Ask the Scholar

Document scope · 1 page
doc
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory. For page-specific OCR and visual context, open one of the page chats.

Scholar Source Context

Document identity
localId
174691286
label
Building 550 - Barracks
core
doc
dtoType
map
pageCount
1
Source metadata
id
174691286
contentType
map
title
Building 550 - Barracks
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691286
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
74e5ec4e951ae953
ocrText
United Reprographic Planroom Page 1 of 9 GOVENOR'S ISLAND: Set Order Full Set Order Individual Sheets Print Order File Name DrawingNumber Description Revision RevisionDate roll#82 bldg#550 32-303-85 1 OF 176 BLDG#550 - COVER SHEET 3/95 office\FILE0001.TIF roll#82 bldg#550 32-303-85 C-201 2 OF DEMOLITION SITE PLAN A 3/95 office\FILE0002.TIF 176 roll#82 bldg#550 32-303-85 C-202 OF SITE PLAN A 3/95 office\FILE0003.TIF 176 roll#82 bldg#550 32-303-85 C-203 OF SITE UTILTIES PLAN A 3/95 office\FILE0004.TIF 176 roll#82 bldg#550 32-303-85 C-203 OF LANDSCAPE PLAN A 3/95 office\FILE0005.TIF 176 roll#82 bldg#550 32-303-85 C-205 OF SITE DETAILS A 3/95 office\FILE0006.TIF 176 roll#82 bldg#550 32-303-85 AA-201 7 OF ASBESTOS ABATEMENT FIRST A 3/95 office\FILE0007.TIF 176 FLOOR roll#82 bldg#550 32-303-85 AA-202 OF ASBESTOS ABATEMENT FIRST A 3/95 office\FILE0008.TIF 176 FLOOR roil#82 bldg#550 32-303-85 AA-203 OF ASBESTOS ABATEMENT A 3/95 office\FILE0009.TIF 176 SECOND FLOOR roll#82 bldg#550 32-303-85 AA-204 OF ASBESTOS ABATEMENT - A 3/95 office\FILE0010.TIF 176 SECOND FLOOR roll#82 bldg#550 32-303-85 AA-205 11 OF ASBESTOS ABATEMENT THIRD A 3/95 office\FILE0011.TIF 176 FLOOR roll#82 bldg#550 32-303-85 AA-206 12 OF ASBESTOS ABATEMENT THIRD A 3/95 office\FILE0012.TIF 176 FLOOR roll#82 bldg#550 32-303-85 AA-207 OF ASBESTOS ABATEMENT ATTIC A 3/95 office\FILE0013.TIF 176 roll#82 bldg#550 32-303-85 S201 14 OF FOUNDATION PLAN A 3/95 office\FILE0014.TIF 176 roll#82 bldg#550 32-303-85 S202 15 OF 2ND FLOOR FRAMING PLAN A 3/95 office\FILE0015.TIF 176 roll#82 bldg#550 32-303-85 S202 OF 3RD FLOOR FRAMING PLAN A 3/95 office\FILE0016.TIF 176 roll#82 bldg#550 32-303-85 S204 17 OF ATTIC FLOOR FRAMING PLAN A 3/95 office\FILE0017.TIF 176 roll#82 bldg#550 32-303-85 S301 18 OF GARAGE & CANOPY PLANS & A 3/95 office\FILE0018.TIF 176 DETAILS roll#82 bldg#550 32-303-85 S302 OF STRUCTURAL DETAILS A 3/95 office\FILE0019.TIF 176 roll#82 bldg#550 32-303-85 S303 20 OF STRUCTURAL DETAILS A 3/95 office\FILE0020.TIF 176 roll#82 bldg#550 32-303-85 D201 21 OF 1ST FLOOR DEMOLITION PLAN A 3/95 office\FILE0021.TIF 176 EAST roll#82 bldg#550 32-303-85 D202 22 OF 1ST FLOOR DEMOLITION PLAN A 3/95 office\FILE0022.TIF 176 WEST roll#82 bldg#550 32-303-85 D203 23 OF 2ND FLOOR DEMOLITION PLAN - A 3/95 office\FILE0023.TIF 176 EAST roll#82 bldg#550 32-303-85 D204 24 OF 2ND FLOOR DEMOLITION PLAN A 3/95 office\FILE0024.TIF 176 WEST roll#82 bldg#550 32-303-85 D205 25 OF 3RD FLOOR DEMOLITION PLAN A 3/95 office\FILE0025.TIF 176 EAST roll#82 bldg#550 32-303-85 D206 26 OF 3RD FLOOR DEMOLITION PLAN A 3/95 office\FILE0026.TIF 176 WEST 1/20/2006 United Reprographic Planroom Page 2 of 9 roll#82 bldg#550 32-303-85 D207 27 OF ATTIC DEMOLITION PLAN EAST A 3/95 office\FILE0027.TIF 176 roll#82 bldg#550 32-303-85 D208 OF ATTIC DEMOLITION PLAN WEST A 3/95 office\FILE0028.TIF 176 roll#82 bldg#550 32-303-85 D209 29 OF 1ST FL DEMO PLAN - EAST, ELEC, A 3/95 office\FILE0029.