EXECUTIVE MANSION
CONSTRUCTION CONTROL REPORT AS OF
October 12,
1951
WASHINGTON D.C.
RENOVATION AND MODERNIZATION
Project no. 49-100-8
ESTIMATE
ESTIMATED
TOTAL
LUMP SUM
OTHER
ADJUSTED
ADJUSTED
TOTAL COMMITMENTS
EXPENDITURES
CONTRACTS
COMMITMENTS
UNENCUMBERED
PERCENTAGE
BRANCHES OF WORK
12-29-50
8-8-51
INCLUDING
AUTHORIZED
BALANCE
COMPLETION
(2)
(3)
(4)
PAYMENTS
(1)
(5)
(6)
(7)
OF ESTIMATE
(8)
PHYSICAL
(9)
(10)
CONTRACT OF JOHN McSHAIN, INC.
DEMOLITION AND DISMANTLING
$ 164,000.00
$ 160,000.00
$ 159,846.54
$ 3,808.00
$ 156,038.54
1
$ 159,846.54
8
UNDERPINNING
249,000.00
153.46
2
246,603.70
100.0
246,603.70
246,603.70
3
EXCAVATION
SUBCONTR. $775,000
60,000.00
59,442.61
59,442.64
99.5
59,442.64
4
COLUMN FOOTINGS
FEE
48,250
26,000.00
24,072.85
24,072.85
100.0
120,750.00
24,072.85
5
SHORING FLOORS AND WALLS
119,499.72
119,499.72
119,499.72
100.0
SUBCONTRACTOR'S FEE
48,250.00
6
33,775.00
48,250.00
100.0
48,250.00
EXCAVATION (OUTSIDE VAULTS, ETC.)
60,000.00
557,000.00
7
60,111.44
60,395.71
60,395.71
8
GUNNITE
9,000.00
6,800.00
6,800.00
1,264.62
6,800.00
100.0
6,800.00
9
CONCRETE AND CEMENT WORK
236,000.00
285,000.00
281,429.05
284,711.80
100.0
284,711.80
SUB-DRAINAGE
5,500.00
5,900.00
288.20
10
5,547.09
5,881.49
5,881.49
99.0
18.51
11
WATERPROOFING AND DAMPPROOFING
8,600.00
4,500.00
3,366.61
2,849.00
786.61
100.0
3,635.61
12
190,000.00
193,000.00
181,630.15
66,274.71
864.39
STRUCTURAL STEEL
126,655.45
192,930.16
97.0
69.84
13
BRICKWORK
85,115.66
87,356.77
100.0
87,356.77
1h
TERRA COTTA TILE PARTITIONS
110,000.00
96,349.95
97,485.80
97,485.80
15
STRUCTURAL TILE PARTITIONS
41,500.00
180,000.00
449.54
449.54
449.54
5,292.11
16
EXTERIOR GRANITE WORK
99.0
17
EXTERIOR STONE WORK
123,700.00
132,000.00
19,631.84
129,000.00
708.44
129,708.44
2,291.56
18
40.0
INTERIOR STONE WORK
19
INTERIOR MARBLE WORK
267,000.00
252,000.00
144,887.17
236,155.00
2,217.37
238,372.37
13,627.63
20
STRUCTURAL GLASS
22,000.00
21,000.00
19,950.00
63.0
19,950.00
1,050.00
21
TILE WORK (CERAMIC AND QUARRY)
