Ask the Scholar
Document scope · 1 page
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory.
For page-specific OCR and visual context, open one of the page chats.
Source Description
This file contains material mostly dealing with federal coal leasing.
Scholar Source Context
Document identity
localId
19611177
label
Coal (5)
core
doc
dtoType
document
citationUrl
pageCount
1
Source metadata
id
19611177
sourceUrl
contentType
document
title
Coal (5)
description
This file contains material mostly dealing with federal coal leasing.
citationUrl
collections
Vernon C. Loen and Charles Leppert Files
Vernon Loen's and Charles Leppert's General Subject Files
subjects
Coal
Inflation (Finance)
Legislation
Mines and mineral resources
Public lands
Vetoes
iiifBase
thumbnailUrl
largeImageUrl
imageCount
1
hasImages
yes
source
import
hasTranscription
no
Source extras
naId
19611177
coverageEndDate
logicalDate
1976-08-31
month
8
year
1976
coverageStartDate
logicalDate
1974-10-01
month
10
year
1974
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
url
mediaId
fa3a016f816f44ed
ocrText
The original documents are located in Box 4, folder "Coal (5)" of the Loen and Leppert
Files at the Gerald R. Ford Presidential Library.
Copyright Notice
The copyright law of the United States (Title 17, United States Code) governs the making of
photocopies or other reproductions of copyrighted material. Gerald Ford donated to the United
States of America his copyrights in all of his unpublished writings in National Archives collections.
Works prepared by U.S. Government employees as part of their official duties are in the public
domain. The copyrights to materials written by other individuals or organizations are presumed to
remain with them. If you think any of the information displayed in the PDF is subject to a valid
copyright claim, please contact the Gerald R. Ford Presidential Library.
Digitized from Box 4 of the Loen and Leppert Files at the Gerald R. Ford Presidential Library
PHILIP E. RUPPE
203 CANNON OFFICE BUILDING
11TH DISTRICT, MICHIGAN
WASHINGTON, D.C. 20515
CODE 202: 225-4735
COMMITTEES:
MERCHANT MARINE AND FISHERIES
Congress of the United States
FEDERAL BUILDING, ROOM 102
INTERIOR AND INSULAR AFFAIRS
ALPENA, MI 49707
CODE 517: 356-2028
house of Representatibes
FEDERAL BUILDING, ROOM 32
MARQUETTE, MI 49855
Washington, D.C. 20515
CODE 906: 228-8250
June 29, 1976
The Honorable Gerald R. Ford
The White House
Washington, D.C. 20500
Dear Mr. President:
The undersigned strongly urge you to veto S. 391, the
federal coal leasing bill, as we believe it is not in the
best interest of the nation and will severely hinder the
achievement of your administration's objective of energy
independence.
S. 391 will have a devastating impact on the development
of our critically needed low-sulphur western coal reserves be-
cause it is not likely that any new leases can be issued for
up to eight or ten years after enactment. A major cause of
the delay will be numerous public hearings required specifi-
cally by the bill and by the application of NEPA to this
proposed legislation. It specifically calls for four hearings,
namely, upon completion of the land use plan; prior to the
issuance or approval of a lease by the Secretary; upon the
creation of logical mining units; and upon the advice of the
Attorney General that an antitrust problem may exist. The
National Environmental Policy Act will require additional
hearings: a hearing on the promulgation of the regulations
under the act; a hearing on the exploration drilling program;
a hearing on the land use decision; a hearing on the issuance
of a lease; and possibly a hearing on the mining and reclama-
tion plan. Clearly this enormous and repetitive hearing
process, assuming there is no litigation to cause further
delay, will consume several years.
of greater significance, however, are the delays inherent
in the federal exploration program. Sec. 7 of the bill directs
the Secretary to conduct a comprehensive exploratory program
The Honorable Gerald R. Ford
June 29, 1976
Page two
to obtain the resource information necessary for determining
whether commercial quantities of coal are present, and the
geographical extent of the coal fields, in order to estimate
the amount of such coal that is recoverable by underground
mining as well as surface mining. In order for the Secretary
to carry out this program he must submit a plan to the
Congress within 6 months, request appropriations, and let
drilling and other exploration contracts.
The cost of the comprehensive exploratory program has
been estimated to be $1.2 billion over the next five years
by the Congressional Budget Office. The time required to
complete the program in order to permit the commencement of
leasing cannot be easily estimated because there are too many
variables such as the appropriation of funds, the design and
approval of the exploration program, and the availability of
drilling rigs and laboratories. However, if there are around
90 million acres of federal coal lands, the process could take
decades, during which time coal leasing would be halted.
Exploration has been traditionally carried on by the industry
with data being made available to the government at no cost
to the taxpayer.
S. 391 establishes a minimum royalty on federal coal of
12½¹₂ percent. We do not believe that royalties should be set
by legislation which are at or near the historic high. The
current ceiling should not become the floor. The 12½¹₂ percent
royalty could have the effect of making large acreages of
federal coal lands uneconomical to mine. Your administration
recommended a 5 percent minimum royalty. This increase in
royalty will be reflected in higher fuel costs for electric
utilities and in turn, higher costs to energy consumers.
Under the logical mining unit section, no logical mining
unit may exceed 25,000 acres, including both federal and non-
federal lands. This is an arbitrary restriction and flies
in the face of testimony from Department of Interior witnesses
outlining logical mining units in excess of 25,000 acres.
The facts support logical mining units of a larger size in
order to economically and efficiently recover the coal resources.
This requirement may force inefficient operations, thereby
unnecessarily increasing the cost of coal, and may very well
preclude the mining of significant amounts of federal coal.
