Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
174691072
label
"Room in the Back" Drawings
core
doc
dtoType
map
pageCount
1
Source metadata
id
174691072
contentType
map
title
"Room in the Back" Drawings
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691072
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
a515d6565e0c2df1
ocrText
United Reprographic Planroom Page 1 of 4 GOVENOR'S ISLAND: Set Order Full Set Order Individual Sheets Print Order File Name DrawingNumber Description Revision RevisionDate room in the 1 OF 1 back\FILE0001.TIF EXISTING CONDITIONS DEMOLISHED 10/83 room in the 871-3 2 OF 3 back\FILE0002.TIF HEATING & ELECTRIC PLAN REVISION 1 11/2/54 room in the REHAB OF BLDG 690 EXCHANGE 240-086-690 3 OF 5 back\FILE0003.TIF REVISION A 1/21/72 ANNEX PLOT PLAN & PLUMBING room in the USCG EXCHANGE CAR WASH BLDG 240-154-699 OF 1 back\FILE0004.TIF APPROVED 6/23/72 #699 room in the RECORD GAS STATION BLDG 699 LOCATION 699-6400-1 back\FILE0005.TIF DRAWING OF UTILITES UTILITIES room in the 03-12-82 OF 14 SITE PLAN REVISION A 2/25/88 back\FILE0006.TIF room in the PLUMBING & COMPRESSED AIR 03-12-82 11 OF 14 REVISION A 3/3/85 back\FILE0007.TIF PLAN room in the COOLING TOWER REPLACEMENT 540-088-877 OF 1 APPROVED 1/8/85 back\FILE0008.TIF PLAN & ELEV. INSTALLATION OF NEW HOT WATER room in the 990-247-915 OF 1 HEATING COILS & HW S&R PIPING 2/3/69 back\FILE0009.TIF BLDG 915 INSTALLATION OF NEW HOT WATER room in the 990-247-915 OF 1 HEATING COILS & HW S&R PIPING 2/3/69 back\FILE0010.TIF BLDG 915 room in the 990-247-915 OF 2 SITE PLAN APPROVED 8/19/93 back\FILE0011.TIF room in the NY-0460 OF 2 DETAILS APPROVED 8/19/93 back\FILE0012.TIF room in the PROPOSED 1ST FLOOR CLOTHES 140-190-CPT 1 OF 1 APPROVED 9/28/81 back\FILE0013.TIF DRYER EXHAUST VENT room in the PUMP INSTALLATION FOR 040-220-855 OF 1 APPROVED 9/2/80 back\FILE0014.TIF CAPEHAPT APARTMENTS QUATERS-OFFICERS TYPE F- room in the 25-02-13 DOUBLE COLONIAL ELEVATIONS- REVISION A 4/23/47 back\FILE0015.TIF GABLE ROOF QUATERS-OFFICERS TYPE F- room in the 25-02-13 8 OF 8 DOUBLE COLONIAL, SPANISH, APPROVED 11/22/46 back\FILE0016.TIF MODERN ELECTRICAL room in the QUATERS-OFFICERS TYPE F- 25-02-13 6 OF 8 APPROVED 11/22/46 back\FILE0017.TIF DOUBLE COLONIAL HEATING QUATERS-OFFICERS TYPE F- room in the 25-02-13 7 OF 8 back\FILE0018.TIF DOUBLE COLONIAL, SPANISH, APPROVED 11/22/46 MODERN PLUMBING room in the 03-14-36 22 OF 24 LIGHTING PLAN APPROVED 2/12/90 back\FILE0019.TIF room in the 03-14-36 OF 24 ELECTRICAL POWER PLAN APPROVED 2/12/90 back\FILE0020.TIF room in the 03-14-36 24 OF 24 ELECTRICAL LEGEND & SCHEDULES APPROVED 2/12/90 back\FILE0021.TIF room in the PART PLAN-SNACK BAR back\FILE0022.TIF room in the 03-14-86 24 OF 24 ELECTRICAL LEGEND & SCHEDULES APPROVED 2/12/90 back\FILE0023.TIF