Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
702696
label
Cheney (Defense) [1991] [2]
core
doc
dtoType
document
pageCount
1
Source metadata
Source extras
naId
702696
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
3b31fef897f49ce0
ocrText
Originally Processed With FOIA(s): FOIA Number: 1998-0004-F[2] S FOIA MARKER This is not a textual record. This is used as an administrative marker by the George Bush Presidential Library Staff. Record Group/Collection: George H.W. Bush Presidential Records Collection/Office of Origin: Chief of Staff, White House Office of Series: Sununu, John, Files Subseries: Cabinet Agencies Files OA/ID Number: 29187 Folder ID Number: 29187-006 Folder Title: Cheney (Defense) [1991] [2] Stack: Row: Section: Shelf: Position: G 15 25 6 4 DEFENSE BASE CLOSURE AND REALIGNMENT COMMISSION 1625 K STREET, N.W. SUITE 400 WASHINGTON, D.C. 20006-1604 202-653-0823 JIM COURTER, CHAIRMAN COMMISSIONERS: July 1, 1991 WILLIAM L. BALL, III HOWARD H. CALLAWAY GEN. DUANE H. CASSIDY, USAF (R ARTHUR LEVITT, JR. JAMES SMITH II, P.E. ROBERT D. STUART, JR. The President The White House Washington, D.C. 20500 Dear Mr. President: On behalf of the Defense Base Closure and Realignment Commission, we are pleased to submit a report containing both a review of the Defense Secretary's April 12 list and our recommendations for the closure or realignment of U.S. military installations. In preparing this report, the Commission reviewed thousands of pages of oral testimony and written documentation. All of our work was subject to public scrutiny. We held 28 hearings across the United States, visited 47 military installations and met face-to-face with hundreds of representatives in surrounding communities. Among the many people who presented expert testimony were members of Congress and officials representing the Pentagon, the General Accounting Office and the Environmental Protection Agency. Ultimately, this report reflects the independent judgment of the Commission's seven members. Not one of our decisions was easy. Each of the installations recommended for closure enjoys a proud history of service to the United States. Moreover, we recognize that base closure creates economic hardship that only time and initiative can overcome. Nevertheless, budget constraints, coupled with changing national security requirements, compel the United States to reduce its military overhead costs. I am convinced that our recommendations will strengthen this country's ability to meet its international responsibilities. Respectfully yours, Jim Courter Chairman Min Ball. Rhar D. William L. Ball, III Robert D. Stuart, Jr. James C. Smith II, P.E. Commissioner Commissioner Commissioner MM. Arthur Levitt, Jr. Howard H. Callary Gen. Duane H. Cassidy, USAF (I Howard H. Callaway Commissioner Commissioner Commissioner Defense Base Closure and Realignment Commission Report to the President 1991 Defense Base Closure and Realignment Commission Report to the President 1991 DEFENSE BASE CLOSURE AND REALIGNMENT COMMISSION 1625 K STREET, N.W. SUITE 400 WASHINGTON, D. C. 20006-1604 202-653-0823 JIM COURTER, CHAIRMAN COMMISSIONERS: July 1, 1991 WILLIAM L. BALL, III HOWARD H. CALLAWAY GEN. DUANE H. CASSIDY, USAF (RET) ARTHUR LEVITT. JR. JAMES SMITH II, P.E. ROBERT D. STUART, JR. The President The White House Washington, D.C. 20500 Dear Mr. President: On behalf of the Defense Base Closure and Realignment Commission, we are pleased to submit a report containing both a review of the Defense Secretary's April 12 list and our recommendations for the closure or realignment of U.S. military installations. In preparing this report, the Commission reviewed thousands of pages of oral testimony and written documentation. All of our work was subject to public scrutiny. We held 28 hearings across the United States, visited 47 military installations and met face-to-face with hundreds of representatives in surrounding communities. Among the many people who presented expert testimony were members of Congress and officials representing the Pentagon, the General Accounting Office and the Environmental Protection Agency. Ultimately, this report reflects the independent judgment of the Commission's seven members. Not one of our decisions was easy. Each of the installations recommended for closure enjoys a proud history of service to the United States. Moreover, we recognize that base closure creates economic hardship that only time and initiative can overcome. Nevertheless, budget constraints, coupled with changing national security requirements, compel the United States to reduce its military overhead costs. I am convinced that our recommendations will strengthen this country's ability to meet its international responsibilities. Janes Respectfully yours, Jim Courter Min William Ball. L. Ball, III That? Robert D. Stuart, Chairman Jr. CSuit James C. Smith II, P.E. Commissioner Commissioner Commissioner MAT. Arthur Levitt, Jr. Howard H. Callaway Howard H. Callary Gen. Duane H. Cassidy, USAF (Ret.) Commissioner Commissioner Commissioner Report to the President July 1, 1991 Table of Contents Executive Summary EX-1 Chapter 1: History of Base Closures 1-1 Chapter 2: Department of Defense Procedures to Develop Recommended List 2-1 Chapter 3: The Role of the General Accounting Office 3-1 Chapter 4: The Work of the Defense Base Closure and Realignment Commission 4-1 Chapter 5: Closure and Realignment Recommendations of the Commission 5-1 Chapter 6: Communities and Base Reuse 6-1 Appendices A. Public Law 101-510, Title XXIX A-1 B. Force-Structure Summary B-1 C. Selection Criteria for Base Closures and Realignments C-1 D. Department of Defense's Closure and Realignment Recommendations D-1 E. Commissioners' Biographies E-1 F. Commission Staff F-1 G. Hearings G-1 H. Site Visits H-1 I. Menu of Options I-1 i Executive Summary Executive On November 5, 1990, President George Bush signed Public Law 101-510, Title XXIX (the Defense Base Closure and Summary Realignment Act of 1990), establishing the Defense Base Closure and Realignment Commission to ensure a timely, independent, and fair process for closing and realigning U.S. military installations. This statute required the Secretary of Defense to submit a list of proposed military base closures and realignments to the Commission by April 15, 1991. In accordance with the statute, these recommendations were to be based upon a force-structure plan submitted to Congress with the Department of Defense (DoD) budget request for fiscal year (FY) 1992 and selection criteria developed by DoD with public comment. Anticipated levels of funding for defense in the FY 1992-97 period and a reassessment of the probable threats to the United States drove the force-structure plan. The present administration viewed changing world order as an opportunity to implement measured defense reductions. However, Congress has seized upon the reduced threat to our national security and mandated a sharp decline in defense funding. The graph on the next page showing DoD's budget authority depicts Ex-1 Defense Base Closure and Realignment Commission 360 DOD BUDGET AUTHORITY (CONSTANT DOLLARS IN BILLIONS) APRIL 1989 PLAN Average Real Increase = 1.2% per year 330 ACTUAL FY 91 DOD BUDGET Average Real Decline = 2% per year 300 270 FY 1991 = -11.3% Cumulative Real Decline: 1990-1992 = 12% 1985-1992 = 24% FY 92 DOD BUDGET 1985-1996 = 34% Average Real Decline = 3% per year after FY 91 240 FY 85 FY 86 FY 87 FY 88 FY 89 FY 90 FY 91 FY 92 FY 93 FY 94 FY 95 this dramatic decline in funding since the allies. These events had dramatic impacts mid-1980s. on U.S. military requirements. In addition, The Commission's purpose was to the growing U.S. budget deficit provided ensure that the proposals submitted by an impetus to cut U.S. military spending. DoD did not deviate substantially from the Therefore, DoD is planning to decrease force structure and the eight selection the U.S. military by approximately 25 criteria. Where it identified such percent over the next five years. deviations, the Commission was authorized Clearly, fewer forces require fewer to add or delete bases. The Commission's bases. By eliminating unnecessary founding legislation calls for this process facilities, limited dollars can go to vital to be repeated in 1993 and 1995. military needs. Balancing the base The end of the Cold War, evidenced structure with the new force-structure plan by the fall of the Berlin Wall in 1989 and will make DoD more efficient, streamline the formal dissolution of the Warsaw Pact the defense infrastructure, and enhance in 1991, fundamentally altered the military national security. threat posed by the Soviet Union and its Ex-2 Executive Summary This Commission differs from every major site proposed for closure was previous base-closure efforts; its purpose visited by at least one commissioner. was to make independent recommendations These visits enabled the commissioners to to the President based on its review of the gain a firsthand look at the installations. Secretary of Defense's April 1991 Commissioners also heard from members proposal to close 43 bases and realign 29. of the public about the effect that closure The 1988 DoD Commission, on the other would have on local communities. hand, developed its own list of proposed The Commission also received public closures, which it presented to the testimony in Washington, D.C., from Secretary of Defense and Congress. members of Congress, DoD officials, and The U.S. General Accounting Office other expert witnesses. Public hearings, (GAO) was involved closely in the providing community leaders an process. It acquired data from DoD and opportunity to comment, were held at 14 prepared a review of DoD's proposals, other locations across the country. which was forwarded to Congress and the The Commission recognizes that some Commission on May 16, 1991. It also communities depend greatly on these assisted the Commission in its own review installations. It notes, however, in the long of data by detailing staffers to the term, and with effort and initiative, Commission and providing assistance from communities can overcome the hardships field staff. caused by base closures. In fact, history The 1991 Defense Base Closure and has shown many post-closure economies Realignment Commission's are stronger and more stable. recommendations emerged from a uniquely According to a survey by DoD's open process, in which testimony and Office of Economic Adjustment (OEA), viewpoints were heard from community between 1961 and 1990 approximately and congressional leaders. This process 158,000 new jobs had been created to insulated the Commission from partisan replace nearly 93,000 jobs lost as a result politics. All meetings were open to the of base closures. The OEA has also been public. Transcripts of hearings and data working with 21 communities located near received by the Commission were bases recommended for closure by the available for public review. Furthermore, 1988 Base Realignment and Closure Ex-3 Defense Base Closure and Realignment Commission Commission and has provided $1.6 million Research Facility, VA in grants to help develop reuse plans. Since the Commission wanted to Department of the Navy devote its entire effort to considering the bases under study for closure or Construction Battalion Center, realignment, an after-action report will be Davisville, RI prepared and forwarded to the President Hunters Point Annex to Naval Station and Congress. The report will offer the Treasure Island, CA Commission's guidance for improving the Marine Corps Air Station Tustin, CA base-closing process. Naval Air Station Chase Field, TX Based on the Commission's review- Naval Air Station Moffett Field, CA and-analysis and deliberations process, it is Naval Station Long Beach, CA recommending to the President that 36 Naval Station Philadelphia, PA bases be closed and 43 bases be realigned. Naval Station Puget Sound, Sand Point, These actions will result in FY 1992-97 WA savings of $2.3 billion, with one-time costs Philadelphia Naval Shipyard, PA of $4.1 billion. The savings from these 7 RDT & E Engineering and Fleet Support actions will total $1.5 billion annually. Activities The following list summarizes closure and realignment actions of the 1991 Department of the Air Force Commission. Bergstrom Air Force Base, TX Carswell Air Force Base, TX Recommended for Castle Air Force Base, CA Closure: Eaker Air Force Base, AR England Air Force Base, LA Department of the Army Grissom Air Force Base, IN Loring Air Force Base, ME Fort Benjamin Harrison, IN Lowry Air Force Base, CO Fort Devens, MA Myrtle Beach Air Force Base, SC Fort Ord, CA Richards-Gebaur Air Reserve Station, MO Sacramento Army Depot, CA Rickenbacker Air Guard Base, OH Harry Diamond Lab Woodbridge Ex-4 Executive Summary Williams Air Force Base, AZ Mountain Home Air Force Base, ID Wurtsmith Air Force Base, MI Recommended to Recommended for Stay Open: Realignment: Department of the Army Department of the Army Fort McClellan, AL Army Corps of Engineers Aviation Systems Command/Troop Department of the Navy Support Command, St. Louis, MO Naval Training Center Orlando, FL Fort Chaffee, AR Naval Air Station Whidbey Island, WA Fort Dix, NJ Fort Polk, LA Letterkenny Army Depot, PA Department of the Air Force Rock Island Arsenal, IL Moody Air Force Base, GA 10 RDT&E Laboratories 7 Medical Laboratories Department of the Navy Midway Island Naval Air Facility 7 RDT&E Engineering and Fleet Support Activities Department of the Air Force Beale Air Force Base, CA Goodfellow Air Force Base, TX MacDill Air Force Base, FL March Air Force Base, CA Mather Air Force Base, CA Ex-5 1991 BASE CLOSURE AND REALIGNMENT COMMISSION CLOSURES AND REALIGNMENTS 1 3/1 32 26 . 2 33 4 3 30 34 26 27 36 . 5 29. 6 8 15* 24 28 Ex-6 23 . 9 . 22 10 13 21. 36 12 14 16 20 19 17 37 11 18 + Closures and Realignments 28. Fort Benjamin Harrison, Indiana 1. Naval Station Puget Sound (Sand 29. Rickenbacker Air Guard Base, Point), Washington Ohio 2. Mountain Home Air Force Base, 30. Letterkenny Army Depot, Idaho Pennsylvania 3. Beale Air Force Base, California 31. Loring Air Force Base, Maine 4. Mather Air Force Base, California 32. Fort Devens, Massachusetts 5. Sacramento Army Depot, 33. Construction Battalion Center California Davisville, Rhode Island 6. Naval Station Treasure Island 34. Fort Dix, New Jersey (Hunters Point Annex), California 35. Philadelphia Naval Station, 7. Naval Air Station Moffett Field, Pennsylvania California Philadelphia Naval Shipyard, 8. Castle Air Force Base, California Pennsylvania 9. Fort Ord, California 36. Myrtle Beach Air Force Base, 10. Naval Station Long Beach, South Carolina California 37. MacDill Air Force Base, Florida 11. Naval Air Facility Midway Island, Midway 12. Marine Corps Air Station Tustin, NOT PICTURED ON MAP California 13. March Air Force Base, California - 17 Realignments and 7 Closures of 14. Williams Air Force Base, Arizona Naval Research, Development, 15. Lowry Air Force Base, Colorado Testing & Engineering, 16. Carswell Air Force Base, Texas Engineering & Fleet Support 17. Bergstrom Air Force Base, Texas Activities 18. Naval Air Station Chase Field, - Realignment of Combat Materiel Texas Research Lab and Medical Lab 21 19. Fort Polk, Louisiana 20. England Air Force Base, Louisiana 21. Fort Chaffee, Arkansas 22. Eaker Air Force Base, Arkansas 23. Richards-Gebaur Air Reserve Station, Missouri 24. ASC/Troop Support Command, Missouri 25. Rock Island Arsenal, Illinois 26. Wurtsmith Air Force Base, Michigan 27. Grissom Air Force Base, Indiana Ex-7 History of Base Closures Chapter 1: In the early 1960s, then-Secretary of Defense Robert S. McNamara closed many bases to reduce military overhead. Secretary McNamara created within DoD the Office of Economic Adjustment (OEA) to ease the economic impacts of closures History of on affected communities and to allow the reuse of former bases. In the early 1970s, Base Closures and in response to the end of the Vietnam War, hundreds of military facilities across the country closed. In the 1960s and again in the 1970s, accusations were widespread that base closures were being used by the executive branch to punish uncooperative legislators. This sentiment prompted Congress in 1977 to pass section 2687 of title 10, United States Code, which required DoD to notify Congress if an installation became a closure candidate, and it also applied the National Environmental Policy Act to base-closure recommendations. These stipulations, combined with Congress's reluctance to close military bases, effectively prevented DoD from closing any major military installation. The 1980s saw a rapid military expansion as a result of a dramatic increase in defense spending. In 1985, Senator Barry Goldwater recognized the need for DoD to rid itself of excess base 1-1 Defense Base Closure and Realignment Commission capacity. He asked Secretary of Defense former Congressman Jack Edwards, Caspar Weinberger to submit an recommended that 86 bases be closed fully "illustrative" list of military bases for and 59 others be closed partially or closure. A hearing was held to discuss the realigned. These changes would, according twenty-two bases on Secretary to commission estimates, generate an Weinberger's list, but no further action annual savings of $693.6 million. was taken. 1990 DoD Proposals 1988 In an effort to reshape and reduce the Commission military infrastructure, Secretary of Defense Dick Cheney in January 1990 proposed closing 36 bases in the United States. The congressional response was By 1988, while the structure of the reminiscent of the base-closing rounds of U.S. armed forces had changed, the base the 1960s and 1970s. Congressional critics structure remained unaltered. Therefore, claimed that the list unfairly targeted on May 3, 1988, Secretary of Defense districts represented by Democrats. Frank Carlucci chartered the Defense Others charged that Congress again was Secretary's Commission on Base institutionally incapable of making Realignment and Closure, ordering it to decisions that were good for the country conduct an independent study of the but painful for some congressional domestic military base structure and to districts. recommend installations for realignment The list was not acted upon by the and closure. In October 1988, Congress Congress, but the groundwork was laid for passed and President Reagan signed Public a second base-closing commission. Law 100-526, the Defense Authorization Amendments and Base Closure and Realignment Act. The 1988 commission, chaired by former Senator Abraham Ribicoff and 1-2 History of Base Closures 1991 Base Closure facilities, and air space Contingency and mobilization and Realignment requirements Cost and manpower implications Commission The remaining criteria were Return on investment The Defense Base Closure and Local economic impact Realignment Act of 1990 (see Appendix Impact on community infrastructure A) intends, as the law says, "to provide a Environmental impact fair process that will result in the timely closure and realignment of military The Commission received DoD's installations inside the United States." proposed list of closures and realignments The process was built around the after the following process: First, the following standards: Army, Navy, and Air Force analyzed their own base structures, comparing them The force-structure plan submitted against the force-structure plan and the to Congress with the DoD budget selection criteria. The services then request for fiscal year 1992 (see submitted their proposals to Secretary Appendix B) Cheney, who on April 12, 1991 sent Eight selection criteria finalized by DoD's recommendations to the DoD after public comment (see Commission. The Commission was Appendix C) required to send its recommendations to the President by July 1, 1991. Of the eight criteria, the first four The statutory test to be applied by the concerned military value, which were to Commission in justifying modifications to receive preference. DoD's recommended list involves "substantial deviation" from the force- Current and future mission structure plan and selection criterion. The requirements Commission could recommend changes for Availability and condition of land, 1-3 Defense Base Closure and Realignment Commission those bases where a substantial deviation realign those installations listed in the was established. report within two years and complete the action within six years. Approval by the President and Congress Differences between the 1988 and 1991 Commissions The law requires the President to approve or disapprove the Commission's recommendations by July 15, 1991. An Both commissions were set up to approved report will be sent to Congress. overcome the political paralysis that had If the President rejects the report, it will prevented the closure of bases during the be returned to the Commission for previous decade. The recommendations of revision. The Commission must submit to the 1988 commission were driven largely the President by August 15 a revised by the need to size a bloated base report. The President then has 15 days to infrastructure to a reduced threat and force approve or disapprove the report. The structure. The 1991 commission was President must send an approved report to driven by further reductions in DoD Congress by September 1, 1991. If he budgets and dramatic changes in Eastern does not approve the report, the closure Europe. process for 1991 comes to an end with no Structurally, the differences between action. these two commissions are significant. The Once the Commission's 1988 commission was chartered by and recommendations are approved by the reported to the Secretary of Defense. President, the Congress has 45 legislative Congress codified the authority of that days, or until it adjourns for the session, commission when it passed Public Law to consider them. Changes to the approved 100-526. The 1991 commission, on the recommendations are not allowed. Unless other hand, was established by law from Congress enacts a joint resolution the outset. Its members were appointed by disapproving the Commission's proposals, the President and confirmed by the Senate. the Secretary must begin to close or 1-4 History of Base Closures the outset. Its members were appointed by restrictive and had prevented the closing of the President and confirmed by the Senate. several obsolete installations. Other differences between these two Congress, through Title XXIX of commissions resulted primarily from the Public Law 101-510, established the 1991 lessons learned in the congressional debate Defense Base Closure and Realignment that followed the 1988 base closure and Commission to redress these issues. The realignment recommendations. process is open, commissioners have After publication of the 1988 list, visited all major affected bases, and GAO affected members of Congress leveled has been an integral part of the process. three major charges against the commission process. First, they contended the process had been secretive. In fact, hearings had been closed and information on the ranking of facilities and transcripts of commission meetings were hard to Composition of the obtain. Second, Congress noted many of 1991 Commission the affected facilities had not been visited by commissioners. Such visits, believed the legislators, might have helped the The commissioners were chosen for commissioners verify information included their distinguished legislative, business, in the staff reports. Finally, they military, and diplomatic backgrounds. Six complained that faulty data had been used were appointed by President Bush--four in to reach the final closure consultation with House and Senate recommendations. Congress believed GAO majority leaders and two with the advice or another independent organization should of House and Senate minority leaders. The have reviewed the information and data for other appointments were made accuracy. independently by the President. All Commission members and legislators commissioners required Senate also said that the panel's mandate to confirmation. recover the cost within six years was too The staff was drawn from back- 1-5 Defense Base Closure and Realignment Commission Environmental Protection Agency. Under the Commission's founding legislation, no more than one-third of the staff could be detailed from DoD. Divisional directors (including the staff director) were civilians hired directly by the Commission. The Commission also hired independent consultants from the Logistics Management Institute, who helped design and participated in the review and analysis of the services' recommendations. 1-6 Department of Defense Procedure to Develop Recommended List On Chapter 2: April 12, 1991, Secretary of Defense Dick Cheney presented to Congress and the Defense Base Closure and Realignment Commission a list of military installations proposed for realignment or closure. The list Department of recommended 43 base closures and 29 realignments and was the product of an Defense extensive DoD review of military bases. DoD began its review of bases on December 10, 1990, by establishing policy Procedures to guidance for all services to follow. A DoD steering committee developed the final Develop eight base-evaluation criteria for congressional approval and issued several Recommended implementing memoranda. Within this general framework, each service was allowed the flexibility to design an analysis List plan around its unique missions and structure. Four additional memoranda were issued to clarify the DoD review process. Army In November 1990 the Secretary of the Army established the Total Army Basing Study and tasked this study group to recommend potential closures and realignments. 2-1 Defense Base Closure and Realignment Commission The Army divided its installations as the VCNO (Vice Chief of Naval into seven main categories and analyzed Operations) study. It was later called the each category quantitatively using five OpNav Study because it was initiated in existing measures of merit, which were February 1990 by the Office of the Chief then defined in terms of DoD's selection of Naval Operations. criteria 1-4 (military value) and criterion 7 The Base Structure Committee (community infrastructure). Each measure grouped all of its installations into was weighted to reflect the Army's view categories and determined which categories of its importance. The measures of merit contained excess capacity. There, it and attributes were used to determine the searched for closure and realignment military value of the installations. These options. rankings served as a point of departure The Base Structure Committee had from which the analysts applied their intended to use the study prepared by the military judgment to recommend closures OpNav group, but the committee members and realignments. were not satisfied with the total utility of The Army applied the return-on- the data or weights used in the OpNav investment and impact criteria to bases that study. The Base Structure Committee used ranked low in military value. the data from the OpNav study as a Senior Army staff reviewed the starting point and began a series of Army's final proposals and recommended hearings, in which senior Navy officials the list for approval. The Secretary of the briefed the committee on their respective Army and the Army Chief of Staff activities. approved this list. The committee members combined their professional military judgment with Navy the data gleaned from these interviews and existing data from the OpNav study to The Secretary of the Navy established arrive at their base-closure a six-member Base Structure Committee in recommendations. As a result, these December 1990 to determine the Navy's judgments sometimes differed from the closure and realignment candidates. assessments one might make using the raw The Base Structure Committee used empirical data. information from a study originally known 2-2 Department of Defense Procedure to Develop Recommended List The Navy assigned color codes to Unlike the Army and Navy, Air bases in the categories with excess Force analyzed all bases according to all capacity. The color codes were assigned to eight selection criteria. The executive a base by assuming that it could be closed group developed 80 subelements to provide and assessing what impact its closure specific data points for each criterion. would have on the Navy's mission. Like The Air Force prepared color ratings the Army, the Navy considered community for the subelements and used these ratings support (criterion 7) in its analysis of the to rank and group bases. The Secretary of military value of bases. the Air Force selected bases for closure Once the Base Structure Committee from the options developed by the had selected bases for possible closure or executive group. realignment, it evaluated criteria 5, 6, and 8 for these proposals. The Base Structure Committee presented its nominations to the Secretary of the Navy, who recommended to the Secretary of Defense naval installations for closure or realignment. Air Force The Secretary of the Air Force appointed a Base Closure Executive Group of five general officers and five senior- executive-service officials. The Air Force collected data by distributing standard questionnaires-- general, environmental, and air space--to each Air Force base. The executive group sorted the Air Force bases into five categories and ten subcategories, and examined each to identify excess capacity. 