Navy - Bureau of Ships - Reports, April 1942
core
doc
dtoType
document
citationUrl
pageCount
1
Source metadata
id
16618995
sourceUrl
contentType
document
title
Navy - Bureau of Ships - Reports, April 1942
citationUrl
collections
President's Secretary's File (Franklin D. Roosevelt Administration)
Departmental Correspondence
imageCount
1
hasImages
yes
source
import
hasTranscription
no
Source extras
naId
16618995
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
2e6d01259a660505
ocrText
Navy : Burea
VOL. I NO.1
CONFIDENTIAL
PSF
Navy
Box 68
I
GRAPHIC
PROGRESS
REPORT
Vessels and Components
Franklin D. Roosevelt Library
DECLASSIFIED
APRIL 1942
DOD DIR. 5200.9 (9/27/58)
C
Date- 3-11-59
I
my
Signature- Carl L. spicer
OF
THE
NAVY DEPARTMENT
STATE
BUREAU OF SHIPS
BUREAU OF SHIPS
REPRODUCTION OF THIS MATERIAL IN
ANY FORM IS NOT AUTHORIZED EXCEPT
BY SPECIFIC APPROVAL OF THE
SECRETARY 07 THE NAVY.
DISTRIBUTION
The President
The Secretary of the Navy
The Assistant Secretary of the Navy
The Under Secretery of the Navy
The Assistant Secretary for Air
The Commander-in-Chief, U.S. Fleet
The Chief of Naval Operations
Admiral Robinson
Chief of Office of Procurement & Material
Admiral Van Keuren
Chief of Bureau of Ships
Admiral Jones
Ass't Chief of Bureau of Ships
Admiral Howard
Design Division, Bureau of Ships
Admiral Blandy
Chief of Bureau of Ordnance
Admiral Towers
Chief of Bureau of Aeronautics
Admiral Jacobs
Chief of Bureau of Navigation
Captain Rawlings
Shipbuilding Division, Bureau of Ships
Mr. Donald Nelson
W.P.B., Head
Mr. Robert Nathan
W.P.B., Progress
Senator Walsh
Chairman, Senate Naval Affairs Committee
Representative Vinson
Chairman, House Naval Affairs Committee
Mr. Powell
Office of Procurement & Material
Mr. Germain
Office of Procurement & Material
Kr. Belcher
Office of Procurement & Material
Mr. Folsom
Office of Procurement & Material
Mr. Lynge
W.P.B., Shipbuilding
Mr. Stacy May
W.P.B., Statistics
Mr. Harrison
W.P.B., Production
A29583
-|-
Bureau of Ships
Shipbuilding Division (745)
TABLE OF CONTENTS
TITLE
PAGE
Distribution
1
Remarks
5
SHIPS
Combatant Ships
6-7
Mine Craft
12-13
Patrol Craft
16-17
Auxiliaries
18-19
District Craft
26-27
Special Small Boats
36
COMPONENTS
Main Propulsion
39
Machinery Auxiliaries
40
Hull Machinery'
40
Equipment
40
-3-
LEGEND
LEFT-HAND PAGES
RIGHT-HAND PAGES
For each month in 1942 or quarter-
year for 1943 - 1944:
Two bars -
Report Date
2
3
4
Jan Feb Mar
Vessels completed
A
B
on schedule.
1942
For each bar:
Completions behind
A
B
Keel Layings
schedule.
Three Segments - Launchings
Completions ahead
A
B
of schedule.
Completions
First Bar of each pair:
Launchings -
- and
P
Predicted Completions,
Keel Layings -
-
Launchings, Keel Layings
on November 1, 1941.
On Schedule, Behindor Ahead of Schedule,
are indicated in the same way.
Second Bar of each pair:
-
-
A
E
Either
Actual, or
Present
(Builders')
"Schedule" against which progress
Estimated
is shown is the November 1, 1941 build-
Completions,
ing schedule.
Launchings,
Keel Layings.
In computing progress made, all
vessels now contracted for are included.
Where no bar appears, figure 1s "0".
Only vessels contracted for on or
before 11-1-41 are included.
