Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
174691056
label
"On the Floor" Drawings, #1b
core
doc
dtoType
map
pageCount
1
Source metadata
id
174691056
contentType
map
title
"On the Floor" Drawings, #1b
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691056
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
bb79e3b3366c3ec3
ocrText
United Reprographic Planroom Page 1 of 5 GOVENOR'S ISLAND: Set Order Full Set Order Individual Sheets Print Order File Name DrawingNumber Description Revision RevisionDate on the floor 1 MOBILIZATION BLDGS WARD STANDARD S505-4 APPROVED FILE0001.TIF 33 BEDS TYPE-W-1 on the floor 1 1 OF 1 AS BUILT FLOOR PLAN BLDG-505 \FILE0002.TIF on the floor 1 T-304-6 5 OF 11 STRUCTURAL DETAILS RECOMMENDED 6/3/59 \FILE0003.TIF on the floor 1 T-304-7 OF 11 PLUMBING FLOOR PLAN RECOMMENDED 6/3/59 \FILE0004.TIF on the floor 1 T-304-8 OF 11 ELECTRIC PLANS & DETAILS RECOMMENDED 6/3/59 \FILE0005.TIF on the floor 1 T-304-8 OF 11 PLUMBING & ELECTRIC DETIALS RECOMMENDED 6/3/59 \FILE0006.TIF on the floor 1 T-304-9 OF 11 HEATING & AIR CONDITIONING PLAN RECOMMENDED 6/3/59 \FILE0007.TIF on the floor 1 HEATING VENTILATION & AIR T-304-11 10 OF 11 RECOMMENDED 6/3/59 \FILE0008.TIF CONDITIONING DETAILS & SCHEDULES on the floor 1 T-304-5 OF 11 INTERIOR ELEVATIONS RECOMMENDED 6/3/59 \FILE0009.TIF on the floor 1 T-304-2 1 OF 11 TITLE SHEET RECOMMENDED 6/3/59 \FILE0010.TIF on the floor 1 T-304-3 2 OF 11 FLOOR PLAN RECOMMENDED 6/3/59 \FILE0011.TIF on the floor 1 T-304-4 3 OF 11 ELEVATIONS & DETAILS RECOMMENDED 6/3/59 \FILE0012.TIF on the floor 1 T-304-12 OF 11 UTILITIES SITE PLAN & SPRINKLER PLAN RECOMMENDED 6/3/59 \FILE0013.TIF on the floor 1 NEW BOILER WATER SUPPLY & NEW S507-9 \FILE0014.TIF PUMPS BLDG S507 BOILER PLANT on the floor 1 GROUP C SUPPORT FOR OBSTRUCTION S507-5 APPROVED 1/14/41 \FILE0015.TIF LIGHTS ON SMOKE STACK on the floor 1 602-1 STEEL HANGAR \FILE0016.TIF on the floor 1 602-4 STEEL HANGAR 1934 \FILE0017.TIF on the floor 1 NURSERY BLDG 1ST FLOOR PLAN- 305-1 1 OF 1 \FILE0018.TIF ELEVATION & SECTION on the floor 1 58-2 WAITING ROOM ON WHARF GOVS IS. 6/17 \FILE0019.TIF on the floor 1 03-4678 2 OF 7 ARCH SECTIONS & DETAILS REVISION A 1/22/70 \FILE0020.TIF on the floor 1 HEATING & PLUMBING 2ND FLOOR PLAN 1966-504-HP-2 15 OF 50 AS BUILT 11/17/66 \FILE0021.TIF & DETAILS on the floor 1 GENERAL CONSTRUCTION 1ST FLOOR 1966-504-A1 10 OF 50 AS BUILT 11/17/66 \FILE0022.TIF PLAN on the floor 1 1966-504-HP3 16 OF 50 HEATING & PLUMBING DETAILS APPROVED 4/13/66 \FILE0023.TIF on the floor 1 1966-504-E2 18 OF 50 2ND FLOOR PLAN & DETAILS AS BUILT 