2-3 Role of the General Accounting Office Chapter 3: T he General Accounting Office did not become involved in the 1988 process until after that commission published its report. Then Congress called upon GAO to examine the commission's methodology, findings, and recommendations. The Role of GAO's recommendations addressed ways to ensure data accuracy, which cost the General factors and economic impacts should be considered, how to develop specific criteria, and how to measure employment impacts. Accounting To ensure GAO's role during the 1991 commission's analysis, Congress gave GAO a clear role in the 1991 process. Office Under section 2903 (d)(5) of Title XXIX, Public Law 101-510, Congress called on the Comptroller General to do two things: assist the Commission in its review of the Secretary of Defense's recommendations; and transmit an independent report to Congress and the Commission containing GAO's analysis of DoD's proposals and processes. At least one GAO professional served on each of the Commission's Army, Navy, and Air Force review-and-analysis teams. These individuals were fully integrated into all review-and-analysis efforts. GAO also helped the Commission's researchers verify the data used by the 3-1 a E # $ Defense Base Closure and Realignment Commission services. GAO field personnel visited some Navy's ship-berthing capacity to decide how 39 bases to gather firsthand information and many naval stations the Navy needs to verify data selected by the Commission. support its fleet. If only the recommended bases are closed, concluded GAO, the Navy would still have significant excess ship- The GAO Report berthing capacity. GAO did not evaluate the Navy's methodology for air stations, GAO released its report, titled shipyards, or labs. Observations on the Analyses Supporting GAO conducted a "sensitivity check" Proposed Closures and Realignments, on on DoD's estimation of the number of years May 16, 1991. The Assistant Comptroller it would take to recover closing costs. This General testified before the Commission on entailed projecting a 50 percent and 100 May 17. GAO's findings paralleled much of percent increase in one-time costs. While the Commission staff's work up to that time, the payback periods for many of DoD's but provided detail--especially on costs and recommendations changed little, there were savings. some closure or realignment proposals GAO found that the Army and Air where a 50 percent increase in one-time Force could document their use of the force- costs would increase the number of years for structure plan and the military-value criteria. payback from 4 to 100 years. While there were differences in the way the GAO also discovered inconsistencies services developed military-value rankings, in service costs, savings estimates, and these differences were insignificant. payback calculations. Despite DoD guidance Therefore, GAO concluded in its report, the to the contrary, the Army, Navy, and Air recommendations by the Army and Air Force used budget data for other than 1991 Force were "adequately supported." dollars as their baselines. The result of these However, GAO concluded that the inconsistencies were overstatements of Navy did not offer enough documentation to estimated annual savings and a shortening of prove whether or not its process followed the payback period for several closures. the force structure and the selection criteria, preventing GAO from evaluating specific Navy recommendations. GAO analyzed the 3-2 The Work of the Defense Base Closure and Realignment Commission T he Commission was empowered to ensure that the DoD recommendations did Chapter 4: not deviate substantially from Title XXIX of Public Law 101-510. The law also required the Commission to conduct its proceedings in public and open its records and deliberations to public scrutiny. The Work of Four concurrent activities provided the Commission with information. First, the Commission held 15 hearings in the Defense Washington, D.C., to receive information from DoD, legislators, and other experts. Second, the Commission encouraged public comments by holding 14 regional and site Base Closure hearings, where it received testimony on bases being considered for closure or realignment. Third, the commissioners visited the major facilities proposed for and closure. Finally, the Commission's research staff reviewed the services' processes and data to help commissioners arrive at their Realignment recommendations and to ensure that they had adhered to the statutory standards. The input from communities potentially affected by base closures was tremendous. Commission Community and elected leaders were tireless advocates for their military installations. In the two and a half months the Commission conducted its business, it received more than 143,000 letters and more than 100 phone calls a day. This level of input uncovered 4-1 Defense Base Closure and Realignment Commission for Commissioners every possible argument nel, and training. These individuals that could be proffered on behalf of potential responded to questions and supplied infor- impact bases. mation to the Commission. The Commission The Commission set up review-and- studied this data to determine whether the analysis teams--Army, Navy, Air Force, and Navy's compliance with selection criteria Special--to evaluate the services' processes. and the force-structure plan was adequate. The Commission's teams focused on the The Navy provided additional explana- process each service used to adhere to tion for its decisions. The Commission, with legislative requirements. GAO's help, obtained and analyzed several The Army team's review paralleled the hundred items of data from some 29 naval Army's process. The team determined whe- installations across the country. Moreover, ther the Army considered all bases and the Commission examined the Navy's whether its categorization of bases and use berthing capacity in detail. of attributes were sound. The Commission The Commission's Air Force team first did this by comparing the major activities on checked to see that the Air Force had Army bases with the "measures of merit" studied its facilities by identifying all Air and attributes developed by the Army to Force bases and checking updated manpower ensure that all eight criteria were addressed. documents. Second, the team examined the The Commission then looked at the Army's categories and subcategories used by the Air proposals in terms of the capacity needed to Force to compare bases. Third, the team house its forces in 1995 as envisioned by the checked the Air Force's analysis of capacity force-structure plan. within categories and for individual The Navy presented a special challenge facilities. The team also reviewed decisions to the Commission. Its selection process was to exclude certain categories from further more subjective and less documented than consideration due to a lack of excess that of either the Army or the Air Force. To capacity. Then the team checked the Air determine whether the Navy complied with Force application of the eight criteria to the the law, the Commission's staff held a series remaining bases. In this step, the team first of meetings with members of the Navy's examined the individual bases that were Base Structure Committee and other high- excluded as "militarily or geographically ranking naval officers--including the heads unique or mission essential." Finally, the of naval aviation, surface warfare, person- team considered the application of the eight 4-2 The Work of the Defense Base Closure and Realignment Commission selection criteria to the remaining 72 bases. These activities provided the Commission with the information it needed to arrive at its recommendations in accordance with the standards mandated in the law. The commissioners used it to develop a "menu of options"--potential additions and substitutions to the DoD proposals (see Appendix H). The Commission's final recommendations are presented in Chapter 5. 4-3 The Defense Base Closure and Chapter 5: Realignment Commission has completed its review and analysis of the Department of Defense recommendations for base closures and realignments, as transmitted to the Commission on April 12, 1991, by Closure and the Secretary of Defense. This chapter contains the recommendations made by this Commission. Realignment In recommending to the services where to move their units, missions, or forces, Recommenda- the Commission recognizes that the military must retain some flexibility. The force-structure plan itself is not a rigid tions of the document because it reflects a world that is changing rapidly. Aside from recommendations on Commission the status of particular bases, the Commission also made two general recommendations. First, the Commission observed, it is DoD policy to operate military hospitals primarily to support active-duty military personnel. Congress established the Civilian Health and Medical Program of 5-1 the Uniformed Services (CHAMPUS) to Fort Ord, care for the medical needs of non-active- duty beneficiaries. Closures of military hospitals normally follow closures of bases California with active-duty populations served by those hospitals, with CHAMPUS covering Category: Fighting (Maneuver) the beneficiaries in that area. In addition, Mission: 7th Infantry Division Costs to Close: $150.8 million assignments of active-duty health-care Savings: 1992-97: $-38.8 million; Annual: $70.4 million specialists are tied directly to support of Payback: 2 years active-duty forces. The Commission recommends that DoD confer with Department of Defense Congress regarding these policies and Recommendation: report to the Commission in time for the Close Fort Ord and relocate the 7th 1993 Base Closure and Realignment Infantry Division (Light) from Fort Ord to Commission to consider the issue of Fort Lewis, Washington. hospital closures. The Army currently can house 13 Second, with the closure of bases divisions in the United States, but in 1995 bearing the names of American heroes will have 12 divisions. Fort Ord ranks such as President Benjamin Harrison; Ira relatively low in its category. Moving the C. Eaker, astronaut Virgil "Gus" Grissom, 7th Infantry Division from Fort Ord to and World War I pilot, Eddie Fort Lewis reduces excess capacity, Rickenbacker, the Commission urges the maintains flexibility, and capitalizes on the President to find some other means to operational deployability and security honor the contributions of these great attributes at Fort Lewis. Americans. Detailed information on each of the Community Concerns: Commission's base-closure-and- The community asserted that Fort realignment decisions is presented below, Ord was penalized in the Army's ranking including the rationale for each for being small, but that it is perfectly recommendation. Substantial deviations suited to train a light division. The from the application of the force-structure community argued that the Army could plan and the final criteria have been build (or enhance) an airfield at Fort Ord identified, where applicable. for approximately $60-$120 million. The 5-2 community stated that closing Fort Ord was not a factor in the Army's would increase unemployment by 25 recommendation. The Commission found percent. The community also argued that that family housing is limited and the land value included in DoD's expensive. There are currently 1,365 recommendation was overstated. Finally, families inadequately housed at Fort Ord. the community asserted that adequate The Commission also found that training family housing existed at Fort Ord for all for the division, while readily available, is of the soldiers assigned to the installation. split among three different installations-- Fort Ord proper, Fort Hunter-Liggett, and Commission Findings: Camp Roberts. The Commission found that all installations in this category were treated Recommendation: fairly. It also found that moving the 7th The Commission finds DoD's Infantry Division from Fort Ord to Fort recommendation did not deviate Lewis optimizes the use of Fort Lewis. substantially from the force-structure plan The Commission also found that there will and the selection criteria. The be an excess capacity of two installations Commission, therefore, recommends the in the category at the end of 1995. The closure of Fort Ord, California; and the Commission finds that the community movement of the 7th Infantry Division assertion for deployability has some merit; from Fort Ord to Fort Lewis, Washington. however, stationing the division at Fort This recommendation does not impact on Lewis does enable the division to use the status of Fort Hunter-Liggett. Fort nearby McChord Air Force Base for its Hunter-Liggett therefore remains open and deployment. Currently, the 7th Infantry is still recognized as a valuable asset to the Division uses a civilian airport or travels Army and DoD. 150 miles to Travis Air Force Base. The Commission found that building an airfield Fort Polk, Louisiana at Fort Ord (or enhancing the existing airfield) will cost approximately $97 Category: Fighting (Maneuver) Mission: 5th Infantry Division (5 MX) million; however, environmental concerns Costs to Close: $303 million may prevent the construction. Savings: 1992-97: None $-34.2 million; Annual: $22.9 million Payback: 5 years The Commission agreed that the land value was overstated, but the issue 5-3 Department of Defense Commission Findings: Recommendation: The Commission found that excess Realign 5th Infantry Division capacity will exist at Fort Polk after (Mechanized) to Fort Hood, Texas, from completion of the recommended Fort Polk, Louisiana; move the Joint realignment. However, it also found that Readiness Training Center (JRTC) from the Army will likely use this excess Fort Chaffee, Arkansas, to Fort Polk. capacity to house forces that may return Realign the 199th Separate Motorized from overseas or to station other Army or Brigade (SMB) from Fort Lewis, DoD activities. Additionally, the Washington, to Fort Polk. Commission finds that Fort Polk does not This realignment allows the Army have enough training facilities or maneuver to station the JRTC at the installation best acreage to support both a division and the suited to its requirements (Fort Polk) and JRTC at Fort Polk. The Commission to house two divisions at its finest fighting estimates that the unemployment impact installation (Fort Hood). Realignment of will be severe. the 199th SMB from Fort Lewis to Fort Polk to serve as the opposing force for Recommendation: units training at the JRTC enhances the The Commission finds that the JRTC capabilities and opens space at Fort DoD's recommendation did not deviate Lewis for the 7th Infantry Division substantially from the force-structure plan (Light). and the selection criteria. The Commission, therefore, recommends the Community Concerns: realignment of the 5th Infantry Division The community argued that the (Mechanized) from Fort Polk to Fort DoD recommendation would create excess Hood, the JRTC from Fort Chaffee to Fort capacity at Fort Polk. It also stated that Polk, and the 199th SMB from Fort Lewis unemployment would increase six to eight to Fort Polk. percentage points as a result of the combination of the Fort Polk Fort Chaffee, Arkansas recommendation and the Air Force's Category: Major Training Areas proposal to close England Air Force Base. Mission: Major Maneuver and Training Costs to Close: $303 million Savings: 1992-97: $-34.2 million; Annual: $22.9 million Payback: 5 years 5-4 Commission Findings: Department of Defense The Commission found that both Recommendation: Forts Chaffee and Polk were evaluated as Close Fort Chaffee, retaining the potential sites for the JRTC. The selection facilities and training area to support the of Fort Polk as the site for JRTC is the Reserve Component. Station the current result of an Army stationing study that Active Component tenant, the Joint evaluated alternative locations. Readiness Training Center (JRTC), The Commission also found that permanently at Fort Polk, Louisiana unemployment will increase by four (outlined in DoD's recommendation for percentage points. The counties of Fort Polk). Sebastian, Crawford, and Franklin, which are immediately adjacent to Fort Chaffee, Community Concerns: will incur 90 percent of the increase. The The community argued that Commission also finds there are no economic impacts will extend farther than permanent facilities at Fort Chaffee and DoD stated. the Army would incur substantial military Additionally, the community construction costs in preparing Fort claimed that Fort Chaffee provides a more Chaffee to be the permanent home of the challenging, versatile training environment JRTC. than Fort Polk and that Fort Polk was The Commission found that Fort never considered as a candidate for the Chaffee currently has an active component JRTC. The local citizens also argued that garrison and that the garrison will continue DoD overstated costs for facilities to to exist at Fort Chaffee after JRTC is support the JRTC. For example, a hospital moved to Fort Polk and Fort Chaffee and housing are available in the reverts to primarily supporting of reserve community and need not be constructed. component training. This has been Finally, the community argued that World confirmed with DoD. War II facilities can be rehabilitated to meet the needs of JRTC at a cost of $79 Recommendation: million rather than the DoD estimate of The Commission finds DoD's $224 million. recommendation did not deviate substantially from the force-structure plan and the selection criteria. The 5-5 Commission, therefore, recommends that Community Concerns: Fort Chaffee be returned to its semi-active The community argued that the status with an Active Component garrison land value included in DoD's to be used in support of Reserve recommendation ($82.6 million) was Component training and that a permanent overstated. The community also argued Joint Readiness Training Center be that Fort Dix could be used for many established at Fort Polk, Louisiana. alternate purposes, including the U.S. Army Reserve Command headquarters, a Reserve Center of Excellence for training, Fort Dix, New Jersey or the site of other DoD activities that are now in leased space in the Washington, Category: Fighting (Major Training Areas) Mission: Reserve Component Training D.C., area. Costs to Close: $30.2 million The community asserted that the Savings: 1992-97: $60.5 million; Annual: $25.3 million Payback: o years unemployment impact would be large and that the word "close" in DoD's Department of Defense recommendation was not clear. The Recommendation: community was concerned that the word Close Fort Dix, relocating active "closure" would preclude Fort Dix from organizations that do not directly support being available as a potential receiver of the Reserve Component (except those that other Reserve Component training cannot be relocated elsewhere). Retain missions or as a potential receiver of other only those facilities and training areas DoD activities. The community further necessary to support Reserve Component argued that Fort Dix, while ranking second training. This proposal changes the 1988 in its category based on military-value Base Realignment and Closure calculations, was selected for closure Commission's recommendation to maintain because of potential savings. Fort Dix in a semi-active status. It is The community asserted that Fort Dix driven by a desire to reduce base was not given full credit for its quality-of- operations and real-property-maintenance life attributes, such as family housing. costs by eliminating excess facilities and relocating tenants that do not support the Commission Findings: Reserve Component. The Commission found that DoD did not treat all installations in this category equally. Four other lower-ranked 5-6 bases were deferred from further The Commission recommends that consideration because of uncertainty in the Fort Dix be realigned to support the Reserve Component force structure and Reserve Component force structure because the results of a study addressing through retention of an Active Component the Reserve Component training strategies garrison and essential facilities (which and management of major training areas include essential portions of Walson Army were not known. Hospital and housing facilities), ranges, The Commission found that, while and training areas to support Reserve and the land value may have been overstated, Active Component training. The it had no impact on the final decision. Commission also recommends that the Moving certain active missions off Defense Medical Facilities Office (DFMO) Fort Dix to better align its role as a determine the medical facilities Reserve Component training center is requirement to support the Fort Dix and reasonable, but the Army should not McGuire Air Force Base area and ensure declare facilities excess without implementation of the most effective determining what role Fort Dix will play solution. in the future Reserve Component force structure. The Commission further encourages DoD to study the benefits of Fort Benjamin Harrison, the collocation of Fort Dix and McGuire Indiana Air Force Base for mobilization. Category: Initial Entry Training/Branch School Mission: Army Soldier Support Center; Recommendation: Defense Finance and Accounting Service The Commission finds DoD's Cost to Close: $206 million Savings: 1992-97: $-123.8 million; Annual: $36.9 million recommendation deviates substantially Payback: 4 years from the force-structure plan by not allowing for the uncertainties in the future Department of Defense reorganization of Reserve Component Recommendations: division forces. The recommendation also Close Fort Benjamin Harrison and deviates substantially from selection realign the Soldier Support Center from criterion 1. Fort Benjamin Harrison, Indiana, to Fort Jackson, South Carolina, to initiate the Soldier Support Warfighting Center. 5-7 Relocate U.S. Army Recruiting Command Commission Findings: from Fort Sheridan to Fort Knox rather The Commission found that Fort than Fort Benjamin Harrison. This part of Jackson is a more economical location for the proposal is a revision to the 1988 the Army Soldier Support Warfighting BRAC recommendations. Retain Building Center than Fort Benjamin Harrison. It 1 for the continued use by the Defense found that the missions at Fort Benjamin Finance and Accounting Service (DFAS) Harrison do not require extensive and retain part of Fort Benjamin Harrison facilities, and thus can be easily realigned for the Army reserves. at minimal costs. Fort Benjamin Harrison was rated The Commission found that lowest in its category. It has limited Building 1 is underused. Building 1 is the expansion capability, high operating costs, current home of a branch Defense Finance and high real-property-maintenance costs. and Accounting Service responsible for the Department of the Army. The Commission Community Concerns: is aware of an ongoing Defense The community argued that the Management Review initiative to Army Soldier Support Warfighting Center consolidate and streamline DoD's Finance would be more suitable at Fort Benjamin and Accounting Services. DoD should Harrison. Moving the two branch schools look closely at using adequate excess from Fort Jackson to Fort Benjamin government-owned facilities when Harrison would be easier than sending six evaluating its overall facility requirements. schools from Fort Benjamin Harrison to Fort Jackson. The community also Recommendation: claimed that closing Benjamin Harrison The Commission recommends to would cause significant job loss. the President the closure of Fort Benjamin Fort Benjamin Harrison has been a major Harrison; the realignment of the Soldier source of employment for the handicapped Support Center to Fort Jackson, South and minorities and serves thousands of Carolina; and the retention of the retirees. Department of Defense Finance and The community also argued that Accounting Service, Indianapolis Center. Building 1 is currently underused, thus We also recommend the revision of the DoD should relocate functions currently in BRAC 1988 recommendation, relocating leased space to Building 1. the U.S. Army Recruiting Command 5-8 (USAREC) from Fort Sheridan to Fort Arizona, to be collocated with the Knox rather than Fort Benjamin Harrison. Intelligence School. The Commission also recommends an Retain the Pelham Range for use by adjustment in the DoD recommendation. the Alabama National Guard. Retain the We find that the Secretary deviated Special Operations Test Site and a reserve substantially from criterion 2, the enclave. Put Chemical Decontamination availability and condition of land and Training Facility (CDTF) in caretaker facilities at both the existing and potential status. receiving locations. Because of this, the Fort McClellan was recommended Commission recommends to the President for closure because it is the home of the the closure of Building 1. smallest Army training center, and most of The Commission further its missions and facility requirements can recommends that DoD submit its be met elsewhere. consolidation plan of Defense Finance and Accounting Service to the 1993 Base Community Concerns: Closure and Realignment Commission. The local community contended that DoD did not accurately assess the military value of live-agent training at Fort Fort McClellan, Alabama McClellan. The decision to place the CDTF in caretaker status was not Category: Initial Entry Training/ Branch School Mission: Army Military Police School, Army Chemical School predicated upon military value, but rather and Defense Polygraph Institute. on budgetary constraints. The loss of use Costs to Close: N/A Savings: 1992-97: N/A of the CDTF could be detrimental to all Payback: N/A three services' chemical readiness and national security. The CDTF is the only Department of Defense known live-agent training facility in the Recommendation: free world. Close Fort McClellan and realign Local officials claimed that chemical and military police schools to environmental impediments and resulting Fort Leonard Wood, Missouri, to create costs will prevent the CDTF from being the Maneuver Support Warfighting Center. replicated at another installation. Move the Defense Polygraph School from Fort McClellan to Fort Huachuca, 5-9 Finally, closure of Fort McClellan compliance with stringent environmental could result in a CHAMPUS cost of $278 laws. million by the year 2007. The Commission recognized the value of live-agent training in chemical Commission Findings: defense. The Commission questioned maintaining the CDTF in caretaker status Recommendation: because it could contribute little if any to The Commission found a substantial chemical defense preparedness. The CDTF deviation from criteria 1 the current and could not be reactivated quickly. future mission requirements and the impact Moreover, the Army would have to obtain of operational readiness of the Department environmental permits for reactivation if of Defense's total force and criterion 2, the facility is shut down for more than one the availability and condition of land, year, and start-up costs could range from facilities, and associated airspace at both four to seven million dollars. the existing and potential receiving Furthermore, depending upon the locations. Thus, the Commission environmental and regulatory standards, recommends that Fort McClellan remain the permitting process is currently open. estimated to require three to five years. The Commission basically agreed with experts in the chemical field that Fort Devens, Massachusetts CDTF has high military value. The Category: Command and Control Mission: 10th Special Forces Group Commission also agreed with the Cost to Close: $160.2 million commanding general of the U.S. Army Savings: 1992-97: $30.8 million; Annual: $55.2 million Combined Arms Center that if a new Payback: 0 years CDTF cannot be built at the receiving Department of Defense base, then relocating the chemical school Recommendation: should not be implemented. Close Fort Devens, retaining only The Commission has not received any those facilities to support Reserve indication that another CDTF can be Component training. Create a small duplicated at any other installation. Reserve enclave on Fort Devens's main Duplicating the CDTF would require post and retain approximately 3,000 acres for use as a regional training center. 5-10 Retain the Headquarters, Information also claimed that the training ranges were Systems Command (ISC) and supporting adequate to support the 10th SFG. Finally, elements at Fort Huachuca, Arizona, and the community argued that the proposed Fort Monmouth, New Jersey; and relocate closure will have a significant impact on selected ISC elements from Fort Belvoir, the local economy and that the Army Virginia, to Fort Ritchie, Maryland, or overstated the expected land value of the another location in the national capital properties to be sold. region (a change to the 1988 Base Realignment and Closure Commission Commission Findings: recommendations). Relocate the 10th The Commission found that all Special Forces Group (SFG) from Fort installations in this category were treated Devens to Fort Carson, Colorado. fairly. It also found that the change to the The Army will soon need fewer 1988 Base Realignment and Closure command-and-control installations. Fort Commission's recommendation to leave Devens ranked ninth out of eleven the ISC at Fort Huachuca, Fort installations in its category and is not Monmouth, and the National Capital critical to either the midterm management Region does not violate the law. of the Army's build down or the long-term Additionally, a 1989 GAO report revised strategic requirements of the Army's the 1988 Commission's findings regarding command-and-control installation structure. recurring savings, from $21 million to $8.1, million and the payback periods Community Concerns: from 0 years to a range of 43 to 200 The community argued that the DoD years. The Commission also found that recommendation violates the law because it because the Headquarters, ISC had not left changes the 1988 Base Realignment and Fort Huachuca, the mission may best be Closure Commission's recommendation, continued there, avoiding construction which never was enacted. It also claimed costs of approximately $74 million at Fort that the Army would be better served by Devens. having the Headquarters, ISC located The Commission found that the nearer to a "center of high technology." training area at Fort Devens could not The community argued that closing Fort adequately support the 10th SFG training. Devens will remove the active Army It has insufficient maneuver space, a small presence in New England. The community drop zone, limits on demolition training, 5-11 and limits on weapon firing. The to Fort Devens from Fort Huachuca, proximity to a civilian airport also affects Monmouth and Belvoir, and leased space high-altitude, low-opening operations. in the National Capital Region as Army presence will remain in New recommended by the 1988 Base England for Reserve Component support, Realignment and Closure Commission, recruiting, and other activities. retain Headquarters, ISC at Fort Huachuca The Commission also found that the and support elements at Fort Monmouth, Army will retain 4,600, not 3,000 acres and relocate selected ISC elements from for Reserve Component training. This has Fort Belvoir to Fort Ritchie or another been confirmed with the Department of the location in the national capital region. Army. The Commission found that Fort Devens has newly constructed facilities and that DoD should make maximum use of these facilities in future stationing U.S. Army Corps of decisions. The Commission estimates Engineers civilian unemployment would increase by Category: Corps of Engineers two percentage points. The Commission Mission: Military and Civil Works did not include any proposed land sale in Costs to Close: $266 million its calculations and found that this did not Savings: 1992-97: $238 million; Annual: $112 million Payback: 2 years change the Army's decision. Department of Defense Recommendation: Recommendation: The Commission finds that DoD's Consider reorganization of the U.S. recommendation did not deviate Army Corps of Engineers under legislation substantially from the force-structure plan separate from that which established the and the final selection criteria. The Base Realignment and Closure Commission, therefore, recommends the Commission (PL 101-510). The Corps of closure of Fort Devens and the retention of Engineers conducted a reorganization study 4,600 acres and those facilities essential to and submitted it as a part of the support Reserve Component Training Department of the Army's requirements; and realignment of the 10th recommendation to DoD. The Secretary of SFG to Fort Carson. Instead of moving Defense removed the Corps of Engineers Headquarters, ISC and supporting elements 5-12 from his submission to the Base Closure workload. The boundaries for the new and Realignment Commission. divisions were based on watershed locations and optimizing customer support. Community Concerns: The selection of division headquarters was The communities argued that the based solely on the ranking of existing study had not been properly reviewed by headquarters. The number of districts and congressional committees charged with their headquarters were based primarily on oversight of the Corps of Engineers. They their military ranking and their civil works also argued that reducing the number of rankings. In some cases, selections did not divisions from ten to six had no rational follow the rankings to account for needed foundation and that the boundaries that geographic dispersion and unique describe these new divisions and districts capabilities. were not determined in a consistent The Commission found that the manner. The communities stated that the unemployment impacts would increase by great distances between these new no more than two percentage points in any divisions and district headquarters and one area; however, these rates are their respective field offices would create independent of any other action that may inefficiencies. Finally, the communities be occurring in the respective areas. The argued that the proposed realignment implementation costs may be overstated would have a significant impact on the because it is not known exactly how many local economies and regions. personnel will elect to retire or quit as opposed to relocating. Commission Findings: The Commission also found that The Commission found that the Corps 6,600 authorized positions would be of Engineers reorganization plan is based transferred and an additional 2,600 on a business-like approach. It combines authorized positions would be eliminated. like functions at the division level where This represents approximately 22 percent area coverage can be provided, thus of the Corps of Engineers total work force relieving the districts of some of their and 47 percent of the work force available administrative functions. The number of for reorganization. divisions selected was based on four These transfers and eliminations occur options. Each option considered command at the district and division level. Four and control factors and balanced the division and fourteen districts headquarters 5-13 are eliminated to reduce the span of Realign Army Laboratories control and increase operational (Lab 21 Study), Adelphi and efficiencies. However, project and construction offices in support of the Aberdeen, Maryland districts are not affected by the Category: Industrial-Commodity Oriented Installations reorganization. Mission: Research, Development and Testing Costs to Realign: $281.8 million Savings: 1992-97: $-106.0 million; Annual: $44.7 million Recommendations: Payback: 4 years The Commission recommends the Department of Defense realignment of the Army Corps of Recommendation: Engineers. We find that the Secretary Establish the Combat Material deviated substantially from criterion 1, Research Laboratory (CMRL), at Adelphi, current and future mission requirements Maryland. The Army Material Technology and criteria 4, cost and manpower Laboratory (AMTL), now in Watertown, implications. Such realignment will be Massachusetts, not be split among Detroit accomplished primarily through the Arsenal, Michigan; Picatinny Arsenal, elimination of a number of Corps of New Jersey; and Fort Belvoir, Virginia. Engineers division and district Instead, realign the AMTL to Aberdeen management headquarters located in the Proving Ground (APG), Maryland. United States. The realignment will not be Collocate the Structures Element at initiated until July 1, 1992 and will NASA-Langley Research Center, conform to the 1991 Corps of Engineers Hampton, Virginia. This proposal is a Reorganization Study, unless legislation is revision to the recommendations of the enacted by the Congress providing an 1988 Base Realignment and Closure alternative realignment by July 1, 1992, in Commission. which event the Secretary will initiate the realignment as determined by the Community Concerns: legislation. The Community argued the Base Closure and Realignment Commission should wait for the recommendations on laboratory realignments from the Advisory Commission on consolidation and Conversion of Defense Research and 5-14 Development Laboratories. The latter recommends the closure of Harry Diamond commission is an advisory group Laboratory in Woodbridge, Virginia, and established by law to provide realignment of the laboratories to establish recommendations to the Secretary of the Combat Material Technology Defense on how to effectively reorganize Laboratory at Adelphi, Maryland, and the research and development structure. Aberdeen Proving Ground, Maryland. The community also argued portions of the The following specific realignments are realignment were not cost effective and included: would adversely impact readiness. Move the Army Research Institute Commission Findings: MANPRINT function from Alexandria, The Commission found the industrial- Virginia, to Aberdeen Proving Ground commodity oriented installations were (APG), Maryland. treated equally. The Commission found that the DoD studies and Defense Move the 6.1 and 6.2 materials Management Review Decision regarding elements from the Belvoir Research and laboratory realignments were creditable Development Center, Virginia, to APG, and rational. The Army reviewed ten Maryland. scenarios for the realignment of the laboratories and this proposal was cost Move the Army Materials Technology effective. The realignment of the Army Laboratory (AMTL) (less Structures Material Technology Laboratory functions element) from Watertown, Massachusetts, to a single site was determined to have to APG, Maryland (change to the operational and cost advantages over the recommendations of the 1988 Base triple-site option recommended by the Realignment and Closure Commission). 