EXECUTIVE MANSION
CONSTRUCTION CONTROL REPORT AS OF
WASHINGTON D. c.
November 9,
1951
RENOVATION AND MODERNIZATION
Project No. 49-100-8
EST IMATE
EST IMATE
TOTAL
LUMP SUM
BRANCHES OF WORK
ADJUSTED
ADJUSTED
EXPEND ITURES
OTHER
TOTAL COMM ITMENTS
CONTRACTS
UNENCUMBERED
COMMITMENTS
INCLUDING
PERCENTAGE
12-29-50
10-25-51
(5)
AUTHORIZED
BALANCE
COMPLETION
(1)
(2)
(3)
(4)
(6)
PAYMENTS
(7)
OF EST IMATE
(8)
PHYSICAL
(9)
(10)
CONTRACT OF JOHN MOSHA IN, INC.
$ 164,000.00
$ 159,846.54
1
DEMOLITION AND DISMANTLING
$ 160,000.00
$
3,808.00
UNDERPINNING
249,000.00
246,603.70
156,038.54
159,846.54
153.46
2
246,864.33
100.0
EXCAVATION
60,000.00
59,412.64
246,864.33
SUBCONTR. $775,000
99.5
3
COLUMN FOOT INGS
24,072.85
59,442.64
59,442.64
FEE
48,250
26,000.00
24,072.85
100.0
SHORING FLOORS AND WALLS
119,499.72
24,072.85
120,750.00
119,499.72
100.0
33,775.00
119,499.72
6
SUBCONTRACTOR'S FEE
48,250.00
48,250.00
100.0
7
EXCAVATION (OUTS VAULTS, ETC.)
60,000.00
559,000.00
60,111.44
48,250.00
60,486.36
8
GUNNITE
6,800.00
60,486.36
9,000.00
6,800.00
6,800.00
384.10
9
CONCRETE AND CEMENT WORK
295,000.00
282,296.04
6,800.00
100.0
236,000.00
289,352.69
100.0
289,352.69
10
SUB-DRA INAGE
5,500.00
5,900.00
5,581.49
5,647.31
5,881.49
99.0
11
WATERPROFF ING AND DAMPPROOF ING
8,600.00
3,366.61
5,881.49
4,500.00
2,849.00
18,51
786.61
100.0
3,635.61
12
STRUCTURAL STEEL
190,000.00
193,300.00
181,630.15
864.39
66,274.71
126,655.45
13
85,480.11
192,930.16
BRICKWORK
369.84
88,040.45
100.0
88,040.45
14
TERRA COTTA TILE PART IT IONS
110,000.00
96,561.67
97,653.95
97,653.95
15
STRUCTURAL THE PART IT IONS
41,500.00
188,000.00
449.54
449.54
449.54
EXTERIOR GRANITE WORK
1,856.06
16
99.0
17
EXTERIOR STONE WORK
123,700.00
138,000.00
33,351.44
133,000.00
1,170.66
134,170.66
3,829.34
18
INTERIOR STONE WORK
45.0
19
INTER IOR MARBLE WORK
267,000.00
250,000.00
156,188.37
246,305.00
2,217.37
248,522.37
1,477.63
20
STRUCTURAL GLASS
22,000.00
21,000.00
70.0
19,350.00
19,350.00
21
TILE WORK (CERAMIC AND QUARRY )
16,000.00
15,000.00
8,460.00
1,650.00
40.0
14,050.00
14,050.00
950.00
22
TERRAZZO WORK
(ELIMINATED)
80.0
23
ASPHALT COMPOSIT TILE
5,000.00
24
RUBBER THE
2,500.00
4,500.00
3,985.00