The Honorable Gerald R. Ford
June 29, 1976
Page three
S. 391 requires that all leases issued pursuant to it
must be producing in commercial quantities by the end of the
tenth year or be subject to cancellation. There are many
reasons why a lease may not be in production by the end of
ten years; for example, delays in equipment deliveries,
permit approvals, railroad spur construction -- to name just
a few. With respect to gasification or liquifaction plants,
the coal reserve for the entire life of such plants must be
secured prior to construction. Because of the very long lead
times in construction of such plants, including financing,
technological developments, obtaining of FPC permits, and the
actual construction time, and the fact that commercial pro-
duction of coal cannot commence until the plant is complete,
such a ten-year production requirement could well lead to
the exclusion of federal coal for such plants. Experience
indicates that well over 10 years will be required to put
in operation a gasification plant.
Section 9 (a) amends Sec. 35 of the Mineral Leasing Act
and increases the state's share of total federal revenues from
the leasing of federal coal, oil, gas, phosphate, sodium,
potassium, oil shale, native asphalt, sulphur, etc. from the
present 37½ percent to 50 percent. Admittedly, social impacts
will be felt in states in which coal development is substantial.
However, no evidence has been presented to demonstrate that
the current level of revenue sharing is insufficient to meet
these adverse impacts. Additionally, increased revenue sharing
from resources other than coal is unrelated to the adverse
impacts caused by coal development.
S. 391 contains cumbersome antitrust review procedures
which require the Secretary to submit all decisions on the
issuance, renewal or readjustment of every coal lease to the
Attorney General for his assessment of possible violation of
the antitrust laws. These provisions only serve as another
mechanism to delay the leasing of federal coal.
The Department of the Interior has recently finalized
its new coal leasing and reclamation regulations after working
on them for well over three years. The enactment of this bill
The Honorable Gerald R. Ford
June 29, 1976
Page four
would require significant changes that would necessitate a
major revamping of Interior's program with NEPA and public
hearing requirements, promulgation of a leasing program could
be delayed three years or more.
For all of the above reasons we respectfully urge you
to return S. 391 to the Congress without your approval.
Sincerely,
Pluing Puppe
Philip E. Ruppe, M.C.
Sam Sam Steiger, Steeger M.C.
John Breaux
John Breaux, M.C.
Br Baum Bir Pitch
Robert E. Bauman, M.C.
William M. Ketchum, M.C.
George Hansen, M.C. Joe One D. Waggonner D. Ny Jr. M.C.
alove Freen
Used Risenhoover
David €. Treen, M.C.
Theodore M. Risenhoover, M.C.
Don Dongan Young, M.C.
James James M. Collins, m. Callins M.C.
FORD is BERALD LIBRARY
REPUBLICAN WHIP-ROBERT H. MICHEL
Date: July 29, 1976
94th Congress
Question: Will you vote to sustain the Pres.veto of 391 FedCoal Learing Tally
Sheet
Western and Plains (Talcott)
amends act
Midwestern States (Myers)
Yes
No
Und.
N/R
Yes
No
Und.
N/R
California
Indiana
Bell
Hillis.
Burgener
/
Myers
Clausen
Iowa
Clawson
Grassley
Goldwater
Michigan
Hinshaw
Broomfield
Ketchum
Brown
Lagomarsino (ARW)
Cederberg
McCloskey
Esch
Moorhead
Hutchinson
Talcott Rousselot leaning
/
Ruppe
Vander Jagt.
Wiggins
Minnesota
Wilson
?
Frenzel (ARW)
\
Pettis
Hagedorn
Alaska
Quie.
Young
Wisconsin
Arizona
Kasten
Conlan
Steiger
Rhodes
Ohio
Steiger
Ashbrook
/
Colorado
Brown (ARW)
Armstrong (ARW)
Clancy
/
Johnson
Devine
Idaho
Gradison
Hansen
Guyer
Symms
Harsha
New Mexico
Kindness
Lujan
\
Latta
Washington
Miller
Pritchard
Mosher
will Sustain the Ruppe
Kansas
Regula Substitutes
Sebelius
Stanton
Shriver
Whalen
Skubitz
Wylie
Winn
Illinois
Nebraska
Anderson
\
McCollister
Crane
Smith
\
Derwinski
Thone (ARW)
/
Erlenborn
North Dakota
Findley (ARW)
Andrews
/
Hyde
Oklahoma
Madigan
Jarman
McClory
South Dakota
Michel
Abdnor
O'Brien
Pressler
\
Railsback
Total
14
5
9
8
Total
13
5
15
8
Total pages 1 and 2
52
18
44
31
1
FORD is LIBRARY GERALD
REPUBLICAN WHIP-ROBERT H. MICHEL
Date: Question: Pres. veto coal Leasing (5.391)
94th Congres:
Tally Shee
Border and Southern (Young)
New England and Mid-Atlantic (McDade)
Yes
No
Und.
N/R
Yes
No
Und.
N/R
Maryland
Connecticut
Gude
McKinney
Holt
Sarasin
Bauman
\
Delaware
Missouri
duPont
Taylor (ARW)
Maine
Kentucky
Cohen
Carter
Emery
Snyder
Massachusetts
Tennessee
Conte (ARW)
Beard
Heckler
Duncan
New Hampshire
Quillen
Cleveland
Florida
New Jersey
Bafalis
Fenwick
Burke
Forsythe
Frey
Rinaldo
Kelly
Vermont
Young
Jeffords
North Carolina
New York
Broyhill
Conable
Martin
Fish
South Carolina
Gilman
Spence
Hastings
Virginia
Horton
Butler
Kemp
Daniel
Lent
Robinson
McEwen
Wampler
Mitchell (ARW)
Whitehurst (ARW)
Peyser
Alabama
Walsh
Buchanan
Wydler
Dickinson
Pennsylvania
Edwards
Biester
Arkansas
Coughlin
Hammerschmidt
Eshleman
Louisiana
Goodling
Moore
Heinz
Treen
Johnson (ARW)
Mississippi
McDade
Cochran
Myers
Lott.
