINGS \FILE0162.TIF roll#67 - AS BUILT bldg#680 03-14-86 7 OF 23 REFLECTED CEILING PLAN DRAWINGS \FILE0163.TIF roll#67 AS BUILT bldg#680 03-14-86 8 OF 23 PLUMBING-FLOOR PLAN DRAWINGS \FILE0164.TIF roll#67 bldg#680 03-14-86 9 OF 23 PARTIAL PLANS & SCHEDULES \FILE0165.TIF roll#67 - bldg#680 03-14-86 10 OF 23 WATER & SANITARY PIPING DIAGRAMS \FILE0166.TIF roll#67 bldg#680 03-14-86 11 OF 23 FIRE PROTECTION-FLOOR PLAN \FILE0167.TIF roll#67 bldg#680 03-14-86 12 OF 23 FLOOR PLAN-REMOVALS \FILE0168.TIF roll#67 bldg#680 03-14-86 13 OF 23 FLOOR PLAN-HVAC \FILE0169.TIF roll#67 FLOOR PLAN-HVAC & REFRIGERANT bldg#680 03-14-86 14 OF 23 PIPING \FILE0170.TIF roll#67 - bldg#680 03-14-86 15 OF 23 LEGEND & DETAILS \FILE0171.TIF roll#67 bldg#680 03-14-86 16 OF 23 SCHEDULES & DETAILS \FILE0172.TIF roll#67 bldg#680 03-14-86 17 OF 23 SCHEDULES \FILE0173.TIF roll#67 bldg#680 03-14-86 18 OF 23 REFRIGERANT PIPING \FILE0174.TIF roll#67 bldg#680 03-14-86 19 OF 23 ELECTRICAL REMOVAL PLAN \FILE0175.TIF roll#67 bldg#680 03-14-86 20 OF 23 ONE LINE DIAGRAM \FILE0176.TIF roll#67 AS BUILT bldg#680 03-14-86 21 OF 23 LIGHTING PLAN DRAWINGS \FILE0177.TIF roll#67 bldg#680 03-14-86 22 OF 23 ELECTRICAL POWER PLAN \FILE0178.TIF roll#67 bldg#680 03-14-86 23 OF 23 ELECTRICAL LEGEND & SCHEDULES \FILE0179.TIF 0 144 11/PNOnline/viewdetails asp?a=editdiscinline&sid=949&naid=943&prid.. 1/26/2006 United Reprographic Planroom Page 9 of 13 roll#67 bldg#680 03-14-86 1 OF 23 COVER SHEET RECORD DRAWING 8/95 \FILE0180.TIF roll#67 bldg#680 03-14-86 2 OF 23 DEMOLITION PLAN RECORD DRAWING 8/96 \FILE0181.TIF roll#67 bldg#680 03-14-86 3 OF 23 FLOOR PLAN RECORD DRAWING 8/96 \FILE0182.TIF roll#67 - bldg#680 03-14-86 4 OF 23 SCHEDULES DETAILS RECORD DRAWING 8/96 \FILE0183.TIF roll#67 bldg#680 03-14-86 5 OF 23 PARTIAL FLOOR PLAN \FILE0184.TIF roll#67 bldg#680 03-14-86 6 OF 23 SECTION & DETAILS RECORD DRAWING 8/96 \FILE0185.TIF roll#67 bldg#680 03-14-86 7 OF 23 REFLECTED CEILING PLAN RECORD DRAWING 8/96 \FILE0186.TIF roll#67 bldg#680 03-14-86 8 OF 23 PLUMBING FLOOR PLAN DETAILS RECORD DRAWING 8/95 \FILE0187.TIF roll#67 bldg#680 03-14-86 9 OF 23 PARTIAL PLANS & SCHEDULES RECORD DRAWING 8/95 \FILE0188.TIF roll#67 - bldg#680 03-14-86 10 OF 23 WATER & SANITARY PIPING DIAGRAMS RECORD DRAWING 8/95 \FILE0189.TIF roll#67 bldg#680 03-14-86 11 OF 23 FIRE PROTECTION-FLOOR PLAN RECORD DRAWING 8/95 \FILE0190.TIF roll#67 bldg#680 03-14-86 12 OF 23 