-4-
REMARKS
1 PUBLICATION-
Monthly - As of 15th of Month, issued on the 20th.
(Components as of 1st of Month.)
2. SCOPE-
ALL BUREAU OF SHIPS REQUIREMENTS FOR NEW SHIPS, WHETHER:
a). Regular Navy Construction (plus AVG conversions).
b). Emergency Construction.
c). Defense Aid.
(Defense A1d vessels are included with
their U. S. Navy Counterparts - 1. e.
"YMS" includes YMS plus BYMS.)
Note: (Maintenance, repair, alteration,
and conversions included in com-
ponents where possible to schedule.)
3. Total Production Required: Based on Bureau of Ships interpreta-
tion of current Navy Department or National or United
Nations plans whether formally promulgated or not.
4. In Production Schedule: Covered by definite commitments.
5. Authorized but Not Ordered: Ships fully authorized, appropriated
for, and cleared by President (SecNav) (CNO) but not con-
tracted for. Components for same, plus components for ships
in production schedule which themselves have not yet been
ordered.
6. REFERENCE POINTS:
a). All progress will be shown relative to predictions on
1 Nov. 1941. All Statistics start with 11 June 1940.
b). No vessels contracted for after 1 Nov. 1941 are snown
in vertical comparison bars appearing on left-hand
pages. Estimates for April 1942, (vertical "E" bars
on left-hand pages for 3/42) include actual progress
April 1 thru 15 plus estimates for April 16 thru 30.
-5-
COMPARATIVE PROGRESS
"Are we gaining or losing?"
.
COMPLETIONS
#
LAUNCHINGS
.
KEEL LAYINGS
P # PREDICTED ON 11-1-41
A . ACTUAL
E = LAST ESTIMATES ON REPORT DATE
E
BB BATTLESHIPS
P
E
E
P
P
E
P
0
4
5
10
12
1942
1943
CA HEAVY CRUISERS
P
P
E
2
12
3
4
1943
CB LARGE CRUISERS
E
P
E
2
E.
5
10
12
4
1943
CL LIGHT CRUISERS - 10,000T
P
e
P
Il
=
1945
- 6 -
CONE
EVENTS
"WHAT HAVE WE DONE?"
COMBATANT
TOTAL PRODUCTION REQUIRED 6/11/40--1946 -X
L K C
A
B
C
D
A. ACTUAL EVENTS
B. IN PRODUCTION
C. AUTHORIZED BUT
D. ADDITIONAL REQ"D.
6/11/40-4/15/42
SCHEDULE
NOT ORDERED
NOT AUTHORIZED
April 15, 1942
Symbol
Type
BB
Battleships
COMPLETIONS
3A
14 B
LAUNCHINGS
5A
II B
KEEL LAYINGS
0A
68
CA
Heavy Cruisers
C
8B
20
L
88
20
K
4A
4B
2D
CB
Large Cruisers
C
68
20
L
68
20
K
2A
48
2D
CL
Light Cruisers (10,000 T)
C
288
18D
L
3A
25 B
18D
K
13A
158
18D
-7-
KEEL LAYING
LAUNCHING
COMPLETION
CL LIGHT CRUISERS - 6,000 T
P
P
P
E
E
2
$
10
12
3
4
2
3
4
CV AIRCRAFT CARRIERS - 27,000 T
P
E
E
P
e
E
E
P
E
P
P
I
E
3
I
I
E
10
12
4
1942
1943
CV AIRCRAFT CARRIERS - 10,000 T
P
P
P.
P
0
E
E
0
10
12
3
3
1942
1943
DD DESTROYERS - 1,620-1,630 T
E
Il
#
P.
