Ask the Scholar
Document scope · 1 page
Scholar
Ask about this object, its catalog metadata, its source description, or the page inventory.
For page-specific OCR and visual context, open one of the page chats.
Scholar Source Context
Document identity
localId
174691286
label
Building 550 - Barracks
core
doc
dtoType
map
citationUrl
pageCount
1
Source metadata
id
174691286
contentType
map
title
Building 550 - Barracks
citationUrl
collections
Governors Island Corporation/Trust for Governors Island
Index to the Scanned Images of Governors Island Maps and Plans and Architectural and Engineering Drawings
thumbnailUrl
largeImageUrl
imageCount
1
hasImages
yes
source
import
Source extras
naId
174691286
levelOfDescription
fileUnit
recordType
description
ocrSource
nara-archive
Single page context
seq
1
pageIndex
0
type
document
mediaId
74e5ec4e951ae953
ocrText
United Reprographic Planroom
Page 1 of 9
GOVENOR'S ISLAND: Set
Order Full Set
Order Individual Sheets
Print
Order
File Name
DrawingNumber
Description
Revision
RevisionDate
roll#82 bldg#550
32-303-85 1 OF 176
BLDG#550 - COVER SHEET
3/95
office\FILE0001.TIF
roll#82 bldg#550
32-303-85 C-201 2 OF
DEMOLITION SITE PLAN
A
3/95
office\FILE0002.TIF
176
roll#82 bldg#550
32-303-85 C-202 OF
SITE PLAN
A
3/95
office\FILE0003.TIF
176
roll#82 bldg#550
32-303-85 C-203 OF
SITE UTILTIES PLAN
A
3/95
office\FILE0004.TIF
176
roll#82 bldg#550
32-303-85 C-203 OF
LANDSCAPE PLAN
A
3/95
office\FILE0005.TIF
176
roll#82 bldg#550
32-303-85 C-205 OF
SITE DETAILS
A
3/95
office\FILE0006.TIF
176
roll#82 bldg#550
32-303-85 AA-201 7 OF
ASBESTOS ABATEMENT FIRST
A
3/95
office\FILE0007.TIF
176
FLOOR
roll#82 bldg#550
32-303-85 AA-202 OF
ASBESTOS ABATEMENT FIRST
A
3/95
office\FILE0008.TIF
176
FLOOR
roil#82 bldg#550
32-303-85 AA-203 OF
ASBESTOS ABATEMENT
A
3/95
office\FILE0009.TIF
176
SECOND FLOOR
roll#82 bldg#550
32-303-85 AA-204 OF
ASBESTOS ABATEMENT -
A
3/95
office\FILE0010.TIF
176
SECOND FLOOR
roll#82 bldg#550
32-303-85 AA-205 11 OF
ASBESTOS ABATEMENT THIRD
A
3/95
office\FILE0011.TIF
176
FLOOR
roll#82 bldg#550
32-303-85 AA-206 12 OF
ASBESTOS ABATEMENT THIRD
A
3/95
office\FILE0012.TIF
176
FLOOR
roll#82 bldg#550
32-303-85 AA-207 OF
ASBESTOS ABATEMENT ATTIC
A
3/95
office\FILE0013.TIF
176
roll#82 bldg#550
32-303-85 S201 14 OF
FOUNDATION PLAN
A
3/95
office\FILE0014.TIF
176
roll#82 bldg#550
32-303-85 S202 15 OF
2ND FLOOR FRAMING PLAN
A
3/95
office\FILE0015.TIF
176
roll#82 bldg#550
32-303-85 S202 OF
3RD FLOOR FRAMING PLAN
A
3/95
office\FILE0016.TIF
176
roll#82 bldg#550
32-303-85 S204 17 OF
ATTIC FLOOR FRAMING PLAN
A
3/95
office\FILE0017.TIF
176
roll#82 bldg#550
32-303-85 S301 18 OF
GARAGE & CANOPY PLANS &
A
3/95
office\FILE0018.TIF
176
DETAILS
roll#82 bldg#550
32-303-85 S302 OF
STRUCTURAL DETAILS
A
3/95
office\FILE0019.TIF
176
roll#82 bldg#550
32-303-85 S303 20 OF
STRUCTURAL DETAILS
A
3/95
office\FILE0020.TIF
176
roll#82 bldg#550
32-303-85 D201 21 OF
1ST FLOOR DEMOLITION PLAN
A
3/95
office\FILE0021.TIF
176
EAST
roll#82 bldg#550
32-303-85 D202 22 OF
1ST FLOOR DEMOLITION PLAN
A
3/95
office\FILE0022.TIF
176
WEST
roll#82 bldg#550
32-303-85 D203 23 OF
2ND FLOOR DEMOLITION PLAN -
A
3/95
office\FILE0023.TIF
176
EAST
roll#82 bldg#550
32-303-85 D204 24 OF
2ND FLOOR DEMOLITION PLAN
A
3/95
office\FILE0024.TIF
176
WEST
roll#82 bldg#550
32-303-85 D205 25 OF
3RD FLOOR DEMOLITION PLAN
A
3/95
office\FILE0025.TIF
176
EAST
roll#82 bldg#550
32-303-85 D206 26 OF
3RD FLOOR DEMOLITION PLAN
A
3/95
office\FILE0026.TIF
176
WEST
1/20/2006
United Reprographic Planroom