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 OF 1ST FL DEMO PLAN WEST, ELEC, A 3/95 office\FILE0030.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 D211 31 OF 2ND EL DEMO PLAN EAST, ELEC, A 3/95 office\FILE0031.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 D212 OF 2ND FL DEMO PLAN WEST, ELEC, A 3/95 office\FILE0032.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 OF 3RD FL DEMO PLAN EAST, ELEC, A 3/95 office\FILE0033.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 D214 OF 3RD FL DEMO PLAN WEST, ELEC, A 3/95 office\FILE0034.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 D215 OF 4TH FL DEMO PLAN EAST, ELEC, A 3/95 office\FILE0035.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 D216 OF 4TH FL DEMO PLAN WEST, ELEC, A 3/95 office\FILE0036.TIF 176 MECH, PLUMB, SYS roll#82 bldg#550 32-303-85 D217 OF ROOF REMOVALS PLAN A 3/95 office\FILE0037.TIF 176 roll#82 bldg#550 32-303-85 OF SOUTH ELEVATION EXIST A 3/95 office\FILE0038.TIF 176 CONDITIONS/REMOVALS roll#82 bldg#550 32-303-85 D219 OF NORTH ELEVATION EXIST A 3/95 office\FILE0039.TIF 176 CONDITIONS/REMOVALS roll#82 bldg#550 32-303-85 D220 OF EAST & WEST ELEV. EXIST A 3/95 office\FILE0040.TIF 176 CONDITIONS/REMOVALS roll#82 bldg#550 32-303-85 OF BLDG. SECTIONS EXIST A 3/95 office\FILE0041.TIF 176 CONDITIONS/REMOVALS roll#82 bldg#550 32-303-85 A101 OF ARCHITECTURAL LEGEND A 3/95 office\FILE0042.TIF 176 roll#82 bldg#550 32-303-85 A102 OF DOOR SCHEDULE A 3/95 office\FILE0043.TIF 176 roll#82 bldg#550 32-303-85 A103 44 OF DOOR SCHEDULE A 3/95 office\FILE0044.TIF 176 roll#82 bldg#550 32-303-85 A104 OF DOOR DETAILS A 3/95 office\FILE0045.TIF 176 roll#82 bldg#550 32-303-85 A105 OF BORROW - LITE DETAILS A 3/95 office\FILE0046.TIF 176 roll#82 bldg#550 32-303-85 A106 OF BORROW LITE SHCED & DOOR A 3/95 office\FILE0047.TIF 176 DTLS roll#82 bldg#550 32-303-85 A107 OF ROOM FINISH SCHEDULE A 3/95 office\FILE0048.TIF 176 roll#82 bldg#550 32-303-85 A108 OF PARTITION TYPES & DETAILS A 3/95 office\FILE0049.TIF 176 roll#82 bldg#550 32-303-85 A202 OF 1ST FL PLAN A 3/95 office\FILE0050.TIF 176 roll#82 bldg#550 32-303-85 A203 52 OF 2ND FLOOR PLAN EAST A 3/95 office\FILE0051.TIF 176 roll#82 bldg#550 32-303-85 A204 53 OF 2ND FLOOR PLAN WEST A 3/95 office\FILE0052.TIF 176 roll#82 bldg#550 32-303-85 A205 OF 3RD FLOOR PLAN EAST A 3/95 office\FILE0053.TIF 176 roll#82 bldg#550 32-303-85 A206 55 OF 3RD FLOOR PLAN WEST RECORD DRAWING 3/95 office\FILE0054.TIF 176 roll#82 bldg#550 32-303-85 A207 OF ATTIC FLOOR PLAN-EAST RECORD DRAWING 3/95 office\FILE0055.TIF 176 roll#82 bldg#550 32-303-85 A208 57 OF ATTIC FLOOR PLAN-WEST RECORD DRAWING 3/95 office\FILE0056.TIF 176 roll#82 bldg#550 32-303-85 A209 OF 1ST FLOOR FINISH PLAN EAST AS BUILT 3/95 office\FILE0057.TIF 176 roll#82 bldg#550 32-303-85 A210 OF 1ST FLOOR FINISH PLAN WEST AS BUILT 3/95 office\FILE0058.TIF 176 1/20/2006 United Reprographic Planroom Page 3 of 9 roll#82 bldg#550 32-303-85 A902 OF office\FILE0059.TIF 1ST FLOOR RCP-WEST 176 RECORD DRAWING 3/95 roll#82 bldg#550 32-303-85 A901 93 OF office\FILE0060.TIF 1ST FLOOR RCP-EAST 176 RECORD DRAWING 3/95 roll#82 bldg#550 32-303-85 A201 50 OF 1ST FLOOR PLAN-EAST office\FILE0061.TIF 176 RECORD DRAWING 3/95 roll#82 bldg#550 32-303-85 A211 60 OF 2ND-FLOOR FINISH PLAN-EAST office\FILE0062.TIF AS BUILT 176 3/95 roll#82 bldg#550 32-303-85 A212 61 OF office\FILE0063.TIF 2ND-FLOOR FINISH PLAN-WEST 176 AS BUILT 3/95 roll#82 bldg#550 32-303-85 A213 62 OF 3RD FLOOR FINISH PLAN-WEST office\FILE0064.TIF