Schneebeli
Texas
Schulze P
Archer
Shuster
Collins
Steelman Paul f here
Total
9
5
10
10
Total
16
3
10
5
(Rev. Mar. 1975)
2
50-391-b GPO
FORD i LIBRARY GERALD
REPUBLICAN WHIP-ROBERT H. MICHEL
Date: July 29, 1976
94th Congress
Question: Will you vote to sustain the PRes. veto
Tally Sheet
Western and Plains (Talcott)
Midwestern States (Myers)
Yes
No
Und.
N/R
Yes
No
Und.
N/R
California
Indiana
Bell
Hillis.
Burgener
Myers
Clausen
Iowa
Clawson
Grassley
\
Goldwater
Michigan
Hinshaw
Broomfield
Ketchum
Brown
Lagomarsino (ARW)
Cederberg
McCloskey
Esch
\
Moorhead
Hutchinson
Rousselot Leaning
/
Ruppe
Talcott
Vander Jagt.
N
Wiggins
N
Minnesota
Wilson
Frenzel (ARW)
Pettis
Hagedorn
Alaska
Quie.
Young
Wisconsin
Arizona
Kasten
Conlan
Steiger
Rhodes
Ohio
Steiger
Ashbrook
/
Colorado
Brown (ARW)
Armstrong (ARW)
Clancy
Johnson
Devine
Idaho
Gradison
Hansen
Guyer
Symms
Harsha
\
New Mexico
Kindness
Lujan
Latta
Washington
Miller
?
Pritchard
Mosher
will
Kansas
Regula
Sustain Substitutes if Ruppe
Sebelius
Stanton
Shriver
Whalen
Skubitz
Wylie
Winn
Illinois
Nebraska
Anderson
\
McCollister
Crane
Smith
Derwinski
Thone (ARW)
/
Erlenborn
North Dakota
Findley (ARW)
Andrews
Hyde
Oklahoma
Madigan
Jarman
McClory
South Dakota
Michel
Abdnor
O'Brien
Pressler
Railsback
\
Total
14
5
9
8
Total
13
5
15
8
Total pages 1 and 2
52
18
44
31
1
FORD & LIBRARY 07V839
REPUBLICAN WHIP-ROBERT H. MICHEL
Date: Question: Pres. veto- coal Leasing (5.391)
94th Congress
Tally Sheet
Border and Southern (Young)
New England and Mid-Atlantic (McDade)
Yes
No
Und.
N/R
Yes
No
Und.
N/R
Maryland
Connecticut
Gude
McKinney
Holt
Sarasin
Bauman
Delaware
Missouri
duPont
Taylor (ARW)
Maine
Kentucky
Cohen
Carter
Emery
Snyder
Massachusetts
Tennessee
Conte (ARW)
\
Beard
Heckler
Duncan
New Hampshire
Quillen
Cleveland
Florida
New Jersey
Bafalis
Fenwick
Burke
Forsythe
Frey
Rinaldo
Kelly
Vermont
Young
Jeffords
North Carolina
New York
Broyhill
Conable
Martin
Fish
South Carolina
Gilman
Spence
Hastings
Virginia
Horton
Butler
Kemp
Daniel
Lent
Robinson
McEwen
Wampler
Mitchell (ARW)
Whitehurst (ARW)
Peyser
Alabama
Walsh
Buchanan
/
Wydler
Dickinson
Pennsylvania
Edwards
Biester
Arkansas
Coughlin
Hammerschmidt
Eshleman
Louisiana
Goodling
Moore
Heinz
Treen
Johnson (ARW)
Mississippi
McDade
Cochran
Myers
Lott.
Schneebeli
Texas
Schulze P
Archer
Shuster
Collins
Steelman Paul fhere
Total
9
5
10
10
Total
16
3
10
5
(Rev. Mar. 1975)
2
50-391-b
GPO
FORD is LIBRARY GERALD
REP UBLICAN WHIR-ROBERI H. MICHEL
Date: July 29,1976
94th Congress
Question: Will you vote to sustain the Pres.veto
Tally Sheet
Western and Plains (Talcott)
Midwestern States (Myers)
Yes
No
Und.
N/R
Yes
No
Und.
N/R
California
Indiana
Bell
Hillis
Burgener
Myers
Clausen
Iowa
Clawson
Grassley
Goldwater
Michigan
Hinshaw
Broomfield
Ketchum
Brown
Lagomarsino (ARW)
Cederberg
McCloskey
Esch
Moorhead
Hutchinson
Talcott Rousselot Leaning
/
Ruppe
Vander Jagt.
Wiggins
Minnesota
?
Wilson
Frenzel (ARW)
Pettis
Hagedorn
Alaska
Quie
Young
Wisconsin
Arizona
Kasten
Conlan
Steiger
Rhodes
Ohio
Steiger
Ashbrook
Colorado
Brown (ARW)
Armstrong (ARW)
Clancy
Johnson
Devine
Idaho
Gradison
Hansen
Guyer
Symms
Harsha
New Mexico
Kindness
Lujan
Latta
Washington
Miller
Pritchard
Mosher
will Sustain if Ruffe
Kansas
Regula Substitutes
Sebelius
Stanton
Shriver
Whalen
Skubitz
Wylie
Winn
Illinois
Nebraska
Anderson
McCollister
Crane
Smith
Derwinski
Thone (ARW)
Erlenborn
North Dakota
Findley (ARW)
Andrews
Hyde
R.FO
Oklahoma
Madigan
Jarman
McClory
South Dakota
Michel
Abdnor
O'Brien
Pressler
Railsback
Total
14
5
9
Do
Total
13
5
15
8
Total pages 1 and 2
52
18
44
31
1
REPUBLICAN WHIP-ROBERT H. MICHEL
Question: Date: Pres. veto - coal Learning (5.391)
94th Congress
Tally Sheet
Border and Southern (Young)
New England and Mid-Atlantic (McDade)
Yes
No
Und.
N/R
Yes
No
Und.