11/17/66 \FILE0024.TIF on the floor 1 1966-504-E1 17 OF 50 1ST FLOOR PLAN & DETAILS AS BUILT 11/17/66 \FILE0025.TIF on the floor 1 1966-504-A4 13 OF 50 GENERAL CONSTRUCTION SCHEDULES AS BUILT 11/17/66 \FILE0026.TIF 1/26/2006 United Reprographic Planroom Page 2 of 5 on the floor 1 PAVING AT LATRINE & SKEET RANGE 1400-217 \FILE0027.TIF ALT. TO SKEET RANGE SHELTER & 5/15/56 DUGOUT SHELTER ETC. on the floor 1 STRUCTURAL STEEL FRAMING & 03-5676 1 OF 1 \FILE0028.TIF REVISION A 3/20/80 DETAILS on the floor 1 602-7 GARAGE FOR FORT JAY GOVS. IS. APPROVED \FILE0029.TIF 1/34 on the floor 1 602-6 STEEL GARAGE \FILE0030.TIF 1934 on the floor 1 602-2 GARAGE FOR FORT JAY GOVS. IS. 1934 \FILE0031.TIF on the floor 1 602-5 STEEL GARAGE 1934 \FILE0032.TIF on the floor 1 928-1 REHAB BLDG # S928 DEMOLISHED 8/8/56 \FILE0033.TIF on the floor 1 ALTERATION TO NORTH RESIDENCE 1ST NY 1182 12/7/48 \FILE0034.TIF FLOOR PLAN & MISC. DETAILS on the floor 1 ALTERATION TO NORTH RESIDENCE 1ST NY 1182 \FILE0035.TIF FLOOR PLAN & MISC. DETAILS on the floor 1 NY 1182 \FILE0036.TIF on the floor 1 NY-0462 1 OF 2 PLAN & DETAILS APPROVED 8/25/93 \FILE0037.TIF on the floor 1 NY-0462 2 OF 2 PLAN & DETAILS 8/25/93 \FILE0038.TIF on the floor 1 51 ANCHOR BOLT PLANS 6/14/94 \FILE0039.TIF on the floor 1 PART 1 PROJECT DATA PRELIMINARY 1/19/57 \FILE0040.TIF on the floor 1 1 OF PART 1 PROJECT DATA PRELIMINARY 1/19/57 \FILE0041.TIF on the floor 1 2 OF PART 1 PROJECT DATA PRELIMINARY 1/19/57 \FILE0042.TIF on the floor 1 3 OF PART 1 PROJECT DATA PRELIMINARY 1/19/57 \FILE0043.TIF on the floor 1 PART 2 PRELIMINARY ARRANGEMENT 1 OF 9 PRELIMINARY 1/19/57 \FILE0044.TIF DRAWINGS on the floor 1 PART 2 PRELIMINARY ARRANGEMENT 1 OF 9 PRELIMINARY 1/19/57 \FILE0045.TIF DRAWINGS on the floor 1 4 OF PART PROJECT DATA PRELIMINARY 1/19/57 \FILE0046.TIF on the floor 1 FIELD MEASUREMENTS \FILE0047.TIF on the floor 1 \FILE0048.TIF on the floor 1 LAST GEN 2-D 7/2/93 \FILE0049.TIF ISSUE on the floor 1 GENERAL CONSTRUCTION FLOOR PLAN, 1966-505-A1 19 OF 50 APPROVED 4/12/66 \FILE0050.TIF DETAILS & SCHEDULES on the floor 1 602-6242-1 1 OF 2 TITLE SHEET 5/28/62 \FILE0051.TIF on the floor 1 03 1 OF 1 ARCH ELEVATIONS \FILE0052.TIF on the floor 1 ARCH NEW WINDOWS-SECTIONS & 03-5448 2 OF 2 APPROVED 12/12/74 \FILE0053.TIF DETAILS on the floor 1 GENERAL CONSTRUCTION FLOOR PLAN, 1966-505-A1 19 OF 50 AS BUILT 11/17/66 \FILE0054.TIF DETAILS & SCHEDULES on the floor 1 1966-505-HPE 1 20 OF HEATING, PLUMBING & ELECTRIC FLOOR AS BUILT 11/17/66 \FILE0055.TIF 50 PLANS & DETAILS on the floor 1 540-173-978 2 OF 2 ELECTRICAL PLANS APPROVED 