EXECUTIVE MANSION CONSTRUCTION CONTROL REPORT AS OF October 12, 1951 WASHINGTON D.C. RENOVATION AND MODERNIZATION Project no. 49-100-8 ESTIMATE ESTIMATED TOTAL LUMP SUM OTHER ADJUSTED ADJUSTED TOTAL COMMITMENTS EXPENDITURES CONTRACTS COMMITMENTS UNENCUMBERED PERCENTAGE BRANCHES OF WORK 12-29-50 8-8-51 INCLUDING AUTHORIZED BALANCE COMPLETION (2) (3) (4) PAYMENTS (1) (5) (6) (7) OF ESTIMATE (8) PHYSICAL (9) (10) CONTRACT OF JOHN McSHAIN, INC. DEMOLITION AND DISMANTLING $ 164,000.00 $ 160,000.00 $ 159,846.54 $ 3,808.00 $ 156,038.54 1 $ 159,846.54 8 UNDERPINNING 249,000.00 153.46 2 246,603.70 100.0 246,603.70 246,603.70 3 EXCAVATION SUBCONTR. $775,000 60,000.00 59,442.61 59,442.64 99.5 59,442.64 4 COLUMN FOOTINGS FEE 48,250 26,000.00 24,072.85 24,072.85 100.0 120,750.00 24,072.85 5 SHORING FLOORS AND WALLS 119,499.72 119,499.72 119,499.72 100.0 SUBCONTRACTOR'S FEE 48,250.00 6 33,775.00 48,250.00 100.0 48,250.00 EXCAVATION (OUTSIDE VAULTS, ETC.) 60,000.00 557,000.00 7 60,111.44 60,395.71 60,395.71 8 GUNNITE 9,000.00 6,800.00 6,800.00 1,264.62 6,800.00 100.0 6,800.00 9 CONCRETE AND CEMENT WORK 236,000.00 285,000.00 281,429.05 284,711.80 100.0 284,711.80 SUB-DRAINAGE 5,500.00 5,900.00 288.20 10 5,547.09 5,881.49 5,881.49 99.0 18.51 11 WATERPROOFING AND DAMPPROOFING 8,600.00 4,500.00 3,366.61 2,849.00 786.61 100.0 3,635.61 12 190,000.00 193,000.00 181,630.15 66,274.71 864.39 STRUCTURAL STEEL 126,655.45 192,930.16 97.0 69.84 13 BRICKWORK 85,115.66 87,356.77 100.0 87,356.77 1h TERRA COTTA TILE PARTITIONS 110,000.00 96,349.95 97,485.80 97,485.80 15 STRUCTURAL TILE PARTITIONS 41,500.00 180,000.00 449.54 449.54 449.54 5,292.11 16 EXTERIOR GRANITE WORK 99.0 17 EXTERIOR STONE WORK 123,700.00 132,000.00 19,631.84 129,000.00 708.44 129,708.44 2,291.56 18 40.0 INTERIOR STONE WORK 19 INTERIOR MARBLE WORK 267,000.00 252,000.00 144,887.17 236,155.00 2,217.37 238,372.37 13,627.63 20 STRUCTURAL GLASS 22,000.00 21,000.00 19,950.00 63.0 19,950.00 1,050.00 21 TILE WORK (CERAMIC AND QUARRY) 16,000.00 20.0 13,000.00 5,400.00 13,550.00 13,550.00 550.00 70.0 22 TERRAZZO WORK (ELIMINATED) 23 ASPHALT COMPOSITION TILE 5,000.00 24 RUBBER TILE 2,500.00 4,500.00 3,985.00 3,985.00 25 MISCELLANEOUS STEEL AND IRON 42,000.00 53,000.00 515.00 42,788.37 45,538.47 9,332.95 54,871.42 26 111,000.00 59,000.00 1,871.42 88.0 ORNAMENTAL METAL WORK 996.89 52,175.00 996.89 53,171.89 5,828.11 26A ALUMINUM FOR SUN AND PLAY