K/R
Maryland
Connecticut
Gude
McKinney
Holt
Sarasin
Bauman
Delaware
Missouri
duPont
Taylor (ARW)
Maine
Kentucky
Cohen
Carter
Emery
Snyder
Massachusetts
Tennessee
Conte (ARW)
Beard
Heckler
Duncan
New Hampshire
Quillen
Cleveland
Florida
New Jersey
Bafalis
Fenwick
Burke
Forsythe
Frey
Rinaldo
Kelly
Vermant
Young
-Jeffords
North Carolina
New York
Broyhill
Conable
Martin
Fish
South Carolina
Gilman
Spence
Hastings
Virginia
Horton
Butler
Eemp
Daniel
Lent
Robinson
McEwen
Wampler
Mitchell (ARW)
Whitehurst (ARW)
Peyser
Alabama
Walsh
Buchanan
Wydler
Dickinson
Pennsylvania
Edwards
Biester
Arkansas
Coughlin
Hammerschmidt
Eshleman
Louisiana
Goodling
Moore
Heinz
Treen
Johnson (ARW)
Mississippi
McDade
Cochran
Myers
Lott
Schneebeli
Texas
Schulze P
Archer
Shuster
Collins
Steelman Paul if here
Total
9
5
10
10
Total
16
3
10
5
(Rev. Mar. 1975)
2
50-391-h GPO
LIBRARY GERALD R. FORD
THE WHITE HOUSE
WASHINGTON
July 30, 1976
MEMORANDUM FOR:
MAX FRIEDERSDORF
THROUGH:
CHARLES LEPPERT, JR.
CLg.
FROM:
TOM LOE FFLER
SUBJECT:
Congressional Activity to
Sustain the President's veto
of S. 391, the Federal Coal
Leasing Amendments Act
For your information, attached are three "Dear Colleague"
letters which will be sent to Members the first part of next
week. One letter will be sent from Rhodes, Anderson, Skubitz,
and Ruppe to the Republican colleagues, one letter will be sent
from Ruppe to all Members of the House, and one letter will be
sent from Sam Steiger and one Western Democrat to Members
from Western states.
I am informed that Dave Satterfield and Joe Waggonner will be
sending a "Dear Colleague" urging Members of DRO to sustain
the veto.
In addition, the Republican Study Group will probably convene
a meeting of their members and ask that Secretary Kleppe attend
and explain the reasons for the President's veto.
Attach.
COMMITTEE ON INTERIOR AND INSULAR AFFAIRS
U.S. HOUSE OF REPRESENTATIVES
WASHINGTON. D.C. 20515
August 3, 1976
Dear Republican Colleague:
We urge you to sustain the President's veto of S. 391, the
Federal Coal Leasing Amendments Act.
The cumulative impact of the provisions of this bill will
set back the Department of the Interior's coal leasing program
a minimum of 3 years. S. 391 would require a massive Federal
exploration program, exhaustive antitrust review of the issuance,
renewal and readjustment of every lease, repetitive public
hearings, mandatory production requirements, and unrealistically
high minimum royalties. This bill contains comprehensive land
use planning requirements which in and of themselves will undoubi
edly lead to years of litigation.
The development of Western low-sulfur coal is an essential
part of the President's energy program. This bill will cripple
the comprehensive coal leasing program announced by the
Department of the Interior in May.
We urge you to sustain the veto and permit the Department
of the Interior to implement its program of domestic coal
development.
John J. Rhodes, M.C.
John B. Anderson, M.C.
Minority Leader
Chairman, Republican
Conference
Joe Skubitz, M.C.
Philip E. Ruppe, M.C.
Ranking Minority Member
Ranking Minority Member
Committee on Interior and
Subcommittee on Mines
Insular Affairs
and Mining
FORD i QERALD LIBRARY
CODE 517: 305-202
Donse of Representatives
From MAL BUILDING. Ro
MANDUETTE, MI 43
Washington, D.C. 20515
CODE 906: 228-825
August 2, 1976
Dear Colleague:
The House will consider the President's veto of S. 391,
the Federal Coal Leasing Act, early this week.
I urge you to vote to sustain the veto.
As most of you know, I have been a strong supporter of
legislation to protect the environment. This bill, however,
has nothing to do with the environmental protection of
mining lands. It contains no reclamation or mining standards.
I have worked hard throughout committee and floor consider:
tion of S. 391 in helping to write a bill which would establish
fair and effective mechanism for future coal leasing. Unfortu-
nately, S. 391 has emerged from the Congress laden with so many
restrictions, rigidities, and requirements that the cumulative
impact of the bill will be to delay for a minimum of three
years the implementation of a program which has already taken
the Department of the Interior four years to develop.
S. 391 mandates an extraordinarily costly Federal explora-
tion program that is presently being done by private industry.
The bill requires a lengthy and repetitive hearing process.
It sets unrealistically high minimum royalties. The bill
requires that leases be automatically terminated if not in
production within ten years leaving no administrative flexi-
bility to grant extensions for the long lead times required
by coal gasification and liquefaction plants. S. 391 requires
a cumbersome antitrust review by the Justice Department before
the issuing, renewal or readjustment of every lease.
Taken together, these deficiencies in S. 391 will have a
devastating impact on the development of our critically needed
low-sulphur western coal reserves. I urge you to sustain
the veto.
Sincerely,
Philip E. Ruppe
Member of Congress
LIBRARY GERALD ? FORD
To be sent to Members
from Western States.
Dear Colleague:
The President in his veto message on S. 391, the Federal
Coal Leasing Act, stated that he was in total agreement with
the Congress that the Federal government should provide
financial assistance for communities impacted by development
of Federally-owned minerals. He specifically pledged his
support for increasing the State share of Federal leasing
revenues from 37½ % to 50 %.
The provisions of S. 391 dealing with coal leasing are
so onerous, however, that the President had no choice but to
veto the bill. Very simply stated - S. 391 would inhibit
coal production and raise utility prices.
I want to tell my friends, however, that all is not lost.