AS BUILT 176 3/95 roll#82 bldg#550 32-303-85 A301 63 OF SOUTH ELEVATION office\FILE0065.TIF RECORD DRAWING 3/95 176 roll#82 bldg#550 32-303-85 A302 64 OF NORTH ELEVATION office\FILE0066.TIF RECORD DRAWING 3/95 176 roll#82 bldg#550 32-303-85 A303 65 OF EAST & WEST ELEVATIONS office\FILE0067.TIF 176 RECORD DRAWING 3/95 roll#82 bldg#550 32-303-85 A304 66 OF BUILDING SECTIONS office\FILE0068.TIF RECORD DRAWING 3/95 176 roll#82 bldg#550 32-303-85 A305 OF AS BUILT 3/95 office\FILE0069.TIF 176 roll#82 bldg#550 32-303-85 A306 68 OF GARAGE PLAN, ELEV & SECTIONS AS BUILT 3/95 office\FILE0070.TIF 176 roll#82 bldg#550 32-303-85 A303 69 OF GARAGE WALL SECTIONS AS BUILT 3/95 office\FILE0071.TIF 176 roll#82 bldg#550 32-303-85 A308 OF GARAGE DETAILS AS BUILT 3/95 office\FILE0072.TIF 176 roll#82 bldg#550 32-303-85 A309 71 OF ENTRANCE CANOPY AS BUILT 3/95 office\FILE0073.TIF 176 roll#82 bldg#550 32-303-85 A310 72 OF EXTERIOR RESTORATION AS BUILT 3/95 office\FILE0074.TIF 176 SECTIONS & DETAILS roll#82 bldg#550 32-303-85 A311 OF EXTERIOR RESTORATION AS BUILT 3/95 office\FILE0075.TIF 176 SECTIONS & DETAILS roll#82 bldg#550 32-303-85 A501 74 OF EXTERIOR DETAILS AS BUILT 3/95 office\FILE0076.TIF 176 roll#82 bldg#550 32-303-85 A502 OF TYPICAL DETAILS AS BUILT 3/95 office\FILE0077.TIF 176 roll#82 bldg#550 32-303-85 A503 76 OF TYPICAL DETAILS AS BUILT 3/95 office\FILE0078.TIF 176 roll#82 bldg#550 32-303-85 A504 OF TYPICAL DETAILS AS BUILT 3/95 office\FILE0079.TIF 176 roll#82 bldg#550 32-303-85 A505 OF TYPICAL DETAILS AS BUILT 3/95 office\FILE0080.TIF 176 roll#82 bldg#550 32-303-85 A601 OF STAIR 1 & 3 DETAIL PLANS AS BUILT office\FILE0081.TIF 3/95 176 roll#82 bldg#550 32-303-85 A602 OF STAIR SECTIONS AS BUILT 3/95 office\FILE0082.TIF 176 roll#82 bldg#550 32-303-85 A605 OF 3RD FLOOR CORE PLAN AS BUILT 3/95 office\FILE0083.TIF 176 roll#82 bldg#550 32-303-85 A604 OF 2ND FLOOR CORE PLAN RECORD DRAWING 3/95 office\FILE0084.TIF 176 roll#82 bldg#550 32-303-85 A603 OF 1ST FLOOR CORE PLAN RECORD DRAWING 3/95 office\FILE0085.TIF 176 roll#82 bldg#550 32-303-85 A606 84 OF STAIR/ELEVATOR SECTIONS RECORD DRAWING 3/95 office\FILE0086.TIF 176 roll#82 bldg#550 32-303-85 A607 OF TYPICAL STAIR DETAILS RECORD DRAWING 3/95 office\FILE0087.TIF 176 roll#82 bldg#550 32-303-85 A701 86 OF LARGE SCALE PLAN DETAILS AS BUILT 3/95 office\FILE0088.TIF 176 roll#82 bldg#550 32-303-85 A702 87 OF LARGE SCALE PLAN DETAILS AS BUILT 3/95 office\FILE0089.TIF 176 roll#82 bldg#550 32-303-85 A703 OF INTERIOR ELEVATIONS AS BUILT 3/95 office\FILE0090.TIF 176 1/20/2006 United Reprographic Planroom Page 4 of 9 roll#82 bldg#550 32-303-85 A704 OF INTERIOR ELEVATIONS office\FILE0091.TIF 176 AS BUILT 3/95 roll#82 bldg#550 32-303-85 A705 OF INTERIOR ELEVATIONS office\FILE0092.TIF RECORD DRAWING 3/95 176 roll#82 bldg#550 32-303-85 A706 OF INTERIOR ELEVATIONS office\FILE0093.TIF RECORD DRAWING 3/95 176 roll#82 bldg#550 32-303-85 A801 92 OF INTERIOR ELEVATIONS AS BUILT office\FILE0094.TIF 3/95 176 roll#82 bldg#550 32-303-85 A906 98 OF 3RD FLOOR RCP-WEST AS BUILT office\FILE0095.TIF 3/95 176 roll#82 bldg#550 32-303-85 A905 OF 3RD FLOOR RCP-EAST AS BUILT office\FILE0096.TIF 3/95 176 roll#82 bldg#550 32-303-85 A904 OF 2ND FLOOR RCP-WEST RECORD DRAWING 3/95 office\FILE0097.TIF 176 roll#82 bldg#550 32-303-85 A903 OF 2ND FLOOR RCP-EAST RECORD DRAWING 3/95 office\FILE0098.TIF 176 roll#82 bldg#550 32-303-85 P101 OF PLUMBING LEGEND AS BUILT 3/95 office\FILE0099.TIF 176 roll#82 bldg#550 32-303-85 