ROOMS 19,800.00 10,300.00 8,675.47 8,675.47 50,000.00 1,624.53 72,000.00 75.0 27 CARPENTRY 71,061.57 72,186.84 72,186.84 186.84 28 CABINET WORK 300,000.00 363,500.00 98.5 130,205.39 361,578.20 1,339.32 362,917.52 582.48 29 FINISH HARDWARE 31,000.00 32,000.00 55.0 28,785.75 32,513.55 333.75 32,847.30 847.30 30.0 30 WOOD FLOORING 70,000.00 70,000.00 49.47 72,000.00 49.47 72,049.47 2,049.47 25.0 37 HOLLOW METAL WORK 48,000.00 53,200.00 2,990.92 49,369.45 2,946.52 52,315.97 884.03 25.0 32 LATHING AND PLASTERING 235,000.00 260,000.00 238,700.40 196,382.21 63,863.34 260,245.55 245.55 98.0 33 ROOFING AND SHEET METAL WORK 52,000.00 54,000.00 28,020.00 50,893.00 758.80 51,651.80 2,348.20 60.0 34 INSECT SCREENS 6,700.00 6,000.00 3,523.00 3,523.00 2,477.00 35 CAULKING 800.00 800.00 800.00 36 INSULATION 37 SOUND CONTROL TREATMENT 25,900.00 25,900.00 20,979.00 25,900.00 25,900.00 38 94.0 WEATHERSTRIPS 2,100.00 1,600.00 1,454.00 1,454.00 146.00 39 GLASS AND GLAZING 7,200.00 10,000.00 32.65 7,197.00 112.52 7,309.52 2,690.48 80.0 40 PAINTING 90,000.00 62,000.00 68.80 58,698.00 68.80 58,766.80 3,233.20 il FIRE EQUIPMENT CABINETS (IN HOLLOW METAL WORK) 5.0 2,600.00 2 MED. CAB. AND VANITY SER. RECESSES 7,700.00 661.83 6,424.56 986.45 7,411.01 43 PLUMBING ACCESSORIES 4,800.00 3,270.60 nn METAL топ. ENCL. DOORS (ELIMINATED) 3,270.60 45 SHOWER DOORS AND TUB ENCLOSURES 4,800.00 16,500.00 2,687.00 2,687.00 46 LAMINATED RESINOUS DOORS AND SHELVES 3,131.39 (INCLUDED IN CABINET WORK) 47 VAULT DOORS 7,000.00 5,800.00 5,765.20 5,765.20 34.80 7A METAL LOCKERS, SHELVING, CLOSET FITMENTS, ETC. 10,000.00 10,000.00 350.80 4,342.25 82.55 4,424.80 5,575.20 8A PLUMBING OUTSIDE EXCAVATION 9,875.00 24,000.00 22,089.57 22,109.24 22,109.24 8 1,890.76 PLUMBING SYSTEMS 99.0 149,718.57 167,280.02 8,217.90 175,497.92 49 HEATING SYSTEMS 59,999.57 66,796.41 66,796.41 50 VENT. AND AIR COND. SYSTEMS M. E. 226,844.01 283,601.65 283,601.65 51 VACUUM CLEANING SYSTEM 2,661.00 2,800.59 2,800.59 52 SPRINKLER SYSTEM 560;125.00 609,000.00 361.00 380.00 380.00' 10,191.43 80.0 53 KITCHEN EQUIP. (INCLUDING PORTABLE REFRIGERATOR) 25,000.00 24,000.00 22,772.00 22,772.00 1,228.00 54 INCINERATORS AND CAN WASHER 15.0 3,000.00 3,000.00 2,545.75 2,995.00 2,995.00 5.00 95.0 55 LAUNDRY EQUIPMENT 3,800.00 3,800.00 3,386.70 3,763.00 3,763.00 37.00 75.0 56A ELECTRICAL OUTSIDE EXCAVATION 19,000.00 23,000.00 56 22,495.05 ELECTRICAL WORK (EXCLUDING FIXTURES) 22,495.05 22,495.05 504.95 99.0 57 GENERAL LIGHTING FIXTURES 496,000.00 517,000.00 366,987.90 494,902.95 3,495.90 498,398.85 18,601.15 58 SPECIAL LIGHTING FIXTURES 92.0 25,000.00 67,706.00 59 RE-SET REUSED LIGHTING FIXTURES 67,706.00 15,000.00 73,000.00 5,294.00 5.0 60 ON-CONDUCTING COVERING (INCLUDED IN MECH. EQUIP.) 