Ask the Scholar
Document scope · 1 page
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory.
For page-specific OCR and visual context, open one of the page chats.
Scholar Source Context
Document identity
localId
120359795
label
Action Agenda
core
doc
dtoType
document
citationUrl
pageCount
1
Source metadata
id
120359795
contentType
document
title
Action Agenda
citationUrl
collections
Records of the Council on Environmental Quality (Clinton Administration)
Kathleen McGinty's Files
imageCount
1
hasImages
yes
source
import
hasTranscription
no
Source extras
naId
120359795
levelOfDescription
fileUnit
otherTitles
42-t-7432005-20120769F-Seg2-002-004-2018
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
e7b1af318c374022
ocrText
FOIA Number: 2012-0769-F
FOIA
MARKER
This is not a textual record. This is used as an
administrative marker by the William J. Clinton
Presidential Library Staff.
Collection/Record Group:
Clinton Presidential Records
Subgroup/Office of Origin:
Council on Environmental Quality
Series/Staff Member:
Kathleen (Katie) McGinty
Subseries:
OA/ID Number:
2896
FolderID:
Folder Title:
Action Agenda
Stack:
Row:
Section:
Shelf:
Position:
S
61
6
3
2
FROM CLIMATE CHANGE DIV
10.22.1992 14:56
P. 2
MOVE! 000
United States Department of State
Bureau of Oceans and International
Environmental and Scientific Affuirs
Washington, D.C. 20520
October 20, 1992
TO:
Distribution
FROM:
OES/E - Robert A. Reinstein
RAR
SUBJECT: Schedule for the Preparation of the U.S. Climate
Action Plan
As was discussed at the meeting of lead authors last week,
we will be forced to move rapidly to complete the U.S. National
Action Plan in time for distribution at the 6th Session of the
INC in Geneva (December 7-10). In order to expedite this work,
it was agreed that we would utilize the resources of a
contractor to compile and edit the text. The State Department
will bear the costs of this contract work.
In consultations with the contractor, we are proposing a
tentative schedule for the completion of the work. We have
attempted to balance the need of all drafters to have adequate
time to prepare their original texts, and for all agencies to
have adequate time to review the text once drafting has been
finished. We have also attempted to avoid conflicts with the
IPCC session -- when many of the drafters/reviewers will be in
Harare, Zimbabwe, and with the Thanksgiving recess. Because of
these constraints, we do not have much flexibility in the
distribution. schedule if we hope to complete the text in time for December
One possible place in which the schedule might slip is in
the printing (in the current schedule, we have allotted one
week for the text to be printed). Instead of printing the
final document, we could xerox several hundred copies of the
Plan overnight prior to departure for Geneva (i.e., making
copies on Friday, December 4). By doing so, we could gain an
additional week for interagency review -- although at: the cost
of a less polished final presentation.
Please review the attached schedule, and let us know if you
will be able to meet its timetable. We will attempt to
incorporate your suggestions into the schedule if feasible.
Please inform Jonathan Pershing, tel 202/647-4069, if you have
any recommendations or suggestions for revisions. We will work
with this schedule and assume that all agencies can comply
unless we hear otherwise by COB, Friday, October 23,
FROM CLIMATE CHANGE DIV
10.22.1992 14:56
P. 3
National Action Plan: Document Preparation Schedule
11/2
Agencies/Departments complete writing of chapters
(hopefully, some chapters will be completed earlier)
11/2
Chapters (on computer disk) are sent through DOS to
voice", grammatical mistakes corrected, formats
Contractor for a first edit (i.e., text put in "single
standardized, etc.) Some chapters may need to be sent
to authors for a further review after 1st edit (prior
to general interagency review) to assure that no
substantive changes have been made during editing;
this task would be expedited if chapters were
completed early.
11/6
Edited text is returned to DOS, which sends out
chapters for interagency review.
11/16
which compiles them.
Agencies' comments are returned to State (on disk)
11/17
Contractor. Compiled set of approved edits are sent from DOS to
11/20
Contractor completes revisions; text sent out through
DOS for final interagency review and clearance.
11/23
Final corrections sent to DOS from all agencies.
11/24
DOS compiles changes and sends them to contractor.
11/25
Contractor printer. completes all revisions, sends document to
12/3
Printed document is completed and sent to Geneva.