The BLM Organic Act (formerly H.R. 13777, now S. 507) was
passed by the House a short ten days ago and contains the
identical language of S. 391 giving the States a 50 % share
of mineral royalties. The Senate version of the BLM Organic
Act gives the States a 60 % share. A conference is imminent
and the outlook for settling this matter is good. -
Therefore, let us suştain this veto, put to rest this
unwise and costly piece of coal leasing legislation, and
work to send the mineral royalty sharing provision back to
the White House in the form of a workable bill.
Sincerely,
Diaro
Sam Steiger
Member 01 Congress
Advant GERALD ? FORD
THE WHITE HOUSE
WASHINGTON
August 1, 1976
MEMORANDUM FOR:
JIM CAVANAUGH
CHARLIE LEPPERT
BILL KENDALL
FROM:
GLENN Glenn SCHLEEDE
SUBJECT:
DRAFT PRESIDENTIAL LETTER ON
S. 391 - COAL LEASING BILL
Attached is an advance copy of a draft letter for the
President's consideration. I have sent copies to Secretary
Kleppe, Frank Zarb, Dick Darman (for Secretary Richardson),
and Jim Mitchell for review and comment back by 11 a.m.
Monday.
I'm also attaching a copy of a draft cover memorandum
which has not been circulated to the others.
Any comments you have at this time would be appreciated
and will help expedite later stages.
I understand that override votes are scheduled for Tuesday
in the Senate and Wednesday in the House.
Interior people (Kyl, Rivard, Farrand) tell me that Secretary
Kleppe believes that sustaining the veto in the Senate is
not possible and probably not worth a fight. He believes
there's a chance in the House and is making arrangments to
proceed there.
FORD & 9ERALD LIBRARY
Dear Mr. Speaker:
On July 3, 1976, I returned without my approval, S. 391,
the Federal Coal Leasing Amendments Act of 1975. That
bill dealt with two major issues: the form of Federal
assistance for communities affected by development of
Federally-owned minerals, and Federal procedures for
leasing coal.
I indicated on July 3, and I reiterate now that, on the
first of these issues, I am in total agreement with the
Congress that the Federal Government should provide
assistance, and I concur in the form of assistance adopted
by the Congress in S. 391. Specifically, I pledged
support for increasing the State share of Federal leasing
revenues covered by the bill from 37 1/2 percent to 50
percent. If S. 391 had been limited to that increased
assistance, I would have signed it.
There is ample time remaining in this session of Congress
to pass such a bill and I urge the Congress to do SO. My
Administration will be pleased to work with you to achieve
that objective.
With respect to changes in leasing procedures, S. 391
included a number of provisions that would have created
new burdensome requirements and regulations, increased the
size and role of the Federal Government, and introduced
unnecessary rigidity into Federal leasing procedures.
Instead of facilitating coal production, the bill would
have inhibited production, contributed to our growing
reliance on foreign oil, probably raised prices for
consumers (particularly of electricity), and delayed our
achievement of energy independence.
It is very important that the Congress recognize the
seious deficiencies in the provisions of S. 391 which
- 2 -
deal with coal leasing. For example:
1. The rigid 10-year limit to achieve commercial coal
production from a lease would prevent the use of Federally-
leased coal by major electric utility and synthetic fuel
projects. Even with maximum effort, experience has shown
that more than 10 years is commonly needed to obtain financing
and necessary permits, to order and obtain equipment and
support facilities, to build rail and other transportation
facilities, and to construct associated generating facilities
and coal conversion plants.
2. The requirement that a minimum royalty of 12 1/2
percent be paid on all Federal coal leases (a) would mean
that large acreages which might otherwise be developed would
become uneconomic to mine, and (b) may mean higher costs
passed on to consumers. This figure is arbitrarily and
unnecessarily high. Latitude must be preserved to set either
lower or higher royalties based on economic conditions and
the value of the resource.
3. The Federal exploration program contemplated in the
bill would be extremely costly, would add to the Federal
Budget, and would unnecessarily involve the Federal Government
in activity that can be handled equally well or better by the
private sector. In addition, completion of the studies
called for would result in substantial delays in new leasing
and production.
4. The mandatory requirement for separate public hearings
at four different stages of the leasing process would create
serious duplication of administrative procedures, cause
substantial and unreasonable delays, and add to all parties'
costs -- without any material benefit.
5. The required Justice Department anti-trust review
for each lease would cause unnecessary delays and costs, without
any significant increase in anti-trust protection. It would
generally be impractical or impossible to make a meaningful
anti-trust judgment on the basis of single leases. A full
anti-turst review on the occasion of single leases would be
time consuming and represent a major increase in workload
of the Department of Justice.
6. The requirement that 50 percent of the total acreage
offered must be leased under a deferred bonus payment system
is undesirable and arbitrary. There is no evidence that such
a requirement would aid substantially in the development of
coal. Authority is already available to use a deferred bonus
system when it is justified.
- 3 -
7. It would be impossible in many instances to comply
with the requirement to prepare a detailed mining and devel-
opment plan within three years after issuance of a lease.
Lessees must obtain suitable markets, analyze reserves, arrange
transportation, complete baseline data programs, and plan
environmental protection efforts before they can complete
the development and submission of mining plans which describe
proposed operations in the detail and specificity which Interior
Department requires in order to assure attainment of environ-
mental and production goals.
8. The 25,000 acre limitation for consolidated mining
units would preclude the development of some large scale
electric utility and synthetic fuels projects. For example,
a six-foot seam of coal underlying 25,000 acres amounts to
203 million tons. A synthetic fuels plant requiring 10 million
tons annually would be restricted to 20 years of reserves,
which is too short a period to justify its construction. Also,
such an arbitrary limitation would mean that coal would have
to be left behind unnecessarily in some cases, or that two
separate operations be undertaken when one would suffice.
There are other provisions of S. 391 which would adversely
affect development of the Nation's coal reserves, add admin-
istrative complexity and delay, provide the potential for
lengthy litigation, and add to costs of energy and costs of
government.