16,000.00
20.0
13,000.00
5,400.00
13,550.00
13,550.00
550.00
70.0
22
TERRAZZO WORK
(ELIMINATED)
23
ASPHALT COMPOSITION TILE
5,000.00
24
RUBBER TILE
2,500.00
4,500.00
3,985.00
3,985.00
25 MISCELLANEOUS STEEL AND IRON
42,000.00
53,000.00
515.00
42,788.37
45,538.47
9,332.95
54,871.42
26
111,000.00
59,000.00
1,871.42
88.0
ORNAMENTAL METAL WORK
996.89
52,175.00
996.89
53,171.89
5,828.11
26A ALUMINUM FOR SUN AND PLAY ROOMS
19,800.00
10,300.00
8,675.47
8,675.47
50,000.00
1,624.53
72,000.00
75.0
27
CARPENTRY
71,061.57
72,186.84
72,186.84
186.84
28
CABINET WORK
300,000.00
363,500.00
98.5
130,205.39
361,578.20
1,339.32
362,917.52
582.48
29
FINISH HARDWARE
31,000.00
32,000.00
55.0
28,785.75
32,513.55
333.75
32,847.30
847.30
30.0
30 WOOD FLOORING
70,000.00
70,000.00
49.47
72,000.00
49.47
72,049.47
2,049.47
25.0
37
HOLLOW METAL WORK
48,000.00
53,200.00
2,990.92
49,369.45
2,946.52
52,315.97
884.03
25.0
32
LATHING AND PLASTERING
235,000.00
260,000.00
238,700.40
196,382.21
63,863.34
260,245.55
245.55
98.0
33
ROOFING AND SHEET METAL WORK
52,000.00
54,000.00
28,020.00
50,893.00
758.80
51,651.80
2,348.20
60.0
34
INSECT SCREENS
6,700.00
6,000.00
3,523.00
3,523.00
2,477.00
35
CAULKING
800.00
800.00
800.00
36 INSULATION
37 SOUND CONTROL TREATMENT
25,900.00
25,900.00
20,979.00
25,900.00
25,900.00
38
94.0
WEATHERSTRIPS
2,100.00
1,600.00
1,454.00
1,454.00
146.00
39 GLASS AND GLAZING
7,200.00
10,000.00
32.65
7,197.00
112.52
7,309.52
2,690.48
80.0
40
PAINTING
90,000.00
62,000.00
68.80
58,698.00
68.80
58,766.80
3,233.20
il FIRE EQUIPMENT CABINETS (IN HOLLOW METAL WORK)
5.0
2,600.00
2 MED. CAB. AND VANITY SER. RECESSES
7,700.00
661.83
6,424.56
986.45
7,411.01
43
PLUMBING ACCESSORIES
4,800.00
3,270.60
nn
METAL топ. ENCL. DOORS
(ELIMINATED)
3,270.60
45 SHOWER DOORS AND TUB ENCLOSURES
4,800.00
16,500.00
2,687.00
2,687.00
46 LAMINATED RESINOUS DOORS AND SHELVES
3,131.39
(INCLUDED IN CABINET WORK)
47
VAULT DOORS
7,000.00
5,800.00
5,765.20
5,765.20
34.80
7A METAL LOCKERS, SHELVING, CLOSET FITMENTS, ETC.