3/19/76 \FILE0056.TIF on the floor 1 MODIFICATION OF BLDG S-505 TO S-505-13 APPROVED 2/27/61 \FILE0057.TIF OBSTETRICAL WARD FLOOR PLAN on the floor 1 700-461 STORE HOUSE TYPES SH-6 & SH-7 REVISIONS C 1/6/41 \FILE0058.TIF United Reprographic Planroom Page 3 of 5 on the floor 1 521-1 1 OF 1 WAREHOUSE BLDG #S-521 PLAN, \FILE0059.TIF REVISION 10/16/64 ELEVATION & SECTION on the floor 1 1ST FLOOR PLAN UNITS \FILE0060.TIF on the floor 1 3 OF 4 \FILE0061.TIF HOSPITAL 1ST FLOOR & ATTIC 11/24/42 MOBILIZATION BLDGS SINGLE on the floor 1 700-376 \FILE0062,TIF STOREHOUSE & COMPANY ADMIN. REVISION A 9/17/40 TYPES SA-1 SA-2 PLANS, ELEVS & DETS on the floor 1 511-14 NEW UNDER GROUND PICNIC FOR HEAT \FILE0063.TIF 8/4/51 RETURN LINES BLDGS S-511 on the floor 1 529-2 OF 7 REHAB WARD K BLDG #S-529 ARCH 5/12/58 \FILE0064.TIF on the floor 1 NURSES SIGNALLING SYSTEMS PLANS & 511-13 \FILE0065.TIF 10/4/44 DETAILS on the floor 1 813-1 \FILE0066.TIF RECREATION BLDG BLDG #... TYPE A-5 on the floor 1 REHAB OF WARD K BLDG # S-529 529-4 4 OF 7 5/12/58 \FILE0067.TIF ELECTRICAL on the floor 1 600-2 1 OF 1 FIRE STATION BLDG S-600 PLAN, \FILE0068.TIF ELEVATION & SECTION on the floor 1 MOBILIZATION BLDGS FIRE STATION 700-277 APPROVED 5/5/37 \FILE0069.TIF TYPE F-2 on the floor 1 600-1 OF 1 FIRE STATION BLDG S-600 PLAN, REVISION A 6/26/78 \FILE0070.TIF ELEVATION & SECTION on the floor 1 CONVERSION OF BOILER PLANT BLDG S- S-507-2 5/18/55 \FILE0071.TIF 507 FROM COAL TO OIL on the floor 1 REHAB WARD K BLDG #S-529 HEATING & 529-7 6 OF 7 5/12/58 \FILE0072.TIF AIRCONDITIONING on the floor 1 REPLACEMENT OF UNDERGROUND 529-9 APPROVED 5/14/58 \FILE0073.TIF CABLES BLDGS S531, S529, S503, S505 on the floor 1 REHAB OF WARD K TITLE & INDEX 529-1 OF 7 APPROVED 5/14/58 \FILE0074.TIF SHEET S-529 on the floor 1 511-10 S-511 \FILE0075.TIF on the floor 1 \FILE0076.TIF on the floor 1 603-3 STEEL GARAGE PROJECT #118 \FILE0077.TIF on the floor 1 521-3 PROPOSED ALTERATIOS TO BLDG S-521 11/8/51 \FILE0078.TIF on the floor 1 BOILER ROOM LAYOUT RISER SHEET & 505 4/28/31 \FILE0079.TIF RADIATOR DETAIL on the floor 1 884-1 REHAB OF BLDGS S-884 & S-893 APPROVED 6/12/58 \FILE0080.TIF on the floor 1 REHAB OF PX GARAGE BLDG #602 APPROVED 5/28/62 \FILE0081.TIF on the floor 1 1966-510-A3 GENERAL CONSTRUCTION SCHEDULES REVISION 1 11/17/66 \FILE0082.TIF on the floor 1 524-16 OF 4 HOSPITAL 1ST FLOOR & ATTIC 11/24/42 \FILE0083.TIF on the floor 1 524-13 2 OF 4 HOSPITAL 1ST FLOOR & ATTIC 11/24/42 \FILE0084.TIF on the floor 1 524-13 OF 4 HOSPITAL 1ST FLOOR & ATTIC 11/24/42 \FILE0085.TIF on the floor 1 S-527 \FILE0086.TIF on the