We should, instead, be seeking ways to avoid unnecessary
governmental requirements and costs and to increase the
production and utilization of our domestic coal resources
when this can be done in an environmentally and economically
acceptable manner. The alternatives are greater use of
our rapidly diminishing oil and gas reserves or greater
reliance on imports.
The Interior Department has developed and put in place a
comprehensive Federal coal program, including a new leasing
process, more stringent surface mining and reclamation
requirements, and new standards for diligent development of
Federal leases. Other than the increase in the State share
of leasing revenues, the authorities in S. 391 are not needed
to implement that program and, in fact, would delay it.
For these reasons, S. 391 should not become law and the Congress
should procede with a separte bill providing for an increase
in States' share of leasing revenues without further delay.
Sincerely,
DRAFT
SIGNATURE
THE WHITE HOUSE
WASHINGTON
MEMORANDUM FOR:
THE PRESIDENT
FROM:
JIM CANNON
SUBJECT:
LETTER TO THE SPEAKER (AND THE
SENATE MAJORITY LEADER) ON S. 391-
COAL LEASING AMENDMENT ACT
Enclosed for your consideration are letters to the
Speaker (and the Senate Majority Leader) on S. 391,
the Federal Coal Leasing Amendments Act of 1975, which
you vetoed on July 3, 1976. Briefly, the letters would
- Reiterate your willingness to accept an increase an
increase from 37 1/2 percent to 50 percent in the
States' share of Federal mineral leasing revenues.
- Urges prompt enactment of a bill limited to such
a provision.
- Restates and expands upon the reasons why the other
provisions of S. 391 should not become law.
The Senate has scheduled an override vote for Tuesday
and the House for Wednesday. Secretary Kleppe believes,
and the Congressional Relations Staff agrees, that there
is little opportunity for sustaining the veto in the
Senate but also that there is a chance of sustaining in
the House.
The letters are designed to make clear your position in
those parts of the Country where this bill is particularly
important, and to make clear to members the many undesirable
features of S. 391.
,
/
(etc), have reviewed and
concur in the letters.
Recommenation
That you sign the attached letter (s).
OF OF THE
United States Department of the Interior
OFFICE OF THE SECRETARY
THE
WASHINGTON, D.C. 20240
March
Dear Mr. President:
On July 3, 1976, the President returned without his approval S. 391,
the Federal Coal Leasing Amendments Act of 1975. That bill dealt with
two major issues: the form of Federal assistance for communities
affected by development of Federally-owned minerals, and Federal
procedures for leasing coal.
In his message, the President agreed with the form of assistance
to States adopted by the Congress in S. 391. He pledged support
for increasing the State share of Federal leasing revenues covered
by the bill from 37 1/2 percent to 50 percent and indicated if S. 391
had been limited to that increased assistance, he would have signed it.
There is ample time remaining in this session of Congress to pass a
separate bill and we urge the Congress to do SO. We will be pleased
to work with you to achieve this objective.
After years of intensive work and research, the Department of the
Interior has now implemented a comprehensive new coal program designed
to achieve stringent environmental protection while still providing
access to the Nation's most abundant fossil fuel energy resource. We
believe the Department has adequate authority to fully implement this
coal development program. S. 391 would not add to that authority;
indeed, we are concerned that it would seriously interfere with the
present program and significantly increase the opportunities for
litigation. Instead of facilitating coal production, S. 391 would
inhibit production, contribute to our growing reliance on foreign oil,
probably raise prices for consumers (particularly of electricity),
and delay the achievement of greater energy self sufficiency.
It is very important that the Congress recognize the serious deficiencies
in the provisions of S. 391 which deal with coal leasing. For example:
1. The rigid 10-year limit to achieve commercial coal
production from a lease could prevent the use of Federally-leased coal
by major electric utility and synthetic fuel projects. Even with
maximum effort, experience has shown that more than 10 years is
commonly needed to obtain equipment and support facilities, to build
rail and other transportation facilities, and to construct associated
generating facilities and coal conversion plants.
REVOLUTION
AMERICAN
BICENTENNIAL
1776-1976
2. The requirement that a minimum royalty of 12 1/2 percent
be paid on all Federal coal leases (a) would mean that large acreages
which might otherwise be developed may become uneconomic to mine, and
(b) may mean higher costs passed on to consumers. This figure is
unnecessarily high. Latitude must be preserved to set either lower
or higher royalties based on economic conditions and the value of the
resource.
3. The Federal exploration program contemplated in the bill
could be extremely costly (potentially billions of dollars), and would
unnecessarily involve the Federal Government in an activity that can be
handled better by the private sector. In addition, completion of the
studies called for could result in substantial delays in new leasing
and production.
4. The requirement for public hearings, or opportunity for
public comment at five separate stages in the leasing process is unreasonable
and will cause major delays without any material benefit. Department of
the Interior regulations now provide appropriate opportunity for public
involvement and NEPA and other laws already assure public participation.
5. The required Justice Department anti-trust review for
each lease -no matter how small- would cause unnecessary delays and costs.
The Attorney General already has authority to review leases that he believes
may have significant anti-competitive effects. A full anti-trust review
of single leases would be time-consuming and represent a major increase
in workload for the Department of Justice. Furthermore, it would generally
be impractical or impossible to make a meaningful anti-trust judgment on
the basis of single leases.
6. The requirement that 50 percent of the total acreage
offered must be leased under a deferred bonus payment system is unduly
rigid and may result in diminished development and production. Authority
is already available to use a deferred bonus system when appropriate to
increase competition in leasing and give smaller firms a better opportunity
to participate when this approach can be justified by the economics of
the situation and the degree of interest in leasing Federal coal.