X
3
,
P
E
2
4
5
9
10
3
4
1944
DD DESTROYERS - 2,100 T
P
E
e
10
14
21
en
E
2
10
1942
1943
1944
P . PREDICTED ON 11-1-41 11
A . ACTUAL
E LAST ESTIMATES ON REPORT DATE
- 8-
COMBATANT VESSELS (cont'd)
April 15, 1942
Symbol
Type
CL
Light Cruisers (6,000 T)
COMPLETIONS
4A
48
4D
LAUNCHINGS
4A
48
4D
KEEL LAYINGS
2A
28
OF
4D
CV
Aircraft Carriers (27,000 T)
IA
C
13B
140
IA
L
13B
14D
K
7A
68
140
CV
Aircraft Carriers (10,000 T)
C
6B
5D
L
68
5D
K
6A
5.D
DD
Destroyers (1,620 - 1,630 T)
C
36A
61 B
L
38 A
438
K
64 A
88
DD
Destroyers (2,100 T)
C
138 B
120 D
8A
L
130 B
120 D
K
56 A
828
120D
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-9-
KEEL LAYING
LAUNCHING
DE ESCORT VESSELS
COMPLETION
#
3
4
5
6
6
9
10
=
12
2
3
4
2
3
4
1942
1943
1944
SS SUBMARINES
P.
P
E
E
P.
E
P.
E.
P.
P.
1
P.
P
4
5
5.
4
0
I
3,
D
.
+
E
P.
P
o
1
o
a
10
1943
1944
1942
PREDICTED ON 11-1-41 I
ACTUAL
E.LAST ESTIMATES ON REPORT DATE
- 10-
COMBATANT VESSELS (cont'd)
April 15, 1942
Symbol
Type
DE
Escort Vessels
COMPLETIONS
300B
520D
LAUNCHINGS
300B
500 D
4A
KEEL LAYINGS
286 B
500 D
SS
Submarines
C
24
868
1850
29A
L
768
185 D
K
44A
528
185 D
mm
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule
D. Additional required, not
authorized.
-11-
KEEL LAYING
LAUNCHING
COMPLETION
CM MINELAYERS
E
P
0
o
9
o
=
4
2
3
1943
AM MINESWEEPERS - 220
P
E
E
7
=
3
#
4
-
10
1943
AM MINESWEEPERS - 180'
10
12
1942
AM MINESWEEPERS - 173'
P
P
P
E
3.
0
©
P
E
o
0
0
2
@
4
5
.
9
or
H
12
3
3
4
1943
AMc MINESWEEPERS - 97'
is
E.
0
6
I
0
E
0
4
or
-------
P . PREDICTED ON 11-1-41 I
A ACTUAL
E LAST ESTIMATES ON REPORT DATE
- 12 -
MINE CRAFT
April 15, 1942
Symbol
Type
CM
Mine Layers
COMPLETIONS
38
LAUNCHINGS
IA
2B
KEEL
3A
LAYINGS
AM
Mine Sweepers (220')
2A
B
IOC
C
770
80D
6A
1068
10C
L
748
80D
788 IOC
K
33A
460
BOD
AM
Mine Sweepers (180')
C
IIO B
20C
L
110 B
20C
6A
K
1048
20C
AM
Mine Sweepers (173')
C
188
L
6A
12B
K
18
17A
AMc
Mine Sweepers ( 97') .
78
C
63A
50 C
L
70A
50 C
K
70A
50c
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-13-
KEEL LAYING
11)
LAUNCHING
YMS
MINESWEEPERS - 135'
E
COMPLETION
D
o
T
I
11
6
5
1
D
a
o
DOPOPOR
E
5
10
"
12
3
1943
1944
1942
PREDICTED ON 11-1-41
A ACTUAL
E LAST ESTIMATES ON REPORT DATE
-14-
MINE CRAFT (cont'd)
April 15, 1942
Symbol
Type
YMS
Mine Sweepers (135')
15A
394B
80c
COMPLETIONS
3200
300
170 D
316B
LAUNCHINGS
:85A
BOC
170 D
KEEL LAYINGS
36A
80C
1700
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
In Production Schedule.
D. Additional required, not
authorized.