57,120.00 69,732.00 69,732.00 61 ELEVATOR PLANTS & DUMBWAITERS 82,000.00 85,400.00 70,314.20 75,553.96 8,164.70 83,718.66 1,681.34 52 PAINTING OF MECHANICAL EQUIPMENT 94.0 10,000.00 5,000.00 1,080.00 4,447.00 4,447.00 553.00 75.0 63 TEMPORARY BUILDINGS AND FENCES 80,000.00 75,000.00 66,627.74 11,172.00 55,455.74 66,627.74 8,372.26 95.0 64 CLEANING AND PROTECTION 50,000.00 66,000.00 62,200.68 66,697.73 66,697.73 697.73 65 INAURANCE AND TAXES 85.0 40,000.00 60,000.00 31,860.57 56,571.31 56,571.31 3,428.69 65A WELFARE FUND 15,000.00 12,400.61 14,600.61 14,600.61 66 BOND 399.39 12,480.00 12,480.00 12,480.00 12,480.00 12,480.00 67 TEMPORARY MECHANICAL WORK 60,000.00 65,000.00 46,312.93 17,736.34 35,513.06 53,249.40 11,750.60 68 APPROACH WORK 95.0 23,000.00 28,000.00 68A APPROACH WORK, EAST WING 4,817.88 7,516.25 7,516.25 20,483.75 10.0 2,000.00 2,000.00 TOTAL GENERAL CONTRACT 69 $4,407,480.00 $4,670,980.00 $3,321,954.52 $2,762,397.59 $1,786,932.12 $4,549,329.71 $ 121,650.29 GENERAL CONTRACTOR'S FEE, (JOHN MOSHAIN, INC.) 100,000.00 100,000.00 PUBLIC BUILDINGS SERVICE 100,000.00 100,000.00 70 MATERIALS TESTING, EXPEDITING, SAMPLES, ETC. 15,000.00 3,000.00 1,020.62 2,020.62 2,020.62 979.38 95.0 75 71 MISC. CONSTR. CHARGES, SURVEYS, TEST BORINGS, ETC. 40,000.00 40,000.00 CONTINGENCIES 29,490.97 36,776.60 36,776.60 3,223.40 95.0 96,020.00 76 FURNITURE, DRAPES, MOVING, ETC. 11,200.00 11,200.00 200,000.00 191,820.00 9,981.65 133,739.65 133,739.65 58,080.35 GENERAL EXPENSES 72 DRAWINGS AND SPECIFICATIONS 376,500.00 OPERATOR'S DIAGRAMS, INACCESSIBLE INSTALLATION 393,000.00 382,132.45 383,998.71 383,998.71 9,001.29 98.0 72A ARCHIVAL DRAWINGS P SUPERVISION 7a OFFICE EXPENSES 130,000.00 130,000.00 117:148.32 121,591.78 121,591.78 8,408.22 78.0 35,000.00 35,000.00 26,407.27 26,717.27 26,717.27 8,282.73 98.0 $5,400,000.00 $5,575,000.00 $3,888,135.80 $2,862,397.59 $2,491,776.75 $5,354,174.34 220,825.66 REMARKS: *Col. 9 Indicates Overrun Col. la $75,000.00 of $5,575,000.00 authorised but not appropriated (refer to Independent Offices Appropriation Act 1952).