room in the United Reprographic Planroom Page 2 of 4 back\FILE0024.TIF 03-14-86 22 OF 24 LIGHTING PLAN APPROVED 2/12/90 room in the 03-14-86 23 OF 24 ELECTRICAL POWER PLAN APPROVED 2/12/90 back\FILE0025.TIF room in the ALT BLDS 2-871 PROPOSED 3/9/54 back\FILE0026.TIF BOWLING ALLEYS room in the 871-4 3 OF 3 ELECTRIC PLAN S-871 6/4/54 back\FILE0027.TIF room in the FACILITIES ENGINEERING BLDG 711- 1 OF 2 APPROVED 11/92 back\FILE0028.TIF PS26 HVAC room in the FACILITIES ENGINEERING BLDG 711- 2 OF 2 APPROVED 11/92 back\FILE0029.TIF PS26 HVAC INSTALLATION OF ROADWAY room in the 090-089-ELE 1 OF 1 LIGHTING CAPEHART BLDG-NORTH APPROVED 1/6/90 back\FILE0030.TIF CRAIG ROAD room in the EXTERIOR LIGHTING FOR G-1007 OF 1 APPROVED 8/16/88 back\FILE0031.TIF PERIMETER OF BLDG 680 room in the back\FILE0032.TIF room in the EXTERIOR LIGHTING FOR G-1007 OF APPROVED 8/16/88 back\FILE0033.TIF PERIMETER OF BLDG 680 BLDG 680 COMMISSARY, room in the 440-183-980 10 OF 10 ELECTRICAL FLOOR PLAN., DETAILS, REVISION 2 4/86 back\FILE0034.TIF SCHEDULES & KEY PLAN BLDG 680 COMMISSARY, room in the 440-183-980 10 OF 10 ELECTRICAL FLOOR PLAN., DETAILS, REVISION 2 4/86 back\FILE0035.TIF SCHEDULES & KEY PLAN MECHANICAL FREEZER room in the NE-0066 OF 4 REPLACEMENT-REMOVAL PARTIAL APPROVED 6/30/88 back\FILE0036.TIF PLAN & ELEVATIONS ELECTRICAL FREEZER room in the NE-0066 2 OF 4 REPLACEMENT-REMOVAL PLAN & APPROVED 6/30/88 back\FILE0037.TIF PANEL SCHED. room in the 440-183-680 1 OF 10 FLOOR PLAN, KEY PLAN REVISION 1 12/84 back\FILE0038.TIF room in the 440-183-680 1 OF 10 FLOOR PLAN, KEY PLAN REVISION 1 12/84 back\FILE0039.TIF room in the UTILITY SITE PLAN (PLUMBING OF 10 REVISION 4 7/16/58 back\FILE0040.TIF H&V&ELECT) room in the A-1 MAIN LEVEL PLAN REVISION 2 2/14/92 back\FILE0041.TIF room in the A-2 FRONT ELEVATION REVISION 1 1/29/92 back\FILE0042.TIF room in the A-3 REVISION 2 2/14/92 back\FILE0043.TIF room in the A-1 REVISION 2 2/14/92 back\FILE0044.TIF room in the M-1 MAIN LEVEL PLAN REVISION 2 2/14/92 back\FILE0045.TIF room in the E-1 MAIN LEVEL PLAN REVISION 2 2/14/92 back\FILE0046.TIF room in the TELEPHONE SYSTEMS EXCHANGE & 1 OF 1 3/27/90 back\FILE0047.TIF COUNTRY STORE room in the 1 OF 4 SITE PLAN & DETAILS REVISION 2 9/2/86 back\FILE0048.TIF room in the FLOOR PLAN & DETAILS E-1 COMPLETED 9/15/82 back\FILE0049.TIF ELECTRICAL TYPICAL FLOOR CORE-BED ROOM- room in the 03-4353-M7 7 OF 15 LEVEL PLUMBING ELECTRIC-FSP- APPROVED 9/30/68 back\FILE0050.TIF HEAT VENT-AIR COND TYPICAL FLOOR CORE-LIVING ROOM room in the LEVEL PLUMBING-ELECTRICAL FIRE 03-4353-M6 6 OF 15 APPROVED 9/30/68 back\FILE0051.TIF STANDPIPE HEATING-VENT-AIR CONDITIONING room in the HEATING & AIR CONDITIONING 03-4353-M13 13 OF 15 APPROVED 9/30/68 back\FILE0052.TIF DETAILS United Reprographic Planroom Page 3 of 