Page 2 of 9
roll#82 bldg#550
32-303-85 D207 27 OF
ATTIC DEMOLITION PLAN EAST
A
3/95
office\FILE0027.TIF
176
roll#82 bldg#550
32-303-85 D208 OF
ATTIC DEMOLITION PLAN WEST
A
3/95
office\FILE0028.TIF
176
roll#82 bldg#550
32-303-85 D209 29 OF
1ST FL DEMO PLAN - EAST, ELEC,
A
3/95
office\FILE0029.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 OF
1ST FL DEMO PLAN WEST, ELEC,
A
3/95
office\FILE0030.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 D211 31 OF
2ND EL DEMO PLAN EAST, ELEC,
A
3/95
office\FILE0031.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 D212 OF
2ND FL DEMO PLAN WEST, ELEC,
A
3/95
office\FILE0032.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 OF
3RD FL DEMO PLAN EAST, ELEC,
A
3/95
office\FILE0033.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 D214 OF
3RD FL DEMO PLAN WEST, ELEC,
A
3/95
office\FILE0034.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 D215 OF
4TH FL DEMO PLAN EAST, ELEC,
A
3/95
office\FILE0035.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 D216 OF
4TH FL DEMO PLAN WEST, ELEC,
A
3/95
office\FILE0036.TIF
176
MECH, PLUMB, SYS
roll#82 bldg#550
32-303-85 D217 OF
ROOF REMOVALS PLAN
A
3/95
office\FILE0037.TIF
176
roll#82 bldg#550
32-303-85 OF
SOUTH ELEVATION EXIST
A
3/95
office\FILE0038.TIF
176
CONDITIONS/REMOVALS
roll#82 bldg#550
32-303-85 D219 OF
NORTH ELEVATION EXIST
A
3/95
office\FILE0039.TIF
176
CONDITIONS/REMOVALS
roll#82 bldg#550
32-303-85 D220 OF
EAST & WEST ELEV. EXIST
A
3/95
office\FILE0040.TIF
176
CONDITIONS/REMOVALS
roll#82 bldg#550
32-303-85 OF
BLDG. SECTIONS EXIST
A
3/95
office\FILE0041.TIF
176
CONDITIONS/REMOVALS
roll#82 bldg#550
32-303-85 A101 OF
ARCHITECTURAL LEGEND
A
3/95
office\FILE0042.TIF
176
roll#82 bldg#550
32-303-85 A102 OF
DOOR SCHEDULE
A
3/95
office\FILE0043.TIF
176
roll#82 bldg#550
32-303-85 A103 44 OF
DOOR SCHEDULE
A
3/95
office\FILE0044.TIF
176
roll#82 bldg#550
32-303-85 A104 OF
DOOR DETAILS
A
3/95
office\FILE0045.TIF
176
roll#82 bldg#550
32-303-85 A105 OF
BORROW - LITE DETAILS
A
3/95
office\FILE0046.TIF
176
roll#82 bldg#550
32-303-85 A106 OF
BORROW LITE SHCED & DOOR
A
3/95
office\FILE0047.TIF
176
DTLS
roll#82 bldg#550
32-303-85 A107 OF
ROOM FINISH SCHEDULE
A
3/95
office\FILE0048.TIF
176
roll#82 bldg#550
32-303-85 A108 OF
PARTITION TYPES & DETAILS
A
3/95
office\FILE0049.TIF
176
roll#82 bldg#550
32-303-85 A202 OF
1ST FL PLAN
A
3/95
office\FILE0050.TIF
176
roll#82 bldg#550
32-303-85 A203 52 OF
2ND FLOOR PLAN EAST
A
3/95
office\FILE0051.TIF
176
roll#82 bldg#550
32-303-85 A204 53 OF
2ND FLOOR PLAN WEST
A
3/95
office\FILE0052.TIF
176
roll#82 bldg#550
32-303-85 A205 OF
3RD FLOOR PLAN EAST
A
3/95
office\FILE0053.TIF
176
roll#82 bldg#550
32-303-85 A206 55 OF
3RD FLOOR PLAN WEST
RECORD DRAWING
3/95
office\FILE0054.TIF
176
roll#82 bldg#550
32-303-85 A207 OF
ATTIC FLOOR PLAN-EAST
RECORD DRAWING
3/95
office\FILE0055.TIF
176
roll#82 bldg#550
32-303-85 A208 57 OF
ATTIC FLOOR PLAN-WEST
RECORD DRAWING
3/95
office\FILE0056.TIF
176
roll#82 bldg#550
32-303-85 A209 OF
1ST FLOOR FINISH PLAN EAST
AS BUILT
3/95
office\FILE0057.TIF
176
roll#82 bldg#550
32-303-85 A210 OF
1ST FLOOR FINISH PLAN WEST
AS BUILT
3/95
office\FILE0058.TIF
176
1/20/2006
United Reprographic Planroom
Page 3 of 9
roll#82 bldg#550
32-303-85 A902 OF
office\FILE0059.TIF
1ST FLOOR RCP-WEST
176
RECORD DRAWING 3/95
roll#82 bldg#550
32-303-85 A901 93 OF
office\FILE0060.TIF
1ST FLOOR RCP-EAST
176
RECORD DRAWING 3/95
roll#82 bldg#550
32-303-85 A201 50 OF
1ST FLOOR PLAN-EAST
office\FILE0061.TIF
176