10,000.00
10,000.00
350.80
4,342.25
82.55
4,424.80
5,575.20
8A PLUMBING OUTSIDE EXCAVATION
9,875.00
24,000.00
22,089.57
22,109.24
22,109.24
8
1,890.76
PLUMBING SYSTEMS
99.0
149,718.57
167,280.02
8,217.90
175,497.92
49
HEATING SYSTEMS
59,999.57
66,796.41
66,796.41
50 VENT. AND AIR COND. SYSTEMS M. E.
226,844.01
283,601.65
283,601.65
51
VACUUM CLEANING SYSTEM
2,661.00
2,800.59
2,800.59
52
SPRINKLER SYSTEM
560;125.00
609,000.00
361.00
380.00
380.00'
10,191.43
80.0
53 KITCHEN EQUIP. (INCLUDING PORTABLE REFRIGERATOR)
25,000.00
24,000.00
22,772.00
22,772.00
1,228.00
54 INCINERATORS AND CAN WASHER
15.0
3,000.00
3,000.00
2,545.75
2,995.00
2,995.00
5.00
95.0
55
LAUNDRY EQUIPMENT
3,800.00
3,800.00
3,386.70
3,763.00
3,763.00
37.00
75.0
56A ELECTRICAL OUTSIDE EXCAVATION
19,000.00
23,000.00
56
22,495.05
ELECTRICAL WORK (EXCLUDING FIXTURES)
22,495.05
22,495.05
504.95
99.0
57 GENERAL LIGHTING FIXTURES
496,000.00
517,000.00
366,987.90
494,902.95
3,495.90
498,398.85
18,601.15
58 SPECIAL LIGHTING FIXTURES
92.0
25,000.00
67,706.00
59 RE-SET REUSED LIGHTING FIXTURES
67,706.00
15,000.00
73,000.00
5,294.00
5.0
60 ON-CONDUCTING COVERING (INCLUDED IN MECH. EQUIP.)
57,120.00
69,732.00
69,732.00
61 ELEVATOR PLANTS & DUMBWAITERS
82,000.00
85,400.00
70,314.20
75,553.96
8,164.70
83,718.66
1,681.34
52 PAINTING OF MECHANICAL EQUIPMENT
94.0
10,000.00
5,000.00
1,080.00
4,447.00
4,447.00
553.00
75.0
63 TEMPORARY BUILDINGS AND FENCES
80,000.00
75,000.00
66,627.74
11,172.00
55,455.74
66,627.74
8,372.26
95.0
64 CLEANING AND PROTECTION
50,000.00
66,000.00
62,200.68
66,697.73
66,697.73
697.73
65 INAURANCE AND TAXES
85.0
40,000.00
60,000.00
31,860.57
56,571.31
56,571.31
3,428.69
65A WELFARE FUND
15,000.00
12,400.61
14,600.61
14,600.61
66 BOND
399.39
12,480.00
12,480.00
12,480.00
12,480.00
12,480.00
67 TEMPORARY MECHANICAL WORK
60,000.00
65,000.00
46,312.93
17,736.34
35,513.06
53,249.40
11,750.60
68 APPROACH WORK
95.0
23,000.00
28,000.00
68A APPROACH WORK, EAST WING
4,817.88
7,516.25
7,516.25
20,483.75
10.0
2,000.00
2,000.00
TOTAL GENERAL CONTRACT
69
$4,407,480.00
$4,670,980.00
$3,321,954.52
$2,762,397.59
$1,786,932.12
$4,549,329.71
$ 121,650.29
GENERAL CONTRACTOR'S FEE, (JOHN MOSHAIN, INC.)
100,000.00
100,000.00
PUBLIC BUILDINGS SERVICE
100,000.00
100,000.00
70 MATERIALS TESTING, EXPEDITING, SAMPLES, ETC.
15,000.00
3,000.00
1,020.62
2,020.62
2,020.62
979.38
95.0
75 71 MISC. CONSTR. CHARGES, SURVEYS, TEST BORINGS, ETC.
40,000.00
40,000.00
CONTINGENCIES
29,490.97
36,776.60
36,776.60
3,223.40
95.0
96,020.00
76 FURNITURE, DRAPES, MOVING, ETC.
11,200.00
11,200.00
200,000.00
191,820.00
9,981.65
133,739.65
133,739.65
58,080.35
GENERAL EXPENSES
72
DRAWINGS AND SPECIFICATIONS
376,500.00
OPERATOR'S DIAGRAMS, INACCESSIBLE INSTALLATION
393,000.00
382,132.45
383,998.71
383,998.71
9,001.29
98.0
72A
ARCHIVAL DRAWINGS
P
SUPERVISION
7a
OFFICE EXPENSES
130,000.00
130,000.00
117:148.32
121,591.78
121,591.78
8,408.22
78.0
35,000.00
35,000.00
26,407.27
26,717.27
26,717.27
8,282.73
98.0
$5,400,000.00
$5,575,000.00
$3,888,135.80
$2,862,397.59
$2,491,776.75
$5,354,174.34
220,825.66
REMARKS: *Col. 9 Indicates Overrun
Col. la $75,000.00 of $5,575,000.00 authorised but not appropriated (refer to Independent Offices Appropriation Act 1952).