1988 Base Realignment and Closure Commission. Move the AMTL structures element to the Army Aviation Aerostructures Recommendation: Directorate collocated at NASA-Langley The Commission finds DoD's Research Center at Hampton, Virginia, recommendations did not deviate and expand the mission at that site to form substantially from the force-structure plan an Army Structures Directorate (change to and the criteria. The Commission 5-15 the recommendations of the 1988 Base Move the Fuze Development and Realignment and Closure Commission). Production Mission (armament related) from Harry Diamond Laboratories, Move the Directed Energy and Sensors Adelphi, Maryland, to Picatinny Arsenal, Basic and Applied Research element of the New Jersey. Center for Night Vision and Electro-Optics from Fort Belvoir, Virginia, to Adelphi, Move the Fuze Development and Maryland. Production Mission (missile related) from Harry Diamond Laboratories, Adelphi, Move the Electronic Technology Maryland, to Redstone Arsenal, Alabama. Device Laboratory from Fort Monmouth, New Jersey, to Adelphi, Maryland. The Secretary of Defense must defer implementation until January 1, 1992 in Move the Battlefield Environment order to consider the recommendations and Effects element of the Atmospheric findings of the Advisory Commission on Science Laboratory from White Sands Consolidation and Conversion of Defense Missile Range, New Mexico, to Adelphi, Research and Development Laboratories Maryland. and consult with the appropriate committees of the Congress thereon. Collocate the Ground Vehicle Propulsion Basic and Applied Research from Warren, Michigan, with the Army Aviation Systems Command Aviation Propulsion Directorate, at the NASA-Lewis Research Center in and Troop Support Cleveland, Ohio. They will form the Army Command, St. Louis, Propulsion Directorate. Missouri Move the Harry Diamond Laboratories Category: Industrial-Commodity Oriented Installations Woodbridge Research Facility element to Mission: Logistics Support Costs to Realign: $6.4 million CMRL, Adelphi, Maryland, and Savings: 1992-97: $33.5 million; Annual: $22.5 million close/dispose of the Woodbridge, Virginia, Payback: Immediate facility. 5-16 Department of Defense activities from leased space to government- Recommendation: owned facilities and provide appropriate Merge Aviation Systems Command recommendations to the 1993 Base Closure (AVSCOM) and Troop Support Command and Realignment Commission. (TROSCOM) in St. Louis, Missouri, as part of the Defense Management and Letterkenny Army Depot, Report decision to consolidate the Pennsylvania inventory control point. Category: Industrial-Depot Mission: Depot Maintenance Community Concerns: Costs to Realign: $36.4 million There were no formal expressions Savings: 1991-97: $27.0 million; Annual: $17.7 million Payback: Immediate from the community. Department of Defense Commission Findings: Recommendation: The Commission found the Realign the Headquarters; Depot consolidation of inventory control points Systems Command, including the Systems and resultant elimination of an inventory Integration Management Activity (SIMA), control point was a rational approach to from Letterkenny Army Depot, management efficiencies. The cost Pennsylvania, to Rock Island Arsenal, efficiencies of merging AVSCOM and Illinois, and merge it with the Armaments TROSCOM support the DoD proposal. Munitions and Chemical Command to form the Industrial Operations Command. Recommendation: Realign the Materiel Readiness Support The Commission finds that the DoD Activity from Lexington-Blue Grass Army recommendation did not deviate Depot, Kentucky, and the Logistics substantially from the force-structure plan Control Activity from Presidio of San and the final selection criteria. The Francisco, California, to Redstone Commission recommends the merger of Arsenal, Alabama. The latter proposal is AVSCOM with TROSCOM as proposed. a revision to the recommendations of the Also, the Commission recommends that 1988 Base Realignment and Closure the Army evaluate the relocation of those Commission, which relocated Materiel 5-17 Readiness Support Activity to Letterkenny of the activities designated for relocation. Army Depot. The Commission determined that the formation of the Industrial Operations Community Concerns: Command in a single location was The community argued that the Depot operationally more effective. The Systems Command need not be relocated realignments of Depot Systems Command, in order to form the Industrial Operations the Materiel Readiness Support Activity, Command. The new command could and the Logistics Control Agency were operate effectively in a split configuration. also determined to be economical. The Additionally, the community believed that relocation of SIMA was operationally the SIMA was a separate entity that expedient in the long term and beneficial supported a variety of customers. to the economy at the receiving location Relocating that activity would result in an (Rock Island Arsenal), which is losing a unwarranted up-front cost and an large number of employees because of additional operational cost to support to other base realignment and closure actions. the entire customer base. The community was also concerned that the realignments Recommendations: would degrade the mission because The Commission finds the DoD experienced personnel would not move. recommendation did not deviate substantially from the force-structure plan Commission Findings: and final selection criteria. Therefore, the The Commission found that the Commission recommends that DoD realign depots were treated equally. The Depot Systems Command with the Systems formation of the Industrial Operations Integration Management Activity to Rock Command and resultant reduction of the Island and form the Industrial Operations number of subordinate commands was a Command. Additionally, it recommends rational approach to management that the Materiel Readiness Support efficiencies. Activity and the Logistics Control Agency The Commission did consider be realigned at Redstone Arsenal as alternative ways to form the Industrial proposed. This proposal is a revision to Operations Command and to realign each the recommendations of the 1988 Base 5-18 Closure Commission which directed medical research, development, test, and Material Readiness Support Activity to evaluation facilities. The proposal also relocate from Lexington-Bluegrass Army recommends the collocation of seven Tri- Depot to Letterkenny. Service medical research programs at existing Army, Navy, and Air Force medical laboratories as follows: the Army Tri-Service Project Reliance blood research with the Navy; the Army combat dentistry with the Navy; Army Study, Various Locations directed energy (laser and microwave) Category: Commodity-Oriented Installation bioeffects with the Air Force; elements of Mission: Research, Development and Testing Costs To Realign: $24.3 million the Army and Navy biodynamics with the Savings: 1992-97: $71.0 million; Annual: $6.9 million Air Force; Navy and Army toxicology Payback: Less than 1 year (environmental quality and occupational Department of Defense health) with the Air Force; Navy infectious Recommendation: disease research and Air Force Execute the Tri-Service Project environmental medicine (heat physiology) Reliance medical research study by with the Army. reducing the number of Army medical research labs from nine to six. Community Concerns: Disestablish the Letterman Army The various communities argued that Institute of Research (LAIR), Presidio of the Commission should wait to recommend San Francisco, California (change to the laboratory realignments until the Federal 1988 Base Realignment and Closure Advisory Commission on the Commission recommendation); disestablish Consolidation and Conversion of Defense the U.S. Army Institute of Dental Research and Development Laboratories Research, Washington, D.C.; and has finished its study. The latter disestablish U.S. Army Biomedical Commission is an advisory group Research Development Laboratory, Fort established by law to recommend to the Detrick, Maryland. Consolidate the Secretary of Defense how to reorganize Army's trauma-research and medical- the research-and-development structure. materiel-development with existing Army 5-19 Maryland. Realign LAIR's research Commission Findings: programs in the following manner (change The Commission found the to recommendations of the 1988 Base disestablishment of LAIR and realignment Realignment and Closure Commission): of its residual functions offers more operational and cost advantages than the Move trauma research to the U.S. option recommended by the 1988 Base Army Institute of Surgical Research, Fort Realignment and Closure Commission. Sam Houston, Texas. The Commission determined that its jurisdiction did include authority to Collocate blood research with the recommend realignment and closure of Naval Medical Research Institute, laboratories without the input of the (NMRI), Bethesda, Maryland. Federal Advisory Commission. Collocate laser bioeffects research Recommendation: with the Armstrong Laboratory, Brooks The Commission finds DoD's Air Force Base, Texas. recommendation did not deviate substantially from the force-structure plan Disestablish U.S. Army Biomedical and the final selection criteria. The Research Development Laboratory at Fort Commission recommends the Detrick, Maryland, and transfer medical disestablishment of the LAIR and material research to the U.S. Army realignment, as explained under Medical Material and Development "Department of Defense Activity at Fort Detrick. Collocate Recommendations," of the associated environmental and occupational toxicology medical functions to the locations research with the Armstrong Laboratory at specified below. Specific actions and Wright-Patterson Air Force Base, Ohio. realignments are: Disestablish the U.S. Army Institute Disestablish LAIR as part of the of Dental Research, Washington, D.C., closure of the Presidio of San Francisco. and collocate combat dentistry research Cancel the design and construction of the with the Naval Dental Research Institute at replacement laboratory at Fort Detrick, Great Lakes Naval Base, Illinois. 5-20 Move microwave bioeffects research Arsenal, Illinois, to Redstone Arsenal, from Walter Reed Army Institute of Alabama, as part of the Defense Research, (WRAIR), Washington, D.C., Management Review's inventory control and collocate with Armstrong Laboratory, point consolidations. Brooks Air Force Base, Texas. Collocate infectious disease research Community Concerns: at NMRI with WRAIR. The community argued that the Army Move biodynamics research from miscategorized Rock Island Arsenal as a U.S. Army Aeromedical Research production installation. The community Laboratory, Fort Rucker, Alabama, and also noted that Rock Island Arsenal had collocate with Armstrong Laboratory at excess administrative space and Wright-Paterson Air Force Base, Ohio. consolidation could occur at Rock Island Move heat physiology research from instead of Redstone Arsenal. The USAFSAM [now called Armstrong community also noted that the workforce Laboratory at Brooks Air Force Base, at Rock Island had a higher skill- level Texas] and collocate with U.S. Army base and private-sector pay rates were Research Institute of Environmental lower. Medicine, Natick, Massachusetts. Commission Findings: The Commission found that the Rock Island Arsenal, industrial-commodity oriented installations were treated equally. The Commission Illinois found the consolidation of inventory Category: Industrial-Commodity Oriented Installations control points would yield cost Mission: Production Cost to Realign: $65.2 million efficiencies that support the DoD Savings: 1992-97: $-18.2 million; Annual: $38.8 million realignment proposal. Payback: 1 Year The Commission found categorization Department of Defense of Rock Island Arsenal was debatable, but Recommendation: did not affect the proposed realignment. Realign of the Armament, Munitions, Rock Island Arsenal does have excess and Chemical Command from Rock Island capacity, but it is inefficient to consolidate 5-21 the inventory control point at Rock Island. Department of Defense Redstone Arsenal has a slightly higher Recommendation: skill-level base and lower government pay Close Sacramento Army Depot. rate. Transfer the ground communication's The Commission did consider electronic maintenance workload from alternatives such as splitting the inventory Sacramento Army Depot, California, to control point or separating the inventory Tobyhanna Army Depot, Pennsylvania; control point from its parent command. Anniston Army Depot, Alabama; Red However, it determined the DoD River Army Depot, Texas; Letterkenny realignment to be more operationally Army Depot, Pennsylvania; and Corpus sound and cost effective. Christi Army Depot, Texas. Retain 50 acres for Reserve Component use. Recommendation: The Commission finds DoD's Community Concerns: recommendation did not deviate The community agreed with the substantially from the force-structure plan closure of Sacramento Army Depot, but and the final selection criteria. The disagreed with the transfer of all workload Commission recommends that the Army outside the Sacramento area. The realign the Armaments, Munitions, and community argued about the personnel Chemical Command as proposed and form disruption following closure and said that a single inventory control point at the DoD proposal did not contain a Redstone Arsenal. sufficient degree of DoD-wide interservice consolidation. It proposed an alternative plan that consolidated all ground communications electronics in two centers: Sacramento Army Depot, Tobyhanna Army Depot on the East Coast California and Sacramento Air Logistics Center at McClellan Air Force Base (Sacramento, Category: Industrial-Depot California) on the West Coast. Mission: Logistics Support Costs to Close: $84.9 million Savings: 1992-97: $33.4 million; Annual: $55.8 million Payback: Immediate 5-22 Commission Findings: Recommendation: The Commission found that all The Commission finds that DoD industrial-depots were treated equally. deviated substantially from criterion 5. There was excess maintenance capacity for Therefore the Commission recommends ground communications electronics and the closure of Sacramento Army Depot Sacramento Army Depot ranked the lowest and the realignment of its workload by of the installations with communications- competition to ensure the most cost- electronics maintenance capability. effective distribution of work. The DoD did consider the alternative Secretary of Defense will develop proposal of consolidation of the ground statements of work and a plan to conduct a communications electronics at Tobyhanna public-public competition. This Army Depot and McClellan Air Force competition will determine how best to Base. The Commission found that the distribute the workload currently DoD decision not to use McClellan Air performed at Sacramento Army Depot, Force Base was due to the high man-hour among those depots in the DoD plan rates that resulted in higher costs for depot (Tobyhanna Army Depot, Anniston Army level maintenance work. Depot, Corpus Christi Army Depot, Red The Commission found that both the River Army Depot, Letterkenny Army DoD proposal and the community Depot) and the Sacramento Air Logistics counterproposal were rational approaches Center at McClellan Air Force Base. The to the distribution of the ground implementation plan will include the communications electronics maintenance logical groups of items to be competed, a workload after closure of the Sacramento time-phased schedule, and source selection Army Depot. The Commission also criteria. The competition will begin as developed modifications of the community soon as possible. The Communications plan. The DoD approach provided the Systems Test Activity from Sacramento larger savings, and the Commission's Army Depot will be realigned to Fort modification of the community proposal Lewis, Washington. As much as 50 acres required fewer people to relocate. of Sacramento Army Depot may be retained for Reserve Component use. The residual supply mission at Sacramento 5-23 Army Depot will be transferred to the Southern California ships. Finally, the Defense Depot West at Sharpe Depot or closure would produce significant savings. Tracy Depot. Community Concerns: The community argued that the Navy's Base Structure Committee Naval Station Long Beach, overturned an earlier recommendation by the OpNav working group not to close California Long Beach. The community claimed the Category: Naval Station Base Structure Committee was intent on Mission: Support Homeported Ships and Shipyard Costs to Close: $118.6 million protecting new strategic homeports, Savings: 1992-97: 201.8 million; Annual: $85.2 million specifically Naval Station Everett, Payback: Less than 1 year Washington, currently under construction. Department of Defense The community maintained that a draft Recommendation: GAO report on strategic homeports, now Close Naval Station Long Beach and released, advocated deleting Everett and the supporting Naval Hospital Long Beach. keeping Long Beach open. The community Transfer ship-support functions and a claimed that the Navy overstated berthing parcel of land to the Long Beach Naval capacity. Shipyard. Reassign ships to other Pacific The community also asserted that the Fleet homeports. station supports a large regional reserve The Navy has considerable excess presence, has excellent access to open sea pier capacity on the West Coast and will and Southern California training areas, can be able to accommodate its 1997 force homeport a nuclear-powered carrier, and structure at the more essential ports of San provides critical support for the shipyard. Diego and Everett. Long Beach rated low The community stated that the in military value because its facilities are economic impact of closure would be high, deficient and require military construction, claiming that Navy ships constitute 97 the location is expensive, and, unlike San percent of local private repair work. Diego, it lacks capacity to homeport all Finally, the community believed the Navy underestimated the military construction 5-24 required at receiving locations, thus Currently Long Beach piers do not serve a understating the actual payback period. nuclear carrier. Upgrading one of its pier's to homeport a nuclear carrier would cost Commission Findings: $75 million. The Commission found that the The Commission found that the OpNav group recommendation was not potential savings from closure are high. definitive, the Navy did in fact evaluate its The Navy should expand the San Diego homeports, and the GAO report did not homeport area to include private repair compare the homeports against other naval facilities now in the Long Beach area in stations as the community alleged. Halting order to ameliorate local job loss, which is construction at Everett would remove too projected to be only two-tenths of one little of the Navy's excess berthing percentage point. capacity. The declining force structure enables Recommendation: San Diego and Everett to provide all the The Commission finds the DoD naval station berthing required in 1997. recommendation did not deviate The declining number of Naval substantially from the force-structure plan Reserve ships enables the Navy to and the final selection criteria. Therefore, relinquish the support provided by Long the Commission recommends the closure Beach. of Naval Station Long Beach and the The Commission found that closing supporting Naval Hospital Long Beach. Long Beach would eliminate more than Ship support functions and a parcel of land two-thirds of the Navy's excess berthing will be transferred to the naval shipyard. capacity on the West Coast. However, the Ships assigned to the naval station will be Navy will have to continue to use San reassigned to other Pacific Fleet Diego piers classified as inadequate until homeports. Alternate use of the hospital funds become available to meet its stated facilities should be explored by the requirement to replace them. Veterans Administration, Public Health While most piers are classified as Service, state and local governments and substandard, only $17 million would be the community. required to make them adequate. 5-25 Naval Station Philadelphia, further believes that the Navy failed to consider costs at receiving bases, the high Pennsylvania cost of environmental cleanup after Category: Naval Stations closure, and the ability of assigned Naval Mission: Support Shipyard and Assigned Ships Costs to Close: $53.5 million Reserve ships to tap the large local reserve Savings: 1992-97: $55.9 million; Annual: $40.4 million. pool. Payback: Less than 1 year. Department of Defense Commission Findings: Recommendation: The naval station has no piers. Close Naval Station Philadelphia. Assigned ships are berthed at the shipyard, Reassign ships to other Atlantic Fleet which the station supports. Closing the homeports, close the naval base, and shipyard will remove the station's primary move the Naval Damage Control Training mission. Assigned ships must steam a Center to the Naval Training Center, Great relatively long distance to reach the open Lakes, Illinois. Transfer remaining ocean, which can lengthen reserve drill tenants to other bases or retain them in weekends and affect retention. Closure leased space. Retain the regional brig. will account for a relatively small fraction Naval Station Philadelphia was graded of the overall local job loss resulting from low in military value because of significant closing the entire naval complex. Closure facility deficiencies that would require will produce significant savings. construction to correct, its high-cost location, and the elimination of the Recommendation: requirement to support the naval shipyard, The Commission finds that DoD's which DoD is also recommending for recommendation did not deviate closure. substantially from the force-structure plan and the final selection criteria. Therefore, Community Concerns: the Commission recommends the closure The Philadelphia community believes of Naval Station Philadelphia. the naval shipyard should remain open, Ships assigned to the Naval Station and therefore the naval station must also will be reassigned to other Atlantic Fleet remain open to support it. The community homeports. The office of Commander, 5-26 Naval Base Philadelphia will close. The Hunters Point Annex has low military Naval Damage Control Training Center, a value because of significant encroachment major tenant, will move to the Naval that will result from Congressionally- Training Center at Great Lakes, IL. Other mandated outleasing to the city of San tenants will transfer to other bases or Francisco. The infrastructure at the base is remain in leased space. The regional brig deficient. Moreover, this closure will have will remain. little impact on the economy or environment of the San Francisco area. Implementation costs will be minimal. Hunters Point Annex to Community Concerns: Naval Station Treasure The community is anxious to gain use Island, San Francisco, of the land that Hunters Point occupies and California thus did not argue against closure. Category: Naval Stations Commission Findings: Mission: Support Tenant Activities Costs to Close: 0 The Commission found that few Savings: 1992-97: $325,000; Annual: $319,000 tenants use the facilities and that the piers Payback: Less than 1 year are not in use. Closure removes 15,900 Department of Defense feet of excess berthing capacity. The Recommendation: outlease obligation renders the large Dry Close Hunters Point Annex. Outlease Dock 4 unusable for emergent repairs. the entire property, with provisions for Recommendation: continued occupancy of space by The Commission finds the DoD Supervisor of Shipbuilding, Conversion, and Repair; Planning, Engineering, proposal did not deviate substantially from Repair, and Alterations Detachment; and a the force-structure plan and the final contractor-operated test facility. This is a selection criteria. Therefore, the change to the 1988 Base Realignment and Commission recommends closing the Hunters Point Annex to Naval Station Closure Commission recommendation. Treasure Island. Outlease the entire 5-27 property, with provisions for continued culminating in the loss of almost one-half occupancy of space by Supervisor of of the property. Commander, Naval Base Shipbuilding, Conversion, and Repair; Seattle, the Navy's Pacific Northwest Planning, Engineering, Repair, and regional coordinator, will move to Alterations Detachment; and a contractor- Submarine Base Bangor, consistent with operated test facility. This is a change to his concurrent responsibilities as the 1988 Base Realignment and Closure Commander Submarine Group Nine. Commission recommendation. Commanding Officer, Naval Station Puget Sound, will move to Naval Station Everett when construction there is completed. Naval Station Puget Sound Since most existing Sand Point billets will remain in the area and since new billets (Sand Point), Washington will be added at Everett, economic impacts Category: Naval Station will be slight. Mission: Support Staff and Tenant Activities Costs to Close: $28.4 million Savings: 1992-97 $-22.9 million; Annual: $1.6 million Community Concerns: Payback: 100 years The community did not argue against Department of Defense the closure of Sand Point. The local Recommendation: government plans to use the land for park Close Naval Station Puget Sound expansion and has proposed additional (Sand Point). Relocate most functions and community uses. The main community activities to Everett, Washington. Retain concerns were expeditious cleanup of the the regional brig and a small surrounding site and the incompatibility of the parcel of land. Dispose of the rest of the remaining Navy brig with planned park property. This changes the 1988 Base use. Realignment and Closure Commission's recommendation to partially close this Commission Findings: base. Naval Station Sand Point has no Sand Point received a low grade for mission, its facilities are poor, and it military value because previous functions cannot contribute significantly to meeting and missions had been reduced, surge requirements. The major tenants are 5-28 relocating. The current small overhead Department of Defense explains the long payback period. Recommendation: Close Naval Air Station Chase Field, Recommendation: retain the capability to be operated as an The Commission finds that DoD's outlying field (OLF), and retain the air recommendation did not deviate operations personnel necessary to operate substantially from the force-structure plan it. Disestablish air training squadrons and and the final selection criteria. Therefore, all other tenants. Expand air training the Commission recommends the closure squadrons at Naval Air Station Kingsville, of Puget Sound Naval Station (Sand Texas, and Naval Air Station Meridian, Point). A majority of the functions will be Mississippi, to handle any increased relocated to Everett, Washington. The student output. Improve Kingsville regional brig and a small surrounding runways for safety and efficiency with parcel of land maybe retained by the additional flight operations. Secretary after study. The Navy will Projected reductions of carrier and air dispose of the remainder of the property. wing force structure reduces the annual This is a change to the 1988 Base Closure strike pilot training rate (PTR) Commission recommendation to partially requirement, creating an excess of close the installation. approximately one base. Chase Field graded lower in military value because of infrastructure deficiencies identified as Naval Air Station Chase facility construction required for the introduction of the T-45 trainer. Chase Field, Beeville, Texas Field was determined to more readily Category: Naval Air Stations function as an OLF than Naval Air Station Mission: Naval Aviation Training Costs to Close: $47.7 million Kingsville, and Naval Air Station Savings: 1992-97: $-7.5 million; Annual: $24.7 million Meridian. Finally, realignment of Chase Payback: Less than 1 year Field is more easily reversible should force-structure increase to the point where base reconstitution may become required. 