P201 OF 1ST FLOOR PLAN-EAST RECORD DRAWING 3/95 office\FILE0100.TIF 176 roll#82 bldg#550 32-303-85 P202 OF 1ST FLOOR PLAN-WEST RECORD DRAWING 3/95 office\FILE0101.TIF 176 roll#82 bldg#550 32-303-85 P203 OF office\FILE0102.TIF 176 2ND FLOOR PLAN-EAST AS BUILT 3/95 roll#82 bldg#550 32-303-85 P204 OF 2ND FLOOR PLAN-WEST RECORD DRAWING 3/95 office\FILE0103.TIF 176 roll#82 bldg#550 32-303-85 P205 OF 3RD FLOOR PLAN-EAST AS BUILT 3/95 office\FILE0104.TIF 176 roll#82 bldg#550 32-303-85 P206 OF 3RD FLOOR PLAN-WEST AS BUILT 3/95 office\FILE0105.TIF 176 roll#82 bldg#550 32-303-85 P207 OF ATTIC FLOOR PLAN-EAST AS BUILT 3/95 office\FILE0106.TIF 176 roll#82 bldg#550 32-303-85 P208 OF ATTIC PLAN-WEST AS BUILT 3/95 office\FILE0107.TIF 176 roll#82 bldg#550 32-303-85 P301 108 OF 1ST FLOOR PLAN-EAST RECORD DRAWING 3/95 office\FILE0108.TIF 176 roll#82 bldg#550 32-303-85 P302 109 OF 1ST FLOOR PLAN-WEST RECORD DRAWING 3/95 office\FILE0109.TIF 176 roll#82 bldg#550 32-303-85 P303 OF 2ND FLOOR PLAN-EAST AS BUILT 3/95 office\FILE0110.TIF 176 roll#82 bldg#550 32-303-85 P304 OF 2ND FLOOR PLAN-WEST AS BUILT 3/95 office\FILE0111.TIF 176 roll#82 bldg#550 32-303-85 P305 112 OF 3RD FLOOR PLAN-EAST AS BUILT 3/95 office\FILE0112.TIF 176 roll#82 bldg#550 32-303-85 P306 OF 3RD FLOOR PLAN-WEST RECORD DRAWING 3/95 office\FILE0113.TIF 176 roll#82 bldg#550 32-303-85 P307 OF ATTIC FLOOR PLAN-EAST AS BUILT 3/95 office\FILE0114.TIF 176 roll#82 bldg#550 32-303-85 P308 OF ATTIC FLOOR PLAN-WEST AS BUILT 3/95 office\FILE0115.TIF 176 roll#82 bldg#550 32-303-85 P601 116 OF DETAILS RECORD DRAWING 3/95 office\FILE0116.TIF 176 roll#82 bldg#550 32-303-85 P602 OF DETAILS AS BUILT 3/95 office\FILE0117.TIF 176 roll#82 bldg#550 32-303-85 P603 118 OF STACK DIAGRAM-EAST AS BUILT 3/95 office\FILE0118.TIF 176 roll#82 bldg#550 32-303-85 P604 118 OF STACK DIAGRAM-EAST AS BUILT 3/95 office\FILE0119.TIF 176 roll#82 bldg#550 32-303-85 P605 118 OF STACK DIAGRAM-WEST AS BUILT 3/95 office\FILE0120.TIF 176 roll#82 bldg#550 32-303-85 P606 OF STACK DIAGRAM-WEST AS BUILT 3/95 office\FILE0121.TIF 176 roll#82 bldg#550 32-303-85 P607 122 OF WATER RISER DIAGRAM-EAST AS BUILT 3/95 office\FILE0122.TIF 176 144 asn7a=editdiscinline&sid=938&naid=929&prid. 1/20/2006 United Reprographic Planroom Page 5 of 9 roll#82 bldg#550 32-303-85 P608 123 OF office\FILE0123.TIF WATER RISER DIAGRAM-EAST 176 AS BUILT 3/95 roll#82 bldg#550 32-303-85 P609 124 OF office\FILE0124.TIF WATER RISER DIAGRAM-WEST 176 AS BUILT 3/95 roll#82 bldg#550 32-303-85 P610 OF office\FILE0125.TIF 176 WATER RISER DIAGRAM-WEST AS BUILT 3/95 roll#82 bldg#550 32-303-85 P611 126 OF office\FILE0126.TIF GAS RISER DIAGRAMS-EAST 176 AS BUILT 3/95 roll#82 bldg#550 32-303-85 H101 127 OF office\FILE0127.TIF HVAC LEGEND 176 AS BUILT 3/95 roll#82 bldg#550 32-303-85 H201 128 OF 1ST FLOOR DUCTWORK PLAN- office\FILE0128.TIF RECORD DRAWING 176 3/95 EAST roll#82 bldg#550 32-303-85 H202 OF 1ST FLOOR DUCTWORK PLAN- RECORD DRAWING office\FILE0129.TIF 3/95 176 WEST roll#82 bldg#550 32-303-85 H203 OF 2ND FLOOR DUCTWORK PLAN- office\FILE0130.TIF AS BUILT 176 3/95 EAST roll#82 bldg#550 32-303-85 H204 OF 2ND FLOOR DUCTWORK PLAN- office\FILE0131.TIF AS BUILT 3/95 176 WEST roll#82 bldg#550 32-303-85 H205 OF 3RD FLOOR DUCTWORK PLAN- AS BUILT 3/95 office\FILE0132.TIF 176 EAST roll#82 bldg#550 32-303-85 H206 OF 3RD FLOOR DUCTWORK PLAN- AS BUILT 3/95 office\FILE0133.TIF 176 WEST roll#82 bldg#550 32-303-85 H207 OF ATTIC DUCTWORK PLAN-EAST AS BUILT 3/95 office\FILE0134.TIF 