RECORD DRAWING 3/95
roll#82 bldg#550
32-303-85 A211 60 OF
2ND-FLOOR FINISH PLAN-EAST
office\FILE0062.TIF
AS BUILT
176
3/95
roll#82 bldg#550
32-303-85 A212 61 OF
office\FILE0063.TIF
2ND-FLOOR FINISH PLAN-WEST
176
AS BUILT
3/95
roll#82 bldg#550
32-303-85 A213 62 OF
3RD FLOOR FINISH PLAN-WEST
office\FILE0064.TIF
AS BUILT
176
3/95
roll#82 bldg#550
32-303-85 A301 63 OF
SOUTH ELEVATION
office\FILE0065.TIF
RECORD DRAWING 3/95
176
roll#82 bldg#550
32-303-85 A302 64 OF
NORTH ELEVATION
office\FILE0066.TIF
RECORD DRAWING 3/95
176
roll#82 bldg#550
32-303-85 A303 65 OF
EAST & WEST ELEVATIONS
office\FILE0067.TIF
176
RECORD DRAWING 3/95
roll#82 bldg#550
32-303-85 A304 66 OF
BUILDING SECTIONS
office\FILE0068.TIF
RECORD DRAWING 3/95
176
roll#82 bldg#550
32-303-85 A305 OF
AS BUILT
3/95
office\FILE0069.TIF
176
roll#82 bldg#550
32-303-85 A306 68 OF
GARAGE PLAN, ELEV & SECTIONS
AS BUILT
3/95
office\FILE0070.TIF
176
roll#82 bldg#550
32-303-85 A303 69 OF
GARAGE WALL SECTIONS
AS BUILT
3/95
office\FILE0071.TIF
176
roll#82 bldg#550
32-303-85 A308 OF
GARAGE DETAILS
AS BUILT
3/95
office\FILE0072.TIF
176
roll#82 bldg#550
32-303-85 A309 71 OF
ENTRANCE CANOPY
AS BUILT
3/95
office\FILE0073.TIF
176
roll#82 bldg#550
32-303-85 A310 72 OF
EXTERIOR RESTORATION
AS BUILT
3/95
office\FILE0074.TIF
176
SECTIONS & DETAILS
roll#82 bldg#550
32-303-85 A311 OF
EXTERIOR RESTORATION
AS BUILT
3/95
office\FILE0075.TIF
176
SECTIONS & DETAILS
roll#82 bldg#550
32-303-85 A501 74 OF
EXTERIOR DETAILS
AS BUILT
3/95
office\FILE0076.TIF
176
roll#82 bldg#550
32-303-85 A502 OF
TYPICAL DETAILS
AS BUILT
3/95
office\FILE0077.TIF
176
roll#82 bldg#550
32-303-85 A503 76 OF
TYPICAL DETAILS
AS BUILT
3/95
office\FILE0078.TIF
176
roll#82 bldg#550
32-303-85 A504 OF
TYPICAL DETAILS
AS BUILT
3/95
office\FILE0079.TIF
176
roll#82 bldg#550
32-303-85 A505 OF
TYPICAL DETAILS
AS BUILT
3/95
office\FILE0080.TIF
176
roll#82 bldg#550
32-303-85 A601 OF
STAIR 1 & 3 DETAIL PLANS
AS BUILT
office\FILE0081.TIF
3/95
176
roll#82 bldg#550
32-303-85 A602 OF
STAIR SECTIONS
AS BUILT
3/95
office\FILE0082.TIF
176
roll#82 bldg#550
32-303-85 A605 OF
3RD FLOOR CORE PLAN
AS BUILT
3/95
office\FILE0083.TIF
176
roll#82 bldg#550
32-303-85 A604 OF
2ND FLOOR CORE PLAN
RECORD DRAWING 3/95
office\FILE0084.TIF
176
roll#82 bldg#550
32-303-85 A603 OF
1ST FLOOR CORE PLAN
RECORD DRAWING 3/95
office\FILE0085.TIF
176
roll#82 bldg#550
32-303-85 A606 84 OF
STAIR/ELEVATOR SECTIONS
RECORD DRAWING 3/95
office\FILE0086.TIF
176
roll#82 bldg#550
32-303-85 A607 OF
TYPICAL STAIR DETAILS
RECORD DRAWING 3/95
office\FILE0087.TIF
176
roll#82 bldg#550
32-303-85 A701 86 OF
LARGE SCALE PLAN DETAILS
AS BUILT
3/95
office\FILE0088.TIF
176
roll#82 bldg#550
32-303-85 A702 87 OF
LARGE SCALE PLAN DETAILS
AS BUILT
3/95
office\FILE0089.TIF
176
roll#82 bldg#550
32-303-85 A703 OF
INTERIOR ELEVATIONS
AS BUILT
3/95
office\FILE0090.TIF
176
1/20/2006
United Reprographic Planroom
Page 4 of 9
roll#82 bldg#550
32-303-85 A704 OF
INTERIOR ELEVATIONS
office\FILE0091.TIF
176
AS BUILT
3/95
roll#82 bldg#550
32-303-85 A705 OF
INTERIOR ELEVATIONS
office\FILE0092.TIF
RECORD DRAWING 3/95
176
roll#82 bldg#550
32-303-85 A706 OF
INTERIOR ELEVATIONS
office\FILE0093.TIF
RECORD DRAWING 3/95
176
roll#82 bldg#550
32-303-85 A801 92 OF
INTERIOR ELEVATIONS
AS BUILT
office\FILE0094.TIF
3/95
176
roll#82 bldg#550
32-303-85 A906 98 OF
3RD FLOOR RCP-WEST
AS BUILT
office\FILE0095.TIF
3/95
176
roll#82 bldg#550
32-303-85 A905 OF
3RD FLOOR RCP-EAST
AS BUILT
office\FILE0096.TIF
3/95
176
roll#82 bldg#550
32-303-85 A904 OF