5-29 Community Concerns: airspace, encroachment, and weather were The community principally argued that not significant enough to be a basis for a the Navy plan was excessively wasteful, closure recommendation. The relevant inflicted economic and environmental issues were determined to be relative cost damage, ignored real savings, and was and military value. predicated on false information, doubtful The Commission found that DoD data, and improbable projections. The underestimated the costs to relocate the T- community asserted that Naval Air Station 45 from Naval Air Station Kingsville to Chase Field was the most productive strike Naval Air Station Chase Field. training base, suggesting that Naval Air Naval Air Station Kingsville was Station Meridian was the most logical considered too expensive to relocate. choice for closure due to its lower Naval Air Station Meridian and Naval Air productivity and greater savings achieved Station Chase Field became the potential by consolidation of training in South candidates for closure. Geographical Texas. The community also made issue of diversity and cost were predominant superior airspace and zoning ordinances factors in retaining Naval Air Station that insured long term freedom from both Meridian. land and airspace encroachment. Recommendations: Commission Findings: The Commission agrees with the DoD The Commission found that DoD's recommendation to close Naval Air Station closure recommendation was consistent Chase Field. However, the Commission with projected force-structure reductions finds that, in recommending the retention with the exception that the requirement for of an OLF, the DoD substantially deviated an outlying field is not fully supported by from the force structure plan. Projected projected PTR requirements. The surge reductions of carrier and air wing force requirement for 600 PTR was revised to structure reduce Navy-wide pilot training 450 by the Vice Chief of Naval rate requirements to a level that does not Operations. require retention of the Chase Field as an The Commission assessed that issues of OLF. relative productivity, airfield design, 5-30 The Commission also found that the four bases in the maritime patrol aircraft DoD substantially deviated from criterion subcategory. The base suffers from severe 6 in that realignment to retain an OLF ground and airspace encroachment. There imposes significantly greater adverse is no potential for increased aircraft economic impact on the local community operations. Moffett Field is located in a than closure of the entire air station. high-cost area. Finally, a force-structure The Commission therefore reduction of 25 percent results in an excess recommends the complete closure of Naval of one base in this subcategory. Air Station Chase Field, including the OLF. Community Concerns: The community argued that the benefits afforded by Moffett Field are Naval Air Station Moffett essential to the San Francisco Bay Area Field, California economy and to the nation. The long-term Category: Naval Air Stations/Maritime Patrol Aircraft coexistence between businesses and the Mission: Maritime Patrol Aircraft Support naval air station is profitable to the federal Costs to Close: $112 million government. If the naval air station were Savings: 1992-97: $104.8 million; Annual: $72.4 million Payback: Less than 1 year to close, the base should remain federally operated and maintained so that defense Department of Defense contractors can continue to use the air Recommendation: facilities. While Moffett Field may no Close Moffett Field, decommission longer meet national military needs, it three active-duty maritime patrol remains a crucial part of the high- squadrons, and redistribute the remaining technology and aerospace industries. squadrons among Naval Air Stations Jacksonville, Florida; Barbers Point, Commission Findings: Hawaii; and Brunswick, Maine. The Commission found that DoD's Consolidate the P-3 Fleet Replacement closure recommendation was consistent Squadron operations at Naval Air Station with projected force-structure reductions. Jacksonville, Florida. It was also consistent with the aircraft- Moffett Field ranked low among all relocation plan proposed by DoD and with naval air stations and lowest among the 5-31 recent military construction that supports Naval Air Station Whidbey it. Under that plan, the maritime patrol Island, Washington force will move from its traditional 50-50 split between fleets to a new deployment Category: Carrier Airwing Support Mission: A-6 attack and EA-6B electronic warfare aircraft strategy with 40 percent of the force in the Costs to Close: N/A Pacific Fleet and 60 percent in the Atlantic Savings: N/A Payback: N/A Fleet. The Commission found that ground and airspace encroachment at Naval Air Department of Defense Station Moffett Field and quality of life Recommendation: problems for Navy personnel in the San Close Whidbey Island and the Francisco Bay Area are significant. supporting Naval Hospital Oak Harbor. Transfer aviation activities to Naval Air Recommendation: Station Lemoore, California. Retain the The Commission finds that the ranges in Navy custody. Secretary's recommendation on Naval Air Force-structure reductions in aircraft Station Moffett Field did not deviate carriers and carrier airwings, and the substantially from the force-structure plan imminent departure of the A-6 Intruder and the final selection criteria. Therefore, medium-attack aircraft from the Navy's the Commission recommends closing inventory argued for the closure of Naval Air Station Moffett Field; Whidbey Island. Lemoore, where the transferring assigned P-3 aircraft to Naval Navy wants to consolidate all West Coast Air Stations Jacksonville, Brunswick, and attack squadrons, has available capacity. Barbers Point; and consolidating P-3 Fleet Whidbey's single-runway configuration Replacement Squadron operations at Naval limits operational flexibility and future Air Station Jacksonville. Additionally, the growth. Whidbey's outlying field is Commission suggests that the base remain encroached. in federal custody in support of non-DoD The economic consequences will be agencies and industry. The Secretary the most severe of any proposed closure, a should consult with NACA on possible 58.3 percent loss in jobs. use. 5-32 Community Concerns: replacement aircraft should become The community argued that the available. economic impact would be devastating-- Naval Air Station Whidbey Island almost 84 percent unemployment after operates from two runways with only one closure. The community argued that the being operational at a time. This affects base's mission is not diminishing, since the operational flexibility and growth in that it A-6E is being rewinged. limits the ability to conduct field carrier Whidbey actually has two runways, landing practice. The functional wing optimized for variable winds, and the base commander conducts this training through offers flexible training with its outlying use of the Outlying Field Coupeville. field. While this optimizes training and enhances Moreover, the EA-6B will be unable the single runway operations, noted in the to perform its electronic warfare mission DoD recommendation, it exacerbates the at Lemoore, which lacks the ranges. The encroachment at the outlying field. The airspace at Lemoore is too limited for encroachment issue at outlying field receipt of all Whidbey's aircraft. Further, Coupeville is significant. The A-6 and DoD underestimated the construction costs EA-6B aircraft are two of the loudest a move to Lemoore would entail. aircraft in the Navy inventory. The local Finally, the closure of Whidbey community has not passed any zoning Island would leave a demographic void ordinances that preclude development near with regard to the Naval Reserves. the airfield. The community has organized an aggressive campaign focusing on Commission Findings: abating the noise. The Commission found The Commission found that the A-6 that the noise and encroachment issues are force structure reduces at a rate no greater moderate relative to other Navy bases. than that associated with projected carrier- Expansion of the base is possible. With air-wing force-structure reductions. While the exception of Naval Air Station the A-6 aircraft is reaching the end of it's Lemoore, all carrier support naval air operating service life, major aircraft stations rate worse than Naval Air Station modifications are being incorporated that Whidbey Island with respect to extend its wing life until 2005, when a encroachment on air installation 5-33 compatible use zone management. This The Commission found excess issue can be resolved without closing the capacity at Naval Air Station Lemoore, the base. relocating base for the Whidbey Island The Spectrum Aviation Division of aviation tenants. But not enough capacity the Federal Aviation Administration exists to preclude DoD's estimate of more documented projected impacts to operating than $300 million in military construction and training the EA-6B aircraft in to accommodate the aircraft from Whidbey California. The interference to national Island. Based on varying accounts of the airspace system will degrade air safety and construction requirements by Navy efficiency. organizations, the Commission found the The Commission found that while estimate could well grow. The excess capacity exists at training ranges in Commission found the return on California and Nevada, no coordination investment to be high. was conducted with DoD, other federal agencies, and local governments toward Recommendation: facilitating the 100 percent growth in The Commission finds that DoD tactical aircraft in the Central California deviated substantially from the force- operating areas. The need to perform this structure plan and from criteria 1 and 3 by coordination was recommended in the not accurately focusing on the current and Navy analysis, An Analysis of Naval future mission requirements of the carrier Airspace Utilization and Requirements medium-attack mission, it also inaccurately (Project Blue Air Update) of November 2, assessed the availability of land, facilities 1987. The report documented the traffic- and airspace at the current location and the flow problems through choke-point full impacts on facilities and airspace at corridors between the California and Naval Air Station Lemoore. Therefore the Nevada operating areas. The congestion Commission recommends that Naval Air imposes severe limits on the number of Station Whidbey Island and the supporting aircraft that can be handled as well as Naval Hospital Oak Harbor remain open. significant traffic-flow management problems for the Federal Aviation Administration. 5-34 Marine Corps Air Station helicopter support to Twentynine Palms integrates it more closely with training for Tustin, California Camp Pendleton ground forces. Category: Marine Corps Air Station Helicopter facilities at Camp Pendleton are Mission: Support Marine Corps Aviation Costs to Close: $590.4 million located too far from training areas at Savings: 1992-97: $56.8 million; Annual: $0.4 million Twentynine Palms to permit MAG-39 to Payback: 100 years play an integral role in ground-force Department of Defense training. Recommendation: Close Marine Corps Air Station Community Concerns: (MCAS) Tustin, retaining family housing The community supports closure of and related personnel facilities to support MCAS Tustin so the property can be MCAS El Toro, California. Combine commercially developed, thereby Marine Aircraft Group (MAG) 16 with increasing the community tax base. The MAG 39 from Camp Pendleton and community also supports eliminating transfer the combined MAG, along with helicopter noise pollution. There is a the Tustin's headquarters components and minor economic impact of 0.1% to 0.3%. related units, to a new air station to be built at the Marine Corps Air Ground Commission Findings: Combat Center at Twentynine Palms, The Commission found that there was California. not a significant force-structure reduction Before relocation, MAG 16 and MAG dictating the closure of a MCAS; however, 39 at MCAS Camp Pendleton, California, MCAS Tustin has only a slight excess will be combined. Projected requirements capacity. There is significant community necessitate restructuring aviation support to encroachment and there are increasing complement combined-arms training. Only limitations on airspace used by low-flying MCAS Yuma, Arizona, which has a helicopters. The same factors that limit unique mission, ranked lower than Tustin the base's military value provide MCAS in military value. The air station and its Tustin with an unusually high air space are being encroached. The aging redevelopment value. facilities have many deficiencies. Moving 5-35 Recommendation: Philadelphia Naval The Commission finds that the Shipyard, Pennsylvania Secretary's recommendation on MCAS Tustin deviated substantially from criterion Category: Naval Shipyards Mission: Repair, Maintenance, and Overhaul of Navy Ships 2, availability and condition of land and Costs to Close: $102 million facilities at receiving locations, and criteria Savings: 1992-97: $38.1 million; Annual: $36 million Payback: 2 years 4, cost implications. Therefore, the Commission Department of Defense recommends the closure of MCAS Tustin Recommendation: and the retention of the family housing and Close Philadelphia Naval Shipyard related personnel support facilities in and preserve for emergent requirements. support of MCAS El Toro. It further Retain the propeller facility (shops and recommends MAG 16 be composited with foundry), Naval Inactive Ships MAG 39 and relocated to Marine Air Maintenance Facility, and Naval Ship Ground Combat Center, Twentynine Palms System Engineering Station in active status or Camp Pendleton or both and with MAG on shipyard property. 39 continued tenancy at Marine Corps Air Changes in the force structure will Station Camp Pendleton. reduce ship-repair requirements and Further, the Secretary of Defense terminate the carrier service life extension shall propose for consideration in the fiscal program (CV-SLEP). Closure of a naval year 1992 or 1993 Defense Authorization shipyard is necessary to balance the Bill a fair-market exchange of land and Navy's industrial infrastructure with this facilities for construction of military reduced workload. Maintaining the facilities at Twentynine Palms or Camp shipyard in mothball status will allow its Pendleton. If a fair exchange is not use for unplanned requirements or its authorized in fiscal year 1992 or 1993, reconstitution if future needs are greater then the Secretary of Defense should than now anticipated. proceed with the relocation to Twentynine Palms or Camp Pendleton or both, Community Concerns: utilizing the Defense Base Closure The community stated that Account. Philadelphia provides the skilled workforce 5-36 and facilities that the Navy will need to pursue legislative relief to force reversion repair its large conventional ships in the or outleasing of shipyard property to the future. It believes that the shipyard is city. particularly well suited to repair Aegis- equipped ships because of specialized Commission Findings: public and private industrial facilities in The Commission found that the the area. The community also claimed that overall public shipyard workload is falling Philadelphia is the most cost-effective and significantly because of force reductions efficient public shipyard, with the lowest and budget limitations. The projected man-day rate and highest productive ratio. workload in nuclear shipyards during the This, along with its facilities for repairing 1990s was found to limit the potential for large ships, justifies keeping the facility closing any nuclear shipyard until the late open during the 1990s, even at a reduced 1990s. workload level, until the conventional ship The largest portion of Philadelphia's workload increases. recent workload has been CV-SLEP, The community pointed to the recent which the Navy desires to terminate. congressional decision to require the However, Congress has passed legislation aircraft carrier John F. Kennedy to that requires a CV-SLEP at Philadelphia. undergo a CV-SLEP in Philadelphia, as a The Commission found that this CV-SLEP reason not to consider the shipyard for should be completed in mid-1996, about a closure--the planned schedule runs too year before the required closure date. close to the end of the required closure Workload is available that could be milestone date. diverted from public and private East The impact on the city of Philadelphia Coast shipyards to Philadelphia to bring its would be severe, particularly when added activity up to levels that justify keeping it to proposed closures of other Philadelphia- open. However, this would limit the area bases. The community believes that Navy's ability to meet its target of putting this is too large an impact for any single 30 percent of its repair work in private region to bear. If Philadelphia Naval yards. It may increase costs at public Shipyard is closed and mothballed, the shipyards, such as Norfolk, which would community stated that it would vigorously lose workload. The Commission found that 5-37 retaining Philadelphia active at a low Naval Training Center employment level, such as the 1,200- Orlando, Florida person option considered by the Navy, would increase the cost for work Category: Training Mission: Recruit Training, Service School Command, performed at Philadelphia over the cost for Nuclear Power Schools the same work performed at a public Cost to Close: N/A Savings: N/A shipyard with a traditional staffing level. Payback: N/A The Commission found that the combination of carrier-capable drydocks at Department of Defense Norfolk Naval Shipyard, Newport News Recommendation: Shipbuilding, and the mothballed drydocks Close Naval Training Center (NTC) at Philadelphia provide capacity for Orlando and the supporting Naval Hospital unplanned requirements. Orlando. The recruit training will be absorbed by NTC Great Lakes, Illinois, Recommendation: and NTC San Diego, California. The The Commission finds that the nuclear training function and all "A" Secretary's recommendation did not schools will be relocated. deviate substantially from the force- Force-structure reductions decrease structure plan and the final selection requirements for basic recruit and follow- criteria. Therefore, the Commission on training. As a result, slightly over two recommends the closure and preservation Recruit Training Commands (RTCs) can of Philadelphia Naval Shipyard for accommodate future requirements, leaving emergent requirements. The propeller an excess capacity of approximately one facility, Naval Inactive Ships Maintenance RTC. Major savings can only be realized Facility, and Naval Ship System by closure of a complete NTC. Engineering Station will remain in active NTC Orlando was graded lowest in status on shipyard property. military value for the following key reasons: First, the Navy wants to retain the NTC in San Diego because of its collocation with major fleet concentrations. Second, significant capital is invested in 5-38 complex, sophisticated, and expensive capacity adversely affected its overall training devices, systems, and buildings at ranking. NTC Great Lakes. Third, NTC Great Lakes has expansion and surge capability; Commission Findings: NTC Orlando does not. And finally, The Commission found that DoD Naval Hospital Orlando was based its closure recommendation of NTC identified for closure as a "follower" Orlando on the basis of excess capacity in because of its reduced support to the the recruit training assets. The active-duty population in the area. Commission found that although NTC Orlando has excess capacity in recruit Community Concerns: training, this excess did not carry over to The community claimed that the Navy the other training schools. The improperly rated NTC Orlando lowest in Commission also found that DoD based its expansion capability. The community also closure recommendation of Orlando on an argued that one of the reasons for overall low military rating and that this excluding NTC Great Lakes from rating was significantly influenced by a consideration for closure was the estimated low rating for criterion 3. Further, the cost to relocate its extensive training Commission found that NTC Orlando had devices, but that the training devices are more surge capacity than NTC San Diego not recruit related. which received a high rating for criterion The community argued that the 3. The Commission also found that major reason for not proposing the closure Orlando has much more land than NTC of San Diego was, its collocation with the San Diego, on which to develop additional fleet, which is not recruit related. Also, facilities in the event of mobilization the Navy omitted the infrastructure costs at requirements. Great Lakes to accommodate the Orlando The Commission found that the move. The community also noted that Navy's analysis was very sensitive to one- extensive pharmacy costs had been omitted time costs due to the sizable military from the hospital COBRA computations. construction (MILCON) required to And finally, the community claimed that relocate the Orlando schools to NTC Great failure to consider Orlando's mobilization Lakes. The original COBRA submitted by 5-39 the Navy yielded a 12-year payback and a Construction Battalion $57.1 million annual savings. An updated Center Davisville, COBRA submitted by the Navy indicates a 20-year payback and a 35.5 million dollar Rhode Island annual savings after six years. The Commission's COBRA run on NTC Category: Construction Battalion Centers Mission: Mobilization and Logistics Support to Reserve Seabees Orlando yielded a cost to close of $423.2 Costs to Close: $36.6 million million and a payback period of 100 years. Savings: 1992-97: $-12.8 million; Annual: $5.5 million Payback: 10 years Recommendation: Department of Defense The Commission finds that with Recommendation: regard to the DoD recommendation to Close Davisville and relocate three close Naval Training Center Orlando the sets of equipment and tools for Reserve Secretary deviated substantially from Naval Mobile Construction Battalions criteria 3 and 5 by not considering he (RNMCB) and other prepositioned war significant surge capacity as required for reserve material stock to the other mobilization and by overestimating return Construction Battalion Centers at Gulfport, on investment. Therefore, the Commission Mississippi, and Port Hueneme, recommends that the Naval Training California. Center and the Naval Hospital Orlando The projected reduction of RNMCBs remain open. and ability of the other construction battalion centers to provide required mobilization support enables reduction in the Naval Construction Force support infrastructure. The personnel-support facilities at Davisville are deteriorated and the facility will no longer be designated as a site for mobilizing reserve personnel. 5-40 Community Concerns: of Construction Battalion Center The community stated that Davisville Davisville. had historically been critical for support of the Seabees and that the support is still needed, particularly for storage space and Naval Air Facility Midway equipment repair. The community Island questioned the need to build new warehouse space when existing Davisville Category: Naval Air Stations/Other Unique Mission: Logistic Support buildings could continue to be used. The Costs to Close: $7.2 million community also was concerned about the Savings: 1992-97: $33.8 million; Annual: $6.9 million Payback: Less than 1 year loss of jobs in an economically depressed area. Department of Defense Recommendation: Commission Findings: Realign Naval Air Facility Midway The Commission found that many of Island. Eliminate the mission. Retain the facilities at Davisville are deteriorated caretaker presence to support intermittent and unusable. The ability of the other two joint special operations. construction battalion centers to support Naval Air Facility Midway Island was the major Naval Construction Force effort a likely candidate for realignment because during Desert Shield/Storm demonstrated the site-specific mission requirements are the ability of these bases to provide reducing and the degradations to joint required support without Davisville. operations are acceptable. Recommendation: Community Concerns: The Commission finds that the DoD The Naval Air Facility Midway recommendation on Construction Battalion Island's civilian population is comprised of Center Davisville did not deviate 230 contract personnel. The community substantially from the force-structure plan expressed no concerns with regard to the and the final selection criteria. Therefore, realignment. the Commission recommends the closure 5-41 Commission Findings and and Ocean Surveillance Center; Naval Recommendation: Surface Warfare Center; and Naval The Commission finds that the Undersea Warfare Center. Secretary's recommendation did not deviate from the force-structure plan and Community Concerns: the final selection criteria. Therefore, the The communities argued that Commission recommends realigning Naval implementing the consolidation plan would Air Facility Midway Island. Eliminate the disrupt the RDT&E, engineering, and mission and operate under a caretaker fleet-support functions these activities status. perform. Much of this disruption, they claimed, would result from the loss of key scientists and engineers who would be Navy Research, unwilling to relocate. Communities expressed concern that Development, Test and the Navy underestimated the costs of the Evaluation, Engineering, consolidation, that it failed to evaluate all alternatives, and that the new warfare and Fleet Support Activities centers would not emphasize research and development sufficiently. The communities Category: Research, Development, Testing, and Evaluation Mission: Research and Engineering Facilities requested the Commission to wait for the Costs to Consolidate: $513 million completion of the DoD Advisory Savings: 1992-97: $-119 million; Annual: $107 million Commission on Consolidation and Payback period: 2-6 years (varies by warfare center) Conversion of Defense Research and Department of Defense Development Laboratories study before Recommendation: making any recommendations. Close 10 and realign 16 Research, Development, Test and Evaluation Commission Findings: (RDT&E), Engineering and Fleet Support The Commission found that the DoD Facilities as part of a facility consolidation did not adequately examine the availability plan. Create four centers: Naval Air of alternative facilities for the location of Warfare Center; Naval Command, Control the East Coast In-Service Engineering 5-42 Directorate, which the DoD proposed to Closures: be located in Portsmouth, VA. Existing Integrated Combat Systems Test Facility, facilities may be available in Charleston, San Diego, CA SC, elsewhere in the Norfolk metropolitan Naval Electronic Systems Engineering area, or at other locations. Additionally, Center, San Diego, CA the Committee found that development in Naval Electronic Systems Eng. Center, the Portsmouth area could affect the Vallejo, CA Navy's ability to conduct tests on radars Naval Mine Warfare Engineering Activity, and communications equipment. While the Yorktown, VA Commission found inaccuracies in the Naval Space Systems Activity, DoD cost and savings estimates, these Los Angeles, CA errors were insignificant. Naval Ocean Systems Center Detachment, Kaneohe, HI Recommendation: Naval Weapons Evaluation Facility, The Commission finds that, with one Albuquerque, New Mexico exception, the Secretary's proposal for closure and realignment of RDT&E, Realignments: Engineering, and Fleet Support Activities David Taylor Research Center did not deviate substantially from the force Detachment, Annapolis, MD structure plan and the selection criteria. Naval Air Development Center, In its recommended establishment of Warminster, PA Naval Command, Control and Ocean Naval Air Engineering Center, Surveillance Center's East Coast In- Lakehurst, NJ Service Engineering Directorate in Naval Air Propulsion Center, Trenton, NJ Portsmouth, VA., the Commission finds Naval Avionics Center, Indianapolis, IN that the Secretary deviated substantially Naval Coastal Systems Center, from criteria 2 and 4 by not examining Panama City, FL fully all available alternatives for location Naval Ordnance Station, Indian Head, MD of the Directorate. Naval Ordnance Station, Louisville, KY The Commission recommends the Naval Surface Weapons Center following closures and realignments. Detachment, White Oak, MD 5-43 Naval Underwater Systems Center reorganization will require the careful Detachment, New London, CT development and execution of personnel Naval Undersea Warfare Engineering management plans to minimize the Station, Keyport, WA disruption of critical research and Naval Weapons Center, China Lake, CA development activities in the Navy Naval Weapons Support Center, Crane, IN laboratory system. Pacific Missile Test Center, Point Magu, California Trident Command and Control Systems Lowry Air Force Base, Maintenance Activity, Newport, RI Colorado Naval Sea Combat Systems Engineering Station, Norfolk, VA Category: Training Mission: Technical Training Center Additionally, the Commission Cost to Close: $222.5 million recommends to the President that the Savings: 1992-97: $-44.5 million; Annual: $42.2 million Payback: 5 years Secretary defer implementation of this consolidation plan until January 1, 1992 in Department of Defense order to give the Secretary time to Recommendation: consider the findings and recommendations Close Lowry Air Force Base and of the DoD Advisory Commission on redistribute all technical training to the Consolidation and Conversion of Defense remaining technical training centers. The Research and Development Laboratories 1001st Space Systems Squadron Defense and to consult with the appropriate Finance and Accounting Service and Air committees of the Congress. Force Reserve Personnel Center remain at The Commission also believes there is Lowry. The Lowry Technical Training a clear role for the Advisory Commission Center will inactivate. to advise the Secretary of how best to Lowry's long-term military value was implement this consolidation plan so as to low compared with other bases in its minimize the impact of the turbulence it category. Its ranking suffered because base could create, including the loss of key facilities ranked below the category personnel. Clearly, the challenge of average and the lack of a runway limits its undertaking such a comprehensive ability to accept additional missions. 