176 roll#82 bldg#550 32-303-85 H208 135 OF ATTIC DUCTWORK PLAN-WEST RECORD DRAWING 3/95 office\FILE0135.TIF 176 roll#82 bldg#550 32-303-85 H301 OF 1ST FLOOR PIPING PLAN-EAST AS BUILT 3/95 office\FILE0136.TIF 176 roll#82 bldg#550 32-303-85 H302 OF 1ST FLOOR PIPING PLAN-WEST RECORD DRAWING 3/95 office\FILE0137.TIF 176 roll#82 bldg#550 32-303-85 H303 OF 2ND FLOOR PIPING PLAN-EAST RECORD DRAWING 3/95 office\FILE0138.TIF 176 roll#82 bldg#550 32-303-85 H304 OF 2ND FLOOR PIPING PLAN-WEST AS BUILT 3/95 office\FILE0139.TIF 176 roll#82 bldg#550 32-303-85 H305 OF 3RD FLOOR PIPING PLAN-EAST AS BUILT 3/95 office\FILE0140.TIF 176 roll#82 bldg#550 32-303-85 H306 OF 3RD FLOOR PIPING PLAN-WEST AS BUILT 3/95 office\FILE0141.TIF 176 roll#82 bldg#550 32-303-85 H307 OF ATTIC PIPING PLAN-EAST AS BUILT 3/95 office\FILE0142.TIF 176 roll#82 bldg#550 32-303-85 H308 OF ATTIC PIPING PLAN-WEST RECORD DRAWING 3/95 office\FILE0143.TIF 176 roll#82 bldg#550 32-303-85 H401 144 OF LARGE SCALE PLAN AS BUILT 3/95 office\FILE0144.TIF 176 roll#82 bldg#550 32-303-85 H402 OF PARTIAL LARGE SCALE PLANS RECORD DRAWING 3/95 office\FILE0145.TIF 176 roll#82 bldg#550 32-303-85 H501 OF FLOW DIAGRAM AS BUILT 3/95 office\FILE0146.TIF 176 roll#82 bldg#550 32-303-85 H601 OF DETAILS AS BUILT 3/95 office\FILE0147.TIF 176 roll#82 bldg#550 32-303-85 H602 OF DETAILS AS BUILT 3/95 office\FILE0148.TIF 176 roll#82 bldg#550 32-303-85 H603 OF DETAILS AS BUILT 3/95 office\FILE0149.TIF 176 roll#82 bldg#550 32-303-85 H701 OF SCHEDULES AS BUILT 3/95 office\FILE0150.TIF 176 roll#82 bldg#550 32-303-85 H702 151 OF SCHEDULES AS BUILT 3/95 office\FILE0151.TIF 176 roll#82 bldg#550 32-303-85 H703 OF SCHEDULES AS BUILT 3/95 office\FILE0152.TIF 176 roll#82 bldg#550 32-303-85 OF ELECTRICAL LAYOUT AS BUILT 3/95 office\FILE0153.TIF 176 roll#82 bldg#550 32-303-85 E102 154 OF ABBREV. & SITE DETAILS AS BUILT 3/95 office\FILE0154.TIF 176 1/20/2006 United Reprographic Planroom Page 6 of 9 roll#82 bldg#550 32-303-85 E103 154 OF ELECTRICAL SITE PLAN office\FILE0155.TIF 176 RECORD DRAWING 3/95 roll#82 bldg#550 32-303-85 E201 OF 1ST FLOOR LIGHTING PLAN-EAST AS BUILT 3/95 office\FILE0156.TIF 176 roll#82 bldg#550 32-303-85 E202 157 OF 1ST FLOOR LIGHTING PLAN-WEST RECORD DRAWING 3/95 office\FILE0157.TIF 176 roll#82 bldg#550 32-303-85 E203 158 OF 2ND FLOOR LIGHTING PLAN-EAST AS BUILT 3/95 office\FILE0158.TIF 176 roll#82 bldg#550 32-303-85 E204 159 OF 2ND FLOOR LIGHTING PLAN-WEST RECORD DRAWING 3/95 office\FILE0159.TIF 176 roll#82 bldg#550 32-303-85 E205 160 OF 3RD FLOOR LIGHTING PLAN-WEST AS BUILT 3/95 office\FILE0160.TIF 176 roll#82 bldg#550 32-303-85 E301 161 OF 1ST FLOOR PWR/SYS PLAN-EAST RECORD DRAWING 3/95 office\FILE0161.TIF 176 roll#82 bldg#550 32-303-85 E302 162 OF 1ST FLOOR PWR/SYS PLAN-WEST RECORD DRAWING 3/95 office\FILE0162.TIF 176 roll#82 bldg#550 32-303-85 E303 OF 2ND FLOOR PWR/SYS PLAN-EAST RECORD DRAWING 3/95 office\FILE0163.TIF 176 roll#82 bldg#550 32-303-85 E304 OF 2ND FLOOR PWR/SYS PLAN-WEST RECORD DRAWING 3/95 office\FILE0164.TIF 176 roll#82 bldg#550 32-303-85 E305 165 OF 3RD FLOOR PWR/LTG/SYS PLAN- RECORD DRAWING 3/95 office\FILE0165.TIF 176 EAST roll#82 bldg#550 32-303-85 E306 166 OF 3RD FLOOR PWR/SYS PLAN-WEST RECORD DRAWING 3/95 office\FILE0166.TIF 176 roll#82 bldg#550 32-303-85 E307 167 OF ATTIC PWR/LTG/SYS PLAN-EAST AS BUILT 3/95 office\FILE0167.TIF 176 roll#82 bldg#550 32-303-85 E308 168 OF ATTIC PWR/LTG/SYS PLAN-WEST AS BUILT 3/95 office\FILE0168.TIF 176 roll#82 bldg#550 