Page data
- Page
- 3
- Source index
- 0
- Type
- photo
- Media ID
- 0e44cae430f5d7f9
- Size
- unknown
Document data
- ID
- 170104232
- Core
- doc
- Type
- document
DTO data
{
"id": "170104232",
"sourceUrl": "https://catalog.archives.gov/id/170104232",
"contentType": "document",
"title": "Account Statements for the White House Renovation",
"citationUrl": "https://catalog.archives.gov/id/170104232",
"collections": [
"President's Secretary's Files (Truman Administration)",
"White House Files"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
"imageCount": 3,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Context sent to Scholar
Document identity
{
"localId": "170104232",
"label": "Account Statements for the White House Renovation",
"core": "doc",
"dtoType": "document",
"citationUrl": "https://catalog.archives.gov/id/170104232"
}
Document source metadata
{
"id": "170104232",
"sourceUrl": "https://catalog.archives.gov/id/170104232",
"contentType": "document",
"title": "Account Statements for the White House Renovation",
"citationUrl": "https://catalog.archives.gov/id/170104232",
"collections": [
"President's Secretary's Files (Truman Administration)",
"White House Files"
],
"iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
"thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
"largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
"imageCount": 3,
"hasImages": true,
"source": "import",
"hasTranscription": false
}
Document source extras
{
"url": "https://catalog.archives.gov/id/170104232",
"naId": 170104232,
"levelOfDescription": "item",
"productionDates": [
{
"logicalDate": "1951-10-01",
"month": 10,
"year": 1951
}
],
"recordType": "description",
"ocrSource": "nara-archive"
}
Page context
{
"seq": 3,
"pageIndex": 0,
"type": "photo",
"url": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-003.JPG",
"mediaId": "0e44cae430f5d7f9",
"ocrText": "EXECUTIVE MANSION\nCONSTRUCTION CONTROL REPORT AS OF\nOctober 12,\n1951\nWASHINGTON D.C.\nRENOVATION AND MODERNIZATION\nProject no. 49-100-8\nESTIMATE\nESTIMATED\nTOTAL\nLUMP SUM\nOTHER\nADJUSTED\nADJUSTED\nTOTAL COMMITMENTS\nEXPENDITURES\nCONTRACTS\nCOMMITMENTS\nUNENCUMBERED\nPERCENTAGE\nBRANCHES OF WORK\n12-29-50\n8-8-51\nINCLUDING\nAUTHORIZED\nBALANCE\nCOMPLETION\n(2)\n(3)\n(4)\nPAYMENTS\n(1)\n(5)\n(6)\n(7)\nOF ESTIMATE\n(8)\nPHYSICAL\n(9)\n(10)\nCONTRACT OF JOHN McSHAIN, INC.