Page data

Page
3
Source index
0
Type
photo
Media ID
0e44cae430f5d7f9
Size
unknown

Document data

ID
170104232
Core
doc
Type
document
DTO data
{
    "id": "170104232",
    "sourceUrl": "https://catalog.archives.gov/id/170104232",
    "contentType": "document",
    "title": "Account Statements for the White House Renovation",
    "citationUrl": "https://catalog.archives.gov/id/170104232",
    "collections": [
        "President's Secretary's Files (Truman Administration)",
        "White House Files"
    ],
    "iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
    "thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
    "largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
    "imageCount": 3,
    "hasImages": true,
    "source": "import",
    "hasTranscription": false
}

Context sent to Scholar

Document identity
{
    "localId": "170104232",
    "label": "Account Statements for the White House Renovation",
    "core": "doc",
    "dtoType": "document",
    "citationUrl": "https://catalog.archives.gov/id/170104232"
}
Document source metadata
{
    "id": "170104232",
    "sourceUrl": "https://catalog.archives.gov/id/170104232",
    "contentType": "document",
    "title": "Account Statements for the White House Renovation",
    "citationUrl": "https://catalog.archives.gov/id/170104232",
    "collections": [
        "President's Secretary's Files (Truman Administration)",
        "White House Files"
    ],
    "iiifBase": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
    "thumbnailUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
    "largeImageUrl": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-001.jpg",
    "imageCount": 3,
    "hasImages": true,
    "source": "import",
    "hasTranscription": false
}
Document source extras
{
    "url": "https://catalog.archives.gov/id/170104232",
    "naId": 170104232,
    "levelOfDescription": "item",
    "productionDates": [
        {
            "logicalDate": "1951-10-01",
            "month": 10,
            "year": 1951
        }
    ],
    "recordType": "description",
    "ocrSource": "nara-archive"
}
Page context
{
    "seq": 3,
    "pageIndex": 0,
    "type": "photo",
    "url": "https://s3.amazonaws.com/NARAprodstorage/lz/presidential-libraries/truman/hst-psf/602208/976343/976343-097-003.JPG",
    "mediaId": "0e44cae430f5d7f9",