5-44 Additionally, it is the second-least downgraded equally with regard to future expensive base to close in this category. mission capabilities. Lowry's base facilities rated lower than the category Community Concerns: average. The Commission found that the The community argued that Lowry cost of training per student is a function of was penalized too severely for the lack of the type of training conducted at Lowry a runway and that the DoD criteria placed and not a function of the physical too much emphasis on runway operations. properties of Lowry Air Force Base. The community also noted that the base Concerning the remaining technical has a favorable cost-per-student-trained training capacity, the closure of Chanute ratio when compared with the other and Lowry removes 33 percent of the technical training centers. It also argued training infrastructure. The Air Force's that the closure of Lowry would reduce projected accessions are 50 percent of too much infrastructure in light of the what they were in the 1980s, when there fiscal year 1988 decision to close Chanute were six training centers. Therefore, the Air Force Base. The elimination of two one-third reduction in facilities allows for large training centers does not allow surge capability if and when it is required. enough infrastructure to handle a quick The Department of Defense should look surge in training that might be required. closely at using the excess facilities created by this closure when evaluating the Commission Findings: Department's overall facility requirements The Commission found that all such as the consolidation of the Defense training bases were treated fairly and Finance and Accounting Service. Lowry did rank low in its category. The lack of a runway was considered correctly Recommendation: since it does limit future mission The Commission finds that the DoD capabilities. However, the lack of a recommendation on Lowry Air Force Base runway did not penalize Lowry when did not deviate substantially from the evaluated for supporting the current force-structure plan and the final selection mission. Three training bases lacking criteria. Therefore, the Commission active runway operations were all recommends the closure of Lowry Air 5-45 Force Base and the redistribution of all Force Base rather than move to Bergstrom technical training to the remaining tech Air Force Base as recommended by the training centers. The 1001st Space Systems 1988 Commission. Finally, move the Squadron Defense Finance and Accounting 712th Air Support Operations Center Service, and the Air Force Reserve Squadron to Fort Hood, Texas. Personnel Center remain open, in Bergstrom ranked relatively low in cantonment areas as proposal by the the flying/tactical category based on its Secretary Defense. long-term military value compared with other bases in the category. The base suffers from ground and regional airspace Bergstrom Air Force Base, encroachment. The regional airspace is increasingly stressed by growth in air Texas traffic. There are insufficient suitable air- Category: Flying/Tactical to-ground or electronic combat ranges Mission: Tactical Reconnaissance, RF-4 Cost to Close: $39.8 million nearby for flight training. Finally, the Savings: 1992-97: $128 million; Annual: $36.3 million capacity of on-base family housing is Payback: 2 years below average compared with other bases Department of Defense in the category. Recommendation: Close Bergstrom and retire the Community Concerns: assigned RF-4 aircraft. The 67th Tactical The community claimed that Reconnaissance Wing will inactivate. Bergstrom simply needs a new mission. It Maintain the existing Air Force Reserve declared that the base is strategically units in an enclosed area if the base is located to support Fort Hood, Texas, with converted to a civil airport. Relocate the Close Air Support operations and airlift for 12th Air Force Headquarters, 12th Tactical operational or exercise deployments. The Intelligence Squadron, and 602nd Tactical community also was concerned that the Air Control Center Squadron to Davis- closure recommendation was based upon Monthan Air Force Base, Arizona. The the impression that the base would 41st Electronic Combat Squadron will definitely be converted to a commercial remain in place at Davis-Monthan Air airport. The community minimized the 5-46 severity of ground and airspace the Air Force to operate it there. The Air encroachment. Force Reserve units shall remain in a cantonment area if the base is converted to Commission Findings: a civil airport. If no decision on a civil The Commission found that DoD's airport is reached by June 1993, the closure recommendation was not tied to reserve units will be redistributed. If the the conversion of the airfield to a civil reserve units stay but the airport is not an airport. However, there is an option to economically viable entity by the end of maintain the Air Force Reserve unit if the 1996, these units would also be airfield is converted to commercial use. redistributed. The 12th Air Force The lack of adequate ranges and increasing Headquarters 12th TAC Intelligence encroachment limit the base's overall Squadron and the 602nd Tactical Air military value. Other tactical units such as Control Center Squadron will relocate to the 149th Tactical Fighter Group at Kelly Davis-Monthan Air Force Base, Arizona. Air Force Base, Texas, can adequately The 712th Air Support Operations Center support Fort Hood. Finally, Fort Hood Squadron will relocate to Fort Hood, uses its own Grey Army Airfield for airlift Texas. The 41st Electronic Combat operations. Squadron will remain in place at Davis- Monthan Air Force Base. Recommendation: The Commission finds that the DoD recommendation on Bergstrom Air Force England Air Force Base, Base did not deviate substantially from the Louisiana force-structure plan and the final selection criteria. Therefore, the Commission Category: Flying/Tactical Mission: Tactical Fighters, A-10 recommends that Bergstrom Air Force Cost to Close: $40.3 million Base close and that the assigned RF-4 Savings: 1992-97: $176 million; Annual: $47.2 million Payback: 1 year aircraft retire. The 67th Tactical Reconnaissance Wing will inactivate. The Regional Corrosion Control Facility will remain if it continues to be economical for 5-47 Department of Defense DoD understated the combined economic Recommendation: impact of England's closure and Fort Close England and retire or Polk's realignment. redistribute all aircraft among remaining Active and Reserve Component units. Commission Findings: Inactivate the 23rd Tactical Fighter Wing. The Commission found that the Realign one A/OA-10 squadron to Eglin airspace and weather can impact the Air Force Base, Florida, and one to military value of the base. With its McChord Air Force Base, Washington. surrounding airspace England can meet England ranked relatively low in the current mission requirements, but will not flying/tactical category. The long-term be able to support future missions. military value of England is limited by Concerns that the current mission degraded available airspace for training and by the base rankings were unfounded. Air weather, for which England ranked lowest Force proposals to provide support to the in its category. The Air Force Army were reasonable and formally acknowledged the advantage of England's endorsed by the Army. Finally, the proximity to Fort Polk, but stated that combined economic impact of the two other bases could support the Army. Also, adjustments was substantially higher than the cost to close is low while the savings for a single base. are high. Recommendation: Community Concerns: The Commission finds that the DoD The community argued that England's recommendation on England Air Force mix of weather was good for training. It Base did not deviate substantially from the stated that the local airspace, low-altitude force-structure plan and the selection military operating areas, and availability of criteria. Therefore, the Commission higher-altitude airspace were not recommends the closure of England Air adequately considered. It questioned Force Base and the redistribution of one whether the Air Force could meet the squadron to Eglin Air Force Base, one Army's needs at Fort Polk if England squadron to McChord Air Force Base, and closed. The community also stated that the retirement of other remaining assigned 5-48 aircraft, including the 23rd Tactical F-16 training wing. DoD did not Fighter Wing. recommend full closure because of the high cost to relocate two large joint headquarters. MacDill Air Force Base, Community Concerns: Florida The community argued that the Category: Flying/Tactical reduction in the base's hospital staff Mission: Tactical Fighter Training and Joint Headquarters, F-16 associated with the population drawdown Cost to Realign: $31.0 million will reduce support to a large retired Savings: 1992-97: $53 million; Annual: $20.4 million population and increase CHAMPUS costs. Payback: 2 years While it acknowledged airspace Department of Defense congestion, the community argued that Recommendation: airspace problems and accident potential in Realign and partially close MacDill the Phoenix area are significantly worse. Air Force Base. The aircraft realign to Loss of the airfield was also presented as Luke Air Force Base, Arizona; the Joint degrading the ability of the joint Communications Support Element moves headquarters to fulfill their missions. In to Charleston Air Force Base, South particular, the community argued that a Carolina; the airfield closes; and the classified mission at MacDill required a remainder of MacDill becomes an dedicated airfield. The community also administrative base. expressed the concern that realignment was The long-term military value of the first step toward closure. MacDill is limited by pressure on airspace, training areas, and low-level routes. Commission Findings: MacDill is not located near Army units The Commission found that MacDill that would offer joint-training was located in an area with increasing opportunities. MacDill also has ground pressure on airspace and therefore encroachment. Drawdown in the force restricted training capabilities. The structure results in the need for one less increased CHAMPUS costs associated with base closures were factored into the Air 5-49 Force analysis. The CHAMPUS program the Commission recommends the was developed to address medical needs of realignment and partial closure of MacDill all non-active duty beneficiaries since DoD Air Force Base; the realignment of the policy precludes manning a hospital solely aircraft to Luke Air Force Base, Arizona; to meet the needs of a retired population. the movement of the Communications In this case the increased cost was due to Support Element to Charleston Air Force the large number of retirees. Base, South Carolina; and the closure of The Commission examined the broad the airfield and the remainder of MacDill comparisons between Phoenix and Tampa becomes an administrative base. raised by the community. Detailed review revealed that resulting force structure was Myrtle Beach Air Force below historic highs and that air traffic procedures were workable. The Base, South Carolina Commission also noted that Luke has Category: Flying/Tactical exceptional training airspace to the south, Mission: Tactical Fighters, A-10 Cost to Close: $54.4 million which is connected to Luke by established Savings: 1992-97: $76.0 million; Annual: $30.2 million routing. Payback: 2 years Arguments that the missions DoD Department of Defense plans to retain (both unclassified and Recommendation: classified) at MacDill require a military Close Myrtle Beach and redistribute airfield were found wanting. The all aircraft to modernize other Active and Commission also noted the high cost of Reserve Component units. Inactivate the total closure and the low cost and 354th Tactical Fighter Wing. The DoD reasonable savings of realignment. recommendation also states that there be one active squadron each at Shaw and Recommendation: Pope Air Force Bases. The Commission finds that the Myrtle Beach Air Force Base's long- Secretary's recommendation on MacDill term military value was low compared Air Force Base did not deviate with other bases in its category. Its substantially from the force-structure plan ranking suffered because of weather, or the final selection criteria. Therefore, ground encroachment, and because of its 5-50 location in a region where special use Regarding support to the Army, the airspace is being stressed increasingly by Commission found that Shaw Air Force growth in air traffic. Additionally, the cost Base, North Carolina, provides the needed to close is low while the savings are high. support to Army units in the area. Community Concerns: Recommendation: The community argued that Myrtle The Commission finds that the DoD Beach was incorrectly downgraded for recommendation on Myrtle Beach Air ground encroachment and that the weather Force Base did not deviate substantially does not downgrade the base's ability to from the force-structure plan and the final meet its mission. The community also selection criteria. Therefore, the noted that the base was recently identified Commission recommends the closure of as one of the best in the Air Force and has Myrtle Beach Air Force Base and the the potential to house a composite wing, redistribution of all assigned aircraft to which was not considered by the Air other Active and Reserve Component Force. It also argued that the closure of units, and that one active A/OA-10 Myrtle Beach was an example of the Air squadron be realigned to Shaw and Pope Force's failure to consider providing close- Air Force Bases. air support to the Army. Commission Findings: Moody Air Force Base, The Commission found that all Georgia flying/tactical bases were treated fairly and Myrtle Beach did rank low in its category. Category: Flying/Tactical Mission: Tactical Fighters, F-16 It does have training limitations, and Cost to Close: N/A projections indicate increasing pressure on Savings: 1992-97: N/A Payback: N/A airspace. Weather and airspace do degrade Myrtle Beach's military value and justify Department of Defense its low ranking. The base has low closure Recommendation: cost and favorable savings. Close Moody Air Force Base and redistribute all aircraft to modernize other 5-51 active and reserve component units. The commercial aviation is evident, the routing 347th Tactical Fighter Wing will around Moody's airspace and repeated inactivate. examples of the Federal Aviation Moody's long-term military value Administration providing additional compared unfavorably with other bases in airspace to Moody argue against training its category. Its ranking suffered because capability decreasing in the future. Sorties of weather and its location in a region have been lost to weather, but the Air where special-use airspace is being Force has successfully overcome this stressed increasingly by growth in air problem in the past and should be able to traffic. Additionally, it is the least costly do so in the future. The closure of Moody base in its category to close. provides only small savings that justifies leaving what has been recognized as one Community Concerns: of the best bases in the Air Force, for The community argued that Moody installation excellence, open. was incorrectly downgraded for airspace and that the weather does not downgrade Recommendation: the base's ability to meet its mission. The The Commission finds that DoD community also noted that the base was substantially deviated from selection recently identified as the best in the Air criteria 1, 2, and 3 in recommending the Force and has growth potential for a closure of Moody Air Force Base. composite wing, potential that was not Specifically, DoD did not adequately considered by the Air Force. It also argued consider the military value of Moody Air that the closure of Moody was an example Force Base in its assessment of the extent of the Air Force's failure to consider of the impact of weather and airspace support to the Army. problems. Therefore, the Commission recommends Moody remain open. Commission Findings: The Commission found that Moody's minor training limitations are successfully managed and the wing can meet its training needs. While an increase in 5-52 Carswell Air Force Base, and the contractor has defaulted. The Air Force projects this housing to be unusable Texas for the extended future. Category: Flying/Strategic Mission: Strategic Bombardment and Air Refueling, B-52 and KC-135 Community Concerns: Cost to Close: $45.6 million The community claimed that many Savings: 1992-97: $156 million; Annual: $45.5 million Payback: subelement scores were incorrect and that 1 year the "corrected" scores would change the Department of Defense overall rating for the base. The community Recommendation: minimized the impact and severity of Close Carswell Air Force Base and airspace encroachment, citing excellent transfer the assigned B-52H aircraft to procedures and equipment used to control Barksdale Air Force Base, Louisiana. The aircraft in the Dallas/Fort Worth Airport assigned KC-135 aircraft will transfer to area. Similarly, it declared that the the Air Reserve Component, and the 7th existing ground encroachment in both the Bombardment Wing will inactivate. The clear and accident zones will decrease. 436th Strategic Training Squadron The community was also concerned about relocates to Dyess Air Force Base, Texas. the disposition of the base hospital. The Maintain the existing Air Force Reserve hospital serves the active-duty military units in a cantonment area. members and their dependents, as well as Carswell ranked low based on its many retirees. The community was also long-term military value compared with concerned about the economic impact on a other bases in its category. The base is region already hard hit by other cuts in the poorly located for wartime bomber or defense industry. tanker employment. The base has the worst ground and regional airspace Commission Findings: encroachment in its category. The regional The Commission found very few airspace will continue to be stressed by errors in the subelement scores, and the aggressive aviation growth in the area. full Air Force process was validated by the Finally, much of the on-base housing is GAO. Carswell is in an area of continued unusable because it is under renovation aviation growth and strong pressure on 5-53 regional airspace. Additionally, there is Savings: 1992-97: $63.0 million; Annual: $52.7 million Payback: 2 years commercial and residential encroachment in the protected zones off either end of the Department of Defense runway. The poor location for wartime Recommendation: employment and ground and airspace Close Castle Air Force Base and encroachment limit the base's future transfer the assigned B-52G conventional military value. aircraft to K.I. Sawyer Air Force Base, Michigan. Transfer the assigned KC-135 Recommendation: aircraft to other Active or Reserve The Commission finds that the Component units. Transfer the B-52 and Secretary's recommendation on Carswell KC-135 Combat Crew Training mission to Air Force Base did not deviate Fairchild Air Force Base, Washington. substantially from the force-structure plan The 93rd Bombardment Wing will and the final selection criteria. Therefore, inactivate. the Commission recommends the closure Castle ranked relatively low based on of Carswell Air Force Base and the its long-term military value compared with transfer of the assigned B-52 aircraft to other bases in the category. The base is in Barksdale Air Force Base, Louisiana. The a relatively poor location for wartime assigned KC-135 aircraft should transfer to bomber employment. Its ranking also the Air Reserve Component. The 436th suffered because of its relatively poor Strategic Training Squadron will relocate location for wartime and peacetime air- to Dyess Air Force Base. The existing Air refueling operations. The base endures Force Reserve units will remain in a local ground and regional airspace cantonment area. encroachment. The regional airspace is being increasingly stressed by growth in air traffic. Finally, the condition of the Castle Air Force Base, facilities at Castle is below the average of other bases in the same category. California Category: Flying/Strategic Mission: Strategic Bombardment, Air Refueling, and Combat Crew Training School; B-52 and KC-135 Cost to Close: $99.2 million 5-54 Community Concerns: selection criteria. Therefore, the The community claimed that Castle Commission recommends closing Castle was incorrectly categorized as a strategic/ Air Force Base and transferring the flying base when, in its opinion, the assigned B-52 aircraft to K.I. Sawyer Air primary mission of the base is initial Force Base. Transfer the assigned KC-135 training of B-52 and KC-135 aircrews. It aircraft to other Active or Reserve declared Castle has unique attributes to Component units. Transfer the B-52 and perform this training mission, including its KC-135 Combat Crew Training missions many aircrew-training devices, access to to Fairchild Air Force Base, Washington. numerous airfields, and transient student quarters. Finally, it believes that moving Eaker Air Force Base, the training mission would be short-sighted Arkansas because the longevity of the B-52 is in question. Category: Flying/Strategic Mission: Strategic Bombardment and Air Refueling, B-52 and KC-135 Commission Findings: Cost to Close: $18.5 million Savings 1992-97: $221.0 million; Annual: $52.9 million The Commission found that the base Payback: Less than 1 year was properly categorized along with other flying/strategic bases. It is in a poor Department of Defense location for wartime bomber and tanker Recommendation: employment. Regional airspace and local Close Eaker Air Force Base and ground encroachment also degrade its transfer the assigned KC-135 aircraft to overall military value. The DoD force- other Active or Reserve Component units. structure plan includes the B-52 aircraft The assigned B-52G Air Launched Cruise until past the turn of the century. Missile aircraft retire. The 97th Bombardment Wing will inactivate. Recommendation: Eaker ranked relatively low in the The Commission finds that the flying/strategic category based on its long- Secretary's recommendation on Castle Air term military value compared with other Force Base did not deviate substantially bases in the category. The base is in a from the force-structure plan and the final relatively poor location to support wartime 5-55 bomber employment. Its ranking also than one year. The economic impact on suffered because of the limited opportunity the community from the closing of Eaker for peacetime use of tanker assets and will be among the most significant in the access to bombing ranges. The base Air Force. experiences some current restrictions on access to bombing ranges and expects Recommendation: future restrictions as well. Finally, the The Commission finds that the capacity of the facilities are below the Secretary's recommendation on Eaker Air average of other bases in the same Force Base did not deviate substantially category. from the force-structure plan and the final selection criteria. Therefore, the Community Concerns: Commission recommends the closure of The community claimed that Eaker is Eaker Air Force Base. The assigned B-52 close to many air-refueling tracks, and aircraft will retire, and the assigned KC- removing assigned KC-135s will 135 aircraft will transfer to other Active or exacerbate a regional peacetime air- Reserve Component units. refueling tanker shortfall. It also stated that Eaker has better weather than many northern strategic bases. The community Grissom Air Force Base, was especially concerned with the Indiana economic impact of the closure. Category: Flying/Strategic Mission: Strategic Air Refueling, KC-135 Commission Findings: Cost to Close: $24.9 million The Commission found that, although Savings: 1992-97: $157 million; Annual: $48.3 million Payback: 1 year Eaker is close to many designated air refueling tracks, it is still relatively distant Department of Defense from an area of high air-refueling Recommendation: requirements. Eaker is in a relatively poor Close Grissom Air Force Base and location for wartime bomber and tanker transfer the assigned KC-135 aircraft to employment. The cost to close Eaker is the Air Reserve Component. The low, and the pay back is achieved in less EC-135 aircraft will retire and the 305th 5-56 Air Refueling Wing will inactivate. the bases military value. Grissom is the Grissom ranked below average in the fourth lowest cost to close in the category flying/strategic category based on its long- and offers a significant annual savings. term overall military value compared with Closing the base will have a negative other bases in the category. The base's economic impact on the local community. location provides limited opportunity for Finally, the condition of facilities at peacetime use of tankers and access to Grissom graded lower than the category bombing ranges. Finally, Grissom costs average. the fourth least to close in the category and the savings generated after closure are Recommendation: substantial. The Commission finds that the DoD recommendation on Grissom Air Force Community Concerns: Base did not deviate substantially from the The community claimed that Grissom force-structure plan and the final selection has no airspace restrictions and that criteria. Therefore, the Commission expansion capability is unlimited around recommends the closure of Grissom Air the base. The community also highlighted Force Base, the retirement of assigned EC- that, because of its distance to the coast, 135 aircraft, the inactivation of the 305th the base's survivability is enhanced due to Air Refueling Wing, and the transfer of its midwestern location. Also, the existing KC-135 aircraft to the Air Reserve ramp can accommodate additional aircraft Component. and the quality of life at Grissom is better than at several bases not recommended for closure. Loring Air Force Base, Maine Commission Findings: The Commission found that the base Category: Flying/Strategic Mission: Conventional Bombardment and Air Refueling, B-52 was properly graded. The base has no and KC-135 flying restrictions and can expand. Cost to Close: $46.6 million Savings: 1992-97: $182 million; Annual: $61.8 million Payback: However, the distance to air-refueling 1 year receivers and primary ranges diminishes 5-57 Department of Defense did not adequately consider the economic Recommendation: impact. Close Loring Air Force Base and transfer the assigned B-52 aircraft to K.I. Commission Findings: Sawyer and disperse KC-135 aircraft to The Commission found that, although Active and Reserve Component units. Loring is the closest base to potential Loring ranked relatively low in the targets east of the United States, the flying/strategic category based on its long- advantage is relative when the total term military value compared with other mission is considered. Loring is rated bases in the category. The base's location lower in military value because of the provides limited opportunity for peacetime limited opportunity for peacetime use of use of tankers and access to bombing tankers and access to bombing ranges. The ranges. The condition of base facilities is condition of the facilities are below the below the average of other bases in the command's average and the cost of category. The cost to close Loring is low required upgrades to meet the current and and the savings are among the highest of future missions is high. Loring has only the bases in, this subcategory. one fully operational runway and one pre- launch survivability runway. The annual Community Concerns: savings will be the highest of all bases The community claimed that Loring is closed in the flying/strategic category. The the closest base to conventional and economic impact on the Loring community strategic targets east of the United States. will be severe. It also pointed out that Loring has two fully operational runways. Further, it Recommendation: stated that the base is near air-refueling The Commission finds that the routes, base facilities are adequate to meet Secretary's recommendation on Loring Air current mission requirements, not enough Force Base did not deviate substantially credit was given for improvements to from the force-structure plan and the final facilities, distance to bombing ranges is selection criteria. Therefore, the not a significant factor, and the Air Force Commission recommends the closure of Loring Air Force Base, the transfer of the 5-58 assigned B-52 aircraft to K.I. Sawyer, and Community Concerns: the dispersal of the KC-135 aircraft to The community claimed that active and Air Reserve Component units. Wurtsmith has no airspace restrictions and that all operational requirements for the assigned aircraft can be met without Wurtsmith Air Force Base, interference. The community also stated that closing Wurtsmith would have Michigan significant negative economic impact on Category: Flying/Strategic northern Michigan. It directly challenged Mission: Strategic Bombardment and Air Refueling, B-52 and KC-135 individual ratings of the Air Force Base Cost to Close: $29.1 million Closure Executive Group. In addition it Savings: 1992-97: $256 million; Annual: $63.3 million argued for keeping Wurtsmith open and Payback: 1 year closing K.I. Sawyer Air Force Base, Department of Defense Michigan. Recommendation: Close Wurtsmith Air Force Base and Commission Findings: transfer the assigned KC-135 aircraft to The Commission found that the base the Air Reserve Component. The B-52G was properly graded. The base has no Air Launched Cruise Missile aircraft will flying restrictions and can perform all retire and the 379th Bombardment Wing operations required to sustain the mission. inactivates. However, the distance to scored training Wurtsmith ranked below average in routes is significant and lowers the the flying/strategic category based on its efficiency of the missions at Wurtsmith. long-term overall military value compared Also, tankers must travel a significant with other bases in the category. The low distance to air-refueling receivers. ranking results from the base's distance to Wurtsmith costs the third least to close in primary low-altitude training routes and the category and offers the highest annual peacetime air-refueling training savings of any Air Force base closure. requirements. Finally, Wurtsmith costs the Closing the base will have a severe third least to close in the category and the economic impact on the local community. savings generated after closure are high. 5-59 Finally, K.I. Sawyer graded higher overall Williams ranked low in the flying/ in military value than Wurtsmith. training category and lowest for airspace encroachment--a problem that is expected Recommendation: to worsen. The condition of its facilities The Commission finds that the DoD also ranked lowest. Williams's closure recommendation on Wurtsmith Air Force will have the least severe impact on its Base did not deviate substantially from the local community of any of the bases in its force structure plan and the final selection category. criteria. Therefore, the Commission recommends the closure of Wurtsmith Air Community Concerns: Force Base, the transfer of KC-135 aircraft The community argued principally to the Air Reserve Component, and the that the Air Force did not give Williams retirement of the assigned B-52G aircraft enough credit for its excellent weather and and the inactivation of the 379th incorrectly rated its facilities. The Bombardment Wing. community believed that DoD placed too much emphasis on airspace without recognizing adjustments made in the region Williams Air Force Base, to alleviate encroachment problems. In addition, the community claimed the Arizona closure and movement of the Aircrew Category: Flying/Training Training Research Facility will be too Mission: Flying/Training, T-37 and T-38 Cost to Close: $26.7 million costly. Savings 1992-97: $222 million; Annual: $54.1 million Payback: 1 year Commission Findings: The Commission found that all Department of Defense flying/training bases were treated fairly Recommendation: and Williams ranked lowest in its Close Williams and retire or category. It has the most severe airspace redistribute all aircraft. Inactivate 82nd problems--a situation that is only projected Flying/Training Wing. Move Aircrew to worsen. Projected air traffic growth of Training Research Facility to Orlando, 65 percent by 2005, civilian traffic cutting Florida. 