\nDEMOLITION AND DISMANTLING\n$ 164,000.00\n$ 160,000.00\n$ 159,846.54\n$ 3,808.00\n$ 156,038.54\n1\n$ 159,846.54\n8\nUNDERPINNING\n249,000.00\n153.46\n2\n246,603.70\n100.0\n246,603.70\n246,603.70\n3\nEXCAVATION\nSUBCONTR. $775,000\n60,000.00\n59,442.61\n59,442.64\n99.5\n59,442.64\n4\nCOLUMN FOOTINGS\nFEE\n48,250\n26,000.00\n24,072.85\n24,072.85\n100.0\n120,750.00\n24,072.85\n5\nSHORING FLOORS AND WALLS\n119,499.72\n119,499.72\n119,499.72\n100.0\nSUBCONTRACTOR'S FEE\n48,250.00\n6\n33,775.00\n48,250.00\n100.0\n48,250.00\nEXCAVATION (OUTSIDE VAULTS, ETC.)\n60,000.00\n557,000.00\n7\n60,111.44\n60,395.71\n60,395.71\n8\nGUNNITE\n9,000.00\n6,800.00\n6,800.00\n1,264.62\n6,800.00\n100.0\n6,800.00\n9\nCONCRETE AND CEMENT WORK\n236,000.00\n285,000.00\n281,429.05\n284,711.80\n100.0\n284,711.80\nSUB-DRAINAGE\n5,500.00\n5,900.00\n288.20\n10\n5,547.09\n5,881.49\n5,881.49\n99.0\n18.51\n11\nWATERPROOFING AND DAMPPROOFING\n8,600.00\n4,500.00\n3,366.61\n2,849.00\n786.61\n100.0\n3,635.61\n12\n190,000.00\n193,000.00\n181,630.15\n66,274.71\n864.39\nSTRUCTURAL STEEL\n126,655.45\n192,930.16\n97.0\n69.84\n13\nBRICKWORK\n85,115.66\n87,356.77\n100.0\n87,356.77\n1h\nTERRA COTTA TILE PARTITIONS\n110,000.00\n96,349.95\n97,485.80\n97,485.80\n15\nSTRUCTURAL TILE PARTITIONS\n41,500.00\n180,000.00\n449.54\n449.54\n449.54\n5,292.11\n16\nEXTERIOR GRANITE WORK\n99.0\n17\nEXTERIOR STONE WORK\n123,700.00\n132,000.00\n19,631.84\n129,000.00\n708.44\n129,708.44\n2,291.56\n18\n40.0\nINTERIOR STONE WORK\n19\nINTERIOR MARBLE WORK\n267,000.00\n252,000.00\n144,887.17\n236,155.00\n2,217.37\n238,372.37\n13,627.63\n20\nSTRUCTURAL GLASS\n22,000.00\n21,000.00\n19,950.00\n63.0\n19,950.00\n1,050.00\n21\nTILE WORK (CERAMIC AND QUARRY)\n16,000.00\n20.0\n13,000.00\n5,400.00\n13,550.00\n13,550.00\n550.00\n70.0\n22\nTERRAZZO WORK\n(ELIMINATED)\n23\nASPHALT COMPOSITION TILE\n5,000.00\n24\nRUBBER TILE\n2,500.00\n4,500.00\n3,985.00\n3,985.00\n25 MISCELLANEOUS STEEL AND IRON\n42,000.00\n53,000.00\n515.00\n42,788.37\n45,538.47\n9,332.95\n54,871.42\n26\n111,000.00\n59,000.00\n1,871.42\n88.0\nORNAMENTAL METAL WORK\n996.89\n52,175.00\n996.89\n53,171.89\n5,828.11\n26A ALUMINUM FOR SUN AND PLAY ROOMS\n19,800.00\n10,300.00\n8,675.47\n8,675.47\n50,000.00\n1,624.53\n72,000.00\n75.0\n27\nCARPENTRY\n71,061.57\n72,186.84\n72,186.84\n186.84\n28\nCABINET WORK\n300,000.00\n363,500.00\n98.5\n130,205.39\n361,578.20\n1,339.32\n362,917.52\n582.48\n29\nFINISH HARDWARE\n31,000.00\n32,000.00\n55.0\n28,785.75\n32,513.55\n333.75\n32,847.30\n847.30\n30.0\n30 