-15-
KEEL LAYING
PC SUBMARINE CHASERS - 110'
LAUNCHING
COMPLETION
a
G
©
E
-
10
2
4
2
M
PC SUBMARINE CHASERS - 173
P
3
E
E
1
P
-
1
13
1
G
1943
PC SUBMARINE CHASERS - - 180
1942
1943
PT MOTOR TORPEDO BOATS
I
I
0
4
10
12
3
4
1942
1943
E
YP DISTRICT PATROL VESSELS
P
P
o
o
0
1942
1943
P . PREDICTED ON 11-1-41
A-ACTUAL
E *LAST ESTIMATES ON REPORT DATE
- 16-
PATROL VESSELS
April 15, 1942
Symbol
Type
PC
Submarine Chasers (110')
IOA
266 8
16C
COMPLETIONS
2260
160
LAUNCHINGS
53A
222B
16C
KEEL LAYINGS
152 A
124B
PC
Submarine Chasers (173')
19A
150
C
328 B
411D
49A
150
L
2978
411D
94A
I5C
K
251B
411D
PC
Submarine Chasers (180')
C
130 B
200
L
130B
20C
K
130B
200
PT
Motor Torpedo Boats
216B
4C 100
C
67A
0000
2/6 B
4C
IOD
L
62A
2260
1698
4C
X
96A
+798
IOD
YP
District Patrol Vessels
C
68
50
L
2A
4B
5 G
K
6A
50
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-17
KEEL LAYING
LAUNCHING
COMPLETION
AD DESTROYER TENDERS
10
12
1943
AN NET LAYERS
P
e
o
o
0
10
1942
1943
AOG GASOLINE TANKERS
P
o
E
il
10
1942
1943
AP TRANSPORTS
a
©
1942
12
1943
APM TRUCK TRANSPORTS
E
0
o
o
a
0
1942
1943
P . PREDICTED ON 11-1-41 .
A . ACTUAL
E LAST ESTIMATES ON REPORT DATE
- 18-
AUXILIARY VESSELS
April 15, 1942
Symbol
Type
AD
Destroyer Tenders
COMPLETIONS
IA
38
LAUNCHINGS
38
KEEL LAYINGS
3A
AN
Net Layers
C
48
L
48
K
2A
28
AOG
Gasoline Tankers
C
6D
118
60
L
IIB
K
IIB
60
AP
Transports
C
2B
L
28
K
2A
APM
Truck Transports
15 B
C
00
10 C
to
10 C
L
88
158
K
00
10 C
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
D. Additional required, not
B. In Production Schedule.
authorized.
-19-
KEEL LAYING
LAUNCHING
APR RESCUE TRANSPORTS
COMPLETION
4
10
12
4
3
1943
AR & ARH REPAIR SHIPS
P
P
a
ARS SALVAGE VESSELS (STEEL)
e
P
o
a
P
0
21
ARS SALVAGE VESSELS (WOOD)
AS SUBMARINE TENDERS
a
e
E
0
1943
PREDICTED ON 11-1541
A ACTUAL
E LAST ESTIMATES ON REPORT DATE
-20-
AUXILIARY VESSELS (cont'd)
April 15, 1942
Symbol
Type
APR
Rescue Transports
COMPLETIONS
Il C
LAUNCHINGS
110
KEEL LAYINGS
II C
AR & ARH
Repair Ships
C
IA
38
L
3B
È
3A
ARS
Salvage Vessels (steel)
188
C
108
L
$68
138
K
5A
++8
ARS
Salvage Vessels (wood)
118
C
50
2c
B
L
60
20
K
3A
-eo
2c
AS
Submarine Tenders
C
IA
6B
i
2A
5B
Y.
4A
2B
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-21-
KEEL LAYING
ASR SUBMARINE RESCUE VESSELS
LAUNCHING
COMPLETION
0
-
AT FLEET TUGS
.
e
o
10
1943
ATL TANK LANDING CRAFT CARRIERS
10
1943
ATR RESCUE TUGS
10
4
AV SEAPLANE TENDERS
E
E
P
E
0
0
10
1942
1943
1944
-
P *PREDICTED ON 11-1-41
A *ACTUAL
E LAST ESTIMATES ON REPORT DATE
-22-
CONF
AUXILIARY VESSELS (cont'd)
April 15, 1942
Symbol
Type
ASR
Submarine Rescue Vessels
COMPLETIONS
58
LAUNCHINGS
58
KEEL
5A
LAYINGS
AT
Fleet Tugs
628
C
51B
9 C
RO
B.