5-60 into instrument training, and the potential Training Research Facility to Orlando, of a new regional airport are a few of the Florida, and the deactivation of the 82nd problems. Flying/Training Wing. The Air Force did consider a recent agreement with the Federal Aviation Administration to improve the utility of Richards-Gebaur Air one of Williams' Military Operating Reserve Base, Missouri Areas. However, this adjustment fails to address the more pressing problem of Category: Air Reserve Component Bases Mission: Tactical Fighters, A-10 minimum airspace. Williams has the Cost to Close: $47.6 million minimum airspace per sortie considered Savings: 1992-97: $-4 million; Annual: $12.9 million Payback: 5 years safe and the least of any flying/training base. Department of Defense Williams did rate highest in the Recommendation: category for weather. However, even with Close Richards-Gebaur Air Force added emphasis this rating could not Base and transfer the 442nd Tactical overcome deficiencies in other areas. Fighter Wing to Whiteman Air Force Finally, Orlando, in addition to being Base, Missouri. The 36th Aeromedical the least expensive alternative for the Evacuation Squadron and the 77th and relocation of the lab, also provides 78th Aerial Port Squadrons will transfer to synergism by collocating Air Force and Peterson Air Force Base, Colorado. Navy elements working in the same area. Since the joint-use plan with the Kansas City Department of Aviation, Recommendation: which was envisioned 12 years ago, has The Commission finds that the not materialized, the Air Force Reserve Secretary's recommendation did not has borne a substantial portion of the deviate substantially from the force- operating costs of this airfield. The structure plan and the final selection economically viable airport that the Air criteria. Therefore, the Commission Force anticipated and the expected recommends the closure of Williams Air reduction in costs have not materialized. Force Base, the transfer of the Aircrew Therefore, relocating the Reserve activities 5-61 to an active Air Force base would achieve The Air Force's payback period would be significant cost savings. Consideration was seven years, not five years. The given to the recruiting needs of these units recruitment area and the travel distance to ensure that the realignment meets required is within the Air Force guidance. military requirements and is cost effective. The move will enable the unit to use The long-term effect on training is additional training ranges and support Fort minimal since Whiteman has similar access Leonard Wood, Missouri. Fort Riley, to training ranges, low-level routes, and Kansas, and Fort Sill, Oklahoma, will get Army exercise areas. their support from Tinker Air Force Base, Oklahoma. Community Concerns: The community stated that the units Recommendation: would not be able to use current training The Commission finds that the ranges and could not support Fort Riley Secretary's recommendation did not and Fort Sill. It also stated that the move deviate substantially from the force- would adversely affect recruitment, structure plan or the final selection retention, and training because of the criteria. Therefore, the Commission reduced population available for recommends the closure of Richards- recruitment. In addition, it stated that the Gebaur Air Reserve Base, the transfer of cost to move was understated because the the 442nd Tactical Fighter Wing to missile wing would not move as soon as Whiteman Air Force Base, and the transfer anticipated. of the 36th Aeromedical Evacuation Squadron and the 77th and 78th Aerial Commission Findings: Port Squadrons to Peterson Air Force The Commission found that the Air Base. Force's and community's cost estimates for relocating to Whiteman were incorrect. There will be some additional rehabilitation costs for temporary facilities, but the relocation costs would not be as much as envisioned for new construction. 5-62 Rickenbacker Air Guard Community Concerns: The community questioned the costing Base, Ohio methodology and claimed that the costs to Category: Air Reserve Component Bases move the Air Reserve Component units Mission: Tactical Fighters and Air Refueling, A-7, and KC-135 Cost to Close: $106.1 million were understated. It also said that the eight Savings 1992-97: $-16 million; Annual: $22.7 million criteria were not consistently applied. In Payback: 5 years addition, it claimed that moving three more flying units to Dayton would cause airspace congestion. It also claimed that Department of Defense because Dayton's population is one-half Recommendation: the size of the population of Columbus, Close Rickenbacker Air Guard Base recruiting will be hurt. and transfer the 160th Air Refueling Group and the 907th Tactical Airlift Group Commission Findings: to Wright-Patterson Air Force Base, Ohio. The Commission found that the The 4950th Test Wing will consolidate community's cost estimate was for with the Air Force Flight Test Center at building all new facilities at Wright- Edwards Air Force Base, California. Patterson. The community did not Since the Air Reserve Component recognize that the Air Force was using units located at Rickenbacker are the vacated facilities. Small additional predominate users of the airfield, the increases in air traffic will be manageable. support costs for these activities are high Using the Air Force's recruiting and the relocation of the units could bring guidelines, locating the units in Dayton about significant savings. Transferring the does not degrade the recruiting base. The units to Wright-Patterson keeps the Air Air Force modified its selection criteria for National Guard units in Ohio and reduces Air Reserve Component bases first by the costs to move, since the 4950th would determining if there was a significant cost vacate useable facilities. Also, moving the savings, and then by applying the eight Guard and Reserve units to Dayton would criteria. An underlying concern was the increase the overall recruiting area moving of Air National Guard units across population. In addition, collocation with active forces will improve operations. 5-63 state lines. This did not adversely affect Texas, and realign the technical training the selection process. fire course to Goodfellow unless a satisfactory and cost-effective contract can Recommendation: be arranged. The 1988 Commission on The Commission finds that the Base Realignment and Closure Secretary's recommendation on recommended that both of these courses be Rickenbacker Air Reserve Base did not realigned to Goodfellow Air Force Base, deviate substantially from the force- Texas. structure plan and the final selection criteria. Therefore, the Commission Commission Findings and recommends the closure of Rickenbacker Recommendation: Air Guard Base, the transfer of the 160th The Commission finds that the DoD Air Refueling Group and the 907th recommendation on realignment of Tactical Airlift Group to Wright-Patterson Goodfellow Air Force Base did not deviate Air Force Base, and the consolidation of substantially from the force structure and the 4950th Test Wing from Wright- the final selection criteria. Therefore, the Patterson Air Force Base with the Air Commission recommends the realignment Force Flight Test Center at Edwards Air of the fuels training from Goodfellow Air Force Base. Force Base to Sheppard Air Force Base. Goodfellow Air Force Base, Beale Air Force Base, Texas California Category: Training Category: Flying/Strategic Mission: Technical Training Mission: Strategic Reconnaissance and Air Refueling, U-2, TR-1 and KC-135 Department of Defense Recommendation: Department of Defense Recommendation: As part of the closure of Chanute Air Force Base, Illinois, realign the fuels Realign Undergraduate Navigator training to Sheppard Air Force Base, Training and the 323rd Flying Training Wing from Mather Air Force Base, 5-64 California, to Randolph Air Force Base, Department of Defense Texas, instead of realigning to Beale Air Recommendation: Force Base as recommended by the 1988 Realign 45 Air Force Audit Agency Commission on Base Realignment and manpower authorizations from Norton Air Closure. Force Base, California, to the National Capital Region instead of to March Air Community Concerns: Force Base as recommended by the 1988 The economic impact will harm an Commission on Base Realignment and already depressed area. Closure. The remaining 139 manpower authorizations will transfer to March Air Commission Findings and Force Base as directed by the 1988 Recommendation: Commission. The Commission finds that the DoD recommendation on realignment of Beale Commission Findings and Air Force Base did not deviate Recommendation: substantially from the force structure on The Commission finds that the DoD the final selection criteria. The economic recommendation on realignment of these impact will not be severe. Therefore, the limited manpower authorizations did not Commission recommends the realignment deviate substantially from the force of Undergraduate Navigator Training and structure and the final selection criteria. the 323rd Flying Training Wing from Therefore, the Commission recommends Mather Air Force Base to Randolph Air the realignment of the 45 Air Force Audit Force Base, California. Agency manpower authorizations from Norton Air Force Base to the National Capital Region and the transfer of 139 manpower authorizations from Norton Air March Air Force Base, Force Base to March Air Force Base. California Category: Flying/Strategic Mission: Air Refueling, KC-10 5-65 Mather Air Force Base, California Mountain Home Air Force Category: Flying/Training Mission: Navigator Training, T-43 and T-37 Base, Idaho Category: Flying/Tactical Department of Defense Mission: Tactical Fighter and Electronic Warfare, F-111 and Recommendation: EF-111 Realign the 940th Air Refueling Group from Mather Air Force Base to Department of Defense McClellan Air Force Base. Leave the Recommendation: 323rd Flying Training Wing Hospital open Realign the remaining F-4G aircraft as an annex to McClellan Air Force Base to the Idaho and Nevada Air National instead of leaving the 940th Air Refueling Guard; inactivate the 35th Tactical Group at Mather Air Force Base and Training Wing; maintain the 41st closing the 323rd Flying Training Wing Electronic Combat Squadron at Davis- Hospital, as recommended by the 1988 Monthan Air Force Base, Arizona; realign Commission on Base Realignment and the EF-111 aircraft assigned from Closure. Mountain Home Air Force Base to Cannon Air Force Base, New Mexico. Establish a Commission Findings and composite wing at Mountain Home. Recommendation: The Commission finds that the DoD Commission Findings and recommendation did not deviate Recommendation: substantially from the force-structure and The Commission finds that the DoD final selection criteria. Therefore, the recommendation did not deviate Commission recommends the realignment substantially from the force-structure plan of the 940th Air Refueling Group from and the final selection criteria. Therefore, Mather Air Force Base to McClellan Air the Commission recommends the Force Base and the retention of the 323rd following: Realign the remaining F-4G Flying Training Wing Hospital as an annex aircraft to the Idaho and Nevada Air to McClellan Air Force Base. National Guard; inactivate the 35th 5-66 Tactical Training Wing; maintain the 41st Electronic Combat Squadron at Davis- Monthan Air Force Base, Arizona; realign the EF-111 aircraft assigned from Mountain Home Air Force Base to Cannon Air Force Base, New Mexico. Establish a composite wing at Mountain Home. 5-67 Communities and Base Reuse Chapter 6: Communities will have a wide range of experiences in developing reuse proposals. Even as the Commission conducted its review, a few communities were already developing plans for reusing base facilities. While short-term economic Communities impacts from base closures are unavoidable, communities can take steps to mitigate these impacts and use the former base to stimulate and Base new economic growth. Full economic recovery from base Reuse closure is dependent upon timely disposition of the facilities and land vacated by the services. The Secretary of Defense should do everything in his power to ensure a timely transfer of these valuable assets to the local communities. Mobilizing for Reuse Reusing former military base property offers communities the best opportunity to rebuild their economies. The buildings and facilities can fill residential, commercial, and industrial needs and thus can replace jobs and income lost. Airfields are especially marketable because of the national shortage of available hangar space. Several communities that lost bases as a result of the 1988 base-closing commission 6-1 Defense Base Closure and Realignment Commission have taken advantage of this opportunity for creativity present in a community. a quick economic turnaround. Attracting permanent tenants for the property, once disposal occurs, is an integral Economic part of a community's strategy for economic recovery. Adjustment Successes can result from two things: early creation of an organization to plan and Assistance implement a suitable base reuse strategy, and aggressive marketing of base assets and available facilities. DoD created the Economic DoD's Office of Economic Adjustment Program for this purpose in Adjustment (OEA) surveyed reuse of closed May 1961. Since 1970, DoD has rendered military installations between 1961 and 1990 adjustment assistance through the President's and concluded that 158,000 new jobs had Economic Adjustment Committee (EAC), been created to replace 93,000 jobs lost as a which is composed of 18 federal result of base closures. departments and agencies and chaired by the There are six steps that communities Secretary of Defense. can take in preparing a strategy for reusing EAC works with representatives of a closed installation: local, state and federal agencies to develop Form a reuse committee strategies and coordinate action plans that Work with federal and state will generate new job opportunities and to representatives alleviate the social and economic impacts Maintain close relations with DoD resulting from DoD program changes. To Be active in the planning process assist communities, the Secretary of Defense Use federal and state programs can make grants to qualified local Hire experts to fill any gaps in government entities for development of your professional staff. community-adjustment plans. Each community will have unique The transition period (often three to five opportunities and constraints. The successful years) in securing new civilian uses can be implementation of any base-reuse strategy difficult for many communities. But the hinges upon harnessing the energy and 6-2 Communities and Base Reuse difficult for many communities. But the restoration process and thereby speed local experience of communities affected by economic recovery. earlier base closures clearly indicates communities can adjust successfully. DoD is forming a task force to report More recently, OEA has been working on ways to improve interagency with 21 communities that are near bases coordination of environmental- recommended for closure by the 1988 Base response actions; streamline and Closure and Realignment Commission. consolidate regulations, practices, and OEA has provided $1.6 million in grants to policies; and improve environmental the affected communities to help develop restoration at closing bases. reuse plans and is working through the EAC DoD has established a model program to help these communities implement their that will test ways of expediting reuse plans. cleanup and accelerating the contracting process. The program will also probe alternatives that will help Environmental Restoration avoid disputes, concurrent regulatory review, and options for local reuse at Closing Bases while cleanup is in progress. DoD is reemphasizing ongoing DoD is obligated under the Defense efforts, including expanded use of Environmental Restoration Program and the interagency agreements that detail Comprehensive Environmental Response, restorations at National Priority List Compensation and Liability Act to restore sites and memoranda of agreement contaminated sites on military bases. between DoD and states for resolving Within the capabilities of technology technical disputes at National Priority and the availability of funds, DoD is List sites. committed to restoring closing bases to safe condition. The Department of Defense Base Closure Account 1990 can be used to fund Homeowners Assistance this environmental restoration. DoD also has several initiatives Program under way to expedite the environmental 6-3 Defense Base Closure and Realignment Commission The Homeowners Assistance Program, in operation since 1966, assists DoD military The Displaced Employee Program and civilian employees who are forced to provides for priority placement referral of move as a result of a base closure. separated employees to other federal The government helps eligible employees agencies. In addition, DoD and the Office of who cannot sell their homes within a Personnel Management have initiated a reasonable amount of time by either buying project to link data systems. Upon their homes for 75 percent of the pre- completion, the linked systems will support closure-announcement value or reimbursing a significantly expanded Defense Referral them for most of the lost equity should the System. homeowners sell the house for less than the The communities that will lose bases as a value before the closure was announced. result of the 1991 closure and realignment The program also provides relief for process face an uncertain future. Local displaced employees facing foreclosure. leaders, with the assistance of federal and The program is initially funded with state agencies, can steer a path from appropriated funds; however, proceeds from economic dislocation to economic growth. the sale or rental of government-purchased houses replenish the fund. Civilian Employee Assistance The DoD Priority Placement Program is another program that was originally established to help DoD civilian employees adjust to the base closures of the 1960s. A state-of-the-art automated referral is currently in operation. In the years since its inception, the referral system has helped more than 98,000 employees find new assignments. This cost-effective system supports the Priority Placement Program. 6-4 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1808 PUBLIC LAW 101-510-NOV. 5, 1990 TITLE XXIX-DEFENSE BASE CLOSURES AND REALIGNMENTS Defense Base PART A-DEFENSE BASE CLOSURE AND REALIGNMENT COMMISSION Closure and Realignment Act SEC. 2901. SHORT TITLE AND PURPOSE of 1990. 10 USC 2687 (a) SHORT TITLE.-This part may be cited as the "Defense Base note. Closure and Realignment Act of 1990". (b) PURPOSE.-The purpose of this part is to provide a fair process that will result in the timely closure and realignment of military installations inside the United States. 10 USC 2687 SEC. 2902. THE COMMISSION note. (a) ESTABLISHMENT.-There is established an independent commis- sion to be known as the "Defense Base Closure and Realignment Commission". (b) DUTIES.-The Commission shall carry out the duties specified for it in this part. (c) APPOINTMENT.-(1)(A) The Commission shall be composed of eight members appointed by the President, by and with the advise and consent of the Senate. President. (B) The President shall transmit to the Senate the nominations for appointment to the Commission- (i) by no later than January 3, 1991, in the case of members of the Commission whose terms will expire at the end of the first session of the 102nd Congress; (ii) by no later than January 25, 1993, in the case of members of the Commission whose terms will expire at the end of the first session of the 103rd Congress; and (iii) by no later than January 3, 1995, in the case of members of the Commission whose terms will expire at the end of the first session of the 104th Congress. (2) In selecting individuals for nominations for appointments to the Commission, the President should consult with- (A) the Speaker of the House of Representatives concerning the appointment of two members; (B) the majority leader of the Senate concerning the appoint- ment of two members; (C) the minority leader of the House of Representatives concerning the appointment of one member; and (D) the minority leader of the Senate concerning the appoint- ment of one member. (3) At the time the President nominates individuals for appoint- ment to the Commission for each session of Congress referred to in paragraph (1)(B), the President shall designate one such individual who shall serve as Chairman of the Commission. (d) TERMS.-(1) Except as provided in paragraph (2), each member of the Commission shall serve until the adjournment of Congress sine die for the session during which the member was appointed to the Commission. (2) The Chairman of the Commission shall serve until the con- firmation of a successor. (e) MEETINGS.-(1) The Commission shall meet only during cal- endar years 1991, 1993, and 1995. Public (2)(A) Each meeting of the Commission, other than meetings in information. which classified information is to be discussed, shall be open to the public. A-1 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1809 (B) All the proceedings, information, and deliberations of the Commission shall be open, upon request, to the following: (i) The Chairman and the ranking minority party member of the Subcommittee on Readiness, Sustainability, and Support of the Committee on Armed Services of the Senate, or such other members of the Subcommittee designated by such Chairman or ranking minority party member. (ii) The Chairman and the ranking minority party member of the Subcommittee on Military Installations and Facilities of the Committee on Armed Services of the House of Representatives, or such other members of the Subcommittee designated by such Chairman or ranking mincrity party member. (iii) The Chairmen and ranking minority party members of the Subcommittees on Military Construction of the Committees on Appropriations of the Senate and of the House of Represent- atives, or such other members of the Subcommittees designated (f) VACANCIES.-A vacancy in the Commission shall be filled in the by such Chairmen or ranking minority party members. same manner as the original appointment, but the individual ap- pointed to fill the vacancy shall serve only for the unexpired portion of the term for which the individual's predecessor was appointed. the Chairman, shall be paid at a rate equal to the daily equivalent of (g) PAY AND TRAVEL EXPENSES.-(1)(A) Each member, other than the minimum annual rate of basic pay payable for level IV of the Executive Schedule under section 5315 of title 5, United States Code, for each day (including travel time) during which the member is engaged in the actual performance of duties vested in the Commis- sion. (B) The Chairman shall be paid for each day referred to in subparagraph (A) at a rate equal to the daily equivalent of the minimum annual rate of basic pay payable for level III of the Executive Schedule under section 5314 of title 5, United States Code. (2) Members shall receive travel expenses, including per diem in lieu of subsistence, in accordance with sections 5702 and 5703 of title 5, United States Code. (h) DIRECTOR OF STAFF.-(1) The Commission shall, without regard to section 5311(b) of title 5, United States Code, appoint a Director who has not served on active duty in the Armed Forces or as a civilian employee of the Department of Defense during the one-year period preceding the date of such appointment. (2) The Director shall be paid at the rate of basic pay payable for level IV of the Executive Schedule under section 5315 of title 5, United States Code. (i) STAFF.-(1) Subject to paragraphs (2) and (3), the Director, with the approval of the Commission, may appoint and fix the pay of additional personnel. (2) The Director may make such appointments without regard to the provisions of title 5, United States Code, governing appoint- ments in the competitive service, and any personnel so appointed may be paid without regard to the provisions of chapter 51 and subchapter III of chapter 53 of that title relating to classification and General Schedule pay rates, except that an individual so ap- pointed may not receive pay in excess of the annual rate of basic pay payable for GS-18 of the General Schedule. (3) Not more than one-third of the personnel employed by or detailed to the Commission may be on detail from the Department of Defense. A-2 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1810 PUBLIC LAW 101-510-NOV. 5, 1990 (4) Upon request of the Director, the head of any Federal depart- ment or agency may detail any of the personnel of that department or agency to the Commission to assist the Commission in carrying out its duties under this part. assistance, including the detailing of employees, to the Commission (5) The Comptroller General of the United States shall provide in accordance with an agreement entered into with the Commission. tract, to the extent funds are available, the temporary or intermit- (j) OTHER AUTHORITY.-(1) The Commission may procure by con- tent services of experts or consultants pursuant to section 3109 of title 5, United States Code. (2) The Commission may lease space and acquire personal prop- erty to the extent funds are available. Commission such funds as are necessary to carry out its duties (k) FUNDING.-(1) There are authorized to be appropriated to the under this part. Such funds shall remain available until expended. the second session of the 101st Congress, the Secretary of Defense (2) If no funds are appropriated to the Commission by the end of transfer, for fiscal year 1991, to the Commission funds from the Department may of Defense Base Closure Account established by section until 207 of Public Law 100-526. Such funds shall remain available expended. (1) TERMINATION.-The Commission shall terminate on December 31, 1995. 10 USC 2687 SEC. 2903. PROCEDURE FOR MAKING RECOMMENDATIONS FOR BASE note. CLOSURES AND REALIGNMENTS documents submitted to Congress in support of the budget for and (a) FORCE-STRUCTURE PLAN.-(1) As part of the budget justification the Department of Defense for each of the fiscal years 1992, 1994, the Armed Forces based on an assessment by the Secretary of 1996, the Secretary shall include a force-structure plan for the probable threats to the national security during the six-year period made beginning with the fiscal year for which the budget request is for and of the anticipated levels of funding that will be available national defense purposes during such period. (2) Such plan shall include, without any reference (directly that or indirectly) to military installations inside the United States may be closed or realigned under such plan- (A) a description of the assessment referred to in paragraph (1); (B) a description (i) of the anticipated force structure during and at the end of each such period for each military department the (with specifications of the number and type of units in of the units that will need to be forward based (with a justification active and reserve forces of each such department), and (ii) thereof) during and at the end of each such period; and (C) a description of the anticipated implementation of such (3) The Secretary shall also transmit a copy of each such force- force-structure plan. structure plan to the Commission. Federal December 31, 1990, publish in the Federal Register and transmit be (b) SELECTION CRITERIA.-(1) The Secretary shall, by no later than to Register, publication. the congressional defense committees the criteria proposed to for used by the Department of Defense in making recommendations the the closure or realignment of military installations inside United States under this part. The Secretary shall provide an A-3 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1811 opportunity for public comment on the proposed criteria for a period of at least 30 days and shall include notice of that opportunity in the publication required under the preceding sentence. (2)(A) The Secretary shall, by no later than February 15, 1991, Federal publish in the Federal Register and transmit to the congressional Register, publication. defense committees the final criteria to be used in making rec- ommendations for the closure or realignment of military installa- tions inside the United States under this part. Except as provided in subparagraph (B), such criteria shall be the final criteria to be used, along with the force-structure plan referred to in subsection (a), in making such recommendations unless disapproved by a joint resolu- tion of Congress enacted on or before March 15, 1991. (B) The Secretary may amend such criteria, but such amendments may not become effective until they have been published in the Federal Register, opened to public comment for at least 30 days, and then transmitted to the congressional defense committees in final form by no later than February 15 of the year concerned. Such amended criteria shall be the final criteria to be used, along with the force-structure plan referred to in subsection (a), in making such recommendations unless disapproved by a joint resolution of Con- gress enacted on or before March 15 of the year concerned. (c) DOD RECOMMENDATIONS.-(1) The Secretary may, by no later Federal than April 15, 1991, April 15, 1993, and April 15, 1995, publish in the Register, publication. Federal Register and transmit to the congressional defense commit- tees and to the Commission a list of the military installations inside the United States that the Secretary recommends for closure or realignment on the basis of the force-structure plan and the final criteria referred to in subsection (b)(2) that are applicable to the year concerned. (2) The Secretary shall include, with the list of recommendations published and transmitted pursuant to paragraph (1), a summary of the selection process that resulted in the recommendation for each installation, including a justification for each recommendation. (3) In considering military installations for closure or realign- ment, the Secretary shall consider all military installations inside the United States equally without regard to whether the installation has been previously considered or proposed for closure or realign- ment by the Department. (4) The Secretary shall make available to the Commission and the Comptroller General of the United States all information used by the Department in making its recommendations to the Commission for closures and realignments. (d) REVIEW AND RECOMMENDATIONS BY THE COMMISSION.-(1) After Public information. receiving the recommendations from the Secretary pursuant to subsection (c) for any year, the Commission shall conduct public hearings on the recommendations. (2)(A) The Commission shall, by no later than July 1 of each year Reports. in which the Secretary transmits recommendations to it pursuant to subsection (c), transmit to the President a report containing the Commission's findings and conclusions based on a review and analy- sis of the recommendations made by the Secretary, together with the Commission's recommendations for closures and realignments of military installations inside the United States. (B) In making its recommendations, the Commission may make changes in any of the recommendations made by the Secretary if the Commission determines that the Secretary deviated substantially A-4 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1812 PUBLIC LAW 101-510-NOV. 5, 1990 from the force-structure plan and final criteria referred to in subsec- tion (c)(1) in making recommendations. (3) The Commission shall explain and justify in its report submit- ted to the President pursuant to paragraph (2) any recommendation made by the Commission that is different from the recommenda- tions made by the Secretary pursuant to subsection (c). The Commis- sion shall transmit a copy of such report to the congressional defense committees on the same date on which it transmits its recommendations to the President under paragraph (2). (4) After July 1 of each year in which the Commission transmits recommendations to the President under this subsection, the Commission shall promptly provide, upon request, to any Member of Congress information used by the Commission in making its rec- ommendations. Reports. (5) The Comptroller General of the United States shall- (A) assist the Commission, to the extent requested, in the Commission's review and analysis of the recommendations made by the Secretary pursuant to subsection (c); and (B) by no later than May 15 of each year in which the Secretary makes such recommendations, transmit to the Con- gress and to the Commission a report containing a detailed analysis of the Secretary's recommendations and selection Reports. (e) process. REVIEW BY THE PRESIDENT.-(1) The President shall, by no later than July 15 of each year in which the Commission makes rec- ommendations under subsection (d), transmit to the Commission and to the Congress a report containing the President's approval or disapproval of the Commission's recommendations. (2) If the President approves all the recommendations of the Commission, the President shall transmit a copy of such rec- ommendations to the Congress, together with a certification of such approval. (3) If the President disapproves the recommendations of the Commission, in whole or in part, the President shall transmit to the Commission and the Congress the reasons for that disapproval. The Commission shall then transmit to the President, by no later than August 15 of the year concerned, a revised list of recommendations for the closure and realignment of military installations. (4) If the President approves all of the revised recommendations of the Commission transmitted to the President under paragraph (3), the President shall transmit a copy of such revised recommenda- tions to the Congress, together with a certification of such approval. (5) If the President does not transmit to the Congress an approval and certification described in paragraph (2) or (4) by September 1 of any year in which the Commission has transmitted recommenda- tions to the President under this part, the process by which military installations may be selected for closure or realignment under this part with respect to that year shall be terminated. 