4 room in the 1ST FLOOR PLAN STORM & 03-4353-M4 4 OF 15 back\FILE0053.TIF APPROVED 9/30/68 SANITARY DRAINAGE SYSTEMS room in the 1ST FLOOR PLAN WATER & FSP 03-4353-M3 OF 15 back\FILE0054.TIF APPROVED 9/30/68 SYSTEM room in the 1ST FLOOR PLAN HEATING 03-4353-M2 2 OF 15 back\FILE0055.TIF APPROVED 9/30/68 VENTILATION & AIR CONDITIONING room in the 03-4353-A13 3 OF 15 ELEVATIONS back\FILE0056.TIF APPROVED 9/30/68 room in the NY-0335 10 OF 11 CONTROL DIAGRAMS APPROVED back\FILE0057.TIF 4/27/92 ELECTRICAL BOILER ROOM POWER room in the NY-0335 OF 11 back\FILE0058.TIF PLAN, ONE-LINE DIAGRAM & APPROVED 4/27/92 LEGEND room in the ELECTRICAL BOILER ROOM NY-0335 8 OF 11 APPROVED 4/27/92 back\FILE0059.TIF REMOVAL PLAN room in the PLUMBING BOILER ROOM PLAN & NY-0335 APPROVED 4/27/92 back\FILE0060.TIF LEGEND room in the PLUMBING BOILER ROOM REMOVAL APPROVED 4/27/92 back\FILE0061.TIF PLAN room in the MECHANICAL DETAILS APPROVED 4/27/92 back\FILE0062.TIF room in the MECHANICAL EQUIPMENT APPROVED 4/27/92 back\FILE0063.TIF SCHEDULES & LEGEND room in the NY-0335 MECHANICAL FLOW DIAGRAM APPROVED 4/27/92 back\FILE0064.TIF room in the NY-0335 MECHANICAL BOILER ROOM PLAN APPROVED 4/27/92 back\FILE0065.TIF room in the MECHANICAL BOILER ROOM NY-0335 OF 11 APPROVED 4/27/92 back\FILE0066.TIF REMOVAL PLAN room in the 03-15-80 13 OF 28 FIRE STATION PLAN PILES APPROVED 8/1/83 back\FILE0067.TIF room in the 03-15-80 8 OF 28 FIRE STATION SITE PLAN REVISION 1 4/9/85 back\FILE0068.TIF room in the 03-15-80 OF 28 FIRE STATION SITE LAYOUT PLAN REVISION 1 4/9/85 back\FILE0069.TIF room in the 03-15-80 13 OF 28 FIRE STATION PLAN PILES REVISION 1 4/6/85 back\FILE0070.TIF room in the 03-15-80 11 OF 28 FIRE STATION MISC. DETAILS REVISION 1 4/9/85 back\FILE0071.TIF room in the FIRE STATION ROOM FINISHED 03-15-80 10 OF 28 REVISION 1 4/9/85 back\FILE0072.TIF DOOR SCHEDULES room in the 03-15-80 OF 28 FIRE STATION ELEVATIONS REVISION 1 4/9/85 back\FILE0073.TIF room in the FIRE STATION LANDSCAPE PLAN & 03-15-80 4 OF 28 APPROVED 8/1/83 back\FILE0074.TIF DETAILS room in the 03-15-80 19 OF 28 BEAM & SLAB SCHEDULES APPROVED 8/1/83 back\FILE0075.TIF room in the 03-15-80 17OF 28 FIRE STATION CONCRETE DETAILS REVISION A 2/8/84 back\FILE0076.TIF FIRE STATION HEATING, room in the 03-15-80 2 OF 28 VENTILATING & AIR CONDITIONING APPROVED 8/1/83 back\FILE0077.TIF DETAILS FIRE STATION HEATING, room in the 03-15-80 20 OF 28 VENTILATING & AIR CONDITIONING REVISION 1 4/9/85 back\FILE0078.TIF SYSTEM room in the 03-15-80 14 OF 28 FIRE STATION PLAN GRADE BMS REVISION A 2/2/84 back\FILE0079.TIF room in the 03-15-80 12 OF 28 FIRE STATION CEILING PLAN APPROVED 8/1/88 back\FILE0080.TIF room in the 03-15-80 9 OF 28 FIRE STATION WALL SECTIONS REVISION 1 4/9/85 back\FILE0081.TIF room in the 03-15-80 8 OF 28 FIRE