3,985.00
515.00
25
MISCELLANEOUS STEEL AND IRON
42,000.00
55,000.00
45,239.97
45,482.47
9,332.95
54,815.42
184.58
26
ORNAMENTAL METAL WORK
111,000.00
90.0
59,000.00
2,359.49
56,241.00
996.89
57,237.89
26A
ALUMINUM FOR SUN AND PLAY ROOMS
19,800.00
1,762.11
35.0
9,000.00
8,675.47
8,675.47
27
CARPENTRY
50,000.00
77,000.00
71,315.89
324.53
90.0
75,599.09
75,599.00
28
CABINET WORK
1,400.91
300,000.00
370,000.00
208,155.39
99.0
361,478.20
1,047.48
362,525.68
29
FINISH HARDWARE
7,474.32
60.0
31,000.00
34,000.00
30,500.45
32,513.55
373.75
32,887.30
WOOD FLOORING
1,112.70
30
70,000.00
80,000.00
27,049.47
35.0
72,000.00
49.47
72,049.47
31
HOLLOW METAL WORK
7,950.53
25.0
48,000.00
57,000.00
14,971.92
49,609.45
2,946.52
52,555.97
32
LATHING AND PLASTERING
4,444.03
235,000.00
270,000.00
244,945.21
25.0
202,263.51
63,863.34
266,126.85
3,873.15
98.0
33
ROOF ING AND SHEET METAL WORK
52,000.00
54,000.00
28,034.35
51,651.80
14.35
INSECT SCREENS
51,666.15
34
6,700.00
2,333.85
4,500.00
75.0
3,523.00
3,523.00
977.00
35
CAULKING
800.00
800.00
800.00
36
INSULATION
37
SOUND CONTROL TREATMENT
25,900.00
25,900.00
20,979.00
25,900.00
38
25,900.00
WEATHERSTRIPS
2,100.00
1,600.00
95.0
1,454.00
1,454.00
146.00
40.0
39
GLASS AND GLAZING
7,200.00
15,000.00
1,200.85
12,197.00
112.52
12,309.52
PAINTING
2,690.48
80.0
40
90,000.00
70,000.00
68.80
65,922.50
68.80
FIRE EQUIPMENT CABINETS (IN HOLLOW METAL WORK)
65,991.30
4,008.70
41
10.0
2,600.00
42
MED. CAB. AND VANITY SER. RECESSES
7,700.00
850.20
6,424.56
1,986.45
8,411.01
43
PLUMBING ACCESSORIES
4,800.00
3,864.60
3,864.60
44
METAL топ. ENCL. DOORS
(ELIMINATED)
45
SHOWER DOORS AND TUB ENCLOSURES
4,800.00
16,500.00
2,687.00
2,687.00
46
LAMINATED RESINOUS DOORS AND SHELVES
1,537.39
0.0
(INCLUDED I
CABINET WORK)
47
VAULT DOORS
7,000.00
5,800.00
5,765.20
5,765.20
34.80
15.0
47A
METAL LOCKERS, SHELVING, CLOSET FITMENTS, ETC.
10,000.00
13,000.00
350.80
4,342.25
1,369.61
5,711.86
7,288.14
48A
PLUMBING OUTSIDE EXCAVATION
9,875.00
26,000.00
22,109.24
23,038.04
23,038.04
2,961.96
99.0
48
PLUMBING SYSTEMS
153,044.82
177,213.04
8,217.87
185,430.91
49
HEATING SYSTEMS
59,999.57
66,336.01
66,336.01
50
VENT. AND AIR COND. SYSTEMS M.E.