10 USC 2687 SEC. 2904. CLOSURE AND REALIGNMENT OF MILITARY INSTALLATIONS note. (a) IN GENERAL.-Subject to subsection (b), the Secretary shall- (1) close all military installations recommended for closure by the Commission in each report transmitted to the Congress by the President pursuant to section 2903(e); (2) realign all military installations recommended for realign- ment by such Commission in each such report; A-5 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1813 (3) initiate all such closures and realignments no later than two years after the date on which the President transmits a report to the Congress pursuant to section 2903(e) containing the recommendations for such closures or realignments; and (4) complete all such closures and realignments no later than the end of the six-year period beginning on the date on which the President transmits the report pursuant to section 2903(e) containing the recommendations for such closures or (b) realignments. CONGRESSIONAL DISAPPROVAL.-(1) The Secretary may not carry out any closure or realignment recommended by the Commis- sion in a report transmitted from the President pursuant to section 2903(e) if a joint resolution is enacted, in accordance with the provisions of section 2908, disapproving such recommendations of the Commission before the earlier of- (A) the end of the 45-day period beginning on the date on which the President transmits such report; or (B) the adjournment of Congress sine die for the session during which such report is transmitted. (2) For purposes of paragraph (1) of this subsection and subsections (a) and (c) of section 2908, the days on which either House of Congress is not in session because of an adjournment of more than three days to a day certain shall be excluded in the computation of a period. 10 USC 2687 SEC. 2905. IMPLEMENTATION note. (a) IN GENERAL.-(1) In closing or realigning any military installa- tion under this part, the Secretary may- (A) take such actions as may be necessary to close or realign any military installation, including the acquisition of such land, the construction of such replacement facilities, the performance of such activities, and the conduct of such advance planning and design as may be required to transfer functions from a military installation being closed or realigned to another military installation, and may use for such purpose funds in the Account or funds appropriated to the Department of Defense for use in planning and design, minor construction, or operation and maintenance; Community (B) provide- (i) economic adjustment assistance to any community action programs. located near a military installation being closed or re- aligned, and (ii) community planning assistance to any community located near a military installation to which functions will be transferred as a result of the closure or realignment of a military installation, if the Secretary of Defense determines that the financial re- sources available to the community (by grant or otherwise) for such purposes are inadequate, and may use for such purposes funds in the Account or funds appropriated to the Department of Defense for economic adjustment assistance or community planning assistance; (C) carry out activities for the purposes of environmental Environmental restoration and mitigation at any such installation, and may protection. use for such purposes funds in the Account or funds appro- priated to the Department of Defense for environmental res- toration and mitigation; A-6 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1814 PUBLIC LAW 101-510-NOV. 5, 1990 (D) provide outplacement assistance to civilian employees employed by the Department of Defense at military installa- tions being closed or realigned, and may use for such purpose funds in the Account or funds appropriated to the Department of Defense for outplacement assistance to employees; and (E) reimburse other Federal agencies for actions performed at the request of the Secretary with respect to any such closure or realignment, and may use for such purpose funds in the Ac- count or funds appropriated to the Department of Defense and available for such purpose. Environmental (2) In carrying out any closure or realignment under this part, the protection. Secretary shall ensure that environmental restoration of any prop- erty made excess to the needs of the Department of Defense as a result of such closure or realignment be carried out as soon as possible with funds available for such purpose. (b) MANAGEMENT AND DISPOSAL OF PROPERTY.-(1) The Adminis- trator of General Services shall delegate to the Secretary of Defense, with respect to excess and surplus real property and facilities located at a military installation closed or realigned under this part- (A) the authority of the Administrator to utilize excess prop- erty under section 202 of the Federal Property and Administra- tive Services Act of 1949 (40 U.S.C. 483); (B) the authority of the Administrator to dispose of surplus property under section 203 of that Act (40 U.S.C. 484); (C) the authority of the Administrator to grant approvals and make determinations under section 13(g) of the Surplus Prop- erty Act of 1944 (50 U.S.C. App. 1622(g)); and (D) the authority of the Administrator to determine the avail- ability of excess or surplus real property for wildlife conserva- tion purposes in accordance with the Act of May 19, 1948 (16 U.S.C. 667b). (2)(A) Subject to subparagraph (C), the Secretary of Defense shall exercise the authority delegated to the Secretary pursuant to para- graph (1) in accordance with- (i) all regulations in effect on the date of the enactment of this Act governing the utilization of excess property and the disposal of surplus property under the Federal Property and Administra- tive Services Act of 1949; and (ii) all regulations in effect on the date of the enactment of this Act governing the conveyance and disposal of property under section 13(g) of the Surplus Property Act of 1944 (50 U.S.C. App. 1622(g)). (B) The Secretary, after consulting with the Administrator of General Services, may issue regulations that are necessary to carry out the delegation of authority required by paragraph (1). (C) The authority required to be delegated by paragraph (1) to the Secretary by the Administrator of General Services shall not in- clude the authority to prescribe general policies and methods for utilizing excess property and disposing of surplus property. (D) The Secretary of Defense may transfer real property or facili- ties located at a military installation to be closed or realigned under this part, with or without reimbursement, to a military department or other entity (including a nonappropriated fund instrumentality) within the Department of Defense or the Coast Guard. (E) Before any action may be taken with respect to the disposal of any surplus real property or facility located at any military installa- A-7 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1815 tion to be closed or realigned under this part, the Secretary of Defense shall consult with the Governor of the State and the heads of the local governments concerned for the purpose of considering any plan for the use of such property by the local community concerned. (c) APPLICABILITY OF NATIONAL ENVIRONMENTAL POLICY ACT OF 1969.-(1) The provisions of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall not apply to the actions of the President, the Commission, and, except as provided in paragraph (2), the Department of Defense in carrying out this part. (2)(A) The provisions of the National Environmental Policy Act of 1969 shall apply to actions of the Department of Defense under this part (i) during the process of property disposal, and (ii) during the process of relocating functions from a military installation being closed or realigned to another military installation after the receiv- ing installation has been selected but before the functions are relocated. (B) In applying the provisions of the National Environmental Policy Act of 1969 to the processes referred to in subparagraph (A), the Secretary of Defense and the Secretary of the military depart- ments concerned shall not have to consider- (i) the need for closing or realigning the military installation which has been recommended for closure or realignment by the Commission; (ii) the need for transferring functions to any military installation which has been selected as the receiving installa- tion; or (iii) military installations alternative to those recommended or selected. (3) A civil action for judicial review, with respect to any require- ment of the National Environmental Policy Act of 1969 to the extent such Act is applicable under paragraph (2), of any act or failure to act by the Department of Defense during the closing, realigning, or relocating of functions referred to in clauses (i) and (ii) of paragraph (2)(A), may not be brought more than 60 days after the date of such act or failure to act. (d) WAIVER.-The Secretary of Defense may close or realign mili- tary installations. under this part without regard to- (1) any provision of law restricting the use of funds for closing or realigning military installations included in any appropria- tions or authorization Act; and (2) sections 2662 and 2687 of title 10, United States Code. 10 USC 2687 SEC. 2906. ACCOUNT note. (a) IN GENERAL.-(1) There is hereby established on the books of the Treasury an account to be known as the "Department of Defense Base Closure Account 1990" which shall be administered by the Secretary as a single account. (2) There shall be deposited into the Account- (A) funds authorized for and appropriated to the Account; (B) any funds that the Secretary may, subject to approval in an appropriation Act, transfer to the Account from funds appro- priated to the Department of Defense for any purpose, except that such funds may be transferred only after the date on which the Secretary transmits written notice of, and justification for, such transfer to the congressional defense committees; and A-8 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1816 PUBLIC LAW 101-510-NOV. 5, 1990 (C) proceeds received from the transfer or disposal of any property at a military installation closed or realigned under this (b) part. USE OF FUNDS.-(1) The Secretary may use the funds in the Account only for the purposes described in section 2905(a). (2) When a decision is made to use funds in the Account to carry out a construction project under section 2905(a) and the cost of the project will exceed the maximum amount authorized by law for a minor military construction project, the Secretary shall notify in writing the congressional defense committees of the nature of, and justification for, the project and the amount of expenditures for such project. Any such construction project may be carried out without regard to section 2802(a) of title 10, United States Code. (c) REPORTS.-(1) No later than 60 days after the end of each fiscal year in which the Secretary carries out activities under this part, the Secretary shall transmit a report to the congressional defense committees of the amount and nature of the deposits into, and the expenditures from, the Account during such fiscal year and of the amount and nature of other expenditures made pursuant to section 2905(a) during such fiscal year. (2) Unobligated funds which remain in the Account after the termination of the Commission shall be held in the Account until transferred by law after the congressional defense committees re- ceive the report transmitted under paragraph (3). (3) No later than 60 days after the termination of the Commission, the Secretary shall transmit to the congressional defense commit- tees a report containing an accounting of- (A) all the funds deposited into and expended from the Ac- count or otherwise expended under this part; and (B) any amount remaining in the Account. 10 USC 2687 SEC. 2907. REPORTS note. As part of the budget request for fiscal year 1993 and for each fiscal year thereafter for the Department of Defense, the Secre- tary shall transmit to the congressional defense committees of Congress- (1) a schedule of the closure and realignment actions to be carried out under this part in the fiscal year for which the request is made and an estimate of the total expenditures required and cost savings to be achieved by each such closure and realignment and of the time period in which these savings are to be achieved in each case, together with the Secretary's assessment of the environmental effects of such actions; and (2) a description of the military installations, including those under construction and those planned for construction, to which functions are to be transferred as a result of such closures and realignments, together with the Secretary's assessment of the environmental effects of such transfers. 10 USC 2687 SEC. 2908. CONGRESSIONAL CONSIDERATION OF COMMISSION REPORT note. (a) TERMS OF THE RESOLUTION.-For purposes of section 2904(b), the term "joint resolution" means only a joint resolution which is introduced within the 10-day period beginning on the date on which the President transmits the report to the Congress under section 2903(e), and- (1) which does not have a preamble; A-9 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1817 (2) the matter after the resolving clause of which is as follows: "That Congress disapproves the recommendations of the De- fense Base Closure and Realignment Commission as submitted by the President on -", the blank space being filled in with the appropriate date; and (3) the title of which is as follows: "Joint resolution disapprov- ing the recommendations of the Defense Base Closure and Realignment Commission.". (b) REFERRAL.-A resolution described in subsection (a) that is introduced in the House of Representatives shall be referred to the Committee on Armed Services of the House of Representatives. A resolution described in subsection (a) introduced in the Senate shall be referred to the Committee on Armed Services of the Senate. (c) DISCHARGE.-If the committee to which a resolution described in subsection (a) is referred has not reported such resolution (or an identical resolution) by the end of the 20-day period beginning on the date on which the President transmits the report to the Con- gress under section 2903(e), such committee shall be, at the end of such period, discharged from further consideration of such resolu- tion, and such resolution shall be placed on the appropriate calendar of the House involved. (d) CONSIDERATION.-(1) On or after the third day after the date on which the committee to which such a resolution is referred has reported, or has been discharged (under subsection (c)) from further consideration of, such a resolution, it is in order (even though a previous motion to the same effect has been disagreed to) for any Member of the respective House to move to proceed to the consider- ation of the resolution (but only on the day after the calendar day on which such Member announces to the House concerned the Mem- ber's intention to do so). All points of order against the resolution (and against consideration of the resolution) are waived. The motion is highly privileged in the House of Representatives and is privi- leged in the Senate and is not debatable. The motion is not subject to amendment, or to a motion to postpone, or to a motion to proceed to the consideration of other business. A motion to reconsider the vote by which the motion is agreed to or disagreed to shall not be in order. If a motion to proceed to the consideration of the resolution is agreed to, the respective House shall immediately proceed to consid- eration of the joint resolution without intervening motion, order, or other business, and the resolution shall remain the unfinished business of the respective House until disposed of. (2) Debate on the resolution, and on all debatable motions and appeals in connection therewith, shall be limited to not more than 2 hours, which shall be divided equally between those favoring and those opposing the resolution. An amendment to the resolution is not in order. A motion further to limit debate is in order and not debatable. A motion to postpone, or a motion to proceed to the consideration of other business, or a motion to recommit the resolu- tion is not in order. A motion to reconsider the vote by which the resolution is agreed to or disagreed to is not in order. (3) Immediately following the conclusion of the debate on a resolu- tion described in subsection (a) and a single quorum call at the conclusion of the debate if requested in accordance with the rules of the appropriate House, the vote on final passage of the resolution shall occur. (4) Appeals from the decisions of the Chair relating to the applica- tion of the rules of the Senate or the House of Representatives, as A-10 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1818 PUBLIC LAW 101-510-NOV. 5, 1990 the case may be, to the procedure relating to a resolution described in subsection (a) shall be decided without debate. (e) CONSIDERATION BY OTHER HOUSE.-(1) If, before the passage by one House of a resolution of that House described in subsection (a), that House receives from the other House a resolution described in subsection (a), then the following procedures shall apply: (A) The resolution of the other House shall not be referred to a committee and may not be considered in the House receiving it except in the case of final passage as provided in subpara- graph (B)(ii). (B) With respect to a resolution described in subsection (a) of the House receiving the resolution- (i) the procedure in that House shall be the same as if no resolution had been received from the other House; but (ii) the vote on final passage shall be on the resolution of the other House. (2) Upon disposition of the resolution received from the other House, it shall no longer be in order to consider the resolution that originated in the receiving House. (f) RULES OF THE SENATE AND HOUSE.-This section is enacted by Congress- (1) as an exercise of the rulemaking power of the Senate and House of Representatives, respectively, and as such it is deemed a part of the rules of each House, respectively, but applicable only with respect to the procedure to be followed in that House in the case of a resolution described in subsection (a), and it supersedes other rules only to the extent that it is inconsistent with such rules; and (2) with full recognition of the constitutional right of either House to change the rules (so far as relating to the procedure of that House) at any time, in the same manner, and to the same extent as in the case of any other rule of that House. 10 USC 2687 SEC. 2909. RESTRICTION ON OTHER BASE CLOSURE AUTHORITY note. (a) IN GENERAL-Except as provided in subsection (c), during the period beginning on the date of the enactment of this Act and ending on December 31, 1995, this part shall be the exclusive authority for selecting for closure or realignment, or for carrying out any closure or realignment of, a military installation inside the United States. (b) RESTRICTION.-Except as provided in subsection (c), none of the funds available to the Department of Defense may be used, other than under this part, during the period specified in subsection (a)- (1) to identify, through any transmittal to the Congress or through any other public announcement or notification, any military installation inside the United States as an installation to be closed or realigned or as an installation under consider- ation for closure or realignment; or (2) to carry out any closure or realignment of a military installation inside the United States. (c) EXCEPTION.-Nothing in this part affects the authority of the Secretary to carry out- (1) closures and realignments under title II of Public Law 100- 526; and (2) closures and realignments to which section 2687 of title 10, United States Code, is not applicable, including closures and A-11 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1819 realignments carried out for reasons of national security or a military emergency referred to in subsection (c) of such section. 10 USC 2687 SEC. 2910. DEFINITIONS note. As used in this part: Base Closure Account 1990 established by section 2906(a)(1). (1) The term "Account" means the Department of Defense (2) The term "congressional defense committees" means the Committees on Armed Services and the Committees on Appro- priations of the Senate and of the House of Representatives. (3) The term "Commission" means the Commission estab- lished by section 2902. (4) The term "military installation" means a base, camp, post, station, yard, center, homeport facility for any ship, or other activity under the jurisdiction of the Department of Defense, including any leased facility. (5) The term "realignment" includes any action which both reduces and relocates functions and civilian personnel positions but does not include a reduction in force resulting from work- load adjustments, reduced personnel or funding levels, or skill imbalances. (6) The term "Secretary" means the Secretary of Defense. (7) The term "United States" means the 50 States, the District of Columbia, the Commonwealth of Puerto Rico, Guam, the Virgin Islands, American Samoa, and any other commonwealth, territory, or possession of the United States. SEC. 2911. CLARIFYING AMENDMENT Section 2687(e)(1) of title 10, United States Code, is amended— (1) by inserting "homeport facility for any ship," after "center,"; and (2) by striking out "under the jurisdiction of the Secretary of a military department" and inserting in lieu thereof "under the jurisdiction of the Department of Defense, including any leased facility,". Part B-Other Provisions Relating to Defense Base Closures and Realignments SEC. 2921. CLOSURE OF FOREIGN MILITARY INSTALLATIONS 10 USC 2687 note. (a) SENSE OF CONGRESS.-It is the sense of the Congress that- (1) the termination of military operations by the United States at military installations outside the United States should be accomplished at the discretion of the Secretary of Defense at the earliest opportunity; (2) in providing for such termination, the Secretary of Defense should take steps to ensure that the United States receives, through direct payment or otherwise, consideration equal to the fair market value of the improvements made by the United States at facilities that will be released to host countries; (3) the Secretary of Defense, acting through the military component commands or the sub-unified commands to the combatant commands, should be the lead official in negotiations relating to determining and receiving such consideration; and (4) the determination of the fair market value of such improvements released to host countries in whole or in part by A-12 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1820 PUBLIC LAW 101-510-NOV. 5, 1990 the United States should be handled on a facility-by-facility (b) basis. RESIDUAL VALUE.-(1) For each installation outside the United States at which military operations were being carried out by the United States on October 1, 1990, the Secretary of Defense shall transmit, by no later than June 1, 1991, an estimate of the fair market value, as of January 1, 1991, of the improvements made by the United States at facilities at each such installation. (2) For purposes of this section: (A) The term "fair market value of the improvements" means the value of improvements determined by the Secretary on the basis of their highest use. (B) The term "improvements" includes new construction of facilities and all additions, improvements, modifications, or ren- ovations made to existing facilities or to real property, without regard to whether they were carried out with appropriated or nonappropriated funds. (c) ESTABLISHMENT OF SPECIAL ACCOUNT.-(1) There is established on the books of the Treasury a special account to be known as the "Department of Defense Overseas Military Facility Investment Recovery Account". Any amounts paid to the United States, pursu- ant to any treaty, status of forces agreement, or other international agreement to which the United States is a party, for the residual value of real property or improvements to real property used by civilian or military personnel of the Department of Defense shall be deposited into such account. (2) Money deposited in the Department of Defense Overseas Mili- tary Facility Investment Recovery Account shall be available to the Secretary of Defense for payment, as provided in appropriation Acts, of costs incurred by the Department of Defense in connection with facility maintenance and repair and environmental restoration at military installations in the United States. Funds in the Account shall remain available until expended. SEC. 2922. MODIFICATION OF THE CONTENT OF BIANNUAL REPORT OF THE COMMISSION ON ALTERNATIVE UTILIZATION OF MILI- TARY FACILITIES (a) USES OF FACILITIES.-Section 2819(b) of the National Defense Authorization Act, Fiscal Year 1989 (Public Law 100-456; 102 Stat. 2119; 10 U.S.C. 2391 note) is amended— (1) in paragraph (2), by striking out "minimum security facili- ties for nonviolent prisoners" and inserting in lieu thereof "Federal confinement or correctional facilities including shock incarceration facilities"; (2) by striking out "and" at the end of paragraph (3); (3) by redesignating paragraph (4) as paragraph (5); and (4) by inserting after paragraph (3) the following new para- graph (4): "(4) identify those facilities, or parts of facilities, that could be effectively utilized or renovated to meet the needs of States and local jurisdictions for confinement or correctional facilities; 10 USC 2391 (b) and". EFFECTIVE DATE.-The amendments made by subsection (a) note. shall take effect with respect to the first report required to be submitted under section 2819 the National Defense Authorization Act, Fiscal Year 1989, after September 30, 1990. A-13 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1821 SEC. 2923. FUNDING FOR ENVIRONMENTAL RESTORATION AT MILITARY INSTALLATIONS SCHEDULED FOR CLOSURE INSIDE THE UNITED STATES (a) AUTHORIZATION OF APPROPRIATIONS.-There is hereby au- thorized to be appropriated to the Department of Defense Base Closure Account for fiscal year 1991, in addition to any other funds authorized to be appropriated to that account for that fiscal year, the sum of $100,000,000. Amounts appropriated to that account pursuant to the preceding sentence shall be available only for activities for the purpose of environmental restoration at military installations closed or realigned under title II of Public Law 100-526, as authorized under section 204(a)(3) of that title. (b) EXCLUSIVE SOURCE OF FUNDING.-(1) Section 207 of Public Law 100-526 is amended by adding at the end the following: 10 USC 2687 "(b) BASE CLOSURE ACCOUNT To BE EXCLUSIVE SOURCE OF FUNDS note. FOR ENVIRONMENTAL RESTORATION PROJECTS.-No funds appro- priated to the Department of Defense may be used for purposes described in section 204(a)(3) except funds that have been authorized for and appropriated to the Account. The prohibition in the preced- ing sentence expires upon the termination of the authority of the Secretary to carry out a closure or realignment under this title.". (2) The amendment made by paragraph (1) does not apply with respect to the availability of funds appropriated before the date of the enactment of this Act. (c) TASK FORCE REPORT.-(1) Not later than 12 months after the 10 USC 2687 note. date of the enactment of this Act, the Secretary of Defense shall submit to Congress a report containing the findings and rec- ommendations of the task force established under paragraph (2) concerning— (A) ways to improve interagency coordination, within existing laws, regulations, and administrative policies, of environmental response actions at military installations (or portions of installa- tions) that are being closed, or are scheduled to be closed, pursuant to title II of the Defense Authorization Amendments and Base Closure and Realignment Act (Public Law 100-526); and (B) ways to consolidate and streamline, within existing laws and regulations, the practices, policies, and administrative procedures of relevant Federal and State agencies with respect to such environmental response actions so as to enable those actions to be carried out more expeditiously. (2) There is hereby established an environmental response task force to make the findings and recommendations, and to prepare the report, required by paragraph (1). The task force shall consist of the following (or their designees): (A) The Secretary of Defense, who shall be chairman of the task force. (B) The Attorney General. (C) The Administrator of the General Services Administra- tion. (D) The Administrator of the Environmental Protection Agency. (E) The Chief of Engineers, Department of the Army. (F) A representative of a State environmental protection agency, appointed by the head of the National Governors Association. A-14 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1822 PUBLIC LAW 101-510-NOV. 5, 1990 (G) A representative of a State attorney general's office, appointed by the head of the National Association of Attorney Generals. (H) A representative of a public-interest environmental organization, appointed by the Speaker of the House of Rep- resentatives. 10 USC 2687 SEC. 2924. COMMUNITY PREFERENCE CONSIDERATION IN CLOSURE AND note. REALIGNMENT OF MILITARY INSTALLATIONS In any process of selecting any military installation inside the United States for closure or realignment, the Secretary of Defense shall take such steps as are necessary to assure that special consid- eration and emphasis is given to any official statement from a unit of general local government adjacent to or within a military installation requesting the closure or realignment of such installa- tion. SEC. 2925. RECOMMENDATIONS OF THE BASE CLOSURE COMMISSION (a) NORTON AIR FORCE BASE.-(1) Consistent with the rec- ommendations of the Commission on Base Realignment and Closure, the Secretary of the Air Force may not relocate, until after September 30, 1995, any of the functions that were being carried out at the ballistics missile office at Norton Air Force Base, California, on the date on which the Secretary of Defense transmitted a report to the Committees on Armed Services of the Senate and House of Representatives as described in section 202(a)(1) of Public Law 100- 526. (2) This subsection shall take effect as of the date on which the report referred to in subsection (a) was transmitted to such Commit- tees. (b) GENERAL DIRECTIVE.-Consistent with the requirements of sec- tion 201 of Public Law 100-526, the Secretary of Defense shall direct each of the Secretaries of the military departments to take all actions necessary to carry out the recommendations of the Commis- sion on Base Realignment and Closure and to take no action that is inconsistent with such recommendations. 10 USC 2687 SEC. 2926. CONTRACTS FOR CERTAIN ENVIRONMENTAL RESTORATION note. ACTIVITIES (a) ESTABLISHMENT OF MODEL PROGRAM.-Not later than 90 days after the date of enactment of this Act, the Secretary of Defense shall establish a model program to improve the efficiency and effectiveness of the base closure environmental restoration program. (b) ADMINISTRATOR OF PROGRAM.-The Secretary shall designate the Deputy Assistant Secretary of Defense for Environment as the Administrator of the model program referred to in subsection (a). Reports. The Deputy Assistant Secretary shall report to the Secretary of Defense through the Under Secretary of Defense for Acquisition. (c) APPLICABILITY.-This section shall apply to environmental res- toration activities at installations selected by the Secretary pursu- ant to the provisions of subsection (d)(1). (d) PROGRAM REQUIREMENTS.