2ND FLOOR RCP-WEST
RECORD DRAWING
3/95
office\FILE0097.TIF
176
roll#82 bldg#550
32-303-85 A903 OF
2ND FLOOR RCP-EAST
RECORD DRAWING 3/95
office\FILE0098.TIF
176
roll#82 bldg#550
32-303-85 P101 OF
PLUMBING LEGEND
AS BUILT
3/95
office\FILE0099.TIF
176
roll#82 bldg#550
32-303-85 P201 OF
1ST FLOOR PLAN-EAST
RECORD DRAWING 3/95
office\FILE0100.TIF
176
roll#82 bldg#550
32-303-85 P202 OF
1ST FLOOR PLAN-WEST
RECORD DRAWING 3/95
office\FILE0101.TIF
176
roll#82 bldg#550
32-303-85 P203 OF
office\FILE0102.TIF
176
2ND FLOOR PLAN-EAST
AS BUILT
3/95
roll#82 bldg#550
32-303-85 P204 OF
2ND FLOOR PLAN-WEST
RECORD DRAWING
3/95
office\FILE0103.TIF
176
roll#82 bldg#550
32-303-85 P205 OF
3RD FLOOR PLAN-EAST
AS BUILT
3/95
office\FILE0104.TIF
176
roll#82 bldg#550
32-303-85 P206 OF
3RD FLOOR PLAN-WEST
AS BUILT
3/95
office\FILE0105.TIF
176
roll#82 bldg#550
32-303-85 P207 OF
ATTIC FLOOR PLAN-EAST
AS BUILT
3/95
office\FILE0106.TIF
176
roll#82 bldg#550
32-303-85 P208 OF
ATTIC PLAN-WEST
AS BUILT
3/95
office\FILE0107.TIF
176
roll#82 bldg#550
32-303-85 P301 108 OF
1ST FLOOR PLAN-EAST
RECORD DRAWING
3/95
office\FILE0108.TIF
176
roll#82 bldg#550
32-303-85 P302 109 OF
1ST FLOOR PLAN-WEST
RECORD DRAWING 3/95
office\FILE0109.TIF
176
roll#82 bldg#550
32-303-85 P303 OF
2ND FLOOR PLAN-EAST
AS BUILT
3/95
office\FILE0110.TIF
176
roll#82 bldg#550
32-303-85 P304 OF
2ND FLOOR PLAN-WEST
AS BUILT
3/95
office\FILE0111.TIF
176
roll#82 bldg#550
32-303-85 P305 112 OF
3RD FLOOR PLAN-EAST
AS BUILT
3/95
office\FILE0112.TIF
176
roll#82 bldg#550
32-303-85 P306 OF
3RD FLOOR PLAN-WEST
RECORD DRAWING 3/95
office\FILE0113.TIF
176
roll#82 bldg#550
32-303-85 P307 OF
ATTIC FLOOR PLAN-EAST
AS BUILT
3/95
office\FILE0114.TIF
176
roll#82 bldg#550
32-303-85 P308 OF
ATTIC FLOOR PLAN-WEST
AS BUILT
3/95
office\FILE0115.TIF
176
roll#82 bldg#550
32-303-85 P601 116 OF
DETAILS
RECORD DRAWING 3/95
office\FILE0116.TIF
176
roll#82 bldg#550
32-303-85 P602 OF
DETAILS
AS BUILT
3/95
office\FILE0117.TIF
176
roll#82 bldg#550
32-303-85 P603 118 OF
STACK DIAGRAM-EAST
AS BUILT
3/95
office\FILE0118.TIF
176
roll#82 bldg#550
32-303-85 P604 118 OF
STACK DIAGRAM-EAST
AS BUILT
3/95
office\FILE0119.TIF
176
roll#82 bldg#550
32-303-85 P605 118 OF
STACK DIAGRAM-WEST
AS BUILT
3/95
office\FILE0120.TIF
176
roll#82 bldg#550
32-303-85 P606 OF
STACK DIAGRAM-WEST
AS BUILT
3/95
office\FILE0121.TIF
176
roll#82 bldg#550
32-303-85 P607 122 OF
WATER RISER DIAGRAM-EAST
AS BUILT
3/95
office\FILE0122.TIF
176
144 asn7a=editdiscinline&sid=938&naid=929&prid.
1/20/2006
United Reprographic Planroom
Page 5 of 9
roll#82 bldg#550
32-303-85 P608 123 OF
office\FILE0123.TIF
WATER RISER DIAGRAM-EAST
176
AS BUILT
3/95
roll#82 bldg#550
32-303-85 P609 124 OF
office\FILE0124.TIF
WATER RISER DIAGRAM-WEST
176
AS BUILT
3/95
roll#82 bldg#550
32-303-85 P610 OF
office\FILE0125.TIF
176
WATER RISER DIAGRAM-WEST
AS BUILT
3/95
roll#82 bldg#550
32-303-85 P611 126 OF
office\FILE0126.TIF
GAS RISER DIAGRAMS-EAST
176
AS BUILT
3/95
roll#82 bldg#550
32-303-85 H101 127 OF
office\FILE0127.TIF
HVAC LEGEND
176
AS BUILT
3/95
roll#82 bldg#550
32-303-85 H201 128 OF
1ST FLOOR DUCTWORK PLAN-
office\FILE0128.TIF
RECORD DRAWING
176
3/95
EAST
roll#82 bldg#550
32-303-85 H202 OF
1ST FLOOR DUCTWORK PLAN-
RECORD DRAWING
office\FILE0129.TIF
3/95
176
WEST
roll#82 bldg#550
32-303-85 H203 OF
2ND FLOOR DUCTWORK PLAN-
office\FILE0130.TIF
AS BUILT
176
3/95
EAST
roll#82 bldg#550
32-303-85 H204 OF
2ND FLOOR DUCTWORK PLAN-
office\FILE0131.TIF
AS BUILT
3/95
176
WEST
roll#82 bldg#550
32-303-85 H205 OF