floor 1 REHAB OF WARD K BLDG # S-529 529-6 OF 7 APPROVED 5/12/58 \FILE0087.TIF SPRINKLER SYSTEM on the floor 1 REHAB OF WARD K BLDG # S-529 529-3 3 OF 7 APPROVED 5/12/58 \FILE0088.TIF PLUMBING on the floor 1 529-5 S-529 \FILE0089.TIF on the floor 1 GENERAL CONSTRUCTION & PLUMBING 1966-527-AP1 46 OF 50 APPROVED 4/13/66 \FILE0090.TIF FLOOR PLAN, DETAILS & SCHEDULES United Reprographic Planroom Page 4 of 5 ALTERATIONS & ADDITIONS on the floor 1 527-8 11 OF 11 ALTERATION OF BLDG S-527 TO TYPICAL 12/28/51 \FILE0091.TIF WARD MECHAICAL PLANS on the floor 1 GENERAL CONSTRUCTION & PLUMBING 1966-527 AP1 48 OF 50 APPROVED 4/13/66 \FILE0092.TIF FLOOR PLAN, DETAILS & SCHEDULES on the floor 1 WAREHOUSE BLDG # S-527 PLAN, 527-1 1 OF 1 \FILE0093.TIF ELEVATION & SECTION on the floor 1 527-3 ALT. FOR STORAGE & TOILETS APPROVED 1/22/53 \FILE0094.TIF on the floor 1 BOILER HOUSE-BLDG #S-507 PLAN, 1 OF 1 \FILE0095.TIF ELEVATION & SECTION on the floor 1 527-14 12/28/42 \FILE0096.TIF on the floor 1 21-8 SEVENTH FLOOR PLAN 7/20/51 \FILE0097.TIF on the floor 1 1400-34 TARGET BUTT FOR RIFLE RANGE 4/13/56 \FILE0098.TIF on the floor 1 CONVERTED TO STORAGE BINS AS 892-1 9/5/60 \FILE0099.TIF BUILT on the floor 1 03-5676 1 OF 1 STRUCTURAL STEEL FRAMING DETAILS REVISION A 3/20/80 \FILE0100.TIF on the floor 1 PROPOSED HEALTH SPA & 840-121-706 1 OF 1 1/17/79 \FILE0101.TIF RACQUETBALL FACILITY on the floor 1 CIVIL OILY WATER SEPARATOR SYSTEM 03-5592 3 OF 3 REVISION A 11/19/76 \FILE0102.TIF DETAILS on the floor 1 CIVIL INSTALLATION OF OILY WATER 03-5592 2 OF 3 REVISION A 11/19/76 \FILE0103.TIF SEPARATOR SYSTEM on the floor 1 CIVIL INSTALLATION OF OILY WATER 03-5592 1 OF 3 REVISION A 11/19/76 \FILE0104.TIF SEPARATOR SYSTEM on the floor 1 896-1 1 OF 1 REHAB OF BLDG 2-896 APPROVED 6/10/59 \FILE0105.TIF on the floor 1 03-5297 1 OF 1 MECHANICAL OIL WATER SEPARATOR APPROVED 9/18/73 \FILE0106.TIF on the floor 1 893-1 GROUP OFFICE 6/58 \FILE0107.TIF on the floor 1 RM RENOVATIONS ARCH & MECHANICAL 540-173-978 1 OF 2 REVISION 1 8/1/83 \FILE0108.TIF PLANS on the floor 1 WAREHOUSE BLDG #S-527 PLAN, 527-2 1 OF 1 \FILE0109.TIF ELEVATION & SECTION PROPOSED PREFABRICATED on the floor 1 140-115-703 3 OF 3 CONCESSION STAND & REST ROOM APPROVED 5/14/81 \FILE0110.TIF PLUMBING on the floor 1 S507-3 ALT TO CHIMNEY STACK APPROVED 5/25/59 \FILE0111.TIF on the floor 1 S507-1 INCINERATOR FOR HOSPITAL WASTE REVISION 2 4/17/62 \FILE0112.TIF MOBILIZATION BLDGS HOSPITAL BOILER on the floor 1 700-1513 HOUSE TYPES HBH1;H1;HBH2 & HBH3 REVISION A 10/14/40 \FILE0113.TIF PLANS & ELEVATIONS on the floor 1 BOILER HOUSE-BLDG #S-507 PLAN, S507-1 1 OF 1 \FILE0114.TIF ELEVATION & SECTION MOBILIZATION BLDGS HOSPITAL BOILER on the floor 1 513-3 HOUSE TYPES MECHANICAL APPROVED 8/7/40 \FILE0115.TIF EQUIPMENT on the floor 1 SCHEMATIC AUTOMATIC CONTROLS 529-15 \FILE0116.TIF DIAGRAM on the floor 1 PROPOSED POST ENGINEER 1/10/66 \FILE0117.TIF WAREHOUSE on the floor 1 GENERAL CONSTRUCTION FLOOR PLAN, 1966-5 APPROVED \FILE0118.TIF DETAILS & SCHEDULES on the floor 1 505-3 ALTERATION & ADDITION REVISION 2,3,4 7/31 \FILE0119.TIF on the floor 1 1966-531-HPE 1 50 OF HEATING, PLUMBING & ELECTRIC FLOOR APPROVED 4/13/66 \FILE0120.TIF 50 PLANS & DETAILS NY-1551 OF 1 INSTALLATION SANITARY FACILITIES AS BUILT 2/16/53 on the floor 1 United Reprographic Planroom Page 5 of 5 \FILE0121.TIF on the floor 1 MOBILIZATION BLDGS RECREATION 700-378 REVISION A 9/24/40 \FILE0122.TIF BLDG TYPE A-5 PLANS & ELEVATIONS on the floor 1 OUT PATIENT CLINIC REVISION 511-8 REVISION 1 5/11/57 \FILE0123.TIF CUSTODIAN ROOM on the floor 1 CONVERSION OF WARD G TO 511-5 4 OF 6 11/16/56 \FILE0124.TIF OUTPATIENT CLINIC on the floor 1 ALTERATION TO SPRINKLER SYSTEM 511-7 5 OF 6 APPROVED 11/16/56 \FILE0125.TIF BLDG S-511 on the floor 1 ELECTRICAL CONVERSION OF WARD G 511-7 6 OF 6 APPROVED 11/56 \FILE0126.TIF TO OUT PATIENT CLINIC CONVERSION OF WARD G TO on the floor 1 511-3 2 OF 6 OUTPATIENT CLINIC ARCH PLAN FOR S- APPROVED 11/56 \FILE0127.TIF 511 on the floor 1 FLOOR PLAN OF T-BLDGS HOSPITAL \FILE0128.TIF S503=4 APPROVED 11/27/59 AREA on the floor 1 511-2 1 OF 6 CONVERSION OF WARD G (S-511) TO APPROVED 11/56 \FILE0129.TIF OUT PATIENT CLINIC on the floor 1 PLUMBING FLOW DIAGRAMS, 1ST & 2ND 03-1827 27 OF 34 REVISION B 7/8/59 \FILE0130.TIF FLOOR PLANS on the floor 1 PLUMBING 3RD FLOOR PLAN, 03-1827 28 OF 34 APPROVED 11/8/57 \FILE0131.TIF PENTHOUSE & DETAILS on the floor 1 511-4 PLUMBING SYSTEM BLDG S-511 APPROVED 11/16/56 \FILE0132.TIF on the floor 1 PROPOSED ENCLOSURE FOR THE AIR 511-9 APPROVED 1/6/58 \FILE0133.TIF CONDITION UNIT MOBILIZATION BLDGS HOSPITAL BOILER on the floor 1 700-1513 HOUSE TYPES HBH1;H1;HBH2 & HBH3 REVISION A 10/14/40 \FILE0134.TIF PLANS & ELEVATIONS on the floor 1 MOBILIZATION BLDGS WARD STANDARD 700-452 APPROVED 5/5/37 \FILE0135.TIF 33 BEDS TYPE-W-1 on the floor 1 GENERAL CONSTRUCTION 2ND FLOOR 1966-504-A2 11 OF 50 APPROVED 4/13/66 \FILE0136.TIF PLAN & TOILET ROOM DETAILS on the floor 1 HEATING & PLUMBING 1ST FLOOR PLAN 1966-504-HP 1 14 OF 50 REVISION 1 11/17/66 \FILE0137.TIF & DETAILS on the floor 1 GENERAL CONSTRUCTION 1ST FLOOR 1966-504-A3 12 OF 50 AS BUILT 11/17/66 \FILE0138.TIF PLAN 138 Items 2.516