-In carrying out the model program, the Secretary of Defense shall: (1) Designate for the model program two installations under his jurisdiction that have been designated for closure pursuant to the Defense Authorization Amendments and Base Closure and Realignment Act (Public Law 100-526) and for which A-15 Defense Base Closure and Realignment Commission PUBLIC LAW 101-510-NOV. 5, 1990 104 STAT. 1823 preliminary assessments, site inspections, and Environmental Impact Statements required by law or regulation have been completed. The Secretary shall designate only those installa- tions which have satisfied the requirements of section 204 of the Defense Authorization Amendments and Base Closure and Re- alignment Act (Public Law 100-526). (2) Compile a prequalification list of prospective contractors for solicitation and negotiation in accordance with the proce- dures set forth in title IX of the Federal Property and Adminis- trative Services Act (Public Law 92-582; 40 U.S.C. 541 et seq., as amended). Such contractors shall satisfy all applicable statutory and regulatory requirements. In addition, the contractor se- lected for one of the two installations under this program shall indemnify the Federal Government against all liabilities, claims, penalties, costs, and damages caused by (A) the contrac- tor's breach of any term or provision of the contract; and (B) any negligent or willful act or omission of the contractor, its employ- ees, or its subcontractors in the performance of the contract. (3) Within 180 days after the date of enactment of this Act, solicit proposals from qualified contractors for response action (as defined under section 101 of the Comprehensive Environ- mental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601)) at the installations designated under paragraph (1). Such solicitations and proposals shall include the following: (A) Proposals to perform response action. Such proposals shall include provisions for receiving the necessary authorizations or approvals of the response action by appro- priate Federal, State, or local agencies. (B) To the maximum extent possible, provisions offered by single prime contractors to perform all phases of the response action, using performance specifications supplied by the Secretary of Defense and including any safeguards the Secretary deems essential to avoid conflict of interest. (4) Evaluate bids on the basis of price and other evaluation criteria. (5) Subject to the availability of authorized and appropriated funds to the Department of Defense, make contract awards for response action within 120 days after the solicitation of propos- als pursuant to paragraph (3) for the response action, or within 120 days after receipt of the necessary authorizations or approv- als of the response action by appropriate Federal, State, or local agencies, whichever is later. (e) APPLICATION OF SECTION 120 OF CERCLA.-Activities of the model program shall be carried out subject to, and in a manner consistent with, section 120 (relating to Federal facilities) of the Comprehensive Environmental Response, Compensation, and Liabil- ity Act of 1980 (42 U.S.C. 9620). (f) EXPEDITED AGREEMENTS.-The Secretary shall, with the concur- rence of the Administrator of the Environmental Protection Agency, assure compliance with all applicable Federal statutes and regula- tions and, in addition, take all reasonable and appropriate measures to expedite all necessary administrative decisions, agreements, and concurrences. (g) REPORT.-The Secretary of Defense shall include a description of the progress made during the preceding fiscal year in implement- ing and accomplishing the goals of this section within the annual A-16 Appendix A: Title XXIX, Public Law 101-510 104 STAT. 1824 PUBLIC LAW 101-510-NOV. 5, 1990 report to Congress required by section 2706 of title 10, United States Code. (h) APPLICABILITY OF EXISTING LAW.-Nothing in this section af- fects or modifies, in any way, the obligations or liability of any person under other Federal or State law, including common law, with respect to the disposal or release of hazardous substances or pollutants or contaminants as defined under section 101 of the Comprehensive Environmental Response, Compensation, and Liabil- ity Act of 1980 (42 U.S.C. 9601). DIVISION C-OTHER NATIONAL DEFENSE AUTHORIZATIONS TITLE XXXI-DEPARTMENT OF ENERGY NATIONAL SECURITY PROGRAMS PART A-NATIONAL SECURITY PROGRAMS AUTHORIZATIONS SEC. 3101. OPERATING EXPENSES Funds are authorized to be appropriated to the Department of Energy for fiscal year 1991 for operating expenses incurred in carrying out national security programs (including scientific re- search and development in support of the Armed Forces, strategic and critical materials necessary for the common defense, and mili- tary applications of nuclear energy and related management and support activities) as follows: (1) For weapons activities, $3,795,381,000, to be allocated as follows: (A) For research and development, $1,092,218,000. (B) For weapons testing, $437,268,000. (C) For weapons safety, $160,000,000, to be derived from funds available under subparagraph (A) or (B) or both. (D) For production and surveillance, $2,161,180,000. (E) For program direction, $104,715,000. (2) For defense nuclear materials production, $1,892,770,000, to be allocated as follows: (A) For production reactor operations, $811,457,000. (B) For processing of defense nuclear materials, including naval reactors fuel, $628,969,000. (C) For supporting services, $292,043,000. (D) For uranium enrichment for naval reactors, $117,801,000. (E) For program direction, $42,500,000. (3) For verification and control technology, $181,484,000. (4) For nuclear materials safeguards and security technology development program, $83,934,000. (5) For security investigations, $65,000,000. (6) For new production reactors, $134,900,000. (7) For naval reactors development, $569,200,000. SEC. 3102. PLANT AND CAPITAL EQUIPMENT Funds authorized to be appropriated to the Department of Energy for are fiscal year 1991 for plant and capital equipment (includ- ing maintenance, restoration, planning, construction, acquisition, modification of facilities, and the continuation of projects authorized A-17 Force-Structure Summary Appendix B: Background Force- Public Law 101-510 required the Secretary of Defense to submit to the Structure Congress and to the Commission a force structure plan for fiscal years (FY) 1992 through 1997. The Secretary submitted the Summary plan to Congress on March 19, 1991, and to the Commission on March 23, 1991. The force-structure plan incorporates an assessment by the Secretary of the probable threats to the national security during the FY92-97 period and takes account of the anticipated levels of funding for this period. The plan comprises three sections: The military threat assessment, The need for overseas basing, and The force structure, including the implementation plan. The force-structure plan is classified SECRET. What follows is an unclassified summary of the plan. Military Threat Assessment (Note: Taken verbatim from Department of Defense Base Closure and Realignment Report, April 1991) For 40 years, the Soviet Union and its B-1 Defense Base Closure and Realignment Commission surrogates posed the principal threat to U.S. The Nuclear Threat. The most interests and objectives. However, enduring concern for U.S. America's security agenda is being rewritten leadership is that the Soviet Union because of the collapse of East European remains the one country in the communism, the demise of the Warsaw world capable of destroying the Pact, ongoing changes within the Soviet United States with a single, Union, the reshaping of the U.S.-Soviet devastating attack. However, the relationship, and a reduction in Soviet rationale for such an attack is conventional military power. This difficult to construe. Nevertheless, redefinition of our threat perception has until and unless the Soviet strategic been accelerated by the emergence and nuclear arsenal is vastly modified, intensification of both new and historical the cornerstone of U.S. military regional quarrels, one of which has already strategy must continue to be a brought the United States into armed conflict modern, credible, flexible, and in the Persian Gulf. Threats to U.S. interests survivable nuclear deterrent force. range from the enmity of nations like North The Conventional Threat. Even Korea and Cuba, to pressures from friend though Soviet military power is and foe alike to reduce U.S. presence reducing and changing in form and around the world. In addition, our efforts to purpose, the Soviet state still will promote regional stability and to enhance the have millions of well armed men in spread of democracy will continue to be uniform and will remain the challenged by insurgencies and terrorism. strongest military force on the Eurasian landmass. As leader of the Free World, the United States must Threats maintain, in conjunction with our allies, the conventional capability to counterbalance the might of the Even with the promise of a greatly Soviet Union's huge conventional reduced Soviet force posture in Eastern forces. Europe, certain crucial constants endure in our long-term assessment of Soviet military capability and global threats. B-2 Force-Structure Summary Across the Atlantic obligations will place continuing demands on our Armed Forces. Escort operations in the Persian Gulf, conducted for over two years, Looking eastward from our Atlantic established the precedent of U.S. military shore, the focus of U.S. security concern intervention to protect the free flow of oil. has shifted from Western Europe to the Then, just as the Soviets and the Iran-Iraq defense of both Europe and the Persian war receded as threats to regional stability, Gulf. With respect to Europe, the demise of Iraq emerged from eight years of war with the Warsaw Pact, Soviet retrenchment a fanatic zeal, a large arsenal, a shattered within its borders, German unification, and economy, overwhelming foreign debts, and the prospect of economic integration embody a trumped-up quarrel with Kuwait. Even the success of collective defense, as well as though Iraq has been ejected from Kuwait the imperatives for new approaches to by the United Nations-sponsored and U.S.- collective security. Although the prospect of led international coalition, the region still a concerted military threat to Western faces an uncertain future. We will maintain Europe from the east has faded dramatically, our commitment and expect to significantly continuing political and economic instability reduce, but not entirely eliminate, our forces in Eastern Europe and the Soviet Union in this region. presents new concerns. Consequently, we and our North Atlantic Treaty Organization Immediate security concerns for many (NATO) partners are conducting a thorough nations in Southwest Asia will be review of alliance strategy. The broad lessened because of the resounding outlines of a new force posture are already defeat of the Iraqi military during emerging and include highly mobile units, Operation Desert Storm. Over the some of which will be restructured into longer term, however, a number of multinational formations. The number of problems including the prospect of active units will be scaled back, and Iraqi rearmament, the Arab-Israeli increasing reliance will be placed on peace process, and subsequent mobilization and reconstitution. reconfiguration of regional security Looking across the Mediterranean to the arrangement, and relationships will Middle East and Persian Gulf, regional complicate defense planning and threats to U.S. vital interests and enduring shape strategic choices for all parties B-3 Defense Base Closure and Realignment Commission in the region. could initiate a gradual transition toward a While Iraq will require perhaps a partnership in which Republic of Korea decade to rebuild its military armed forces assume the leading role. capabilities to prehostilities levels, Should deterrence fail, however, in-place Baghdad will likely remain a and reinforcing U.S. forces would still be disruptive political force in the required. For the region as a whole, a region. The calculus of regional modest level of U.S. military presence-- security will shift as Western coalition principally maritime--will be essential to forces draw down and political preserve stability, encourage democracy, leaders are challenged to construct a and deter aggression. more stable and predictable regional environment. The prospect of regional instability will likely remain the chief cause of concern among most political The Rest of the World and military decision makers for at least the next two or three years. This broad characterization is not intended to either diminish or denigrate the importance of U.S. interests, friends, and Across the Pacific allies in regions beyond Europe, the Middle East, and the Pacific. Rather, the nature and The divided Korean peninsula stands in urgency of threats beyond those especially stark contrast to the dissipating Cold War in compelling locales are such that the threats Europe. However, the U.S. security burden can be dealt with by a judicious mix of is being eased by the continuing surge of active forces adequate to protect the most democracy, economic growth, and military vital U.S. interests and by units with capacity in South Korea. Our reassessment specialized capabilities and mobility for of regional security concerns concluded that crises at the lower end of the spectrum. the United States could undertake a prudent The more important point is that many phased series of steps to reduce its force regional disputes are becoming increasingly presence in Korea modestly--as well as lethal with the proliferation of advancing Japan and elsewhere in the Pacific--and technological weapons. B-4 Force-Structure Summary is the continuing need for robust, though The Need for reduced, forward presence. Overseas basing remains important to the execution of Overseas Basing peacetime forward presence and to regional contingency operations during crises. Foreign bases enhance deterrence, contribute In August 1990, the President, while to regional stability, and facilitate rapid speaking of our changing defense strategy, response by U.S. forces in meeting threats. said: "Our new strategy must provide the In both Europe and Asia, a continuing framework to guide our deliberate forward-deployed presence will be reductions to no more forces than we need maintained in sufficient strength to deter to guard our enduring interests--the forces to aggression and fulfill mutual security treaty exercise forward presence in key areas, to obligations. However, the rapidly changing respond effectively to crises, to retain the security environment has dictated changes to national capacity to rebuild our forces the overseas deployments of American should this be needed and to forces. maintain an effective deterrent." This strategy necessitates maintaining a balance between Continental United States (CONUS) basing and overseas basing. To provide the Europe foundation for any national military strategy, the military must maintain facilities in These changes will be most noticeable in CONUS for active and reserve forces for Europe where a dramatic reduction in U.S. such purposes as strategic offense, tactical forward-based forces will occur. The United warning and assessment of an attack on the States will continue to maintain an United States, training, research and appropriate mix of conventional and nuclear development, mobilization, maintenance and forces, modernized where necessary, to supply, homeporting, counterdrug serve as the keystone to deterrence. The operations, contingency planning, and day- continuing U.S. presence there signifies our to-day management of the various commitment to deter aggression and is vital components of the military. to regional stability in an uncertain era of Balancing the need for CONUS facilities shifting military balances and. political B-5 Defense Base Closure and Realignment Commission relationships. Similarly, our ability to competition, some reductions will occur. A reinforce Europe in a crisis and maintain the 10 to 12 percent reduction by the end of necessary and scaled-back but ready 1992 in the 135,000 personnel currently reception and basing facilities there becomes forward-deployed in Asia is already increasingly important as our forward underway. The U.S. presence at bases in presence is reduced. Japan, Korea, and the Philippines has historically been accepted and generally Middle East and welcomed as a significant contribution to regional stability. Even if the U.S. basing Persian Gulf structure in the region experiences changes in the years to come, continuing U.S. presence and access to the region will In the Middle East and Persian Gulf, the remain important to preserve strategic United States and its allies will be best interests and regional stability. served by a continued, modest military presence within the region. We have an enduring commitment to this region The Force Structure requiring us to restore and preserve regional stability. It has become increasingly clear that the traditional terms of American Reflecting the reduced chance of global presence in the Gulf region have been conflicts, the President's FY 1992-1993 forever transformed, and future events in budget [and its accompanying Future Years this region will shape the nature of U.S. Defense Program (FYDP)] includes presence. reductions in the U.S. force structure that continues a prudently phased plan for reaching the force targets established for the new strategy and threat projections. By the Asia end of 1995, U.S. forces will approximate those targets and be well below FY 1990 levels. The FY 1995 force will also be In Asia, where potential regional substantially restructured so as to support aggressors have long presented a more likely the new strategy most effectively and threat to stability than has superpower B-6 Force-Structure Summary efficiently. Strategic forces are programmed to be scaled back in accordance with expectations regarding arms reductions agreements and to enable the Department of Defense to maintain credible strategic deterrence at the least cost. Retirement of the MINUTEMEN II force will begin in 1992. Retirements of submarines with the POSEIDON missile will be accelerated. During the 1990s, the current mix of 34 POSEIDON and TRIDENT submarines will be reduced to a force of 18 TRIDENT submarines. Air Force strategic bombers will decrease from 268 in 1990 to 181 in 1995. Conventional forces will be restructured to include significant airlift and sealift capabilities, substantial and highly effective maritime and amphibious forces, a sophisticated array of combat aircraft, special operations forces, Marine Corps divisions, and heavy and light Army divisions. Compared to 1990 force levels, by the end of FY 1995 the Army will have 6 fewer active divisions; the Navy will have 94 fewer battle force ships, 1 less aircraft carrier and 2 fewer carrier air wings; and the Air Force will have 10 fewer tactical fighter wings. B-7 Selection Criteria for Base Closures and Realignments Appendix C: Military Value (given priority consideration) 1. Current and future mission requirements and the impact of operational readiness of Selection the Department of Defense's total-force. Criteria 2. The availability and condition of land, facilities, and associated airspace at both the existing and potential receiving locations. 3. The ability to accommodate contingency, mobilization, and future total force requirements at both the existing and potential receiving locations. 4. The cost and manpower implications. Return on Investment 5. The extent and timing of potential costs and savings, including the number of years, beginning with the date of completion of closure or realignment, for the savings to exceed the costs. Impacts 6. The economic impact on local communities. 7. The ability of both the existing and potential receiving communities' infrastructures to support forces, missions, and personnel. 8. The environmental impact. C-1 Department of Defense's Closure and Realignment Recommendations Appendix D Recommended Closures: Department of Department of the Army Fort Chaffee, AR Fort Benjamin Harrison, IN Defense's Fort Dix, NJ Fort Devens, MA Fort McClellan, AL Closure and Fort Ord, CA Sacramento Army Depot, CA Realignment Harry Diamond Lab Woodbridge Research Facility, VA Recommenda- Department of the Navy tions Chase Field Naval Air Station, TX Hunters Point Annex, CA Long Beach Naval Station, CA Moffett Field Naval Air Station, CA Orlando Naval Training Center, FL Philadelphia Naval Shipyard, PA Philadelphia Naval Station, PA Sand Point (Puget Sound) Naval Station, WA Tustin Marine Corps Air Station, CA Whidbey Island Naval Air Station, WA 10 RDT&E, Engineering and Fleet Support Activities Davisville Construction Battalion Center, RI Department of the Air Force Bergstrom Air Force Base, TX Carswell Air Force Base, TX Castle Air Force Base, CA Eaker Air Force Base, AR England Air Force Base, LA Grissom Air Force Base, IN Loring Air Force Base, ME Lowry Air Force Base, CO D-1 Defense Base Closure and Realignment Commission Moody Air Force Base, GA Myrtle Beach Air Force Base, SC Richards-Gebaur Air Reserve Station, MO Rickenbacker Air Guard Base, OH Williams Air Force Base, AZ Wurtsmith Air Force Base, MI Recommended Realignments: Department of the Army Army Research Institute, Alexandria, VA Aviation Systems Command/Troop Support Command, St. Louis, MO Fort Belvoir, VA Fort Detrick, MD Fort Monmouth, NJ Fort Polk, LA Harry Diamond Laboratories, MD Letterkenny Army Depot, PA Rock Island Arsenal, IL White Sands Missile Range, NM Department of the Navy Midway Island Naval Air Facility, Midway 16 RDT&E Engineering and Fleet Support Activities Department of the Air Force MacDill Air Force Base, FL D-2 Appendix E: Jim Courter, chairman, represented the 12th district of New Jersey in the U.S. House of Representatives from 1978 until Commissioner 1990. While in Congress, he chaired the House Military Reform Caucus and served Biographies on the following subcommittees of the House Armed Services Committee: Military Installations and Facilities, Procurement and Military Nuclear Systems, and Research and Development. In 1983 he wrote and shepherded through Congress a law that created the Office of Defense Test and Evaluation, an ombudsman and advisory office that ensures weapons are properly field-tested before they are mass-produced. Mr. Courter is today senior partner of the law firm he founded, Courter, Kobert, Laufer, Purcell and Cohen, in Hackettstown, New Jersey. William L. Ball III has been Secretary of the Navy, assistant to the President for legislative affairs, and administrative assistant to Senator John Tower. He has served on the Senate Armed Services Committee staff and in the U.S. Navy. Today, Mr. Ball is president of the National Soft Drink Association in Washington, D.C. E-1 Howard H. (Bo) Callaway Exchange. Mr. Levitt served in the U.S. Air Force and is on the board of the Rockefeller was a Member of Congress from Georgia Foundation. prior to serving as Secretary of the Army. He was the manager of President Gerald Ford's 1976 campaign, and he is now James C. Smith II, P.E., was chairman of GOPAC in Washington, D.C. a member of the Secretary of Defense's He is also the chief executive officer and 1988 Commission on Base Realignment and principal owner of the Crested Butte Closure. For many years he was a staff Mountain Resort. He served in the U.S. member of the U.S. Senate Armed Services Army in Korea. Committee. Dr. Smith is an engineer by training and served in the U.S. Army, time General Duane H. Cassidy, that included two tours in Vietnam. Today, he is a vice president of Brown & Root U.S. Air Force (Retired) was U.S.A., Inc., an engineering and commander-in-chief of the U.S. construction company located in Houston, Transportation Command and of the Military Texas. Airlift Command. He served in the Air Force for more than 30 years. During this Robert D. Stuart, Jr., was U.S. time, he served in Vietnam, commanded the ambassador to Norway from 1984 to 1989, Military Airlift Command's 21st Air Force, after serving as president, chief executive and was deputy chief of staff for manpower officer, and then chairman of the board of and personnel. General Cassidy is now vice The Quaker Oats Company. Ambassador president for logistics technology at CSX Stuart is president of the Council of Corporation in Richmond, Virginia. American Ambassadors, vice chairman of the Illinois Commission on the Future of Arthur Levitt, Jr., is chairman of Public Service, and president of North Star the board at Levitt Media Company. He Investments. He served in the U.S. Army in founded the American Business Conference, Europe during World War II. was a director of the President's Private Sector Survey on Cost Control, chairman of the 1980 White House Small Business Conference, and chairman and chief executive officer of the American Stock E-2 Commissioners' Biographies Appendix F: Matthew P. Behrmann, Director of Staff Paul J. Hirsch, Director of Review and Analysis Benton L. Borden, Deputy Director of Review and Analysis Cary Walker, Director of Communications Commission and Public Affairs Caroline Cimons, Director of Administration Staff Robert J. Moore, General Counsel Col. Wayne Purser, USAF, Senior Military Executive* Professional and Administrative Staff David Anderson Rodell Anderson** Follin Armfield Jill Bates Jacqueline Nguyen Bossart Steven A. Bowers Roderick M. Bricksin* LtCol. Randle K. Bunner, USAF* LtCol. Michael Burchett, USA* Marvin Casterline** Elizabeth Combs Robert L. Crosslin*** Michael T. Damgard F-1 Capt. Tim Fletcher, USAF* Lynn M. Schmidt Glenn E. Flood* Paul Sheridan Kenlyn Foster Maj. Thomas L. Snyder, USA* Kim Fuller Beverly A. Spagg## James P. Gallagher Maj. Glenn F. Spears, USAF* James S. Grichar# Jacob Sprouse** David Hadwiger Priscilla W. Stegenga Cdr. John Hart, USN* Alexandra B. Stephenson LtCol. John Hertel, USMC* Richard A. Tendler William James*** Capt. Jerry Vernon, USN* Patricia Keller S. Alexander Yellin Kevin Kenneth Kirk David Yentzer* Steven N. Kleiman* Vic Zangla** Col. Warren Lamont, USAF* Jill Fredricks Lehtonen Stacey Lukens Margaret McCarthy * Detailee from Department of Defense Erin McElroy ** Detailee from General Accounting Grant W. McGuire Office Tobias G. Messitt *** Consultant from Logistics Stephen R. Moffitt Management Institute William B. Moore*** # Detailee from Federal Emergency Clay Nettles Management Agency Trevor L. Neve*** ## Detailee from Environmental Protection John J. Patrick Agency Suzanne J. Petrie Wendi Lou Petsinger James K. Phillips Kristina E. Potts J. Robert Reale Barry D. Rhoads Alonzo Robertson Timothy R. Rupli Robert Salthouse*** F-2 Appendix G Washington D.C. Hearings Hearings and Site Visits Presentation of Department of Defense Recommendations 15 April 1991 1100 Longworth House Office Building 26 April 1991 Presentation of Force Structure Plan and Department of Defense Methodology 1100 Longworth House Office Building 10 May 1991 Presentation on Land Value, Environment, and Economic Impact 1100 Longworth House Office Building 14 May 1991 Presentation of GAO Report on the Department of Defense Analyses Supporting Proposed Closures and Realignments 1100 Longworth House Office Building 21 - 22 May, 1991 Congressional Testimony on Military Facility Closures and Realignments 215 Dirksen Senate House Office Building G-1 5 June 1991 Los Angeles Regional Hearing Testimony on the Army Corps of Engineers 8 May 1991 2167 Rayburn House Office Building California Museum of Science and History, Kinsey Auditorium 6 - 7 June 1991 Commission Deliberations Denver Regional Hearing Office of Thrift Supervision 13 May 1991 Washington, D.C. Denver Auditorium 13 - 14 June 1991 Fort Worth, Texas Regional Hearing Commission Deliberations 14 May 1991 General Services Administration Building Will Rogers Memorial Center Washington, D.C. Jacksonville, Florida Regional Hearing 28, 29, 30 June 1991 23 May 1991 Commission Deliberations Prime F. Osborn Convention Center 2167 Rayburn House Office Building 1100 Longworth House Office Building Philadelphia, Pennsylvania Regional Hearing 24 May 1991 REGIONAL Philadelphia Civic Center HEARINGS Boston, Massachusetts Regional Hearing 28 May 1991 State House, Gardner Auditorium San Francisco Regional Hearing 6 - - 7 May 1991 California Palace of the Legion of Honor G-2 Indianapolis Regional Hearing Regional Hearing - Kingsville NAS 30 May 1991 21 June 1991 Indianapolis Convention Center Kingsville Naval Air Station, TX Regional Hearing, Marine Corps Recruit Depot 17 June 1991 Marine Corps Recruit Depot, San Diego 17 June 1991 Regional Hearing, Washington, D.C. 334 Cannon House Office Building Regional Hearing - Goodfellow Air Force Base 18 June 1991 San Angelo Civic Auditorium Regional Hearing - Plattsburgh Air Force Base 20 June 1991 Plattsburgh Air Force Base, New York Regional Hearing - Meridian Naval Air Station 21 June 1991 Temple Theatre, Meridian, Mississippi G-3 Appendix H Military Army Installa- Fort Benjamin Harrison, IN Fort Chaffee, AR Fort Devens, MA tions Fort Dix, NJ Fort McClellan, AL Fort Ord, CA Visited by Rock Island Arsenal, IL Sacramento Army Depot, CA Commis- Tobyhanna Army Depot, PA sioners Navy Hunters Point Annex, CA Long Beach Naval Shipyard, CA Marine Corps Air Station, Tustin, CA Marine Recruit Training Center San Diego, CA Naval Air Development Center, Warminster, PA Naval Air Station Chase Field, TX H-1 Naval Air Station Kingsville, TX MacDill Air Force Base, FL Naval Air Station Lemoore, CA Moody Air Force Base, GA Naval Air Station Meridian, MS Myrtle Beach Air Force Base, SC Naval Air Station Moffett Field, CA Plattsburgh Air Force Base, NY Naval Air Station Whidbey Island, WA Richards-Gebaur Reserve Station, MO Naval Electronic Systems Rickenbacker Air Guard Base, OH Engineering Center, Charleston, SC Sacramento Air Logistics Center, CA Naval Station Long Beach, CA Williams Air Force Base, AZ Naval Station Philadelphia, PA Wurtsmith Air Force Base, MI Naval Station Sand Point, WA Naval Station Staten Island, NY Naval Underwater Systems Center, New London, CT Naval Training Center Orlando, FL Naval Training Center San Diego, CA Philadelphia Naval Shipyard, PA Air Force Bergstrom Air Force Base, TX Carswell Air Force Base, TX Castle Air Force Base, CA Eaker Air Force Base, AR England Air Force Base, LA Goodfellow Air Force Base, TX Grissom Air Force Base, IN Loring Air Force Base, ME Lowry Air Force Base, CO H-2 Appendix I: Menu of Options Base Category Study For Army Army Corps of Engineers* Close/Realign Fort Richardson, AK Fighting/Maneuver Close Fort Drum, NY Fighting/Maneuver Close Fort McCoy, WI* Major Training To Reserves Fort Pickett, VA* Major Training To Reserves Fort A.P. Hill, VA* Major Training To Reserves Fort Indiantown Gap, PA* Major Training To Reserves Fort Buchanan, PR* Major Training To Reserves Fort Hamilton, NY* Command and Control Close/Realign Fort Totten, NY* Command and Control Close/Realign Navy Long Beach Naval Shipyard Close Shipyard, CA* Treasure Island, CA* Naval Station Close/Realign Staten Island, NY* Homeport Close Pascagoula, MS Homeport Close Mobile, AL Homeport Close Everett, WA Homeport Close Ingleside, TX Homeport Close Marine Corps Logistics Industrial/Depot Realign Base, Barstow, CA Naval Electronic Systems Industrial/Depot Realign Engineering Center, San Diego, CA Naval Aviation Depot, Industrial/Depot Realign Jacksonville, FL U.S. Marine Corps Depot, Industrial/Depot Realign Albany, GA Naval Aviation Depot, Industrial/Depot Realign Norfolk, VA Naval Aviation Depot, Industrial/Depot Realign Pensacola, FL NAS Meridian, MS* Naval Air Station Close NAS Kingsville, TX* Naval Air Station Close NAS Agana, Guam Naval Air Station Close Great Lakes, IL Training Center Close/Realign San Diego Naval Recruit Training Center Close/Realign Training Depot, CA* San Diego Marine Recruit Training Center Close/Realign Training Depot, CA* I-1 Air Force Goodfellow, TX* Training Close Plattsburgh, NY* Flying/Strategic Close Griffiss, NY Flying/Strategic Close Homestead, FL Flying/Tactical Close Mountain Home, ID Flying/Tactical Close MacDill, FL* Flying/Tactical Close * Indicates Commission continued to consider base for closure or realignment after June 7. I-2 Defense Base Closure and Realignment Commission 1625 K Street, N.W., Suite 400 Washington, D.C. 20006-1604 printed on recycled paper