32-303-85 E401 169 OF POWER RISER DIAGRAM AS BUILT 3/95 office\FILE0169.TIF 176 roll#82 bldg#550 32-303-85 E402 OF FIRE ALARM RISER DIAGRAM AS BUILT 3/95 office\FILE0170.TIF 176 roll#82 bldg#550 32-303-85 E403 OF PAGING & TELEPHONE/DATA RECORD DRAWING 3/95 office\FILE0171.TIF 176 RISERS roll#82 bldg#550 32-303-85 E404 OF NURSE CALL, SECURITY & TV SYS AS BUILT 3/95 office\FILE0172.TIF 176 RISER roll#82 bldg#550 32-303-85 E501 173 OF LUMINARE SCHEDULE AS BUILT 3/95 office\FILE0173.TIF 176 roll#82 bldg#550 32-303-85 E502 174 OF PANEL SCHEDULES RECORD DRAWING 3/95 office\FILE0174.TIF 176 roll#82 bldg#550 32-303-85 E503 175OF PANEL SCHEDULES RECORD DRAWING 3/95 office\FILE0175.TIF 176 roll#82 bldg#550 32-303-85 E504 176 OF PANEL SCHEDULES RECORD DRAWING 3/95 office\FILE0176.TIF 176 roll#82 bldg#550 1 OF 1 SITE PLANTING PLAN 3/28/90 office\FILE0177.TIF roll#82 bldg#550 1 OF 1 SITE PLANTING PLAN 3/28/90 office\FILE0178.TIF roll#82 bldg#550 03-6290 OF 1 ARCH ELEVATIONS 2/24/84 office\FILE0179.TIF roll#82 bldg#550 ARCH BLDG 550 2ND FLOOR 03-6257 A2 OF 9 7/19/53 office\FILE0180.TIF PARTIAL PLAN roll#82 bldg#550 TRAINING CENTER ALTERATION 039-092-550 OF 1 COMPLETED 6/81 office\FILE0181.TIF PLANS roll#82 bldg#550 INCREASE IN AC DISTRIBUTION IN 039-094-550 OF 1 COMPLETED 1/81 office\FILE0182.TIF ROOMS 200 THRU 203 roll#82 bldg#550 REPLACEMENT OF 20 TON A/C AIR 840-122-550 OF 1 APPROVED 12/29/78 office\FILE0183.TIF HANDING UNIT STRUCTURAL SUPPORT roll#82 bldg#550 03-5707 OF 2 STRUCTURE FOR RADAR AS BUILT 4/11/77 office\FILE0184.TIF ANTENNA STRUCTURAL SUPPORT roll#82 bldg#550 03-5707 OF 2 STRUCTURE FOR RADAR AS BUILT 4/11/77 office\FILE0185.TIF ANTENNA roll#82 bldg#550 ttp://66 9 144211/PNOnline/viewdetails.asn/a=editdiscinline&sid=938&paid=929&prid. 1/20/2006 United Reprographic Planroom Page 7 of 9 office\FILE0186.TIF 03-5697 2 OF 2 ARCH ROOFING REPAIR DETAILS ADDED DETAIL 2/2/77 ADDED 8'' DIA roll#82 bldg#550 ARCH ROOFING REPAIR PLAN 03-5697 OF 2 ANTENNA & NOTES 2/2/77 office\FILE0187.TIF SECTIONS & DETAIL TO ROOF PLAN roll#82 bldg#550 03-5697 OF 2 ARCH ROOFING REPAIR DETAILS ADDED DETAIL 2/2/77 office\FILE0188.TIF roll#82 bldg#550 MECHANICAL-ELECTRICAL #2 OIL 03-4680 1 OF 2 10/30/69 office\FILE0189.TIF BURNER INSTALLATION ELECTRICAL IMPROVEMENT TO roll#82 bldg#550 03-4765 OF 1 ROOM 209 LIGHTING & 4/17/70 office\FILE0190.TIF ACOUSTICS roll#82 bldg#550 ARCH INSTALLATION OF 03-4757 OF 1 3/31/70 office\FILE0191.TIF ANTENNA & WAVEGUIDE roll#82 bldg#550 INSTALLATION OF FIRE & SMOKE 03-4335 OF 3 11/7/67 office\FILE0192.TIF DETECTION SYSTEM roll#82 bldg#550 03-4335 OF 3 DETECTION SYSTEM APPROVED 3/25/68 office\FILE0193.TIF roll#82 bldg#550 03-4335 OF 3 DETECTION SYSTEM APPROVED 3/25/68 office\FILE0194.TIF roll#82 bldg#550 03-4335 3 OF 3 DETECTION SYSTEM APPROVED 3/25/68 office\FILE0195.TIF roll#82 bldg#550 REMOVAL PLAN BLDG 550 1ST 1966-550-R1 173 OF 191 6/16/66 office\FILE0196.TIF FLOOR roll#82 bldg#550 REMOVAL PLAN BLDG 550 2ND 1966-550-R2 174 OF 191 6/16/66 office\FILE0197.TIF FLOOR roll#82 bldg#550 REMOVAL PLAN BLDG 550 3RD 1966-550-R3 175 OF 191 6/16/66 office\FILE0198.TIF FLOOR roll#82 bldg#550 ALTERATION PLAN BLDG 550 2ND 1966-550-A2 177 OF 191 6/16/66 office\FILE0199.TIF FLOOR roll#82 bldg#550 DOOR SCHEDULE & MISC. 1966-550-A4 179 OF 191 6/16/66 office\FILE0200.TIF DETAILS BLDG 550 roll#82 bldg#550 ALTERATION WORK BLDG 550 1966-550-A5 180 OF 191 6/16/66 office\FILE0201.TIF MISC. DETAILS #1 roll#82 bldg#550 1966-550-HP1 181 