FLOOR PLAN-REMOVALS RECORD DRAWING 8/95 \FILE0191.TIF roll#67 bldg#680 03-14-86 13 OF 23 FLOOR PLAN HVAC RECORD DRAWING 8/95 \FILE0192.TIF roll#67 FLOOR PLAN-HVAC & REFRIGERANT bldg#680 03-14-86 14 OF 23 RECORD DRAWING 8/95 PIPING \FILE0193.TIF roll#67 - bldg#680 03-14-86 15 OF 23 LEGEND & DETAILS RECORD DRAWING 8/95 \FILE0194.TIF roll#67 - bldg#680 03-14-86 16 OF 23 SCHEDULES & DETAILS RECORD DRAWING 8/95 \FILE0195.TIF roll#67 bldg#680 03-14-86 17 OF 23 SCHEDULES RECORD DRAWING 8/95 \FILE0196.TIF roll#67 bldg#680 03-14-86 18 OF 23 REFRIGERANT PIPING RECORD DRAWING 8/95 \FILE0197.TIF roll#67 bldg#680 03-14-86 19 OF 23 ELECTRICAL REMOVAL PLAN RECORD DRAWING 8/95 \FILE0198.TIF roll#67 bldg#680 03-14-86 OF 23 ONE LINE DIAGRAM RECORD DRAWING 8/95 \FILE0199.TIF roll#67 bldg#680 03-14-86 21 OF 23 LIGHTING PLAN RECORD DRAWING 8/95 \FILE0200.TIF roll#67 bldg#680 03-14-86 22 OF 23 ELECTRICAL POWER PLAN RECORD DRAWING 8/95 \FILE0201.TIF roll#67 bldg#680 03-14-86 23 OF 23 ELECTRICAL LEGEND & SCHEDULES RECORD DRAWING 8/95 \FILE0202.TIF 0 144 /PNOnline/viewdetails 1/26/2006 United Reprographic Planroom Page 10 of 13 roll#67 bldg#680 440-183-680 1 OF 10 FLOOR PLAN, KEY PLAN USCG COMMENTS 12/84 \FILE0203.TIF roll#67 AREA A PLAN, WALL SECTION & bldg#680 440-183-680 2 OF 10 DETAILS \FILE0204.TIF roll#67 AREAS B & C PLANS, ELEVATIONS & bldg#680 440-183-680 3 OF 10 DETAILS \FILE0205.TIF roll#67 - - AREA D PLAN & ELEVATIONS FINISH bldg#680 440-183-680 4 OF 10 SCHEDULE DOOR SCHEDULE & \FILE0206.TIF DETAILS roll#67 REFLECTED CEILING PLANS CEILING bldg#680 440-183-680 5 OF 10 DETAILS EQUIPMENT SCHEDULE \FILE0207.TIF roll#67 COMMISSARY PLUMBING-FLOOR bldg#680 440-183-680 6 OF 10 PLAN-DETAILS & DIAGRAMS \FILE0208.TIF roll#67 MECHANICAL FLOOR PLAN & KEY bldg#680 440-183-680 7 OF 10 PLAN \FILE0209.TIF roll#67 MECHANICAL-PARTIAL ROOF & FLOOR bldg#680 440-183-680 8 OF 10 PLAN, & DETAILS \FILE0210.TIF roll#67 - bldg#680 440-183-680 9 OF 10 MECHANICAL DETAILS & ALTERNATES \FILE0211.TIF roll#67 COMMISSARY ELECTRICAL FLOOR bldg#680 440-183-680 10 OF 10 PLAN, DETAILS, SCHEDULES & KEY USCG COMMENTS 4/86 \FILE0212.TIF PLAN roll#67 ELECTRICAL BOILER ROOM & bldg#680 440-169-680 E4 OF 4 ELEVATIONS \FILE0213.TIF roll#67 bldg#680 1 OF 1 FLOOR PLAN \FILE0214.TIF roll#67 CONTROL CIRCUIT FOR 10 TON A/C & bldg#680 2 OF 2 HEATING UNIT \FILE0215.TIF roll#67 bldg#680 03-14-8... COVER SHEET \FILE0216.TIF roll#67 - - bldg#680 03-14-86 2 OF 24 DEMOLITION PLAN \FILE0217.TIF roll#67 INDICATED WALK bldg#680 03-14-86 3 OF 24 FLOOR PLAN 5/18/90 IN FREEZERS \FILE0218.TIF roll#67 bldg#680 03-14-86 4 OF 24 SCHEDULES & DETAILS APPROVED 2/12/90 \FILE0219. TIF roll#67 bldg#680 03-14-86 5 OF 24 PARTIAL FLOOR PLAN APPROVED 2/12/90 \FILE0220.TIF roll#67 bldg#680 03-14-86 6 OF 24 SECTIONS & DETAILS APPROVED 2/12/90 \FILE0221.TIF roll#67 bldg#680 03-14-86 7 OF 24 REFLECTED CEILING PLAN APPROVED 2/12/90 \FILE0222.TIF roll#67 bldg#680 03-14-86 10 OF 24 PLUMBING-FLOOR PLAN APPROVED 2/12/90 \FILE0223.TIF roll#67 bldg#680 03-14-86 11 OF 24 PARTIAL PLANS & SCHEDULES REVISION #1 5/18/90 \FILE0224.TIF roll#67 bldg#680 03-14-86 WATER & SANITARY PIPING DIAGRAMS APPROVED 2/12/90 \FILE0225.TIF http://66 9 144 1/PNOnline/viewdetails asna=editdiscinline&sid=949&naid=943&prid 1/26/2006 United Reprographic Planroom Page 11 of 13 roll#67 REVISED bldg#680 03-14-86 13 OF 24 FIRE PROTECTION-FLOOR PLAN SPRINKLER PIPING 10/30/90 \FILE0226.TIF & DETAILS roll#67 SEE OTHER bldg#680 03-14-86 13 OF 24 FIRE PROTECTION-FLOOR PLAN 2/12/90 REVISED \FILE0227.TIF roll#67 bldg#680 03-14-86 14 OF 24 FLOOR PLAN-REMOVALS APPROVED 2/12/90 \FILE0228.TIF roll#67 bldg#680 03-14-86 15 OF 24 FLOOR PLAN HVAC APPROVED 2/12/90 \FILE0229.TIF roll#67 - FLOOR PLAN-HVAC & REFRIGERANT bldg#680 03-14-86 16 OF 24 APPROVED 2/12/90 PIPING \FILE0230.TIF roll#67 bldg#680 03-14-86 17 OF 24 LEGEND & DETAILS APPROVED 2/12/90 \FILE0231.TIF roll#67 - bldg#680 03-14-86 18 OF 24 SCHEDULE & DETAILS APPROVED 2/12/90 \FILE0232.TIF roll#67 bldg#680 03-14-86 19 OF 24 SCHEDULES APPROVED 2/12/90 \FILE0233.TIF roll#67 bldg#680 03-14-86 20 OF 24 REFRIGERANT PIPING REVISION #1 5/18/90 \FILE0234. TIF roll#67 . bldg#680 03-14-86 21 OF 24 ELECTRICAL REMOVAL PLAN REVISION #1 5/18/90 \FILE0235.TIF roll#67 - bldg#680 03-14-86 22 OF 24 LIGHTING PLAN \FILE0236.TIF roll#67 bldg#680 03-14-86 23 OF 24 ELECTRICAL POWER PLAN REVISION #1 5/18/90 \FILE0237.TIF roll#67 bldg#680 03-14-86 24 OF 24 ELECTRICAL LEGEND & SCHEDULES REVISION #1 5/18/90 \FILE0238.TIF roll#67 bldg#680 2 OF 16 DEMOLITION PLAN \FILE0239.TIF roll#67 - bldg#680 3 OF 16 FLOOR PLAN \FILE0240.TIF roll#67 . bldg#680 4 OF 16 SCHEDULES & DETAILS \FILE0241.TIF roll#67 bldg#680 5 OF 16 PARTIAL FLOOR PLAN \FILE0242.TIF roll#67 bldg#680 6 OF 16 SECTIONS & DETAILS \FILE0243. TIF roll#67 bldg#680 7 OF 16 REFLECTED CEILING PLAN \FILE0244. TIF roll#67 bldg#680 8 OF 16 REMOVAL FLOOR PLAN \FILE0245.TIF roll#67 - - bldg#680 9 OF 16 FLOOR PLAN \FILE0246.TIF roll#67 - bldg#680 10 OF 16 PLUMBING FLOOR PLAN \FILE0247.TIF roll#67 bldg#680 11 OF 16 FIRE PROECTECTION FLOOR PLAN \FILE0248.TIF 9438 1/26/2006 United Reprographic Planroom Page 12 of 13 roll#67 bldg#680 12 OF 16 \FILE0249.TIF roll#67 bldg#680 13 OF 16 \FILE0250.TIF roll#67 bldg#680 14 OF 16 \FILE0251.TIF roll#67 - bldg#680 5/20/77 \FILE0252.TIF roll#67 LIQUOR LOCKER ELECTRICAL bldg#680 440-144-680 3 OF 4 LIGHTING PLAN \FILE0253.TIF roll#67 bldg#680 740-022-680 2 OF 2 RELOCATION OF SMALL STORES \FILE0254.TIF roll#67 bldg#680 1 OF 2 A/C UNITS FOR EXCHANGE \FILE0255.TIF roll#67 bldg#680 COLD STORAGE PLANT \FILE0256.TIF roll#67 NEW REFRIGERANT PIPING bldg#680 SCHEMATIC \FILE0257.TIF roll#67 . COMMISSARY EXPANSION FOR bldg#680 990-276-680 1 OF 2 BUILDING 680 EXISTING ROOF PLAN & \FILE0258.TIF DEMOLITION roll#67 COMMISSARY EXPANSION FOR bldg#680 990-276-680 2 OF 2 BUILDING 680 ROOFING DETAILS \FILE0259.TIF EXISTING & NEW roll#67 EQUIPMENT-VENTILATION FOR COLD bldg#680 544-028-680 1 OF 1 STORAGE REFRIGERATION \FILE0260.TIF roll#67 bldg#680 340-147-680 OF 1 PROPOSED CASH CLERKS OFFICE 4/26/83 \FILE0261.TIF roll#67 - bldg#680 440-144-680 2 OF 4 PROPOSED SECTIONS & DETAILS \FILE0262.TIF roll#67 bldg#680 440-144-680 4 OF 4 REFLECTED CEILING \FILE0263.TIF roll#67 bldg#680 740-034-680 1 OF 1 EXCHANGE EXPANSION \FILE0264.TIF roll#67 RELOCATION OF SMALL STORES BLDG bldg#680 740-022-680 1 OF 2 680 \FILE0265.TIF roll#67 bldg#680 \FILE0266.TIF roll#67 bldg#680 \FILE0267.TIF roll#67 COLD STORAGE PLANT BUILDING 680 bldg#680 AS BUILT \FILE0268.TIF roll#67 - ROOF REPLACEMENT FOR BUILDING bldg#680 990-276-680 5 OF 8 4/7/89 680 NEW ROOF PLAN \FILE0269.TIF roll#67 ROOF REPLACEMENT FOR BUILDING bldg#680 990-276-680 6 OF 8 680 ROOFING DETAILS EXISTING & 4/7/89 \FILE0270.TIF NEW roll#67 ROOF REPLACEMENT FOR BLDG 680 bldg#680 990-276-680 7 OF 8 ROOFING DETAILS-NEW \FILE0271.TIF 0 144 1/PNOnline/viewdetails 1/26/2006 United Reprographic Planroom Page 13 of 13 roll#67 - bldg#680 OVERHEAD MEAT TRACK SYSTEM REVISED 4/16/64 \FILE0272.TIF roll#67 - LOCATION OF STANDBY bldg#680 040-027-680 1 OF 1 3/20/80 REFRIGERATION UNIT \FILE0273.TIF roll#67 - RENOVATE EXCHANGE CEILING BLDG bldg#680 440-140-680 3 OF 4 6/13/84 680 DETAILS & GENERAL NOTES \FILE0274.TIF 274 Items 4.11 1/26/2006