7. It would be impossible in many instances to comply
with the requirement to prepare a detailed mining and development
plan within three years after issuance of a lease. Lessees must
obtain suitable markets, analyze reserves, arrange transportation,
complete baseline data programs, and plan environmental protection
efforts before they can complete the development and submission of
mining plans which describe proposed operations in the detail and
specificity which the Interior Department already requires in order
to assure attainment of environmental and production goals.
2
8. The 25,000 acre limitation including both Federal and
non-Federal lands for consolidated mining units would preclude the
development of some large scale electric utility and synthetic fuels
projects. This acreage is insufficient to amortize the huge capital
investment required to develop many of these projects:
There are other provisions of S. 391 which would adversely affect
development of the Nation's coal reserves, add administrative
complexity and delay, provide the potential for lengthy litigation,
and add to costs of energy and costs of government.
We should, instead, be seeking ways to avoid unnecessary governmental
requirements and costs and to increase the production and utilization
of our domestic coal resources where this can be done in an environmentally
and economically acceptable manner. The alternatives are greater use
of our rapidly diminishing oil and gas reserves or greater reliance
on imports.
For these reasons, S. 391 should not become law and the Congress
should proceed with a separate bill providing for an increase in
States' share of leasing revenues without further delay.
Sincerely yours,
10m
Secretary of the Interior
Honorable Nelson A. Rockefeller
President of the Senate
Washington, D. C. 20510
3
THE WHITE HOUSE
WASHINGTON
AUG 3 1976
August 3, 1976
TO:
BILL KENDALL
CHARLIE LEPPERT
FROM:
GLENN Glean SCHLEEDE
Here are copies of the letters to
the Speaker and to the President
of the Senate from Secretary Kleppe.
Attachment
FORD is LIBRARY 01/810
United States Department of the Interior
OFFICE OF THE SECRETARY
March
0.81
WASHINGTON, D.C. 20240
Dear Mr. Carl Speaker:
AUG 3 1976
On July 3, 1976, the President returned without his approval S. 391,
the Federal Coal Leasing Amendments Act of 1975. That bill dealt with
two major issues: the form of Federal assistance for communities
affected by development of Federally-owned minerals, and Federal
procedures for leasing coal.
In his message, the President agreed with the form of assistance
to States adopted by the Congress in S. 391. He pledged support
for increasing the State share of Federal leasing revenues covered
by the bill from 37 1/2 percent to 50 percent and indicated if S. 391
had been limited to that increased assistance, he would have signed it.
There is ample time remaining in this session of Congress to pass a
separate bill and we urge the Congress to do SO. We will be pleased
to work with you to achieve this objective.
After years of intensive work and research, the Department of the
Interior has now implemented a comprehensive new coal program designed
to achieve stringent environmental protection while still providing
access to the Nation's most abundant fossil fuel energy resource. We
believe the Department has adequate authority to fully implement this
coal development program. S. 391 would not add to that authority;
indeed, we are concerned that it would seriously interfere with the
present program and significantly increase the opportunities for
litigation. Instead of facilitating coal production, S. 391 would
inhibit production, contribute to our growing reliance on foreign oil,
probably raise prices for consumers (particularly of electricity),
and delay the achievement of greater energy self sufficiency.
It is very important that the Congress recognize the serious deficiencies
in the provisions of S. 391 which deal with coal leasing. For example:
1. The rigid 10-year limit to achieve commercial coal
production from a lease could prevent the use of Federally-leased coal
by major electric utility and synthetic fuel projects. Even with
maximum effort, experience has shown that more than 10 years is
commonly needed to obtain equipment and support facilities, to build
rail and other transportation facilities, and to construct associated
generating facilities and coal conversion plants.
REVOLUTION
FORD
AMERICAN
BICENTENNIAL
GERALD
LISTARY
1776-1976
2. The requirement that a minimum royalty of 12 1/2 percent
be paid on all Federal coal leases (a) would mean that large acreages
which might otherwise be developed may become uneconomic to mine, and
(b) may mean higher costs passed on to consumers. This figure is
unnecessarily high. Latitude must be preserved to set either lower
or higher royalties based on economic conditions and the value of the
resource.
3. The Federal exploration program contemplated in the bill
could be extremely costly (potentially billions of dollars), and would
unnecessarily involve the Federal Government in an activity that can be
handled better by the private sector. In addition, completion of the
studies called for could result in substantial delays in new leasing
and production.
4. The requirement for public hearings, or opportunity for
public comment at five separate stages in the leasing process is unreasonable
and will cause major delays without any material benefit. Department of
the Interior regulations now provide appropriate opportunity for public
involvement and NEPA and other laws already assure public participation.
5. The required Justice Department anti-trust review for
each lease -no matter how small- would cause unnecessary delays and costs.
The Attorney General already has authority to review leases that he believes
may have significant anti-competitive effects. A full anti-trust review
of single leases would be time-consuming and represent a major increase
in workload for the Department of Justice. Furthermore, it would generally
be impractical or impossible to make a meaningful anti-trust judgment on
the basis of single leases.
6. The requirement that 50 percent of the total acreage
offered must be leased under a deferred bonus payment system is unduly
rigid and may result in diminished development and production. Authority
is already available to use a deferred bonus system when appropriate to
increase competition in leasing and give smaller firms a better opportunity
to participate when this approach can be justified by the economics of
the situation and the degree of interest in leasing Federal coal.
7. It would be impossible in many instances to comply
with the requirement to prepare a detailed mining and development
plan within three years after issuance of a lease. Lessees must
obtain suitable markets, analyze reserves, arrange transportation,
complete baseline data programs, and plan environmental protection
efforts before they can complete the development and submission of
mining plans which describe proposed operations in the detail and
specificity which the Interior Department already requires in order
to assure attainment of environmental and production goals.
LIBRARY GERALD ? FORD
2
8. The 25,000 acre limitation including both Federal and
non-Federal lands for consolidated mining units would preclude the
development of some large scale electric utility and synthetic fuels
projects. This acreage is insufficient to amortize the huge capital
investment required to develop many of these projects.