OF HEATING & PLUMBING BLDG 550 6/16/66 office\FILE0202.TIF 191 1ST FLOOR PLAN & DETAILS roll#82 bldg#550 1966-550-HP2 182 OF HEATING & PLUMBING BLDG 550 6/16/66 office\FILE0203.TIF 191 2ND FLOOR PLAN & DETAILS roll#82 bldg#550 1966-550-HP3 183 OF HEATING & PLUMBING BLDG 550 6/16/66 office\FILE0204.TIF 191 3RD FLOOR PLAN & DETAILS roll#82 bldg#550 1966-550-HP4 184 OF HEATING & PLUMBING BLDG 550 6/16/66 office\FILE0205.TIF 191 MISC DETAILS SHEET #1 roll#82 bldg#550 1966-550-HP5 185 OF HEATING & PLUMBING BLDG 550 6/16/66 office\FILE0206.TIF 191 MISC DETAILS SHEET #2 roll#82 bldg#550 ELECTRICAL BLDG 550-1ST 1966-550-E1 186 OF 191 6/16/66 office\FILE0207.TIF FLOOR LIGHTING & POWER PLAN roll#82 bldg#550 ELECTRICAL BLDG 550-2ND 1966-550-E2 187 OF 191 6/16/66 office\FILE0208.TIF FLOOR LIGHTING & POWER PLAN roll#82 bldg#550 FURNITURE & EQUIPMENT PLAN 1966-550-FE1 189 OF 191 6/16/66 office\FILE0209.TIF BLDG 550 1ST FLOOR roll#82 bldg#550 FURNITURE & EQUIPMENT PLAN 1966-550-FE2 190 OF 191 6/16/66 office\FILE0210.TIF BLDG 550 2ND FLOOR roll#82 bldg#550 FURNITURE & EQUIPMENT PLAN 1966-550-FE3 191 OF 191 6/16/66 office\FILE0211.TIF BLDG 550 3RD FLOOR roll#82 bldg#550 03-4602 OF 1 ELECTRICAL... office\FILE0212.TIF roll#82 bldg#550 REPLACEMENT OF LEADERS & CGR-6602-2 2 OF 3 8/17/65 office\FILE0213.TIF GUTTERS VARIOS BLDGS roll#82 bldg#550 ELECTRICAL PRESS HIGH LOW 4597 OF 1 3/15/... office\FILE0214.TIF FIRE. roll#82 bldg#550 3 OF 3 3RD FLOOR PLAN REVISED 6/81 office\FILE0215.TIF roll#82 bldg#550 2 OF 3 2ND FLOOR PLAN REVISED 6/81 office\FILE0216.TIF roll#82 bldg#550 //669 144211/PNOnline/viewdetails.asp/a=editdiscipline8sid=938&paid=929&prid. 1/20/2006 United Reprographic Planroom Page 8 of 9 office\FILE0217.TIF 1 OF 3 1ST FLOOR PLAN REVISED 7/28/81 REPLACEMENT OF BOILER #3 & roll#82 bldg#550 550-6233-3 OF 3 REHABILITATION OF BOILER 3/27/62 office\FILE0218.TIF PLANT REPLACEMENT OF BOILER #3 & roll#82 bldg#550 550-6233-3 OF 3 REHABILITATION OF BOILER 3/27/62 office\FILE0219.TIF PLANT REPLACEMENT OF ELECTRICAL roll#82 bldg#550 550-6254-6 OF 6 RISERS & PANELS FLOOR PLANS- 4/12/62 office\FILE0220.TIF 2ND & 3RD FLRS REPLACEMENT OF ELECTRICAL roll#82 bldg#550 ROO MCM MAIN 550-6254-6 5 OF 6 RISERS & PANELS FLOOR PLAN & 5/16/62 office\FILE0221.TIF LUGS DETAILS 1ST FLOOR roll#82 bldg#550 REPLACEMENT OF ELECTRIC 353-6231-1 1 OF 1 REVISED 2/23/62 office\FILE0222.TIF SERVICE TO EQUIPMENT roll#82 bldg#550 550-1 1ST FLOOR PLAN AS BUILT 8/60 office\FILE0223.TIF roll#82 bldg#550 PROPOSED ALTERATIONS 550-20 7/20/54 office\FILE0224.TIF CONSOLODATED MESS DETAIL OF SMOKE PIPE FROM 2 roll#82 bldg#550 6305-662 RANGES & BAKE OVEN TO 6/13/40 office\FILE0225.TIF CHIMNEY LOCATION PLAN & DETAILS FOR roll#82 bldg#550 6305-659 1000 GAL OIL STORAGE TANK 11/24/39 office\FILE0226.TIF INSTALLATION roll#82 bldg#550 BARRACKS ATTIC FRAMING PLAN 11/17/38 office\FILE0227.TIF roll#82 bldg#550 BARRACKS HEATING FIRST 6305-712 11/17/38 office\FILE0228.TIF FLOOR PLAN roll#82 bldg#550 BARRACKS HEATING ENTRANCE 6305-707 REVISIONS 1/4/39 office\FILE0229.TIF DETAILS roll#82 bldg#550 6305-723 BARRACKS ROOF FRAMING PLAN REVISIONS 11/17/38 office\FILE0230.TIF roll#82 bldg#550 BUILDING 6305-379 BARRACKS PLOT & PLAN 7/30/38 office\FILE0231.TIF INCREASED roll#82 bldg#550 STORM & SANITARY SEWERS FOR 6305-619 1/9/39 office\FILE0232.TIF 375 MAN BARRACKS BLDG #550 LOCATION PLAN SHOWING ROAD roll#82 bldg#550 6305-618 & SIDEWALKS AT 18 FAMILY NCO B 8/1/39 office\FILE0233.TIF APT & BARRACKS 