Images (3)
दस्तावेज़
| id |
id
6879724
|
|---|---|
| contentType |
contentType
document
|
| source |
source
import
|
Source image fields (6)
Extracted text
OCR Page 1 of 3SECRET
2
As a matter of policy, national security requirements shall be
the limiting factor in the nuclear force structure. Arbitrary
constraints on nuclear materials availability and weapons
fabrication capacity shall not be allowed to jeopardize
attainment of the forces required to assure our defense and
maintain deterrence. Accordingly, DOE shall:
1. Assure the capability to meet current and projected needs
for nuclear materials. To do this, DOE shall:
(a)
maintain
the currently operating nuclear material production
facilities; (b) begin modification of the Enriched Uranium
Conversion Facility at the Y-12 plant, Oak Ridge, Tennessee;
(c) restart the L Reactor at the Savannah River Plant, Aiken,
S. C., as soon as possible; and (d) restart the Purex
chemical processing plant at Richland, Washington, as soon
as possible. (U)
tausc. 2.
-161-2166)
(g)
3. Initiate design of production facilities necessary to assure
an adequate supply of nuclear materials in the 1990s. (U)
4. and capacity to assure that current and projected production
Establish a baseline nuclear weapon production capability
this
requirements to maintain the nuclear force structure are met.
Additionally, the DOE shall identify critical production
processes and assign backup production responsibilities
for these critical processes to ensure a surge and sprint
production capability. (S-FRD)
(ii)
The FY 1990-1994 Stockpile Projection which was submitted with be the
Stockpile Plan has been noted for planning purposes; it should
updated to reflect policy and programming decisions and used as
the point of departure for the development of future stockpile
plans. The FY 1985-1990 Nuclear Weapons Stockpile Plan should be
submitted by September 30, 1984. This submission should focus on
the budget year FY 1986 but should include a summary of FY 1985
with the Stockpile Plan submission (FY 1985-1990) A projection
through an additional ten-year planning period should also be
provided. (U)
This directive supersedes National Security Decision Directive
Number 68, dated November 18, 1982.
(U)
Rowed Riagan
-GECRET
H0-5 COPIES
Relations
belongs_to