    "ocrText": "EXECUTIVE MANSION\nCONSTRUCTION CONTROL REPORT AS OF\nOctober 12,\n1951\nWASHINGTON D.C.\nRENOVATION AND MODERNIZATION\nProject no. 49-100-8\nESTIMATE\nESTIMATED\nTOTAL\nLUMP SUM\nOTHER\nADJUSTED\nADJUSTED\nTOTAL COMMITMENTS\nEXPENDITURES\nCONTRACTS\nCOMMITMENTS\nUNENCUMBERED\nPERCENTAGE\nBRANCHES OF WORK\n12-29-50\n8-8-51\nINCLUDING\nAUTHORIZED\nBALANCE\nCOMPLETION\n(2)\n(3)\n(4)\nPAYMENTS\n(1)\n(5)\n(6)\n(7)\nOF ESTIMATE\n(8)\nPHYSICAL\n(9)\n(10)\nCONTRACT OF JOHN McSHAIN, INC.\nDEMOLITION AND DISMANTLING\n$ 164,000.00\n$ 160,000.00\n$ 159,846.54\n$ 3,808.00\n$ 156,038.54\n1\n$ 159,846.54\n8\nUNDERPINNING\n249,000.00\n153.46\n2\n246,603.70\n100.0\n246,603.70\n246,603.70\n3\nEXCAVATION\nSUBCONTR. $775,000\n60,000.00\n59,442.61\n59,442.64\n99.5\n59,442.64\n4\nCOLUMN FOOTINGS\nFEE\n48,250\n26,000.00\n24,072.85\n24,072.85\n100.0\n120,750.00\n24,072.85\n5\nSHORING FLOORS AND WALLS\n119,499.72\n119,499.72\n119,499.72\n100.0\nSUBCONTRACTOR'S FEE\n48,250.00\n6\n33,775.00\n48,250.00\n100.0\n48,250.00\nEXCAVATION (OUTSIDE VAULTS, ETC.)\n60,000.00\n557,000.00\n7\n60,111.44\n60,395.71\n60,395.71\n8\nGUNNITE\n9,000.00\n6,800.00\n6,800.00\n1,264.62\n6,800.00\n100.0\n6,800.00\n9\nCONCRETE AND CEMENT WORK\n236,000.00\n285,000.00\n281,429.05\n284,711.80\n100.0\n284,711.80\nSUB-DRAINAGE\n5,500.00\n5,900.00\n288.20\n10\n5,547.09\n5,881.49\n5,881.49\n99.0\n18.51\n11\nWATERPROOFING AND DAMPPROOFING\n8,600.00\n4,500.00\n3,366.61\n2,849.00\n786.61\n100.0\n3,635.61\n12\n190,000.00\n193,000.00\n181,630.15\n66,274.71\n864.39\nSTRUCTURAL STEEL\n126,655.45\n192,930.16\n97.0\n69.84\n13\nBRICKWORK\n85,115.66\n87,356.77\n100.0\n87,356.77\n1h\nTERRA COTTA TILE PARTITIONS\n110,000.00\n96,349.95\n97,485.80\n97,485.80\n15\nSTRUCTURAL TILE PARTITIONS\n41,500.00\n180,000.00\n449.54\n449.54\n449.54\n5,292.11\n16\nEXTERIOR GRANITE WORK\n99.0\n17\nEXTERIOR STONE WORK\n123,700.00\n132,000.00\n19,631.84\n129,000.00\n708.44\n129,708.44\n2,291.56\n18\n40.0\nINTERIOR STONE WORK\n19\nINTERIOR MARBLE WORK\n267,000.00\n252,000.00\n144,887.17\n236,155.00\n2,217.37\n238,372.37\n13,627.63\n20\nSTRUCTURAL GLASS\n22,000.00\n21,000.00\n19,950.00\n63.0\n19,950.00\n1,050.00\n21\nTILE WORK (CERAMIC AND QUARRY)\n16,000.00\n20.0\n13,000.00\n5,400.00\n13,550.00\n13,550.00\n550.00\n70.0\n22\nTERRAZZO WORK\n(ELIMINATED)\n23\nASPHALT COMPOSITION TILE\n5,000.00\n24\nRUBBER TILE\n2,500.00\n4,500.00\n3,985.00\n3,985.00\n25 MISCELLANEOUS STEEL AND IRON\n42,000.00\n53,000.00\n515.00\n42,788.37\n45,538.47\n9,332.95\n54,871.42\n26\n111,000.00\n59,000.00\n1,871.42\n88.0\nORNAMENTAL METAL WORK\n996.89\n52,175.00\n996.89\n53,171.89\n5,828.11\n26A ALUMINUM FOR SUN AND PLAY ROOMS\n19,800.00\n10,300.00\n8,675.47\n8,675.47\n50,000.00\n1,624.53\n72,000.00\n75.0\n27\nCARPENTRY\n71,061.57\n72,186.84\n72,186.84\n186.84\n28\nCABINET