Ask the Scholar
Page 918 of 2346
I can add historical knowledge about this page.
Page image
OCR
(3) 18-447-2
p3
assembling MF motor assembly line putting
notor block onto line. head onto block. . motor off belt
onto flat aro.placing cyclinder head on block.inserting
pistons in block..unting blocks on conveyor--hood top
into press..wor.ing on hood .flanging side of hood--
BODY.,press piercing floor panel..M° & CU floor
penel--shroud--inner door panel o MS turret too oanel and
floor checking door and weiding--welding gate--
preparing body for piercing-=CU man preparing metal body
for piercing.
diff angie of me..preparing for priming--
DETROIT, equipment being brought into plant
as work on tank turrets goes on in ILLAC..tagging
engines..l. assembly line--putting too on e: gine and
engine being removed from assembly line--..ventipane
fremes on conveyor belt. wind OW frames on conveyor belt--
FLITT MICH. (CHEVROLET)hoisting metal press..hoisting
and
ramning enommous bull gear=-DAYTON,OHIO (FRIGIDAIR?) var.
shots. in FG..B-29 propeller blades in prod.
in BG--vaz.shots assembling Frigidaires..bending operation,
spot welding outer chells..cabinets on conveyor line.
braying eabinets. putting on doors. putting in Freezing
Page data
- Page
- 918
- Source index
- 0
- Type
- photo
- Media ID
- d2d7dc41c4355309
- Size
- unknown
Document data
- ID
- 75442378
- Core
- doc
- Type
- document
DTO data
{
"id": "75442378",
"sourceUrl": "https://catalog.archives.gov/id/75442378",
"contentType": "document",
"title": "Aviation: Aviation, 1942 - Aviation, 1952",
"citationUrl": "https://catalog.archives.gov/id/75442378",
"collections": [
"MCA/Universal Pictures Collection",
"Universal Newsreels' Subject Card Catalog"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-AVIATION/Universal-Aviation-M1516-Roll-183/M1516-183-0001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-AVIATION/Universal-Aviation-M1516-Roll-183/M1516-183-0001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-AVIATION/Universal-Aviation-M1516-Roll-183/M1516-183-0001.jpg",
"imageCount": 2346,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Context sent to Scholar
Document identity
{
"localId": "75442378",
"label": "Aviation: Aviation, 1942 - Aviation, 1952",
"core": "doc",
"dtoType": "document",
"citationUrl": "https://catalog.archives.gov/id/75442378"
}
Document source metadata
{
"id": "75442378",
"sourceUrl": "https://catalog.archives.gov/id/75442378",
"contentType": "document",
"title": "Aviation: Aviation, 1942 - Aviation, 1952",
"citationUrl": "https://catalog.archives.gov/id/75442378",
"collections": [
"MCA/Universal Pictures Collection",
"Universal Newsreels' Subject Card Catalog"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-AVIATION/Universal-Aviation-M1516-Roll-183/M1516-183-0001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-AVIATION/Universal-Aviation-M1516-Roll-183/M1516-183-0001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-AVIATION/Universal-Aviation-M1516-Roll-183/M1516-183-0001.jpg",
"imageCount": 2346,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Document source extras
{
"url": "https://catalog.archives.gov/id/75442378",
"naId": 75442378,
"levelOfDescription": "fileUnit",
"recordType": "description",
"ocrSource": "nara-archive"
}
Page context
{
"seq": 918,
"pageIndex": 0,
"type": "photo",
"url": "https://s3.amazonaws.com/NARAprodstorage/lz/mopix/un/microfilm/M1516-AVIATION/Universal-Aviation-M1516-Roll-183/M1516-183-0918.jpg",
"mediaId": "d2d7dc41c4355309",
"ocrText": "(3) 18-447-2\np3\nassembling MF motor assembly line putting\nnotor block onto line. head onto block. . motor off belt\nonto flat aro.placing cyclinder head on block.inserting\npistons in block..unting blocks on conveyor--hood top\ninto press..wor.ing on hood .flanging side of hood--\nBODY.,press piercing floor panel..M° & CU floor\npenel--shroud--inner door panel o MS turret too oanel and\nfloor checking door and weiding--welding gate--\npreparing body for piercing-=CU man preparing metal body\nfor piercing.\ndiff angie of me..preparing for priming--\nDETROIT, equipment being brought into plant\nas work on tank turrets goes on in ILLAC..tagging\nengines..l. assembly line--putting too on e: gine and\nengine being removed from assembly line--..ventipane\nfremes on conveyor belt. wind OW frames on conveyor belt--\nFLITT MICH. (CHEVROLET)hoisting metal press..hoisting\nand\nramning enommous bull gear=-DAYTON,OHIO (FRIGIDAIR?) var.\nshots. in FG..B-29 propeller blades in prod.\nin BG--vaz.shots assembling Frigidaires..bending operation,\nspot welding outer chells..cabinets on conveyor line.\nbraying eabinets. putting on doors. putting in Freezing"
}