234,844.01
283,602.09
283,602.09
51
VACUUM CLEANING SYSTEM
2,661.00
2,800.59
2,800.59
52
SPRINKLER SYSTEM
560,125.00
615,000.00
361.00
380.00
380,00
6,718.40
80.0
53
KITCHEN EQUIP. (INCLUDING PORTABLE REFRIGERATOR)
25,000.00
24,000.00
22,972.00
22,972.00
1,028.00
35.0
54
INC INERATORS AND CAN WASHER
3,000.00
3,000.00
2,545.75
2,995.00
2,995.00
5.00
95.0
55
LAUNDRY EQUIPMENT
3,800.00
3,800.00
3,386.70
3,763.00
3,763.00
37.00
75.0
56A
ELECTRICAL OUTSIDE EXCAVATION
19,000.00
25,000.00
22,495.05
24,494.25
24,494.25
505.75
99.0
56
ELECTRICAL WORK (EXCLUDING IXTURES)
57
GENERAL LIGHT ING IXUTRES
496,000.00
538,000.00
380,613.90
507,497.61
3,495.90
510,993.51
27,006.49
92.0
58
SPECIAL LIGHT ING FIXTURES
25,000.00
59
RE-SET REUSED LIGHTING IXTURES
15,000.00
73,000.00
67,106.00
600.00
67,706.00
5,294.00
10.0
60
NON-CONDUCTING COVERING (INCLUDED IN MECH. EQUIP.)
62,120.00
69,732.00
69,732.00
61
ELEVATOR PLANTS & DUMBWA ITERS
82,000.00
85,400.00
74,371.37
75,553.96
8,164.70
83,718.66
1,681.34
94.0
62
PAINTING OF MECHANICAL EQUIPMENT
10,000.00
5,000.00
1,080.00
63
4,447.00
4,447.00
553.00
80.0
TEMPORARY BUILDINGS AND FENCES
80,000.00
75,000.00
66,627.74
11,172.00
55,455.74
66,627.74
8,372.26
95.0
64
CLEANING AND PROTECTION
50,000.00
79,000.00
63,758.33
65
INSURANCE AND TAXES
71,772.19
71,772.19
7,227.81
90.0
40,000.00
63,000.00
31,901.30
58,841.52
58,841.52
4,158.48
90.0
654
WELFARE FUND
BOND
17,000.00
12,400.61
15,409.76
15,409.76
1,590.24
66
12,480.00
12,480.00
12,480.00
12,480.00
12,480.00
100.0
67
TEMPORARY MECHANICAL WORK
60,000.00
68
65,000.00
48,940.22
17,736.34
38,427.79
56,164.13
8,835.87
95.0
APPROACH WORK
23,000.00
55,000.00
6,670.56
68A
6,000.00
7,516.25
13,516.25
41,483.75
10.0
APPROACH WORK, EAST WING
2,000.00
2,000.00
TOTAL GENERAL CONTRACT
69
$4,407,480.00
$4,825,780.00
$3,521,950.37
$2,827,723.91
$1,812,537.88
$4,640,261.79
$185,518.21
GENERAL CONTRACTOR'S FEE, (JOHN MOSHAIN, INC.)
100,000.00
PUBLIC BUILDINGS SERVICE
100,000.00
100,000.00
100,000.00
70
MATERIALS TESTING, EXPEDITING, SAMPLES, ETC.
71
15,000.00
3,000.00
1,020.62
2,020.62
2,020.62
979.38
95.0
MISC. CONSTR. CHARGES, SURVEYS, TEST BORINGS, ETC.
75
CONT INGENC
40,000.00
40,000.00
29,969.70
37,336.21
37,336.21
2,663.79
95.0
76
FURNITURE, DRAPES, MOVING, ETC.