L
4A
478
9C
468
K
IIA
358
9 C
ATL
Tank Landing Craft Carriers
C
220B
BOC
AAA
1
220B
800
XX,XX
K
2208
800
XXXX
ATR
Rescue Tugs
C
40 C
L
400
K
40 C
AV
Seaplane Tenders
C
2A
4B
L
IA
48
K
48
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-23-
KEEL LAYING
LAUNCHING
AVP SMALL SEAPLANE TENDERS
A
COMPLETION
P
€
#
P
E
I
E
e
E
P.
E
P
I
0
P
o
0
P
E
P
P
E
P
0
0
o
E
o
0
o
o
o
0
#
3
4
5
6
7
.
10
12
2
3
4
2
3
4
1942
1943
1944
AVG ESCORT VESSELS (AIRCRAFT) CONVERSIONS
P
o
4
6
9
10
12
$
4
N
M
1942
1943
1944
PREDICTED ON 11-1-41
A . ACTUAL
E.LAST ESTIMATES ON REPORT DATE
- 24-
CONFIDENTIAL
AUXILIARY VESSELS (cont'd)
April 15, 1942
Symbol
Type
AVP
Small Seaplane Tenders
COMPLETIONS
6A
98
35 C
LAUNCHINGS
HA
4B
35 C
KEML LAYINGS
II A
35 C
AVG
Escort Vessel (Aircraft) Conversions.
2:A
58.
19 C
21D
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
.D. Additional required, not
authorized.
-25-
I
KEEL LAYING
LAUNCHING
YTL SHALLOW DRAFT TANK LANDING CRAFT CARRIERS
COMPLETION
10
=
1942
1943
YO FUEL OIL BARGES - S.P.
P.
o
o
o
10
1942
1943
1944
YO FUEL OIL BARGES - N.S.P.
1942
1943
1944
YOG GASOLINE BARGES - S.P.
3
6
10
il
12
4
2
3
4
1942
1943
1944
YOG GASOLINE BARGES- - N.S.P.
10
12
as
1942
1943
1944
PREDICTED ON 11-1-41
A . ACTUAL
E LAST ESTIMATES ON REPORT DATE
-26-
DISTRICT CRAFT
April 15, 1942
Symbol
Type
YTL
Shallow Draft Tank Landing Craft
COMPLETIONS
500,8
LAUNCHINGS
5008
KEEL LAYINGS
5008
YO
Fuel 011 Barges (S. P.)
3A
C
>98
47 C
L
SAE
6B
47 C
K
7A
38
47 C
YO
Fuel 011 Barges (N. S. P.)
IB
C
24 C
8
L
24C
IA
K
24C
YOG
Gasoline Barges (S. P.)
C
8C
L
8 C
K
8 C
YOG
Gasoline Barges (N. S. P.)
C
9B
16 C
L
98
16 C
98
16 C
K
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-27-
KEEL LAYING
LAUNCHING
YSR SLUDGE REMOVAL BARGES
COMPLETION
0
0
5
10
12
2
3
4
1943
1944
YS STEVEDORE BARGES
0
10
12
1943
YTT TORPEDO TESTING BARGES
E
0
10
12
4
1942
1943
1944
YW WATER BARGES - S.P.
2
3
10
12
1942
3
4
2
3
4
1943
1944
YW WATER BARGES - N.S.P.
10
12
1942
1943
1944
-
PREDICTED ON 11-1-41 "
A . ACTUAL
E LAST ESTIMATES ON REPORT DATE
-28-
DISTRICT CRAFT (cont'd)
April 15, 1942
Symbol
Type
YSR
Sludge Removal Barges
COMPLETIONS
38
60
LAUNCHINGS
2A
IB
6 C
KEEL LAYINGS
IA
28
6 C
YS
Stevedoring Barges
C
(2 A
10 B
13 C
L
12 A
10 B
13 C
K
15 A
7B
13 C
YTT
Torpedo Testing Barge
C
IB
2 C
L
IB
20
X
IB
2 C
YW
Water Barges (S. P.)
