Ask the Scholar
Page 4 of 5
I can add historical knowledge about this page.
Page image
OCR
THE JOINT CHIEFS OF STAFF
SROUMTY INFORMATION
WASHINGTON 25, D.C.
10 October 1952
MEMORANDUM FOR THE SECRETARY OF DEFENSE
Subject: Augmentation of the Wartime Republic of Korea Army
and Marine Corps
1. This is in reply to your memorandum of 8 October 1952 on the above
subject.
2. Analysis of twenty-five representative critical items (including
suitable substitutes) reveals that diversion of equipment and supplies to the
early augmentation of the Republic of Korea (ROK) Army and Marine Corps would
result in a delay of two months in the planned delivery of 105mm Howitzers,
155mm Howitzers, and 75mm Recoilless Rifles to NATO, Japanese National Police
Reserve and Southeast Asia. If, in addition, decision is made to equip con-
currently the two Chinese Nationalist divisions mentioned in your memorandum
of 23 August 1952, a further delay of approximately two months would result.
However, as the rate of production increases in the future, the time delay
will be proportionally decreased.
3. The other critical items of equipment can be furnished from Army
mobilization or depot stocks within the priority assigned Korean operations.
4. Equipment requirements for the Republic of Korea augmentation will
extend by two months the 50% ceiling on critical items presently imposed on
U.S. units in the Zone of the Interior. It is estimated that this restrictive
ceiling will then extend until at least January 1954.
5. Supplies of ammunition in critical categories, including 105mm
Howitzer, 155mm Howitzer, and 75mm Recoilless Rifle ammunition, are barely
adequate for Far East Command requirements, with only limited quantities
available for European Command and training in the Zone of the Interior.
Shipments of this ammunition have been suspended to Mutual Defense Assistance
Program (MDAP) claimants, except to Indochina. Any substantial consumption
by additional combat units in Korea will further delay resumption of ammuni-
tion shipments to MDAP claimants and extend the period of reduced allowances
for United States and ROK training.
For the Joint Chiefs of Staff:
s/ Omar N. Bradley
S.
Chairman
DECLASSIFIED
c ARCHINES N
Joint Chiefs of Staff
B. o. 11652, Sec. 3(E) and 3(D) es
050 4-27-77
OSD letter,
PROJECT NLT 77.39
Bay NLT. NC , NARS Date 6.14:77
C
o
P
tan
Y
Page data
- Page
- 4
- Source index
- 0
- Type
- photo
- Media ID
- 39d737f63c52586a
- Size
- unknown
Document data
- ID
- 229036535
- Core
- doc
- Type
- document
DTO data
{
"id": "229036535",
"sourceUrl": "https://catalog.archives.gov/id/229036535",
"contentType": "document",
"title": "Memorandum from Secretary of Defense Robert Lovett to the Joint Chiefs of Staff, with Related Material",
"citationUrl": "https://catalog.archives.gov/id/229036535",
"collections": [
"President's Secretary's Files (Truman Administration)",
"Korean War Files"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602194/976111/976111-47-001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602194/976111/976111-47-001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602194/976111/976111-47-001.jpg",
"imageCount": 5,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Context sent to Scholar
Document identity
{
"localId": "229036535",
"label": "Memorandum from Secretary of Defense Robert Lovett to the Joint Chiefs of Staff, with Related Material",
"core": "doc",
"dtoType": "document",
"citationUrl": "https://catalog.archives.gov/id/229036535"
}
Document source metadata
{
"id": "229036535",
"sourceUrl": "https://catalog.archives.gov/id/229036535",
"contentType": "document",
"title": "Memorandum from Secretary of Defense Robert Lovett to the Joint Chiefs of Staff, with Related Material",
"citationUrl": "https://catalog.archives.gov/id/229036535",
"collections": [
"President's Secretary's Files (Truman Administration)",
"Korean War Files"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602194/976111/976111-47-001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602194/976111/976111-47-001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602194/976111/976111-47-001.jpg",
"imageCount": 5,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Document source extras
{
"url": "https://catalog.archives.gov/id/229036535",
"naId": 229036535,
"levelOfDescription": "item",
"productionDates": [
{
"logicalDate": "1952-10-01",
"month": 10,
"year": 1952
}
],
"recordType": "description",
"ocrSource": "nara-archive"
}
Page context
{
"seq": 4,
"pageIndex": 0,
"type": "photo",
"url": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602194/976111/976111-47-004.jpg",
"mediaId": "39d737f63c52586a",
"ocrText": "THE JOINT CHIEFS OF STAFF\nSROUMTY INFORMATION\nWASHINGTON 25, D.C.\n10 October 1952\nMEMORANDUM FOR THE SECRETARY OF DEFENSE\nSubject: Augmentation of the Wartime Republic of Korea Army\nand Marine Corps\n1. This is in reply to your memorandum of 8 October 1952 on the above\nsubject.\n2. Analysis of twenty-five representative critical items (including\nsuitable substitutes) reveals that diversion of equipment and supplies to the\nearly augmentation of the Republic of Korea (ROK) Army and Marine Corps would\nresult in a delay of two months in the planned delivery of 105mm Howitzers,\n155mm Howitzers, and 75mm Recoilless Rifles to NATO, Japanese National Police\nReserve and Southeast Asia. If, in addition, decision is made to equip con-\ncurrently the two Chinese Nationalist divisions mentioned in your memorandum\nof 23 August 1952, a further delay of approximately two months would result.\nHowever, as the rate of production increases in the future, the time delay\nwill be proportionally decreased.\n3. The other critical items of equipment can be furnished from Army\nmobilization or depot stocks within the priority assigned Korean operations.\n4. Equipment requirements for the Republic of Korea augmentation will\nextend by two months the 50% ceiling on critical items presently imposed on\nU.S. units in the Zone of the Interior. It is estimated that this restrictive\nceiling will then extend until at least January 1954.\n5. Supplies of ammunition in critical categories, including 105mm\nHowitzer, 155mm Howitzer, and 75mm Recoilless Rifle ammunition, are barely\nadequate for Far East Command requirements, with only limited quantities\navailable for European Command and training in the Zone of the Interior.\nShipments of this ammunition have been suspended to Mutual Defense Assistance\nProgram (MDAP) claimants, except to Indochina. Any substantial consumption\nby additional combat units in Korea will further delay resumption of ammuni-\ntion shipments to MDAP claimants and extend the period of reduced allowances\nfor United States and ROK training.\nFor the Joint Chiefs of Staff:\ns/ Omar N. Bradley\nS.\nChairman\nDECLASSIFIED\nc ARCHINES N\nJoint Chiefs of Staff\nB. o. 11652, Sec. 3(E) and 3(D) es\n050 4-27-77\nOSD letter,\nPROJECT NLT 77.39\nBay NLT. NC , NARS Date 6.14:77\nC\no\nP\ntan\nY"
}