STATION WALL SECTIONS APPROVED 8/1/88 back\FILE0082.TIF room in the FIRE STATION BLDG ELEVATION & 03-15-80 OF 28 REVISION 1 4/9/85 back\FILE0083.TIF SECTIONS ROOF PLAN United Reprographic Planroom Page 4 of 4 room in the 03-15-80 OF 28 back\FILE0084.TIF FIRE STATION ARCH FLOOR PLAN REVISION 2 4/9/85 room in the 03-15-80 15 OF 28 FIRE STATION FLOOR PLAN back\FILE0085.TIF REVISION 1 4/9/85 room in the 03-15-80 16 OF 28 FIRE STATION STRUCT. ROOF PLAN back\FILE0086.TIF REVISION 1 4/9/86 room in the FIRE STATION STRUCTURAL 03-15-80 18 OF 28 APPROVED back\FILE0087.TIF 8/1/83 DETAILS room in the 03-15-80 19 OF 28 BEAM & SLAB SCHEDULES REVISION A back\FILE0088.TIF 2/8/87 room in the FIRE STATION SITE PLAN EXISTG 03-15-80 1 OF 28 APPROVED 8/1/83 back\FILE0089.TIF UTILITIES RELOCATION room in the M10-22-89 1 OF 1 EAGLE MARKETING GROUP 11/3/80 back\FILE0090.TIF room in the M10-22-89 OF 1 EAGLE MARKETING GROUP 1/25/90 back\FILE0091.TIF room in the 2-5078705-1 USCG SUPPORT CENTER GOVS. IS. 10/23/89 back\FILE0092.TIF room in the CG-825-66-23 OF 29 HVAC 1ST FLOOR PLAN REVISION 2 10/23/67 back\FILE0093.TIF room in the HVAC BLD #8-5 2ND FLOOR PLAN & CG-825-66-24 24 OF REVISION 2 10/23/67 back\FILE0094.TIF SECTIONS room in the CG-825-66-23 HVAC SCHEDULES & DETAILS REVISION 2 10/23/67 back\FILE0095.TIF room in the back\FILE0096.TIF room in the PLUMBING SITE PLAN & MISC. CG-825-66-22 OF 29 REVISION 2 10/24/67 back\FILE0097.TIF DETAILS room in the PLUMBING KITCH & DISHWASHING CG-825-66-22 21 OF 29 REVISION 2 10/23/67 back\FILE0098.TIF PLANS room in the ARCH 1ST & 2ND FLOOR PLANS CG-825-66-22 OF 29 REVISION 3 10/15/68 back\FILE0099.TIF FINISH SCHEDULE room in the CG-825-66-20 OF 29 PLUMBING FLOOR & ROOF PLANS REVISION 2 10/15/68 back\FILE0100.TIF room in the PERMANENT FAMILY HOUSING, RECORD WORK 35 OF 47 2/27/61 back\FILE0101.TIF BOILER RM. PLAN... AS BUILT room in the BLDG 515 COAST GUARD SUPPORT 13017 1 OF 1 REVISED 10/15/75 back\FILE0102.TIF CENTER room in the BLDG # 515 1ST FLOOR EXISTING 1 OF 4 4/30/78 back\FILE0103.TIF CONDITION INSTALLATION OF BASEBOARD FIN- room in the 340-078-825 1 OF 2 TUBE RADIATION & CONVECTORS IN COMPLETED 9/84 back\FILE0104.TIF MESS HAL INSTALLATION OF BASEBOARD FIN- room in the 340-078-825 2 OF 2 TUBE RADIATION & CONVECTORS IN APPROVED 4/12/83 back\FILE0105.TIF MESS HALL room in the GENERAL MESS HALL FLOOR PLAN 740-086-825 OF 4 APPROVED 1/9/87 back\FILE0106.TIF HVAC room in the GENERAL MESS HALL SCHEDULES & 740-086-825 OF 4 APPROVED 1/9/87 back\FILE0107.TIF DETAILS HVAC GENERAL MESS HALL SECTIONS room in the 740-086-825 3 OF 4 PART ROOF PLAN & MECHANICAL APPROVED 1/9/87 back\FILE0108.TIF ROOM HVAC room in the GENERAL MESS HALL PART ROOF 740-086-825 OF 4 APPROVED 1/9/87 back\FILE0109.TIF PLAN & DIAGRAMS ELECTRICAL 109 Items 2.016