WOOD FLOORING\n70,000.00\n70,000.00\n49.47\n72,000.00\n49.47\n72,049.47\n2,049.47\n25.0\n37\nHOLLOW METAL WORK\n48,000.00\n53,200.00\n2,990.92\n49,369.45\n2,946.52\n52,315.97\n884.03\n25.0\n32\nLATHING AND PLASTERING\n235,000.00\n260,000.00\n238,700.40\n196,382.21\n63,863.34\n260,245.55\n245.55\n98.0\n33\nROOFING AND SHEET METAL WORK\n52,000.00\n54,000.00\n28,020.00\n50,893.00\n758.80\n51,651.80\n2,348.20\n60.0\n34\nINSECT SCREENS\n6,700.00\n6,000.00\n3,523.00\n3,523.00\n2,477.00\n35\nCAULKING\n800.00\n800.00\n800.00\n36 INSULATION\n37 SOUND CONTROL TREATMENT\n25,900.00\n25,900.00\n20,979.00\n25,900.00\n25,900.00\n38\n94.0\nWEATHERSTRIPS\n2,100.00\n1,600.00\n1,454.00\n1,454.00\n146.00\n39 GLASS AND GLAZING\n7,200.00\n10,000.00\n32.65\n7,197.00\n112.52\n7,309.52\n2,690.48\n80.0\n40\nPAINTING\n90,000.00\n62,000.00\n68.80\n58,698.00\n68.80\n58,766.80\n3,233.20\nil FIRE EQUIPMENT CABINETS (IN HOLLOW METAL WORK)\n5.0\n2,600.00\n2 MED. CAB. AND VANITY SER. RECESSES\n7,700.00\n661.83\n6,424.56\n986.45\n7,411.01\n43\nPLUMBING ACCESSORIES\n4,800.00\n3,270.60\nnn\nMETAL топ. ENCL. DOORS\n(ELIMINATED)\n3,270.60\n45 SHOWER DOORS AND TUB ENCLOSURES\n4,800.00\n16,500.00\n2,687.00\n2,687.00\n46 LAMINATED RESINOUS DOORS AND SHELVES\n3,131.39\n(INCLUDED IN CABINET WORK)\n47\nVAULT DOORS\n7,000.00\n5,800.00\n5,765.20\n5,765.20\n34.80\n7A METAL LOCKERS, SHELVING, CLOSET FITMENTS, ETC.\n10,000.00\n10,000.00\n350.80\n4,342.25\n82.55\n4,424.80\n5,575.20\n8A PLUMBING OUTSIDE EXCAVATION\n9,875.00\n24,000.00\n22,089.57\n22,109.24\n22,109.24\n8\n1,890.76\nPLUMBING SYSTEMS\n99.0\n149,718.57\n167,280.02\n8,217.90\n175,497.92\n49\nHEATING SYSTEMS\n59,999.57\n66,796.41\n66,796.41\n50 VENT. AND AIR COND. SYSTEMS M. E.\n226,844.01\n283,601.65\n283,601.65\n51\nVACUUM CLEANING SYSTEM\n2,661.00\n2,800.59\n2,800.59\n52\nSPRINKLER SYSTEM\n560;125.00\n609,000.00\n361.00\n380.00\n380.00'\n10,191.43\n80.0\n53 KITCHEN EQUIP. (INCLUDING PORTABLE REFRIGERATOR)\n25,000.00\n24,000.00\n22,772.00\n22,772.00\n1,228.00\n54 INCINERATORS AND CAN WASHER\n15.0\n3,000.00\n3,000.00\n2,545.75\n2,995.00\n2,995.00\n5.00\n95.0\n55\nLAUNDRY EQUIPMENT\n3,800.00\n3,800.00\n3,386.70\n3,763.00\n3,763.00\n37.00\n75.0\n56A ELECTRICAL OUTSIDE EXCAVATION\n19,000.00\n23,000.00\n56\n22,495.05\nELECTRICAL WORK (EXCLUDING FIXTURES)\n22,495.05\n22,495.05\n504.95\n99.0\n57 GENERAL LIGHTING FIXTURES\n496,000.00\n517,000.00\n366,987.90\n494,902.95\n3,495.90\n498,398.85\n18,601.15\n58 SPECIAL LIGHTING FIXTURES\n92.0\n25,000.00\n67,706.00\n59 RE-SET REUSED LIGHTING FIXTURES\n67,706.00\n15,000.00\n73,000.00\n5,294.00\n5.0\n60 ON-CONDUCTING COVERING (INCLUDED IN MECH. EQUIP.)