Extracted text

OCR Page 1 of 202
275. /7 3-11-80 $275.17 State corrective action plan. unit--specific project areas in which the deficiency occurs); (a) State agencies shall prepare corrective action plans addressing those deficiencies (5) Identification of causal factor(s) specified in §275.16(b) requiring action by the contributing to the occurrence of each State agency or the combined efforts of the deficiency; State agency and the project 3-11-80 area(s)/management unit(s). This corrective (6) Identification of any action already action plan is an open-ended plan and shall completed to eliminate the deficiency; remain in effect until all deficiencies in program operations have been reduced (7) For each deficiency, an outline of actions substantially or eliminated. State agencies shall to be taken, the expected outcome of each provide updates to their corrective action plans action, the target date for each action, and the through regular, semiannual updates. These date by which each deficiency will have been 2-4-87 semiannual updates shall be received by FCS eliminated; and by May 1st and November 1st respectively. Such updates must contain: (8) For each deficiency, a description of the manner in which the State agency will monitor (1) Any additional deficiencies identified and evaluate the effectiveness of the corrective since the previous corrective action plan action in eliminating the deficiency. update; (c) FCS will provide technical assistance in (2) Documentation that a deficiency has been developing corrective action plans when corrected and is therefore being removed from requested by State agencies. the plan; and (d) State agencies will be held accountable (3) Any changes to planned corrective actions for the efficient and effective operation of all 2-4-87 for previously reported deficiencies. areas of the program. FCS is not precluded from issuing a warning as specified in part 276 (b) Content. State corrective action plans because a deficiency is included in the State shall contain, but not necessarily be limited to, agency's corrective action plan. the following, based on the most recent information available: (1) Specific description and identification of each deficiency; (2) Source(s) through which the deficiency was detected; 3-11-80 (3) Magnitude of each deficiency, if appropriate, as defined in §275.15(c)(3) of this part; [Amdt. 160, 45 FR 15909, Mar. 11, 1980, as amended by (4) Geographic extent of the deficiency (e.g., Amdt. 266, 52 FR 3409, Feb. 4, 1987] Statewide/project area or management 37