3RD FLOOR DUCTWORK PLAN-
AS BUILT
3/95
office\FILE0132.TIF
176
EAST
roll#82 bldg#550
32-303-85 H206 OF
3RD FLOOR DUCTWORK PLAN-
AS BUILT
3/95
office\FILE0133.TIF
176
WEST
roll#82 bldg#550
32-303-85 H207 OF
ATTIC DUCTWORK PLAN-EAST
AS BUILT
3/95
office\FILE0134.TIF
176
roll#82 bldg#550
32-303-85 H208 135 OF
ATTIC DUCTWORK PLAN-WEST
RECORD DRAWING
3/95
office\FILE0135.TIF
176
roll#82 bldg#550
32-303-85 H301 OF
1ST FLOOR PIPING PLAN-EAST
AS BUILT
3/95
office\FILE0136.TIF
176
roll#82 bldg#550
32-303-85 H302 OF
1ST FLOOR PIPING PLAN-WEST
RECORD DRAWING
3/95
office\FILE0137.TIF
176
roll#82 bldg#550
32-303-85 H303 OF
2ND FLOOR PIPING PLAN-EAST
RECORD DRAWING
3/95
office\FILE0138.TIF
176
roll#82 bldg#550
32-303-85 H304 OF
2ND FLOOR PIPING PLAN-WEST
AS BUILT
3/95
office\FILE0139.TIF
176
roll#82 bldg#550
32-303-85 H305 OF
3RD FLOOR PIPING PLAN-EAST
AS BUILT
3/95
office\FILE0140.TIF
176
roll#82 bldg#550
32-303-85 H306 OF
3RD FLOOR PIPING PLAN-WEST
AS BUILT
3/95
office\FILE0141.TIF
176
roll#82 bldg#550
32-303-85 H307 OF
ATTIC PIPING PLAN-EAST
AS BUILT
3/95
office\FILE0142.TIF
176
roll#82 bldg#550
32-303-85 H308 OF
ATTIC PIPING PLAN-WEST
RECORD DRAWING
3/95
office\FILE0143.TIF
176
roll#82 bldg#550
32-303-85 H401 144 OF
LARGE SCALE PLAN
AS BUILT
3/95
office\FILE0144.TIF
176
roll#82 bldg#550
32-303-85 H402 OF
PARTIAL LARGE SCALE PLANS
RECORD DRAWING
3/95
office\FILE0145.TIF
176
roll#82 bldg#550
32-303-85 H501 OF
FLOW DIAGRAM
AS BUILT
3/95
office\FILE0146.TIF
176
roll#82 bldg#550
32-303-85 H601 OF
DETAILS
AS BUILT
3/95
office\FILE0147.TIF
176
roll#82 bldg#550
32-303-85 H602 OF
DETAILS
AS BUILT
3/95
office\FILE0148.TIF
176
roll#82 bldg#550
32-303-85 H603 OF
DETAILS
AS BUILT
3/95
office\FILE0149.TIF
176
roll#82 bldg#550
32-303-85 H701 OF
SCHEDULES
AS BUILT
3/95
office\FILE0150.TIF
176
roll#82 bldg#550
32-303-85 H702 151 OF
SCHEDULES
AS BUILT
3/95
office\FILE0151.TIF
176
roll#82 bldg#550
32-303-85 H703 OF
SCHEDULES
AS BUILT
3/95
office\FILE0152.TIF
176
roll#82 bldg#550
32-303-85 OF
ELECTRICAL LAYOUT
AS BUILT
3/95
office\FILE0153.TIF
176
roll#82 bldg#550
32-303-85 E102 154 OF
ABBREV. & SITE DETAILS
AS BUILT
3/95
office\FILE0154.TIF
176
1/20/2006
United Reprographic Planroom
Page 6 of 9
roll#82 bldg#550
32-303-85 E103 154 OF
ELECTRICAL SITE PLAN
office\FILE0155.TIF
176
RECORD DRAWING 3/95
roll#82 bldg#550
32-303-85 E201 OF
1ST FLOOR LIGHTING PLAN-EAST
AS BUILT
3/95
office\FILE0156.TIF
176
roll#82 bldg#550
32-303-85 E202 157 OF
1ST FLOOR LIGHTING PLAN-WEST RECORD DRAWING 3/95
office\FILE0157.TIF
176
roll#82 bldg#550
32-303-85 E203 158 OF
2ND FLOOR LIGHTING PLAN-EAST AS BUILT
3/95
office\FILE0158.TIF
176
roll#82 bldg#550
32-303-85 E204 159 OF
2ND FLOOR LIGHTING PLAN-WEST RECORD DRAWING 3/95
office\FILE0159.TIF
176
roll#82 bldg#550
32-303-85 E205 160 OF
3RD FLOOR LIGHTING PLAN-WEST AS BUILT
3/95
office\FILE0160.TIF
176
roll#82 bldg#550
32-303-85 E301 161 OF
1ST FLOOR PWR/SYS PLAN-EAST
RECORD DRAWING
3/95
office\FILE0161.TIF
176
roll#82 bldg#550
32-303-85 E302 162 OF
1ST FLOOR PWR/SYS PLAN-WEST
RECORD DRAWING 3/95
office\FILE0162.TIF
176
roll#82 bldg#550
32-303-85 E303 OF
2ND FLOOR PWR/SYS PLAN-EAST
RECORD DRAWING
3/95
office\FILE0163.TIF
176
roll#82 bldg#550
32-303-85 E304 OF
2ND FLOOR PWR/SYS PLAN-WEST RECORD DRAWING 3/95
office\FILE0164.TIF
176
roll#82 bldg#550
32-303-85 E305 165 OF
3RD FLOOR PWR/LTG/SYS PLAN-
RECORD DRAWING 3/95
office\FILE0165.TIF
176
EAST
roll#82 bldg#550
32-303-85 E306 166 OF
3RD FLOOR PWR/SYS PLAN-WEST
RECORD DRAWING
3/95
office\FILE0166.TIF