96,020.00
17,220.00
17,220.00
GENERAL EXPENSES
200,000.00
200,000.00
9,981.65
184,039.65
184,039.65
15,960.35
72
DRAWINGS AND SPECIF
376,500.00
400,000.00
386,233.32
387,734.08
387,734.08
12,265.92
98.0
OPERATOR'S DIAGRAMS, INACCESSIBLE INSTALLATION
72A
ARCHIVAL DRAWINGS
S
SUPERV IS ION
EXPENSES
130,000.00
140,000.00
126,562.43
131,027.71
131,027.71
8,972.29
80.0
35,000.00
35,000.00
26,607.29
26,917.29
26,917.29
8,082.71
98.0
$5,400,000.00
$5,761,000.00
$4,102,325.38
$2,927,723.91
$2,581,613.44
$5,509,337.35
$251,662.65
LONK 11/14/51
WT9-11-14-51
Page data
- Page
- 5
- Source index
- 0
- Type
- photo
- Media ID
- 2f145fba3920b3cd
- Size
- unknown
Document data
- ID
- 170104236
- Core
- doc
- Type
- document
DTO data
{
"id": "170104236",
"sourceUrl": "https://catalog.archives.gov/id/170104236",
"contentType": "document",
"title": "Memorandum, Report on Construction Progress, with Attachment",
"citationUrl": "https://catalog.archives.gov/id/170104236",
"collections": [
"President's Secretary's Files (Truman Administration)",
"White House Files"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-098-001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-098-001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-098-001.jpg",
"imageCount": 5,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Context sent to Scholar
Document identity
{
"localId": "170104236",
"label": "Memorandum, Report on Construction Progress, with Attachment",
"core": "doc",
"dtoType": "document",
"citationUrl": "https://catalog.archives.gov/id/170104236"
}
Document source metadata
{
"id": "170104236",
"sourceUrl": "https://catalog.archives.gov/id/170104236",
"contentType": "document",
"title": "Memorandum, Report on Construction Progress, with Attachment",
"citationUrl": "https://catalog.archives.gov/id/170104236",
"collections": [
"President's Secretary's Files (Truman Administration)",
"White House Files"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-098-001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-098-001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-098-001.jpg",
"imageCount": 5,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Document source extras
{
"url": "https://catalog.archives.gov/id/170104236",
"naId": 170104236,
"levelOfDescription": "item",
"productionDates": [
{
"logicalDate": "1951-11-01",
"month": 11,
"year": 1951
}
],
"recordType": "description",
"ocrSource": "nara-archive"
}
Page context
{
"seq": 5,
"pageIndex": 0,
"type": "photo",
"url": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-098-005.JPG",
"mediaId": "2f145fba3920b3cd",