\n57,120.00\n69,732.00\n69,732.00\n61 ELEVATOR PLANTS & DUMBWAITERS\n82,000.00\n85,400.00\n70,314.20\n75,553.96\n8,164.70\n83,718.66\n1,681.34\n52 PAINTING OF MECHANICAL EQUIPMENT\n94.0\n10,000.00\n5,000.00\n1,080.00\n4,447.00\n4,447.00\n553.00\n75.0\n63 TEMPORARY BUILDINGS AND FENCES\n80,000.00\n75,000.00\n66,627.74\n11,172.00\n55,455.74\n66,627.74\n8,372.26\n95.0\n64 CLEANING AND PROTECTION\n50,000.00\n66,000.00\n62,200.68\n66,697.73\n66,697.73\n697.73\n65 INAURANCE AND TAXES\n85.0\n40,000.00\n60,000.00\n31,860.57\n56,571.31\n56,571.31\n3,428.69\n65A WELFARE FUND\n15,000.00\n12,400.61\n14,600.61\n14,600.61\n66 BOND\n399.39\n12,480.00\n12,480.00\n12,480.00\n12,480.00\n12,480.00\n67 TEMPORARY MECHANICAL WORK\n60,000.00\n65,000.00\n46,312.93\n17,736.34\n35,513.06\n53,249.40\n11,750.60\n68 APPROACH WORK\n95.0\n23,000.00\n28,000.00\n68A APPROACH WORK, EAST WING\n4,817.88\n7,516.25\n7,516.25\n20,483.75\n10.0\n2,000.00\n2,000.00\nTOTAL GENERAL CONTRACT\n69\n$4,407,480.00\n$4,670,980.00\n$3,321,954.52\n$2,762,397.59\n$1,786,932.12\n$4,549,329.71\n$ 121,650.29\nGENERAL CONTRACTOR'S FEE, (JOHN MOSHAIN, INC.)\n100,000.00\n100,000.00\nPUBLIC BUILDINGS SERVICE\n100,000.00\n100,000.00\n70 MATERIALS TESTING, EXPEDITING, SAMPLES, ETC.\n15,000.00\n3,000.00\n1,020.62\n2,020.62\n2,020.62\n979.38\n95.0\n75 71 MISC. CONSTR. CHARGES, SURVEYS, TEST BORINGS, ETC.\n40,000.00\n40,000.00\nCONTINGENCIES\n29,490.97\n36,776.60\n36,776.60\n3,223.40\n95.0\n96,020.00\n76 FURNITURE, DRAPES, MOVING, ETC.\n11,200.00\n11,200.00\n200,000.00\n191,820.00\n9,981.65\n133,739.65\n133,739.65\n58,080.35\nGENERAL EXPENSES\n72\nDRAWINGS AND SPECIFICATIONS\n376,500.00\nOPERATOR'S DIAGRAMS, INACCESSIBLE INSTALLATION\n393,000.00\n382,132.45\n383,998.71\n383,998.71\n9,001.29\n98.0\n72A\nARCHIVAL DRAWINGS\nP\nSUPERVISION\n7a\nOFFICE EXPENSES\n130,000.00\n130,000.00\n117:148.32\n121,591.78\n121,591.78\n8,408.22\n78.0\n35,000.00\n35,000.00\n26,407.27\n26,717.27\n26,717.27\n8,282.73\n98.0\n$5,400,000.00\n$5,575,000.00\n$3,888,135.80\n$2,862,397.59\n$2,491,776.75\n$5,354,174.34\n220,825.66\nREMARKS: *Col. 9 Indicates Overrun\nCol. la $75,000.00 of $5,575,000.00 authorised but not appropriated (refer to Independent Offices Appropriation Act 1952)."
}