176
roll#82 bldg#550
32-303-85 E307 167 OF
ATTIC PWR/LTG/SYS PLAN-EAST
AS BUILT
3/95
office\FILE0167.TIF
176
roll#82 bldg#550
32-303-85 E308 168 OF
ATTIC PWR/LTG/SYS PLAN-WEST
AS BUILT
3/95
office\FILE0168.TIF
176
roll#82 bldg#550
32-303-85 E401 169 OF
POWER RISER DIAGRAM
AS BUILT
3/95
office\FILE0169.TIF
176
roll#82 bldg#550
32-303-85 E402 OF
FIRE ALARM RISER DIAGRAM
AS BUILT
3/95
office\FILE0170.TIF
176
roll#82 bldg#550
32-303-85 E403 OF
PAGING & TELEPHONE/DATA
RECORD DRAWING
3/95
office\FILE0171.TIF
176
RISERS
roll#82 bldg#550
32-303-85 E404 OF
NURSE CALL, SECURITY & TV SYS
AS BUILT
3/95
office\FILE0172.TIF
176
RISER
roll#82 bldg#550
32-303-85 E501 173 OF
LUMINARE SCHEDULE
AS BUILT
3/95
office\FILE0173.TIF
176
roll#82 bldg#550
32-303-85 E502 174 OF
PANEL SCHEDULES
RECORD DRAWING 3/95
office\FILE0174.TIF
176
roll#82 bldg#550
32-303-85 E503 175OF
PANEL SCHEDULES
RECORD DRAWING 3/95
office\FILE0175.TIF
176
roll#82 bldg#550
32-303-85 E504 176 OF
PANEL SCHEDULES
RECORD DRAWING 3/95
office\FILE0176.TIF
176
roll#82 bldg#550
1 OF 1
SITE PLANTING PLAN
3/28/90
office\FILE0177.TIF
roll#82 bldg#550
1 OF 1
SITE PLANTING PLAN
3/28/90
office\FILE0178.TIF
roll#82 bldg#550
03-6290 OF 1
ARCH ELEVATIONS
2/24/84
office\FILE0179.TIF
roll#82 bldg#550
ARCH BLDG 550 2ND FLOOR
03-6257 A2 OF 9
7/19/53
office\FILE0180.TIF
PARTIAL PLAN
roll#82 bldg#550
TRAINING CENTER ALTERATION
039-092-550 OF 1
COMPLETED
6/81
office\FILE0181.TIF
PLANS
roll#82 bldg#550
INCREASE IN AC DISTRIBUTION IN
039-094-550 OF 1
COMPLETED
1/81
office\FILE0182.TIF
ROOMS 200 THRU 203
roll#82 bldg#550
REPLACEMENT OF 20 TON A/C AIR
840-122-550 OF 1
APPROVED
12/29/78
office\FILE0183.TIF
HANDING UNIT
STRUCTURAL SUPPORT
roll#82 bldg#550
03-5707 OF 2
STRUCTURE FOR RADAR
AS BUILT
4/11/77
office\FILE0184.TIF
ANTENNA
STRUCTURAL SUPPORT
roll#82 bldg#550
03-5707 OF 2
STRUCTURE FOR RADAR
AS BUILT
4/11/77
office\FILE0185.TIF
ANTENNA
roll#82 bldg#550
ttp://66 9 144211/PNOnline/viewdetails.asn/a=editdiscinline&sid=938&paid=929&prid. 1/20/2006
United Reprographic Planroom
Page 7 of 9
office\FILE0186.TIF
03-5697 2 OF 2
ARCH ROOFING REPAIR DETAILS
ADDED DETAIL
2/2/77
ADDED 8'' DIA
roll#82 bldg#550
ARCH ROOFING REPAIR PLAN
03-5697 OF 2
ANTENNA & NOTES
2/2/77
office\FILE0187.TIF
SECTIONS & DETAIL
TO ROOF PLAN
roll#82 bldg#550
03-5697 OF 2
ARCH ROOFING REPAIR DETAILS
ADDED DETAIL
2/2/77
office\FILE0188.TIF
roll#82 bldg#550
MECHANICAL-ELECTRICAL #2 OIL
03-4680 1 OF 2
10/30/69
office\FILE0189.TIF
BURNER INSTALLATION
ELECTRICAL IMPROVEMENT TO
roll#82 bldg#550
03-4765 OF 1
ROOM 209 LIGHTING &
4/17/70
office\FILE0190.TIF
ACOUSTICS
roll#82 bldg#550
ARCH INSTALLATION OF
03-4757 OF 1
3/31/70
office\FILE0191.TIF
ANTENNA & WAVEGUIDE
roll#82 bldg#550
INSTALLATION OF FIRE & SMOKE
03-4335 OF 3
11/7/67
office\FILE0192.TIF
DETECTION SYSTEM
roll#82 bldg#550
03-4335 OF 3
DETECTION SYSTEM
APPROVED
3/25/68
office\FILE0193.TIF
roll#82 bldg#550
03-4335 OF 3
DETECTION SYSTEM
APPROVED
3/25/68
office\FILE0194.TIF
roll#82 bldg#550
03-4335 3 OF 3
DETECTION SYSTEM
APPROVED
3/25/68
office\FILE0195.TIF
roll#82 bldg#550
REMOVAL PLAN BLDG 550 1ST
1966-550-R1 173 OF 191
6/16/66
office\FILE0196.TIF
FLOOR
roll#82 bldg#550
REMOVAL PLAN BLDG 550 2ND
1966-550-R2 174 OF 191
6/16/66
office\FILE0197.TIF
FLOOR
roll#82 bldg#550
REMOVAL PLAN BLDG 550 3RD
1966-550-R3 175 OF 191
6/16/66
office\FILE0198.TIF
FLOOR
roll#82 bldg#550
ALTERATION PLAN BLDG 550 2ND
1966-550-A2 177 OF 191
6/16/66
office\FILE0199.TIF
FLOOR
roll#82 bldg#550
DOOR SCHEDULE & MISC.