31004102 TYPICAL DETAILS OF PILE CAPS & roll#82 bldg#550 6305-610 FOUNDATION BEAM 10/27/38 office\FILE0234.TIF CONNECTIONS 375 MAN BARRACKS 18 NCO roll#82 bldg#550 6305-605 APARTMENTS LOCATION & GRID 8/24/38 office\FILE0235.TIF PLAN roll#82 bldg#550 BLDG 550 VENTILATION OF HOOD 550- 3/1/... office\FILE0236.TIF IN KITCHENS LOCATION PLANS & DETAILS OF roll#82 bldg#550 6305-636 OIL TANKS, BARRACKS, THEATER 3/21/39 office\FILE0237.TIF & NCO APTS roll#82 bldg#550 375 MEN BARRACKS 3/4 DETAILS 6305-658 10/17/39 office\FILE0238.TIF OF DISH TABLE & SHELVING roll#82 bldg#550 UTILITIES, SERVICE TO BLDGS 6305-658 RECORD 8/1/39 office\FILE0239.TIF #550-&555 roll#82 bldg#550 UTILITIES, SERVICE TO BLDGS 6305-606 RECORD 8/1/39 office\FILE0240.TIF #550-&555 roll#82 bldg#550 1272-24 office\FILE0241.TIF roll#82 bldg#550 550 11/38 office\FILE0242.TIF roll#82 bldg#550 12-12-22 550 11/38 office\FILE0243.TIF roll#82 bldg#550 72-20 550 11/38 office\FILE0244.TIF http://66.9.144211/PNOnline/viewdetails.asp?a=editdiscioline&sid=938&paid=929bprid. 1/20/2006 United Reprographic Planroom Page 9 of 9 roll#82 bldg#550 6305-705 550 11/38 office\FILE0245.TIF roll#82 bldg#550 550-26 BLDG #102 11/38 office\FILE0246.TIF ELEVATION OF BLDG #550 roll#82 bldg#550 DAMAGED CONCRETE SPANDREL 890-131-LST 11/38 office\FILE0247.TIF BEAMS COLUMNS, PILASTERS & CORNICES REPLACEMENT OF BOILER #3 & roll#82 bldg#550 550-6238-3 3 OF 3 REHABILIATION OF BOILER PLAN office\FILE0248.TIF BLDG 550 roll#82 bldg#550 1966-550-AI 1 23 OF 25 AS IS PLAN BLDG 550 1ST FLOOR office\FILE0249.TIF roll#82 bldg#550 1966-550-AI 3 25 OF 25 AS IS PLAN BLDG 550 3RD FLOOR office\FILE0250.TIF roll#82 bldg#550 6305-390 BARRACKS FOOTING PLAN A 10/14/38 office\FILE0251.TIF roll#82 bldg#550 BARRACKS PILE FOOTING 6305-390 A 10/14/38 office\FILE0252.TIF DETAILS roll#82 bldg#550 BARRACKS 1ST FLOOR WALL 6305-717 11/17/38 office\FILE0253.TIF PLAN & SECTIONS roll#82 bldg#550 6305-714 BARRACKS PLUMBING DETAILS 11/17/38 office\FILE0254.TIF roll#82 bldg#550 BARRACKS PLUMBING 1ST FLOOR 6305-713 11/17/38 office\FILE0255.TIF PLAN roll#82 bldg#550 6305-711 BARRACKS KITCHEN DETAILS 11/17/38 office\FILE0256.TIF roll#82 bldg#550 BARRACKS TOILET & SHOWER 6305-710 11/17/38 office\FILE0257.TIF ROOM DETAILS roll#82 bldg#550 6305-709 BARRACKS STAIR DETAILS 11/17/38 office\FILE0258.TIF roll#82 bldg#550 6305-708 BARRACKS MISC DETAILS 11/17/38 office\FILE0259.TIF roll#82 bldg#550 6305-706 BARRACKS WALL DETAILS 11/17/38 office\FILE0260.TIF roll#82 bldg#550 6305-719 BARRACKS BEAM SCHEDULE 11/17/38 office\FILE0261.TIF roll#82 bldg#550 BARRACKS COLUMN SCHEDULE & 6305-718 11/17/38 office\FILE0262.TIF DETAILS roll#82 bldg#550 PROPOSED INSTALLATION OF 4/11/41 office\FILE0263.TIF ANTENNA POLES roll#82 bldg#550 6305-720 BARRACKS BEAM SCHEDULE 11/17/38 office\FILE0264.TIF roll#82 bldg#550 MODIFIY ELECTRICAL HOOK UP 539-012-550 1 OF 1 office\FILE0265.TIF RM 104 roll#82 bldg#550 239-025-550 1 OF 1 RM-104 ELECTRICAL ALTERATION 7/2/82 office\FILE0266.TIF roll#82 bldg#550 970-417-550 OF 1 BOILER ROOM LIGHTING PLAN 9/28/89 office\FILE0267.TIF roll#82 bldg#550 MECHANICAL-ELECTRICAL #2 OIL 970-417-550 2 OF 2 10/20/68 office\FILE0268.TIF BURNER INSTALLATION roll#82 bldg#550 AIR CONIDTION 2ND & 3RD FLOOR 03-4431 1 OF 1 5/18/68 office\FILE0269.TIF PLAN roll#82 bldg#550 2ND & 3RD FLOOR FRAMING 6305-721 A 5/8/39 office\FILE0270.TIF PLANS 270 Items 4.141 //669144211/PNOnline/viewdetails.asp?a=editdiscipline&sid=938&paid=929&prid. 1/20/2006