"ocrText": "EXECUTIVE MANSION\nCONSTRUCTION CONTROL REPORT AS OF\nWASHINGTON D. c.\nNovember 9,\n1951\nRENOVATION AND MODERNIZATION\nProject No. 49-100-8\nEST IMATE\nEST IMATE\nTOTAL\nLUMP SUM\nBRANCHES OF WORK\nADJUSTED\nADJUSTED\nEXPEND ITURES\nOTHER\nTOTAL COMM ITMENTS\nCONTRACTS\nUNENCUMBERED\nCOMMITMENTS\nINCLUDING\nPERCENTAGE\n12-29-50\n10-25-51\n(5)\nAUTHORIZED\nBALANCE\nCOMPLETION\n(1)\n(2)\n(3)\n(4)\n(6)\nPAYMENTS\n(7)\nOF EST IMATE\n(8)\nPHYSICAL\n(9)\n(10)\nCONTRACT OF JOHN MOSHA IN, INC.\n$ 164,000.00\n$ 159,846.54\n1\nDEMOLITION AND DISMANTLING\n$ 160,000.00\n$\n3,808.00\nUNDERPINNING\n249,000.00\n246,603.70\n156,038.54\n159,846.54\n153.46\n2\n246,864.33\n100.0\nEXCAVATION\n60,000.00\n59,412.64\n246,864.33\nSUBCONTR. $775,000\n99.5\n3\nCOLUMN FOOT INGS\n24,072.85\n59,442.64\n59,442.64\nFEE\n48,250\n26,000.00\n24,072.85\n100.0\nSHORING FLOORS AND WALLS\n119,499.72\n24,072.85\n120,750.00\n119,499.72\n100.0\n33,775.00\n119,499.72\n6\nSUBCONTRACTOR'S FEE\n48,250.00\n48,250.00\n100.0\n7\nEXCAVATION (OUTS VAULTS, ETC.)\n60,000.00\n559,000.00\n60,111.44\n48,250.00\n60,486.36\n8\nGUNNITE\n6,800.00\n60,486.36\n9,000.00\n6,800.00\n6,800.00\n384.10\n9\nCONCRETE AND CEMENT WORK\n295,000.00\n282,296.04\n6,800.00\n100.0\n236,000.00\n289,352.69\n100.0\n289,352.69\n10\nSUB-DRA INAGE\n5,500.00\n5,900.00\n5,581.49\n5,647.31\n5,881.49\n99.0\n11\nWATERPROFF ING AND DAMPPROOF ING\n8,600.00\n3,366.61\n5,881.49\n4,500.00\n2,849.00\n18,51\n786.61\n100.0\n3,635.61\n12\nSTRUCTURAL STEEL\n190,000.00\n193,300.00\n181,630.15\n864.39\n66,274.71\n126,655.45\n13\n85,480.11\n192,930.16\nBRICKWORK\n369.84\n88,040.45\n100.0\n88,040.45\n14\nTERRA COTTA TILE PART IT IONS\n110,000.00\n96,561.67\n97,653.95\n97,653.95\n15\nSTRUCTURAL THE PART IT IONS\n41,500.00\n188,000.00\n449.54\n449.54\n449.54\nEXTERIOR GRANITE WORK\n1,856.06\n16\n99.0\n17\nEXTERIOR STONE WORK\n123,700.00\n138,000.00\n33,351.44\n133,000.00\n1,170.66\n134,170.66\n3,829.34\n18\nINTERIOR STONE WORK\n45.0\n19\nINTER IOR MARBLE WORK\n267,000.00\n250,000.00\n156,188.37\n246,305.00\n2,217.37\n248,522.37\n1,477.63\n20\nSTRUCTURAL GLASS\n22,000.00\n21,000.00\n70.0\n19,350.00\n19,350.00\n21\nTILE WORK (CERAMIC AND QUARRY )\n16,000.00\n15,000.00\n8,460.00\n1,650.00\n40.0\n14,050.00\n14,050.00\n950.00\n22\nTERRAZZO WORK\n(ELIMINATED)\n80.0\n23\nASPHALT COMPOSIT TILE\n5,000.00\n24\nRUBBER THE\n2,500.00\n4,500.00\n3,985.00\n3,985.00\n515.00\n25\nMISCELLANEOUS STEEL AND IRON\n42,000.00\n55,000.00\n45,239.97\n45,482.47\n9,332.95\n54,815.42\n184.58\n26\nORNAMENTAL METAL WORK\n111,000.00\n90.0\n59,000.00\n2,359.49\n56,241.00\n996.89\n57,237.89\n26A\nALUMINUM