1966-550-A4 179 OF 191
6/16/66
office\FILE0200.TIF
DETAILS BLDG 550
roll#82 bldg#550
ALTERATION WORK BLDG 550
1966-550-A5 180 OF 191
6/16/66
office\FILE0201.TIF
MISC. DETAILS #1
roll#82 bldg#550
1966-550-HP1 181 OF
HEATING & PLUMBING BLDG 550
6/16/66
office\FILE0202.TIF
191
1ST FLOOR PLAN & DETAILS
roll#82 bldg#550
1966-550-HP2 182 OF
HEATING & PLUMBING BLDG 550
6/16/66
office\FILE0203.TIF
191
2ND FLOOR PLAN & DETAILS
roll#82 bldg#550
1966-550-HP3 183 OF
HEATING & PLUMBING BLDG 550
6/16/66
office\FILE0204.TIF
191
3RD FLOOR PLAN & DETAILS
roll#82 bldg#550
1966-550-HP4 184 OF
HEATING & PLUMBING BLDG 550
6/16/66
office\FILE0205.TIF
191
MISC DETAILS SHEET #1
roll#82 bldg#550
1966-550-HP5 185 OF
HEATING & PLUMBING BLDG 550
6/16/66
office\FILE0206.TIF
191
MISC DETAILS SHEET #2
roll#82 bldg#550
ELECTRICAL BLDG 550-1ST
1966-550-E1 186 OF 191
6/16/66
office\FILE0207.TIF
FLOOR LIGHTING & POWER PLAN
roll#82 bldg#550
ELECTRICAL BLDG 550-2ND
1966-550-E2 187 OF 191
6/16/66
office\FILE0208.TIF
FLOOR LIGHTING & POWER PLAN
roll#82 bldg#550
FURNITURE & EQUIPMENT PLAN
1966-550-FE1 189 OF 191
6/16/66
office\FILE0209.TIF
BLDG 550 1ST FLOOR
roll#82 bldg#550
FURNITURE & EQUIPMENT PLAN
1966-550-FE2 190 OF 191
6/16/66
office\FILE0210.TIF
BLDG 550 2ND FLOOR
roll#82 bldg#550
FURNITURE & EQUIPMENT PLAN
1966-550-FE3 191 OF 191
6/16/66
office\FILE0211.TIF
BLDG 550 3RD FLOOR
roll#82 bldg#550
03-4602 OF 1
ELECTRICAL...
office\FILE0212.TIF
roll#82 bldg#550
REPLACEMENT OF LEADERS &
CGR-6602-2 2 OF 3
8/17/65
office\FILE0213.TIF
GUTTERS VARIOS BLDGS
roll#82 bldg#550
ELECTRICAL PRESS HIGH LOW
4597 OF 1
3/15/...
office\FILE0214.TIF
FIRE.
roll#82 bldg#550
3 OF 3
3RD FLOOR PLAN
REVISED
6/81
office\FILE0215.TIF
roll#82 bldg#550
2 OF 3
2ND FLOOR PLAN
REVISED
6/81
office\FILE0216.TIF
roll#82 bldg#550
//669 144211/PNOnline/viewdetails.asp/a=editdiscipline8sid=938&paid=929&prid. 1/20/2006
United Reprographic Planroom
Page 8 of 9
office\FILE0217.TIF
1 OF 3
1ST FLOOR PLAN
REVISED
7/28/81
REPLACEMENT OF BOILER #3 &
roll#82 bldg#550
550-6233-3 OF 3
REHABILITATION OF BOILER
3/27/62
office\FILE0218.TIF
PLANT
REPLACEMENT OF BOILER #3 &
roll#82 bldg#550
550-6233-3 OF 3
REHABILITATION OF BOILER
3/27/62
office\FILE0219.TIF
PLANT
REPLACEMENT OF ELECTRICAL
roll#82 bldg#550
550-6254-6 OF 6
RISERS & PANELS FLOOR PLANS-
4/12/62
office\FILE0220.TIF
2ND & 3RD FLRS
REPLACEMENT OF ELECTRICAL
roll#82 bldg#550
ROO MCM MAIN
550-6254-6 5 OF 6
RISERS & PANELS FLOOR PLAN &
5/16/62
office\FILE0221.TIF
LUGS
DETAILS 1ST FLOOR
roll#82 bldg#550
REPLACEMENT OF ELECTRIC
353-6231-1 1 OF 1
REVISED
2/23/62
office\FILE0222.TIF
SERVICE TO EQUIPMENT
roll#82 bldg#550
550-1
1ST FLOOR PLAN
AS BUILT
8/60
office\FILE0223.TIF
roll#82 bldg#550
PROPOSED ALTERATIONS
550-20
7/20/54
office\FILE0224.TIF
CONSOLODATED MESS
DETAIL OF SMOKE PIPE FROM 2
roll#82 bldg#550
6305-662
RANGES & BAKE OVEN TO
6/13/40
office\FILE0225.TIF
CHIMNEY
LOCATION PLAN & DETAILS FOR
roll#82 bldg#550
6305-659
1000 GAL OIL STORAGE TANK
11/24/39
office\FILE0226.TIF
INSTALLATION
roll#82 bldg#550
BARRACKS ATTIC FRAMING PLAN
11/17/38
office\FILE0227.TIF
roll#82 bldg#550
BARRACKS HEATING FIRST
6305-712
11/17/38
office\FILE0228.TIF
FLOOR PLAN
roll#82 bldg#550
BARRACKS HEATING ENTRANCE
6305-707
REVISIONS
1/4/39
office\FILE0229.TIF
DETAILS
roll#82 bldg#550
6305-723
BARRACKS ROOF FRAMING PLAN
REVISIONS
11/17/38
office\FILE0230.TIF
roll#82 bldg#550
BUILDING
6305-379
BARRACKS PLOT & PLAN
7/30/38
office\FILE0231.TIF
INCREASED
roll#82 bldg#550
STORM & SANITARY SEWERS FOR
6305-619
1/9/39
office\FILE0232.TIF
375 MAN BARRACKS BLDG #550
LOCATION PLAN SHOWING ROAD
roll#82 bldg#550
6305-618
& SIDEWALKS AT 18 FAMILY NCO
B
8/1/39
office\FILE0233.TIF
APT & BARRACKS 31004102
TYPICAL DETAILS OF PILE CAPS &
roll#82 bldg#550
6305-610
FOUNDATION BEAM
10/27/38
office\FILE0234.TIF
CONNECTIONS
375 MAN BARRACKS 18 NCO
roll#82 bldg#550
6305-605
APARTMENTS LOCATION & GRID
8/24/38
office\FILE0235.TIF
PLAN
roll#82 bldg#550
BLDG 550 VENTILATION OF HOOD
550-
3/1/...