C
13 C
L
13 C
K
13 C
YW
Water Barges (N. S. P.)
C 2A 3B
20 C
L
2A31B
20 C
K
2A
B
20 C
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-29-
KEEL LAYING
o
LAUNCHING
YSD SEAPLANE WRECKING DERRICKS
COMPLETION
P
0
10
3
4
4
1943
YFB FERRY BOATS - LARGE
10
12
1943
1944
YFB FERRY BOATS - SMALL
10
1943
YCF CAR FLOATS
D
0
10
is
4
1942
1943
YF COVERED LIGHTERS - S.P.
P
P
00
10
If
1945
1944
P PREDICTED ON 11-1-41 I
A.ACTUAL
E *LAST ESTIMATES ON REPORT DATE
-30-
CONFIDENTIAL
DISTRICT CRAFT (cont'd)
April 15, 1942
Symbol
Type
YSD
Seaplane Wrecking Derricks
6B
COMPLETIONS
17 A
22 C
LAUNCHINGS
22 A
22 C
20
KEEL LAYINGS
21 A
220
YFB
Ferry Boats (Large)
C
IA
30
L
TIA
30
K
IA
30
YFB
Ferry Boats (Small)
C
IA
38
20
L
IA
38
2C
X
IA
38
20
YCF
Car Floats
C
6A
30
L
6A
30
K
5A
30
YF
Covered Lighters (S. P.)
C
9A
31 B
2P G
L
10 A
28 B
22 C
K
12 À
288
220
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-31-
KEEL LAYING
LAUNCHING
YF COVERED LIGHTERS-N.S.P.
COMPLETION
»
E
1
U
o
e
E
I
3
6
9
10
3
4
3
4
1942
1943
1944
YG GARBAGE LIGHTERS - S.P.
P
P
P
2
E
#
E
0
2
3
10
12
1942
1943
1944
YG GARBAGE LIGHTERS - N.S.P.
12
3
1943
1944
YC OPEN LIGHTERS
P
P
P
A
P
1
E
E
e
2
3
5
6
e
01
12
a
4
3
4
1943
1944
YT HARBOR TUGS - 100
E
P
E
P
E
P.
E
C
E
#
o
o
0
4
10
a
1942
1943
1944
-
PREDICTED ON 11-1-41 I
A ACTUAL
E LAST ESTIMATES ON REPORT DATE
-
32-
CONFIDENTIAL
DISTRICT CRAFT (cont'd)
April 15, 1942
Symbol
Type
YF
Covered Lighters (N. S. P.)
COMPLETIONS
35A
238
122C
XXXX
LAUNCHINGS
E 40A
188
122C
58
KXEL LAYINGS
53A
122C
YG
Garbage Lighters (S. P.)
C 2A
68
600 7c
L
3A
58
# 7c
K
4A
48
so 7c
YG
Garbage Lighters (N. S. P.)
C
8C
L
8C
K
8C
Open Lighters
C
45A
76B
73 C
L
46A
75 B
73C
K
50 A
718
730
YT
Harbor Tugs (100')
14B
C
IIA
150
530
20D
L
12A
138
530
20D
K
17A
88
53 0
20D
AXI
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
D. Additional required, not
B. In Production Schedule.
authorized.
-33-
KEEL LAYING
LAUNCHING
YT HARBOR TUGS - - 65
COMPLETION
P
1
E
I
P
P
o
4
8
12
E
YR FLOATING WORKSHOPS
P
P
P
E
0
o
10
4
1943
1944
YCV AIRCRAFT LIGHTERS
10
12
4.