WORK\n300,000.00\n363,500.00\n98.5\n130,205.39\n361,578.20\n1,339.32\n362,917.52\n582.48\n29\nFINISH HARDWARE\n31,000.00\n32,000.00\n55.0\n28,785.75\n32,513.55\n333.75\n32,847.30\n847.30\n30.0\n30 WOOD FLOORING\n70,000.00\n70,000.00\n49.47\n72,000.00\n49.47\n72,049.47\n2,049.47\n25.0\n37\nHOLLOW METAL WORK\n48,000.00\n53,200.00\n2,990.92\n49,369.45\n2,946.52\n52,315.97\n884.03\n25.0\n32\nLATHING AND PLASTERING\n235,000.00\n260,000.00\n238,700.40\n196,382.21\n63,863.34\n260,245.55\n245.55\n98.0\n33\nROOFING AND SHEET METAL WORK\n52,000.00\n54,000.00\n28,020.00\n50,893.00\n758.80\n51,651.80\n2,348.20\n60.0\n34\nINSECT SCREENS\n6,700.00\n6,000.00\n3,523.00\n3,523.00\n2,477.00\n35\nCAULKING\n800.00\n800.00\n800.00\n36 INSULATION\n37 SOUND CONTROL TREATMENT\n25,900.00\n25,900.00\n20,979.00\n25,900.00\n25,900.00\n38\n94.0\nWEATHERSTRIPS\n2,100.00\n1,600.00\n1,454.00\n1,454.00\n146.00\n39 GLASS AND GLAZING\n7,200.00\n10,000.00\n32.65\n7,197.00\n112.52\n7,309.52\n2,690.48\n80.0\n40\nPAINTING\n90,000.00\n62,000.00\n68.80\n58,698.00\n68.80\n58,766.80\n3,233.20\nil FIRE EQUIPMENT CABINETS (IN HOLLOW METAL WORK)\n5.0\n2,600.00\n2 MED. CAB. AND VANITY SER. RECESSES\n7,700.00\n661.83\n6,424.56\n986.45\n7,411.01\n43\nPLUMBING ACCESSORIES\n4,800.00\n3,270.60\nnn\nMETAL топ. ENCL. DOORS\n(ELIMINATED)\n3,270.60\n45 SHOWER DOORS AND TUB ENCLOSURES\n4,800.00\n16,500.00\n2,687.00\n2,687.00\n46 LAMINATED RESINOUS DOORS AND SHELVES\n3,131.39\n(INCLUDED IN CABINET WORK)\n47\nVAULT DOORS\n7,000.00\n5,800.00\n5,765.20\n5,765.20\n34.80\n7A METAL LOCKERS, SHELVING, CLOSET FITMENTS, ETC.\n10,000.00\n10,000.00\n350.80\n4,342.25\n82.55\n4,424.80\n5,575.20\n8A PLUMBING OUTSIDE EXCAVATION\n9,875.00\n24,000.00\n22,089.57\n22,109.24\n22,109.24\n8\n1,890.76\nPLUMBING SYSTEMS\n99.0\n149,718.57\n167,280.02\n8,217.90\n175,497.92\n49\nHEATING SYSTEMS\n59,999.57\n66,796.41\n66,796.41\n50 VENT. AND AIR COND. SYSTEMS M. E.\n226,844.01\n283,601.65\n283,601.65\n51\nVACUUM CLEANING SYSTEM\n2,661.00\n2,800.59\n2,800.59\n52\nSPRINKLER SYSTEM\n560;125.00\n609,000.00\n361.00\n380.00\n380.00'\n10,191.43\n80.0\n53 KITCHEN EQUIP. (INCLUDING PORTABLE REFRIGERATOR)\n25,000.00\n24,000.00\n22,772.00\n22,772.00\n1,228.00\n54 INCINERATORS AND CAN WASHER\n15.0\n3,000.00\n3,000.00\n2,545.75\n2,995.00\n2,995.00\n5.00\n95.0\n55\nLAUNDRY EQUIPMENT\n3,800.00\n3,800.00\n3,386.70\n3,763.00\n3,763.00\n37.00\n75.0\n56A ELECTRICAL OUTSIDE EXCAVATION\n19,000.00\n23,000.00\n56\n22,495.05\nELECTRICAL WORK (EXCLUDING FIXTURES)\n22,495.05\n22,495.05\n504.95\n99.0\n57 GENERAL LIGHTING FIXTURES\n496,000.00\n517,000.00\n366,987.90\n494,902.95\n3,495.90\n498,398.85\n18,601.15\n58 SPECIAL LIGHTING FIXTURES\n92.0\n25,000.00\n67,706.00\n59 RE-SET REUSED LIGHTING FIXTURES\n67,706.00\n15,000.00\n73,000.00\n5,294.00\n5.0\n60 ON-CONDUCTING COVERING (INCLUDED IN MECH. EQUIP.)