FOR SUN AND PLAY ROOMS\n19,800.00\n1,762.11\n35.0\n9,000.00\n8,675.47\n8,675.47\n27\nCARPENTRY\n50,000.00\n77,000.00\n71,315.89\n324.53\n90.0\n75,599.09\n75,599.00\n28\nCABINET WORK\n1,400.91\n300,000.00\n370,000.00\n208,155.39\n99.0\n361,478.20\n1,047.48\n362,525.68\n29\nFINISH HARDWARE\n7,474.32\n60.0\n31,000.00\n34,000.00\n30,500.45\n32,513.55\n373.75\n32,887.30\nWOOD FLOORING\n1,112.70\n30\n70,000.00\n80,000.00\n27,049.47\n35.0\n72,000.00\n49.47\n72,049.47\n31\nHOLLOW METAL WORK\n7,950.53\n25.0\n48,000.00\n57,000.00\n14,971.92\n49,609.45\n2,946.52\n52,555.97\n32\nLATHING AND PLASTERING\n4,444.03\n235,000.00\n270,000.00\n244,945.21\n25.0\n202,263.51\n63,863.34\n266,126.85\n3,873.15\n98.0\n33\nROOF ING AND SHEET METAL WORK\n52,000.00\n54,000.00\n28,034.35\n51,651.80\n14.35\nINSECT SCREENS\n51,666.15\n34\n6,700.00\n2,333.85\n4,500.00\n75.0\n3,523.00\n3,523.00\n977.00\n35\nCAULKING\n800.00\n800.00\n800.00\n36\nINSULATION\n37\nSOUND CONTROL TREATMENT\n25,900.00\n25,900.00\n20,979.00\n25,900.00\n38\n25,900.00\nWEATHERSTRIPS\n2,100.00\n1,600.00\n95.0\n1,454.00\n1,454.00\n146.00\n40.0\n39\nGLASS AND GLAZING\n7,200.00\n15,000.00\n1,200.85\n12,197.00\n112.52\n12,309.52\nPAINTING\n2,690.48\n80.0\n40\n90,000.00\n70,000.00\n68.80\n65,922.50\n68.80\nFIRE EQUIPMENT CABINETS (IN HOLLOW METAL WORK)\n65,991.30\n4,008.70\n41\n10.0\n2,600.00\n42\nMED. CAB. AND VANITY SER. RECESSES\n7,700.00\n850.20\n6,424.56\n1,986.45\n8,411.01\n43\nPLUMBING ACCESSORIES\n4,800.00\n3,864.60\n3,864.60\n44\nMETAL топ. ENCL. DOORS\n(ELIMINATED)\n45\nSHOWER DOORS AND TUB ENCLOSURES\n4,800.00\n16,500.00\n2,687.00\n2,687.00\n46\nLAMINATED RESINOUS DOORS AND SHELVES\n1,537.39\n0.0\n(INCLUDED I\nCABINET WORK)\n47\nVAULT DOORS\n7,000.00\n5,800.00\n5,765.20\n5,765.20\n34.80\n15.0\n47A\nMETAL LOCKERS, SHELVING, CLOSET FITMENTS, ETC.\n10,000.00\n13,000.00\n350.80\n4,342.25\n1,369.61\n5,711.86\n7,288.14\n48A\nPLUMBING OUTSIDE EXCAVATION\n9,875.00\n26,000.00\n22,109.24\n23,038.04\n23,038.04\n2,961.96\n99.0\n48\nPLUMBING SYSTEMS\n153,044.82\n177,213.04\n8,217.87\n185,430.91\n49\nHEATING SYSTEMS\n59,999.57\n66,336.01\n66,336.01\n50\nVENT. AND AIR COND. SYSTEMS M.E.\n234,844.01\n283,602.09\n283,602.09\n51\nVACUUM CLEANING SYSTEM\n2,661.00\n2,800.59\n2,800.59\n52\nSPRINKLER SYSTEM\n560,125.00\n615,000.00\n361.00\n380.00\n380,00\n6,718.40\n80.0\n53\nKITCHEN EQUIP. (INCLUDING PORTABLE REFRIGERATOR)\n25,000.00\n24,000.00\n22,972.00\n22,972.00\n1,028.00\n35.0\n54\nINC INERATORS AND CAN WASHER\n3,000.00\n3,000.00\n2,545.75\n2,995.00\n2,995.00\n5.00\n95.0\n55\nLAUNDRY EQUIPMENT\n3,800.00\n3,800.00\n3,386.70\n3,763.00\n3,763.00\n37.00\n75.0\n56A\nELECTRICAL