office\FILE0236.TIF
IN KITCHENS
LOCATION PLANS & DETAILS OF
roll#82 bldg#550
6305-636
OIL TANKS, BARRACKS, THEATER
3/21/39
office\FILE0237.TIF
& NCO APTS
roll#82 bldg#550
375 MEN BARRACKS 3/4 DETAILS
6305-658
10/17/39
office\FILE0238.TIF
OF DISH TABLE & SHELVING
roll#82 bldg#550
UTILITIES, SERVICE TO BLDGS
6305-658
RECORD
8/1/39
office\FILE0239.TIF
#550-&555
roll#82 bldg#550
UTILITIES, SERVICE TO BLDGS
6305-606
RECORD
8/1/39
office\FILE0240.TIF
#550-&555
roll#82 bldg#550
1272-24
office\FILE0241.TIF
roll#82 bldg#550
550
11/38
office\FILE0242.TIF
roll#82 bldg#550
12-12-22
550
11/38
office\FILE0243.TIF
roll#82 bldg#550
72-20
550
11/38
office\FILE0244.TIF
http://66.9.144211/PNOnline/viewdetails.asp?a=editdiscioline&sid=938&paid=929bprid. 1/20/2006
United Reprographic Planroom
Page 9 of 9
roll#82 bldg#550
6305-705
550
11/38
office\FILE0245.TIF
roll#82 bldg#550
550-26
BLDG #102
11/38
office\FILE0246.TIF
ELEVATION OF BLDG #550
roll#82 bldg#550
DAMAGED CONCRETE SPANDREL
890-131-LST
11/38
office\FILE0247.TIF
BEAMS COLUMNS, PILASTERS &
CORNICES
REPLACEMENT OF BOILER #3 &
roll#82 bldg#550
550-6238-3 3 OF 3
REHABILIATION OF BOILER PLAN
office\FILE0248.TIF
BLDG 550
roll#82 bldg#550
1966-550-AI 1 23 OF 25
AS IS PLAN BLDG 550 1ST FLOOR
office\FILE0249.TIF
roll#82 bldg#550
1966-550-AI 3 25 OF 25
AS IS PLAN BLDG 550 3RD FLOOR
office\FILE0250.TIF
roll#82 bldg#550
6305-390
BARRACKS FOOTING PLAN
A
10/14/38
office\FILE0251.TIF
roll#82 bldg#550
BARRACKS PILE FOOTING
6305-390
A
10/14/38
office\FILE0252.TIF
DETAILS
roll#82 bldg#550
BARRACKS 1ST FLOOR WALL
6305-717
11/17/38
office\FILE0253.TIF
PLAN & SECTIONS
roll#82 bldg#550
6305-714
BARRACKS PLUMBING DETAILS
11/17/38
office\FILE0254.TIF
roll#82 bldg#550
BARRACKS PLUMBING 1ST FLOOR
6305-713
11/17/38
office\FILE0255.TIF
PLAN
roll#82 bldg#550
6305-711
BARRACKS KITCHEN DETAILS
11/17/38
office\FILE0256.TIF
roll#82 bldg#550
BARRACKS TOILET & SHOWER
6305-710
11/17/38
office\FILE0257.TIF
ROOM DETAILS
roll#82 bldg#550
6305-709
BARRACKS STAIR DETAILS
11/17/38
office\FILE0258.TIF
roll#82 bldg#550
6305-708
BARRACKS MISC DETAILS
11/17/38
office\FILE0259.TIF
roll#82 bldg#550
6305-706
BARRACKS WALL DETAILS
11/17/38
office\FILE0260.TIF
roll#82 bldg#550
6305-719
BARRACKS BEAM SCHEDULE
11/17/38
office\FILE0261.TIF
roll#82 bldg#550
BARRACKS COLUMN SCHEDULE &
6305-718
11/17/38
office\FILE0262.TIF
DETAILS
roll#82 bldg#550
PROPOSED INSTALLATION OF
4/11/41
office\FILE0263.TIF
ANTENNA POLES
roll#82 bldg#550
6305-720
BARRACKS BEAM SCHEDULE
11/17/38
office\FILE0264.TIF
roll#82 bldg#550
MODIFIY ELECTRICAL HOOK UP
539-012-550 1 OF 1
office\FILE0265.TIF
RM 104
roll#82 bldg#550
239-025-550 1 OF 1
RM-104 ELECTRICAL ALTERATION
7/2/82
office\FILE0266.TIF
roll#82 bldg#550
970-417-550 OF 1
BOILER ROOM LIGHTING PLAN
9/28/89
office\FILE0267.TIF
roll#82 bldg#550
MECHANICAL-ELECTRICAL #2 OIL
970-417-550 2 OF 2
10/20/68
office\FILE0268.TIF
BURNER INSTALLATION
roll#82 bldg#550
AIR CONIDTION 2ND & 3RD FLOOR
03-4431 1 OF 1
5/18/68
office\FILE0269.TIF
PLAN
roll#82 bldg#550
2ND & 3RD FLOOR FRAMING
6305-721
A
5/8/39
office\FILE0270.TIF
PLANS
270 Items
4.141
//669144211/PNOnline/viewdetails.asp?a=editdiscipline&sid=938&paid=929&prid.
1/20/2006