\n57,120.00\n69,732.00\n69,732.00\n61 ELEVATOR PLANTS & DUMBWAITERS\n82,000.00\n85,400.00\n70,314.20\n75,553.96\n8,164.70\n83,718.66\n1,681.34\n52 PAINTING OF MECHANICAL EQUIPMENT\n94.0\n10,000.00\n5,000.00\n1,080.00\n4,447.00\n4,447.00\n553.00\n75.0\n63 TEMPORARY BUILDINGS AND FENCES\n80,000.00\n75,000.00\n66,627.74\n11,172.00\n55,455.74\n66,627.74\n8,372.26\n95.0\n64 CLEANING AND PROTECTION\n50,000.00\n66,000.00\n62,200.68\n66,697.73\n66,697.73\n697.73\n65 INAURANCE AND TAXES\n85.0\n40,000.00\n60,000.00\n31,860.57\n56,571.31\n56,571.31\n3,428.69\n65A WELFARE FUND\n15,000.00\n12,400.61\n14,600.61\n14,600.61\n66 BOND\n399.39\n12,480.00\n12,480.00\n12,480.00\n12,480.00\n12,480.00\n67 TEMPORARY MECHANICAL WORK\n60,000.00\n65,000.00\n46,312.93\n17,736.34\n35,513.06\n53,249.40\n11,750.60\n68 APPROACH WORK\n95.0\n23,000.00\n28,000.00\n68A APPROACH WORK, EAST WING\n4,817.88\n7,516.25\n7,516.25\n20,483.75\n10.0\n2,000.00\n2,000.00\nTOTAL GENERAL CONTRACT\n69\n$4,407,480.00\n$4,670,980.00\n$3,321,954.52\n$2,762,397.59\n$1,786,932.12\n$4,549,329.71\n$ 121,650.29\nGENERAL CONTRACTOR'S FEE, (JOHN MOSHAIN, INC.)\n100,000.00\n100,000.00\nPUBLIC BUILDINGS SERVICE\n100,000.00\n100,000.00\n70 MATERIALS TESTING, EXPEDITING, SAMPLES, ETC.\n15,000.00\n3,000.00\n1,020.62\n2,020.62\n2,020.62\n979.38\n95.0\n75 71 MISC. CONSTR. CHARGES, SURVEYS, TEST BORINGS, ETC.\n40,000.00\n40,000.00\nCONTINGENCIES\n29,490.97\n36,776.60\n36,776.60\n3,223.40\n95.0\n96,020.00\n76 FURNITURE, DRAPES, MOVING, ETC.\n11,200.00\n11,200.00\n200,000.00\n191,820.00\n9,981.65\n133,739.65\n133,739.65\n58,080.35\nGENERAL EXPENSES\n72\nDRAWINGS AND SPECIFICATIONS\n376,500.00\nOPERATOR'S DIAGRAMS, INACCESSIBLE INSTALLATION\n393,000.00\n382,132.45\n383,998.71\n383,998.71\n9,001.29\n98.0\n72A\nARCHIVAL DRAWINGS\nP\nSUPERVISION\n7a\nOFFICE EXPENSES\n130,000.00\n130,000.00\n117:148.32\n121,591.78\n121,591.78\n8,408.22\n78.0\n35,000.00\n35,000.00\n26,407.27\n26,717.27\n26,717.27\n8,282.73\n98.0\n$5,400,000.00\n$5,575,000.00\n$3,888,135.80\n$2,862,397.59\n$2,491,776.75\n$5,354,174.34\n220,825.66\nREMARKS: *Col. 9 Indicates Overrun\nCol. la $75,000.00 of $5,575,000.00 authorised but not appropriated (refer to Independent Offices Appropriation Act 1952)."
}