YN NET TENDERS
P
P
PA
N
4
5
10
4
1943
YNG GATE TENDERS
1943
P . PREDICTED ON 11-1-41
A ACTUAL
E *LAST ESTIMATES ON REPORT DATE
-34-
IDENTIAL
DISTRICT CRAFT (cont'd)
April 15, 1942
Symbol
Type
YT
Harbor Tugs (65')
36B
CORPLETIONS
2IA
848
31C
370
AUNCHINGS
20A
31C
37D
KANL LAYINGS
38A
158
310
370
YR
Floating Workshops
C
7A
128
L
13A
68
K
15A
48
YCV
Aircraft Lighters
C
2B
BC
L
28
80
K
28
80
YN
Net Tenders
38
C
29A
40C
L
32A
40C
K
32A
400
YNG
Gate Tenders
C
18A
90
L
90
K
90
A. Actual Events 6/11/40--4/15/42.
C. Authorized but not ordered.
B. In Production Schedule.
D. Additional required, not
authorized.
-35-
SPECIAL SMALL BOATS
April 15, 1942
Aircraft Rescue Boats - 60' and C3'
BA
618
Aircraft Rescue Boats - "15'
I7A
598
Aircraft Rescue Boats - 29' and 36'
31A
48
Amphibian Tractors
196A
434B
Artillery Lighters
19A
Bomb Target Boats (steel)
26A
98
13D
Buoy Boats - 38' (wood)
15A
46B
IOD
Cruiser Hulls - 30-38' (wood)
6A
6B
Harbor Picket Boats - 37' (wood)
59A
95B
Motor Launches - 30' and 40' (wood)
557A
3B
Motor Launches - 57' (wood)
111A
3B
Motor Launches - 72' (wood)
BA
468
20D
A. Actual Events 6/11/40 - 4/15/42
C. Authorized but not ordered
B. In Production Schedule
D. Additional required, not
authorized.
-37-
SPECIAL SMALL ROATS (Cont'd)
April 15, 1942
Motor Whale Boats and Launches - 2('
554 A
Personnel Landing Boats (Eureka)
36' (wood)
705 A
347,B
825 C
Plane Rearming Launches
6A
1508
Rubber Boats
596A
9308
500D
Support Landing Craft
100 B
100 C
Tank Lighters - 45', Bureau Type - 47',
and Higgins Type - 50' (steel)
149A
583 B.
1100 C
Torpedo Retriever Boats
12 A
Vehicle, Ramp Type Landing Boats -
36' (wood)
283A 611 B
1475 C
Other Small Boats
6D
169 A
A. Actual Events 6/11/40 - 4/15/112
C. Authorized but not ordered
B. In Production Schedule
D. Additional required, not
authorized.
-38-
COMPONENTS
COMPONENTS COMPLETED
COMPONENTS IN
COMPONENTS FOR
COMPONENTS FOR
6/11/40 - 4/1/42 FOR
PRODUCTION SCHEDULE
VESSELS AUTHORIZED
ADDITIONAL VESSELS
VESSELS BUILDING OR
BUT NOT ORDERED, PLUS
NOT FULLY AUTHORIZED
COMPLETED
COMPONENTS NOT YET
ORDERED FOR VESSELS
BUILDING
MAIN PROPULSION
April 1, 1942
Boilers, Main
726
838
270
1488
Condensers, Main
266
592
276
1100
Diesel Engines
927
5216
2031
5909
Gears, Steam Vessels
150
708
36
472
Gears, Diesel Propulsion Vessels
Motors, Main Propulsion
Propellers
Shafting
Switchboards
Turbines, Main
188
670
270
1100
-39-
COMPONENTS (CONT'D)
MACHINERY AUXILIARIES
Blowers, Forced Draft, Turbine Driven
Blowers, Motor Driven
Compressors, Turbine Driven
Compressors, Motor Driven
Distilling Units
Evaporator Units
Generators, Main
Generators, Emergency Diesel
Generators, Auxiliary Diesel
Turbo Generators
Pumps, Turbine Driven
Pumps, Motor Driven, Main
011 Purifiers
Refrigeration Equipment
HULL MACHINERY
Conveyers, Ammunition
Cranes, Boat
Cranes, Airplane
Elevators
Gears, Steering
Hoists, Ammunition
Winches
Windlasses
EQUIPMENT
Echo Ranging Equipment
Echo Sounding Equipment
Flasks, Air
Gyrocompasses
Radar Equipment
Radio Transmitters and Receivers
Periscopes
Above Components are to be included
in future reports as soon as figures
are available.
-40-