There are other provisions of S. 391 which would adversely affect
development of the Nation's coal reserves, add administrative
complexity and delay, provide the potential for lengthy litigation,
and add to costs of energy and costs of government.
We should, instead, be seeking ways to avoid unnecessary governmental
requirements and costs and to increase the production and utilization
of our domestic coal resources where this can be done in an environmentally
and economically acceptable manner. The alternatives are greater use
of our rapidly diminishing oil and gas reserves or greater reliance
on imports.
For these reasons, S. 391 should not become law and the Congress
should proceed with a separate bill providing for an increase in
States' share of leasing revenues without further delay.
Sincerely yours,
Jom
Secretary of the Interior
Honorable Carl B. Albert
Speaker of the
House of Representatives
Washington, D.C. 20515
GERALD R. FORD LIBARAM
3
8/3/76
FACT SHEET
THE FEDERAL COAL LEASING AMENDMENTS ACT OF 1975, S. 391
S. 391 deals with two major issues: the form of Federal assistance
for communities affected by development of Federally-owned minerals,
and Federal procedures for leasing coal.
Assistance to States and Communities
In his July 3 veto message, the President agreed with the need for
assistance and concurred in the form of assistance adopted by the
Congress in S. 391. He pledged support for increasing the State
share of Federal leasing revenues covered by the bill from
37-1/2 percent to 50 percent and indicated if S. 391 had been
limited to that increased assistance, he would have signed it.
Unacceptable Changes in Coal Leasing
S. 391 would seriously interfere with the present coal leasing
program and significantly increase the opportunities for
litigation. Instead of facilitating coal production, it would
inhibit production, contribute to our growing reliance on foreign
oil, probably raise prices for consumers (particularly of electricity),
and delay the achievement of greater energy self sufficiency.
For example:
The rigid 10-year limit to achieve commercial coal production
from a lease could prevent the use of Federally-leased coal
by major electric utility and synthetic fuel projects.
The requirement that a minimum royalty of 12-1/2 percent be
paid on all Federal coal leases (a) would mean that large
acreages which might otherwise be developed may become uneconomic
to mine, and (b) may mean higher costs passed on to consumers.
The Federal exploration program contemplated in the bill could
be extremely costly (potentially billions of dollars), and would
unnecessarily involve the Federal Government in an activity that
can be handled better by the private sector. In addition,
completion of the studies called for could result in substantial
delays in new leasing and production.
The requirement for public hearings, or opportunity for public
comment at five separate stages in the leasing process is un-
reasonable and will cause major delays without any material
benefit.
The required Justice Department anti-trust review for each
least -- no matter how small -- would cause unnecessary delays
and costs. The Attorney General already has authority to review
leases that he believes may have significant anti-competitive
effects.
-2-
The requirement that 50 percent of the total acreage offered
must be leased under a deferred bonus payment system is unduly
rigid and may result in diminished development and production.
Authority is already available to use a deferred bonus system
when appropriate.
It would be impossible in many instances to comply with the
requirement to prepare a detailed mining and development plan
within three years after issuance of a lease.
The 25,000 acre limitation including both Federal and non-
Federal lands for consolidated mining units would preclude
the development of some large scale electric utility and
synthetic fuels projects.
There are other provisions of S. 391 which would adversely affect
development of the Nation's coal reserves, add administrative
complexity and delay, provide the potential for lengthy litigation,
and add to costs of energy and costs of government.
8/3/76
FACT SHEET
THE FEDERAL COAL LEASING AMENDMENTS ACT OF 1975, S. 391
S. 391 deals with two major issues: the form of Federal assistance
for communities affected by development of Federally-owned minerals,
and Federal procedures for leasing coal.
Assistance to States and Communities
In his July 3 veto message, the President agreed with the need for
assistance and concurred in the form of assistance adopted by the
Congress in S. 391. He pledged support for increasing the State
share of Federal leasing revenues covered by the bill from
37-1/2 percent to 50 percent and indicated if S. 391 had been
limited to that increased assistance, he would have signed it.
Unacceptable Changes in Coal Leasing
S. 391 would seriously interfere with the present coal leasing
program and significantly increase the opportunities for
litigation. Instead of facilitating coal production, it would
inhibit production, contribute to our growing reliance on foreign
oil, probably raise prices for consumers (particularly of electricity),
and delay the achievement of greater energy self sufficiency.
For example:
The rigid 10-year limit to achieve commercial coal production
from a lease could prevent the use of Federally-leased coal
by major electric utility and synthetic fuel projects.
The requirement that a minimum royalty of 12-1/2 percent be
paid on all Federal coal leases (a) would mean that large
acreages which might otherwise be developed may become uneconomic
to mine, and (b) may mean higher costs passed on to consumers.
The Federal exploration program contemplated in the bill could
be extremely costly (potentially billions of dollars), and would
unnecessarily involve the Federal Government in an activity that
can be handled better by the private sector. In addition,
completion of the studies called for could result in substantial
delays in new leasing and production.
The requirement for public hearings, or opportunity for public
comment at five separate stages in the leasing process is un-
reasonable and will cause major delays without any material
benefit.
The required Justice Department anti-trust review for each
least -- no matter how small -- would cause unnecessary delays
and costs. The Attorney General already has authority to review
leases that he believes may have significant anti-competitive
effects.
-2-
The requirement that 50 percent of the total acreage offered
must be leased under a deferred bonus payment system is unduly
rigid and may result in diminished development and production.
Authority is already available to use a deferred bonus system
when appropriate.
It would be impossible in many instances to comply with the
requirement to prepare a detailed mining and development plan
within three years after issuance of a lease.
The 25,000 acre limitation including both Federal and non-
Federal lands for consolidated mining units would preclude
the development of some large scale electric utility and
synthetic fuels projects.
There are other provisions of S. 391 which would adversely affect
development of the Nation's coal reserves, add administrative
complexity and delay, provide the potential for lengthy litigation,
and add to costs of energy and costs of government.