OUTSIDE EXCAVATION\n19,000.00\n25,000.00\n22,495.05\n24,494.25\n24,494.25\n505.75\n99.0\n56\nELECTRICAL WORK (EXCLUDING IXTURES)\n57\nGENERAL LIGHT ING IXUTRES\n496,000.00\n538,000.00\n380,613.90\n507,497.61\n3,495.90\n510,993.51\n27,006.49\n92.0\n58\nSPECIAL LIGHT ING FIXTURES\n25,000.00\n59\nRE-SET REUSED LIGHTING IXTURES\n15,000.00\n73,000.00\n67,106.00\n600.00\n67,706.00\n5,294.00\n10.0\n60\nNON-CONDUCTING COVERING (INCLUDED IN MECH. EQUIP.)\n62,120.00\n69,732.00\n69,732.00\n61\nELEVATOR PLANTS & DUMBWA ITERS\n82,000.00\n85,400.00\n74,371.37\n75,553.96\n8,164.70\n83,718.66\n1,681.34\n94.0\n62\nPAINTING OF MECHANICAL EQUIPMENT\n10,000.00\n5,000.00\n1,080.00\n63\n4,447.00\n4,447.00\n553.00\n80.0\nTEMPORARY BUILDINGS AND FENCES\n80,000.00\n75,000.00\n66,627.74\n11,172.00\n55,455.74\n66,627.74\n8,372.26\n95.0\n64\nCLEANING AND PROTECTION\n50,000.00\n79,000.00\n63,758.33\n65\nINSURANCE AND TAXES\n71,772.19\n71,772.19\n7,227.81\n90.0\n40,000.00\n63,000.00\n31,901.30\n58,841.52\n58,841.52\n4,158.48\n90.0\n654\nWELFARE FUND\nBOND\n17,000.00\n12,400.61\n15,409.76\n15,409.76\n1,590.24\n66\n12,480.00\n12,480.00\n12,480.00\n12,480.00\n12,480.00\n100.0\n67\nTEMPORARY MECHANICAL WORK\n60,000.00\n68\n65,000.00\n48,940.22\n17,736.34\n38,427.79\n56,164.13\n8,835.87\n95.0\nAPPROACH WORK\n23,000.00\n55,000.00\n6,670.56\n68A\n6,000.00\n7,516.25\n13,516.25\n41,483.75\n10.0\nAPPROACH WORK, EAST WING\n2,000.00\n2,000.00\nTOTAL GENERAL CONTRACT\n69\n$4,407,480.00\n$4,825,780.00\n$3,521,950.37\n$2,827,723.91\n$1,812,537.88\n$4,640,261.79\n$185,518.21\nGENERAL CONTRACTOR'S FEE, (JOHN MOSHAIN, INC.)\n100,000.00\nPUBLIC BUILDINGS SERVICE\n100,000.00\n100,000.00\n100,000.00\n70\nMATERIALS TESTING, EXPEDITING, SAMPLES, ETC.\n71\n15,000.00\n3,000.00\n1,020.62\n2,020.62\n2,020.62\n979.38\n95.0\nMISC. CONSTR. CHARGES, SURVEYS, TEST BORINGS, ETC.\n75\nCONT INGENC\n40,000.00\n40,000.00\n29,969.70\n37,336.21\n37,336.21\n2,663.79\n95.0\n76\nFURNITURE, DRAPES, MOVING, ETC.\n96,020.00\n17,220.00\n17,220.00\nGENERAL EXPENSES\n200,000.00\n200,000.00\n9,981.65\n184,039.65\n184,039.65\n15,960.35\n72\nDRAWINGS AND SPECIF\n376,500.00\n400,000.00\n386,233.32\n387,734.08\n387,734.08\n12,265.92\n98.0\nOPERATOR'S DIAGRAMS, INACCESSIBLE INSTALLATION\n72A\nARCHIVAL DRAWINGS\nS\nSUPERV IS ION\nEXPENSES\n130,000.00\n140,000.00\n126,562.43\n131,027.71\n131,027.71\n8,972.29\n80.0\n35,000.00\n35,000.00\n26,607.29\n26,917.29\n26,917.29\n8,082.71\n98.0\n$5,400,000.00\n$5,761,000.00\n$4,102,325.38\n$2,927,723.91\n$2,581,613.44\n$5,509,337.35\n$251,662.65\nLONK 11/14/51\nWT9-11-14-51"
}